CHANGE ORDER NO. 1
To contract for: Remove and Install 2 new BB hoops at court #1 City Project No
Contractor: Calstate Construction Inc, Contract Date:
12 -PW -194
1/6/2012
This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and
Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon
acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work.
Description of Work
Remove the two existing basketball court backboards, standards, and footings and replace with new. Calstate to supply and
install city standard Steecraft (Model # 12C44) curved BB Post, (Model # 05) delux fan shaped fiberglass backboard, (Model
#600N) Double goal rim with nylon net included as in Submittal 30.1. Calstate also to supply and install two 6" sleeves
imbedded into new 4000 psi footing to recieve new standards.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
► All Extra Work authorized under this Change Order
must be billed separately from the original contract. All
bills for work done under this Change Order shall
reference this Change Order No. 1.
I (We) agree to make the above change subject to the
terms of this Change Order for a NET INCREASE not to
exceed $10,349.77.
R
By:
Cost Percentage Initial
Original Contract Price
$771,744.00
Previous Change Orders
$0.00 0.00%
Total to Date
$771,744.00
This Change Order
$10,349.77
Total Change Orders to Date
$10,349.77 1.34%
Revised Contract Price $782,093.77
Date:
RECOMMENDED BY: .4-1 C0
Construction anager Date
ACCEPTED BY: � t i
Project er /P oject er to
En ine r Date
City Administrator Date
Project No. 12 -001
San Ysidro Park Recreation Bldg Remodel # 12 -PW -194
DATE: 2/24/2012
San Ysidro Park #12-PW -194 CONTRACTOR: CaM to Construction, Inc.
CONTRACTOR COST PROPOSAL #: 3.2
POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR
DESCRIPTION OF CHANGE: Remove and Install two new basketball hoops at North basket bell court
IT DESCRIPTION
MATERIAL salsa tax krcluded
LABOR (fuliv ancum,
$3,858.15
QUANTITY
UNIT
UNIT COST
EXTENSION
QUANTITY
HOURS
RATE
EXTENSION
QUANTITY
UNIT COST
EXTENSION
New basketball 2
1
2741
S 2,741.0121
$0.00
New BB hom metal slasm
2
220
440.00
$0.00
lraW1ll3urveyI` sycuWAxwdinate
work/Subs
I IS
$82.00
1312.00
IJR for basketball pole Install
1
$2DO.00
S 20D.00
SUBTOTAL
$ 3,181.00
$ 1,312.00
$ 200.00
MARK-UP
$ 477.15
$ 328.00
$ 30.00
TOTALS
$ 3,858.15
Is
1.840.00
$ 230.00
Sub Contractor Costs from Attached Cost Proposal(s)
Option A
MATERIAL + 15%
$3,858.15
LABOR + 26%
$1,840.00
EQUIPMENT + 15%
$230.00
PRIME CONTRACTOR TOTAL
$3,528.15
Sub Contractor Costs from Attached Cost Proposal(s)
SUBCONTRACTOR SUBTOTAL DIRECT COSTS
1 $4,398.
PRIMARY 5% FEE ON SUBCONTRACTORS COST
$219.941
SUBCONTRACTOR TOTAL FEE
,818.89
PRIME TOTAL
$5,528.15
SUBTOTAL COR
$10,146.84
BOND ( not to exceed 2% of sub total)
$ 202.94
TOTAL 1 $10,349.77
PREPARED & SUBMITTED BY: Jim Lyons
COMPANY: Calstate Construction. Inc. TITLE: PM
San Ysidro Park Recreation Bldg Remodel # 12-PW 194
Project No. 12 -001 DATE: 2/24/2012
San Ysidro Park 812-PW -194 CONTRACTOR: Calstate Construction, Inc.
