To contract for: San Ysidro Park Recreation Building Abatement City Project No.:
Contractor: Calstate Construction Inc, Contract Date:
12 -PW -194
1/6/2012
This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and
Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon
acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work.
Description of Work
Calstate is to remove and dispose of all hazardous waste material at the Recreation Building as identified in C &W
Environmental Consulting Inc, Asbestos and Lead Survey Report, dated February 3,2012.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
► All Extra Work authorized under this Change Order
must be billed separately from the original contract. All
bills for work done under this Change Order shall
reference this Change Order No. 2.
I (We) agree to make the above change subject to the
terms of this Change Order for a NET INCREASE not to
exceed $1,328.55.
Cost Percentage Initial
Original Contract Price
$771,744.00
Previous Change Orders
$10,349.77 1.34%
Total to Date
$782,093.77
This Change Order
$1,328.55
Total Change Orders to Date
$11,678.32 1.51%
Revised Contract Price $783,422.32
Calstate Construction, Inc.
CONT AC OR 1
By: .�� Date:
` Z'
RECOMMENDED BY
ACCEPTED BY:
City
San Ysidro Park Recreation Bldg Remodel # 12 -PW -194
Project No. 12.001 DATE: 2/10/2012
San Ysidro Park #12-PW -194 CONTRACTOR: Calstate Construction, Inc.
CONTRACTOR COST PROPOSAL M b
POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR
DESCRIPTION OF CHANGE: Cost to abate asbestos containing bull ft material on roof.
MATERIAL + 15%
LABOR + 25%
EQUIPMENT + 15%
PRIME CONTRACTOR TOTAL
Sub Contractor Costs from Attached Cost Proposal(s)
SUBCONTRACTOR SUBTOTAL DIRECT COSTS
PRIMARY 5% FEE ON SUBCONTRACTORS COST
SUBCONTRACTOR TOTAL FEE
PRIME TOTAL
SUBTOTAL CDR
BOND ( not to wmeed 2% of sub total)
TOTAL
$0.00
$410.00
$0.00
6410.00
$850.001
$42.50
$892.50
10.00
$1.302.50
$ 26.05
:1,328.55
PREPARED & SUBMITTED BY: Jim Lyons
COMPANY. Calstate Construction. Inc. TITLE: PM
Cost Proposal
. ...
_0-
i
MATERIAL + 15%
LABOR + 25%
EQUIPMENT + 15%
PRIME CONTRACTOR TOTAL
Sub Contractor Costs from Attached Cost Proposal(s)
SUBCONTRACTOR SUBTOTAL DIRECT COSTS
PRIMARY 5% FEE ON SUBCONTRACTORS COST
SUBCONTRACTOR TOTAL FEE
PRIME TOTAL
SUBTOTAL CDR
BOND ( not to wmeed 2% of sub total)
TOTAL
$0.00
$410.00
$0.00
6410.00
$850.001
$42.50
$892.50
10.00
$1.302.50
$ 26.05
:1,328.55
PREPARED & SUBMITTED BY: Jim Lyons
COMPANY. Calstate Construction. Inc. TITLE: PM
Cost Proposal
San Ysidro Park Recreation Bldg Remodel # 12 -PW -194
Project No. 12 -001 DATE: 2110!2012
San Ysldro Park S12 -PW -184 CONTRACTOR: Calstate Construction. Inc.
CONTRACTOR COST PROPOSAL #: 5
POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR
DESCRIPTION OF CHANGE: Cost to abase asbestm conta im buldiry nil an roof.
MATERIAL
LABOR
EQUIPMENT
SUBTOTAL DIRECT COSTS
FEE ON DIRECT COSTS (15 %)
SUBCONTRACTOR SUBTOTAL
Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal
SUBCONTRACTOR SUBTOTAL
$0.00
$850.00
$0.00
$850.00
$0.00
1 $11150.001
TOTAL 11850.00
PREPARED & SUBMITTED BY: Jim Lyons - CSCI
COMPANY: Universal TITLE:
Proposed Cost Proposal
Subcontractor
+ 1
Coastwide Environmental Technologies, Inc.
Cal State
4164 Bigness Center Dr.
Fremont, Ca 94538
Phone: 510 -657 -1800 Job Boys & Girls Club
Fax: Location: 7700 Murray Ave., Gilroy
Attn: Jared Perry Class of Work: Asbestos
SCOPE OF WORK
Remove and dispose of asbestos containing building material as follows: 40sf of roof mastic.
BID 12 - 9909
February 10, 2012
Coastwide to provide containment, negative air, HEPA (High Efficiency Particulate Air) vacuuming & cleaning and
personal air sampling. All hazardous and non - hazardous material transported to appropriate disposal site. All work
to Cal/OSHA and EPA regulations. Assumes one mobilization to remove all material. If the service of an
independent hygienist for clearance air monitoring/sampling is desired, it is the responsibility of the building
owner /occupant. A 10-day air pollution control district notification is required, fee is included
Total Abatement Price $850.00
Jose Fregoso, Superintendent
Taxes included - No other exclusions or qualificstions. Prices are good 60 days from bid date.
Ownw/Genenl Contractor to provide water and power to site, and ensure that the jobs site is accessible and free from obstructions. price includes one
mobilization per building to cmVlete job unless stated orbs rise. Any delays after clew udm will be charged @ $95.0oPor. CET assumes no rosponsebility
for, nor liability m inspect, locate, or remove hazardous materials beyond that idastified in the bid or on any inspection report, plans and/or specifications
provided for the bid. Additionally, CET will not be responsible for incidental tape, staple or ad* procedure damage. There will be additional charges for
insurance for the following: increased general liability limits in excess of SmiUSmil; workers oomp increaaod limits in excess of ]mil; additional insured
endorsements; shrike endeavor to; per project aggregate and named insured, are all an additional charge. A 1 % % interest charge will be applied monthly to any
unpaid balance past 30 days fiom original invoice. Attorney's feu — in any action or proceeding involving the issues of this contract between parties baeto,
whether for tart or breach of contract, the prevailing party shall be entitled to an award of it's reasonable attorney's fees and costs. Job
tsroaUation/postponement is required by 5-00 p.m. of previous scheduled workday. If am has reported for work, and job is cancelled or postponed, the
responsible party will be invoiced for a show -up time at our relpilar aforementioned rate for a minimum of two (2) hoes for each person.
License # 523560 B, ASB, C -21 ROSH Registration # 056 SBE # 3174 Laborers Local 67
201 WALKER ST. WATSONVILLE, CA 95076 (831) 761 -5511 FAX (831) 761 -5513