Calstate Construction - San Ysidro Park Rec. Building Remodel - Amendment No. 2(Citp of Offrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 2 To contract for: San Ysidro Park Recreation Building Abatement City Project No.: Contractor: Calstate Construction Inc, Contract Date: 12 -PW -194 1/6/2012 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Calstate is to remove and dispose of all hazardous waste material at the Recreation Building as identified in C &W Environmental Consulting Inc, Asbestos and Lead Survey Report, dated February 3,2012. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 2. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $1,328.55. Cost Percentage Initial Original Contract Price $771,744.00 Previous Change Orders $10,349.77 1.34% Total to Date $782,093.77 This Change Order $1,328.55 Total Change Orders to Date $11,678.32 1.51% Revised Contract Price $783,422.32 Calstate Construction, Inc. CONT AC OR 1 By: .�� Date: ` Z' RECOMMENDED BY ACCEPTED BY: City San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12.001 DATE: 2/10/2012 San Ysidro Park #12-PW -194 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL M b POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: Cost to abate asbestos containing bull ft material on roof. MATERIAL + 15% LABOR + 25% EQUIPMENT + 15% PRIME CONTRACTOR TOTAL Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS PRIMARY 5% FEE ON SUBCONTRACTORS COST SUBCONTRACTOR TOTAL FEE PRIME TOTAL SUBTOTAL CDR BOND ( not to wmeed 2% of sub total) TOTAL $0.00 $410.00 $0.00 6410.00 $850.001 $42.50 $892.50 10.00 $1.302.50 $ 26.05 :1,328.55 PREPARED & SUBMITTED BY: Jim Lyons COMPANY. Calstate Construction. Inc. TITLE: PM Cost Proposal . ... _0- i MATERIAL + 15% LABOR + 25% EQUIPMENT + 15% PRIME CONTRACTOR TOTAL Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS PRIMARY 5% FEE ON SUBCONTRACTORS COST SUBCONTRACTOR TOTAL FEE PRIME TOTAL SUBTOTAL CDR BOND ( not to wmeed 2% of sub total) TOTAL $0.00 $410.00 $0.00 6410.00 $850.001 $42.50 $892.50 10.00 $1.302.50 $ 26.05 :1,328.55 PREPARED & SUBMITTED BY: Jim Lyons COMPANY. Calstate Construction. Inc. TITLE: PM Cost Proposal San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12 -001 DATE: 2110!2012 San Ysldro Park S12 -PW -184 CONTRACTOR: Calstate Construction. Inc. CONTRACTOR COST PROPOSAL #: 5 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: Cost to abase asbestm conta im buldiry nil an roof. MATERIAL LABOR EQUIPMENT SUBTOTAL DIRECT COSTS FEE ON DIRECT COSTS (15 %) SUBCONTRACTOR SUBTOTAL Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal SUBCONTRACTOR SUBTOTAL $0.00 $850.00 $0.00 $850.00 $0.00 1 $11150.001 TOTAL 11850.00 PREPARED & SUBMITTED BY: Jim Lyons - CSCI COMPANY: Universal TITLE: Proposed Cost Proposal Subcontractor + 1 Coastwide Environmental Technologies, Inc. Cal State 4164 Bigness Center Dr. Fremont, Ca 94538 Phone: 510 -657 -1800 Job Boys & Girls Club Fax: Location: 7700 Murray Ave., Gilroy Attn: Jared Perry Class of Work: Asbestos SCOPE OF WORK Remove and dispose of asbestos containing building material as follows: 40sf of roof mastic. BID 12 - 9909 February 10, 2012 Coastwide to provide containment, negative air, HEPA (High Efficiency Particulate Air) vacuuming & cleaning and personal air sampling. All hazardous and non - hazardous material transported to appropriate disposal site. All work to Cal/OSHA and EPA regulations. Assumes one mobilization to remove all material. If the service of an independent hygienist for clearance air monitoring/sampling is desired, it is the responsibility of the building owner /occupant. A 10-day air pollution control district notification is required, fee is included Total Abatement Price $850.00 Jose Fregoso, Superintendent Taxes included - No other exclusions or qualificstions. Prices are good 60 days from bid date. Ownw/Genenl Contractor to provide water and power to site, and ensure that the jobs site is accessible and free from obstructions. price includes one mobilization per building to cmVlete job unless stated orbs rise. Any delays after clew udm will be charged @ $95.0oPor. CET assumes no rosponsebility for, nor liability m inspect, locate, or remove hazardous materials beyond that idastified in the bid or on any inspection report, plans and/or specifications provided for the bid. Additionally, CET will not be responsible for incidental tape, staple or ad* procedure damage. There will be additional charges for insurance for the following: increased general liability limits in excess of SmiUSmil; workers oomp increaaod limits in excess of ]mil; additional insured endorsements; shrike endeavor to; per project aggregate and named insured, are all an additional charge. A 1 % % interest charge will be applied monthly to any unpaid balance past 30 days fiom original invoice. Attorney's feu — in any action or proceeding involving the issues of this contract between parties baeto, whether for tart or breach of contract, the prevailing party shall be entitled to an award of it's reasonable attorney's fees and costs. Job tsroaUation/postponement is required by 5-00 p.m. of previous scheduled workday. If am has reported for work, and job is cancelled or postponed, the responsible party will be invoiced for a show -up time at our relpilar aforementioned rate for a minimum of two (2) hoes for each person. License # 523560 B, ASB, C -21 ROSH Registration # 056 SBE # 3174 Laborers Local 67 201 WALKER ST. WATSONVILLE, CA 95076 (831) 761 -5511 FAX (831) 761 -5513