CONTRACTOR COST PROPOSAL #: 3.2
POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR
DESCRIPTION OF CHANGE: Remove and Install two new basketball hoops at Nam basket ball oart
SUBCONTRACTOR SUBTOTAL TOTAL $4,398.TS
PREPARED & SUBMITTED BY: Jlrn Lyons - CSCI
COMPANY: Universal TITLE:
Proposed Cost Proposal
Subcontractor
p
Option B
MATERIAL
$650.00
LABOR
$1,920.00
EQUIPMENT
$1,255.00
SUBTOTAL DIRECT COSTS
$3,825.00
FEE ON DIRECT COSTS (15 %)
$573.75
SUBCONTRACTOR SUBTOTAL
$4,398.75
Third and Fourth Tior Sub Contractor Costs from Attached Cost Proposal
NMI
SUBCONTRACTOR SUBTOTAL TOTAL $4,398.TS
PREPARED & SUBMITTED BY: Jlrn Lyons - CSCI
COMPANY: Universal TITLE:
Proposed Cost Proposal
Subcontractor
p
Option B
MATERIAL
$650.00
LABOR
$1,920.00
EQUIPMENT
$1,255.00
SUBTOTAL DIRECT COSTS
$3,825.00
FEE ON DIRECT COSTS (15 %)
$573.75
SUBCONTRACTOR SUBTOTAL
$4,398.75
Third and Fourth Tior Sub Contractor Costs from Attached Cost Proposal
SUBCONTRACTOR SUBTOTAL TOTAL $4,398.TS
PREPARED & SUBMITTED BY: Jlrn Lyons - CSCI
COMPANY: Universal TITLE:
Proposed Cost Proposal
Subcontractor
p
Na
Worla
Representing: Play=ft Systems, Webcoat, LA Steelcraft, L.Ph. Bolander &
" Sons, RTH Processing, PLAYltSAFE, Victar Stanley, Hews, Custom Canopies
423 Marshall Avenue * San Jose, CA 98423 . Phone: (408) 557-0462 + Fax: (408) 423 -9039 R E -mail:
alavwo s um.att.aom
Website: www.noreelplayworks.Com
Revised erp,gMal and Contract
Upon acceptance, this Coup tract is between Northern Califamia. Play Works, Inc. ( "Supplies ".) and Buyer. 'Otis
proposal remains good. for 30 days, unless withdrawn by Supplier at earlier date.
Buys; Ptgwt: San Ysitdro Park Biel. hate: December
Gilroy, CA 95020 2, 2011 at 2PM
A. Cantraet Scope. Supplier shill flunish the fallowing materials and equipment:
Quantity besm p6= Amount
Basketball Standards -In Plans Only
2 ea. swe Curved Post, 4112" OD Clalvanized Post w/
5' 0" Offset, Model 12C 45M- Altemate by LA
Steelcraft S 433.00 ea. $ 866.00,
2 aa. Steel Fans Shaped Backboard, PC- Write, Model
03- Altemwe by 1;A, Sibeicraft S 545.100 ea. S 1.192 00
2 ea. Double Rim Goel Ring, PC -Orange w /White
Nylon Net, Model 600N- Altemate by LA
Steelcraft $ 1.25-OUea. R 250.00
Materialls Delivered to Project Site $ x,741.0
(Sales Tax and Freight )Included)
* *BxcWe Sleeve fox Basketball Posts-In Cirouod Mount
Basketball Standards **
FEB -17 -2012 14:15 FROM:MARIP 14083371983 T0: 15106571818
BEMaNTE'S CONCRETE SERVICES, INC.
800 W. 1ST STREET
SAN JOSE, CA. 95112
San Ysidro Park Recreation Building Remodel # 12 -PW -194
OW 9esketbal! Court Chan" order 8 3
Remove 2 ea basketball hoops, drill 2 ea holes W deep 36" diameter, pour concrete
CALSTATE TO PROVIDE SLEEVES.
P.2 ,12
Labor
92
Hrs
$60.00
Hr $1,020.0
Materials Concrete
3
CY
$150.00
S 450.00
Short Ld
1
LS
$200.00
$ 200.00
Equipment
$ -
Drill
S
Mrs
$135.00
$ 675.W
Dump Truck
4
Mrs
$ 95.00
$ 380.00
Crew Tn ick
4
Hrs
$ 50.00
$ 200.0
Subtotal
$3.825.0
15% Mark Up
$ 573.75
TOYAL Bit)
$4,398.75