Calstate Construction - San Ysidro Park Rec. Building Remodel - Amendment No. 3Cite of Oilrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 3 To contract for: San Ysidro Park Recreation Building Abatement City Project No Contractor: Calstate Construction Inc, Contract Date: 12 -PW -194 1/6/2012 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Calstate removed existing outdoor lighting circuit conduits which where 4" below finish grade at court #1. To bring conduits up to code Calstate Construction installed new condiut and wiring at court #1 within a new 2' trench below the surface. / This CO also includes the supply and installation of 2 ea 6 "x 6" anodized aluminum plaques (Accessible Seating Signs) with black screen print to be installed at seat wall. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Cost Percentage Initial ► All Extra Work authorized under this Change Order Original Contract Price $771,744.00 must be billed separately from the original contract. All Previous Change Orders $11,678.32 1.51% bills for work done under this Change Order shall Total to Date $783,422.32 reference this Change Order No. 3. This Change Order $4,122.22 Total Change Orders to Date $15,800.54 2.05% Revised Contract Price $787,544.54 I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $4,122.22. Calstate Constructionn Inc. CONTRA TOR By: RECOMMENDED BY: ACCEPTED BY: Construction Administrator Date: March 7, 2012 3/ 7 //L ate yqJ1 Z Man a r, D 7 D to 13 )2 San Ysidro Park Recreation Bldg Remodel # 12-PW -194 Project No. 12 -001 DATE: 2/27/2012 San Ysidro Park #12-PW -194 CONTRACTOR: Calstate Construction. Inc. CONTRACTOR COST PROPOSAL #: 9 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: Cost to revise layout of underWmM conduit and wiring located 6- from surface to accommodate new North BB Court New conduits with wiring will be placed a min 24* below finished surface of north BB court ITEM DESCRIPTION MATERIAL sales tax Included LABOR (fultv encumbered EQUIPMENT lattach Invoice QUANTITY UNIT UNIT COST EXTENSION ouANnTv HOURS RATE EXTENSION QUANTITY UNIT COST EXTENSION Surve ILa out/Coordinate work/Subs $ 4 $82.00 $328.00 0 $ Calstate install $ $0.00 $ SUBTOTAL $ $ 328.00 $ MARK-UP $ $ 49.20 $ TOTALS $ is 37720 $ MATERIAL + 15% LABOR + 15% EQUIPMENT + 15% PRIME CONTRACTOR TOTAL Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS PRIMARY 5% FEE ON SUBCONTRACTORS COST SUBCONTRACTOR TOTAL FEE PRIME TOTAL SUBTOTAL CDR BOND ( not to exceed 2% of sub total) TOTAL $0.00 $377.20 $0.00 1 $377.20 r— $3,297.22 $164.86 $3,462.08 $377.20 $3,839.28 $ 76.79 $3,916.07 PREPARED & SUBMITTED BY: Jim Lyons COMPANY: Calstate Construction, Inc. TITLE: PM Cost Proposal Project No. 12 -001 San Ysidro Park #12-PW -194 San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 DATE: 2/27/2012 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL #: 9 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: Cost to revise layout of underground conduit and wiring located 6- frorn surface to aecornmodate new North 88 Court. New conduits with wiring will be placed a min 24' below finished surface of north BB court ITEM DESCRIPTION MATERIAL I Bales tax Included LABOR (fully encumbered I EQUIPMENT attach Invoice QUANTITY UNIT UNIT COST I EXTENSION QUANTITY RATE EXTENSION QUANTITY UNIT COST EXTENSION T &M Tag doled 2012 1 1 S 684.561$ 684.56 5.50 S 130.27 $ 716.49 $0.00 $ 5.50 $ 118.67 $ 652.69 TSM Tag dated 2/9112 1 1 $ 496.671$ 496.67 3.00 S 130.27 S 39041 $ 100 S 118.67 $ 356.01 S $ $ s s s s $ $ s s s $ $ $ $ SUBTOTALS: $ 1,181.231 $ 2,11599 $ MATERIAL LABOR EQUIPMENT SUBTOTAL DIRECT COSTS FEE ON DIRECT COSTS (15 %) SUBCONTRACTOR SUBTOTAL Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal SUBCONTRACTOR SUBTOTAL TOTAL PREPARED & SUBMITTED BY: Jim Lyons - CSCI COMPANY: Universal TITLE: $1,181.23 $2.115.99 $0.00 $3.297.22 $0.00 t $3,297.22 $3,297.22 Proposed Cost Proposal Subcontractor License # 961816 Certifiod Ali # 168S 1,jo CUSTOMER: ADDRESS: (831) 524-6416 Tel 18311630-9021 Fox