Loading...
Calstate Construction - San Ysidro Park Rec. Building Remodel - Amendment No. 6Cite of (btCrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 6 To contract for: San Ysidro Park mowband -slab replacement City Project No Contractor: Calstate Construction Inc, Contract Date: 12 -PW -194 1/6/2012 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Remove and replace approximately 20 If of damaged mowband at SE corner of court #2. Reinstall mowband as per detail A121 detail 4. Tie the new mowband into court #2. Location to be determined by construction manager. Install new 2' radius 4" concrete pads at 3 each light pole locations for landscaping purposes All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 6. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $3,474.70. Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Cost Percentage Initial $771,744.00 $33,080.22 4.29 %� $804,824.22 $3,474.70 Q� $36,554.92 4.74% N Revised Contract Price $808,298.92 CONTRAC By. j Date: RECOMMENDED BY: 41!; �-.el �it..�' 3AZ/ // Z— ACCEPTED BY: Construction Date Uty Hamimstrator vale San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12-001 DATE: 3118/2012 San Ysldro Park #12 -PW 194 CONTRACTOR: Caistate Construction, Inc. CONTRACTOR COST PROPOSAL A 12 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: Remove and replace apex 20 LF of damaged concrete mowband at SE corner of Court #2. Reinstall new mowmand as per A1211A. tie the newband into new BB Court#2. Install new concrete 7 radius pad at 3 each light pole locations Court #2 for landscape purposes. Option A MATERIAL + 16% $000 LABOR + 15% $471.50 EQUIPMENT+ 15% $0.00 PRIME CONTRACTOR TOTAL 1 $471.30 Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS 1 $2,796.30 PRIMARY 5% FEE ON SUBCONTRACTORS COST $139.77 SUBCONTRACTOR TOTAL FEE $2,935.07 PRIME TOTAL $471.60 SUBTOTAL COR $3.406.57 BOND ( not to exceed 2% of sub total) $ 68.13 TOTAL 1 $3.474.70 PREPARED & SUBMITTED BY: Jim Lyons COMPANY: Calstate Construction, Inc. TITLE: PM Cost Proposal ♦ � � 1 11 Option A MATERIAL + 16% $000 LABOR + 15% $471.50 EQUIPMENT+ 15% $0.00 PRIME CONTRACTOR TOTAL 1 $471.30 Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS 1 $2,796.30 PRIMARY 5% FEE ON SUBCONTRACTORS COST $139.77 SUBCONTRACTOR TOTAL FEE $2,935.07 PRIME TOTAL $471.60 SUBTOTAL COR $3.406.57 BOND ( not to exceed 2% of sub total) $ 68.13 TOTAL 1 $3.474.70 PREPARED & SUBMITTED BY: Jim Lyons COMPANY: Calstate Construction, Inc. TITLE: PM Cost Proposal San Ysidro Parik Recreation Bldg Remodel # 12 -PW 194 Project No. 12 -001 DATE: 3/16/2012 San Ysldro Perk #124PW -194 CONTRACTOR: Celstate Construction, Inc. CONTRACTOR COST PROPOSAL #: 12 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: Remove and replace apW 20 LF of damaged wncrde mowberd at SE comer of CowW. Rekwtel new moM and as per A12114, tie the new mowband into new mowband into new BB courW2. SUBCONTRACTOR SUBTOTAL TOTAL $1,259.85 PREPARED & SUBMITTED BY: Jim Lyons - CSCI COMPANY: Universal TITLE: Proposed Cost Proposal Subcontractor `. pbon B MATERIAL $375.35 LABOR $720.00 EQUIPMENT $0.00 SUBTOTAL DIRECT COSTS $1,095.35 FEE ON DIRECT COSTS (15%) $164.30 SUBCONTRACTOR SUBTOTAL :1.259.85 Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal 0 SUBCONTRACTOR SUBTOTAL TOTAL $1,259.85 PREPARED & SUBMITTED BY: Jim Lyons - CSCI COMPANY: Universal TITLE: Proposed Cost Proposal Subcontractor San Yeldro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12 -001 DATE: 3/1612012 San Yaldro Park *12-PW -194 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL M 12 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: Instal new wrcn*e 7 radius pad at 3 each IgN pole booth" CourW for Iargaoaping purposee- SUBCONTRACTOR SUBTOTAL TOTAL $1,333.113 PREPARED S SUBMITTED BY: Jim Lyons - CSCI COMPANY: Universal TITLE: Proposed Cost Proposal Subcontractor Option 13 MATERIAL $375.35 LABOR $960-00 EQUIPMENT $0.00 SUBTOTAL DIRECT COSTS $1,335.35 FEE ON DIRECT COSTS (15%) $200•30 SUBCONTRACTOR SUBTOTAL $1,335.65 Third and Fourth Tier Sub Contractor Coats from Attached Cost Proposal __ -_ SUBCONTRACTOR SUBTOTAL TOTAL $1,333.113 PREPARED S SUBMITTED BY: Jim Lyons - CSCI COMPANY: Universal TITLE: Proposed Cost Proposal Subcontractor Option 13 MATERIAL $375.35 LABOR $960-00 EQUIPMENT $0.00 SUBTOTAL DIRECT COSTS $1,335.35 FEE ON DIRECT COSTS (15%) $200•30 SUBCONTRACTOR SUBTOTAL $1,335.65 Third and Fourth Tier Sub Contractor Coats from Attached Cost Proposal SUBCONTRACTOR SUBTOTAL TOTAL $1,333.113 PREPARED S SUBMITTED BY: Jim Lyons - CSCI COMPANY: Universal TITLE: Proposed Cost Proposal Subcontractor MAR- 15-•2012 13:12 FROM:MARIA 14083371983 TO:15106571810 BEMONTE'S CONCRETE SERVICES, INC. 800 N. 15T STREET SAN JOSE, CA, 95112 San Ysidro Park Recreation Building Remodel # 12 -PW -194 FIELD ORDER # 9 Description of work: Remove and replace appx 20 If of damaged concrete mowband at 5E corner of Court #2, Reinstall new mowband as per A1214, tie the new mowband Into new 88 court #2 Labor Materials Concrete short Id P.2 ,,7 22 Hrs $60.00 Hr $ 720.00 1 yd $125.35 1 $250.00 V2/ 3/15/20x2 San Ysidro Park Feld Order it 9 Page 1 $375.35 $ 375.35 Subtotal $1,095.35 15% Mark Up $ 164.30 $1,759.65 Install new concrete 2' radius pad at 3 each fight pole locations Court #2 for landscaping purposes. Labor 16 Hrs $ 60.00 Hr $ 960.00 Materials Concrete 3 cy $12S.35 Short Ld 1 $250.00 $ 375.35 $ 375.35 Subtotal $1,335.35 15% Mark Up $ 200.30 Total $1' 3/15/20x2 San Ysidro Park Feld Order it 9 Page 1