adep!elechOPY-ail co- 330 Son Ts-opez 01 Hollister, CA 95023 WORK ORDER - JOB INVOICE com c� orlovi 07-DERTAKE!18v -VV0RK--- DAY CONTRACT )d7gX'FRA -siA9W;G0A7E tiollisle4, CA 95023 License fk 961816 Cerfifi-c; !AA 16881 -10 cuslolmEpl ----- - ADDRESS. WORK ORDER - JOB INVOICE FU s—r own 1-9 DAY WORK U CONTRACT STARTC:G DATE FEMYED --REspanff T7-C EXTRA -01 DESCRIPTION OF WORK ' 0 r TOTAL ORDER ;TOTAL LABOR j TOTAL LABOR TOTAL MATERIALS DATE CO*,jPLEIFD TOTAL MATERIALS Work ordered by TOTAL 7/t, aw, TOTAL OT -01 CalState Construction, Inc. 4165 Business Center Drive Fremont, CA 94538 Phone: (510)657 -1800 Fax: (510) 657 -1810 REQUEST FOR INFORMATION No: 00015 Date: 02/02/12 Page: 1 of 1 SUBJECTBasketball Court Conduits DATE: PRIORITY: Normal STATUS: Closed JOB: San Ysidro Park Recreation ( #12 -001) C.O. #: N/A Project No. 12 -PW -194 TRACK #: N/A 7700 Murray Ave Gilroy, CA 95020 TO: Judy Hemingway FROM: Jared Perry Hemingway /Stock Inc Calstate Construction, Inc. 939 Reiiez Station Rd P:510.657.1800 F:510.657.1810 Lafayette, CA 9454 -9 4165 Business Center Drive Fremont, CA 94538 QUESTItSfil: The underground electrical conduits which run from the building across the sidewalk along the edge of handball court to center court light pole, and then across center court to the other light pole, are only 6-8 inches below the top of existing AC. These shallow conduits will hinder the grading of this area and be directly under the new concrete which is not up to code. Please advise ANSWER: We sugguest that this existing conduit be buried to 24" deep. 1��<rR F7�t.D8� Schad. Impact Cost Impact COR # CalState Construction, Inc. 4165 Business Center Drive Fremont, CA 94538 Phone: (510) 657 -1800 Fax: (510) 657 -1810 REQUEST FOR INFORMATION No: 00017 Date: 02/02/12 Page: 1 of 1 SUBJECTTrenching Detail DATE: PRIORITY: High STATUS: Closed JOB: San Ysidro Park Recreation ( #12 -001) C.O. #: N/A Project No. 12 -PW -194 TRACK #: NIA 7700 Murray Ave Gilroy, CA 95020 TO: Judy Hemingway FROM: Jared Pent' Hemingway /Stock Inc Calstate Construction, Inc. 939 Reliez Station Rd P;510.657.1800 F:510.657.1810 Lafayette, CA 9454 -9 4165 Business Center Drive Fremont, CA 94538 t2UE3TIQtd: I was going to have my electrician start trenching tomorrow however, I cant find a trenching detail. Please advise. ANSWER; Minimum 24" below finished grade for basketball lighting trench. USER FIELDS: Schad. Impact Cost Impact COR # D / �J San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12-001 DATE: 2128/2012 Son Y91dro Park #124W -194 CONTRACTOR: CsW to Conaftoon, Inc. CONTRACTOR COST PROPOSAL #: 8.1 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL. - PRIME CONTRACTOR DESCRIPTION OF CHANGE: Cat to Urw 2 ocoe"M "oft steno MATERIAL + 15% LABOR + 15% EQUIPMENT + 15% PRNllE CONTRACTOR TOTAL Sub Contmctor Coats *= Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS PRIMARY 5% FEE ON SUBCONTRACTORS COST SUBCONTRACTOR TOTAL FEE PRIME TOTAL SUBTOTAL CDR BOND ( not to exceed 2% of sub total) TOTAL $107.81 $94.30 $0.00 • $202.11 00 0.00 00 11 11 4.04 $206.15 PREPARED & SUBMITTED BY: Jim Lvons COMPANY: Calatats Construdon. Inc. TITLE: PM Cost Proposal I} �. MATERIAL + 15% LABOR + 15% EQUIPMENT + 15% PRNllE CONTRACTOR TOTAL Sub Contmctor Coats *= Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS PRIMARY 5% FEE ON SUBCONTRACTORS COST SUBCONTRACTOR TOTAL FEE PRIME TOTAL SUBTOTAL CDR BOND ( not to exceed 2% of sub total) TOTAL $107.81 $94.30 $0.00 • $202.11 00 0.00 00 11 11 4.04 $206.15 PREPARED & SUBMITTED BY: Jim Lvons COMPANY: Calatats Construdon. Inc. TITLE: PM Cost Proposal m9am 111 i .doss way 8aaramwdoy CA M15 9161i9a S99 9184MI33 Fax aeip odr#z :97-5 7:t-WO-7-177 : t. PO NCL om EIUA* Wo1 Pxint Sm VWdra Pok DIMWM Adda dM 1 bmW afiw bhL Add QWM at . OMM AM ~ tt, IF N x N x UN — Me _W7 11� TIK r 1~ ftkvmhmd to ad son M- P bft* Ohm .bn► v*A RA. AAlo ndL' S mop V x i1" x .9W wadlod �qae vftwm*sormPUtwL 2am g3.33 far Tax 2LO MA Nobwood by A"Spbd by skipw MMM IN Wk Bxpnttvx PA. Tilt Otto "now f Me l i fl