Calstate Construction - San Ysidro Park Rec. Building Remodel - Amendment No. 6Cite of (btCrop
Public Works Department - Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0451; Fax (408) 846 -0429
CHANGE ORDER NO. 6
To contract for: San Ysidro Park mowband -slab replacement City Project No
Contractor: Calstate Construction Inc, Contract Date:
12 -PW -194
1/6/2012
This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and
Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon
acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work.
Description of Work
Remove and replace approximately 20 If of damaged mowband at SE corner of court #2. Reinstall mowband as per detail
A121 detail 4. Tie the new mowband into court #2. Location to be determined by construction manager. Install new 2'
radius 4" concrete pads at 3 each light pole locations for landscaping purposes
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
► All Extra Work authorized under this Change Order
must be billed separately from the original contract. All
bills for work done under this Change Order shall
reference this Change Order No. 6.
I (We) agree to make the above change subject to the
terms of this Change Order for a NET INCREASE not to
exceed $3,474.70.
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Cost Percentage Initial
$771,744.00
$33,080.22 4.29 %�
$804,824.22
$3,474.70 Q�
$36,554.92 4.74% N
Revised Contract Price $808,298.92
CONTRAC
By. j Date:
RECOMMENDED BY: 41!; �-.el �it..�' 3AZ/ // Z—
ACCEPTED BY:
Construction
Date
Uty Hamimstrator vale
San Ysidro Park Recreation Bldg Remodel # 12 -PW -194
Project No. 12-001 DATE: 3118/2012
San Ysldro Park #12 -PW 194 CONTRACTOR: Caistate Construction, Inc.
CONTRACTOR COST PROPOSAL A 12
POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR
DESCRIPTION OF CHANGE: Remove and replace apex 20 LF of damaged concrete mowband at SE corner of Court #2. Reinstall new mowmand as per A1211A.
tie the newband into new BB Court#2. Install new concrete 7 radius pad at 3 each light pole locations Court #2 for landscape purposes.
Option A
MATERIAL + 16% $000
LABOR + 15% $471.50
EQUIPMENT+ 15% $0.00
PRIME CONTRACTOR TOTAL 1 $471.30
Sub Contractor Costs from Attached Cost Proposal(s)
SUBCONTRACTOR SUBTOTAL DIRECT COSTS 1 $2,796.30
PRIMARY 5% FEE ON SUBCONTRACTORS COST $139.77
SUBCONTRACTOR TOTAL FEE $2,935.07
PRIME TOTAL $471.60
SUBTOTAL COR $3.406.57
BOND ( not to exceed 2% of sub total) $ 68.13
TOTAL 1 $3.474.70
PREPARED & SUBMITTED BY: Jim Lyons
COMPANY: Calstate Construction, Inc. TITLE: PM
Cost Proposal
♦ �
�
1 11
Option A
MATERIAL + 16% $000
LABOR + 15% $471.50
EQUIPMENT+ 15% $0.00
PRIME CONTRACTOR TOTAL 1 $471.30
Sub Contractor Costs from Attached Cost Proposal(s)
SUBCONTRACTOR SUBTOTAL DIRECT COSTS 1 $2,796.30
PRIMARY 5% FEE ON SUBCONTRACTORS COST $139.77
SUBCONTRACTOR TOTAL FEE $2,935.07
PRIME TOTAL $471.60
SUBTOTAL COR $3.406.57
BOND ( not to exceed 2% of sub total) $ 68.13
TOTAL 1 $3.474.70
PREPARED & SUBMITTED BY: Jim Lyons
COMPANY: Calstate Construction, Inc. TITLE: PM
Cost Proposal
San Ysidro Parik Recreation Bldg Remodel # 12 -PW 194
Project No. 12 -001 DATE: 3/16/2012
San Ysldro Perk #124PW -194 CONTRACTOR: Celstate Construction, Inc.
CONTRACTOR COST PROPOSAL #: 12
POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR
DESCRIPTION OF CHANGE: Remove and replace apW 20 LF of damaged wncrde mowberd at SE comer of CowW. Rekwtel new moM and as per A12114, tie the
new mowband into new mowband into new BB courW2.
SUBCONTRACTOR SUBTOTAL TOTAL $1,259.85
PREPARED & SUBMITTED BY: Jim Lyons - CSCI
COMPANY: Universal TITLE:
Proposed Cost Proposal
Subcontractor
`. pbon B
MATERIAL
$375.35
LABOR
$720.00
EQUIPMENT
$0.00
SUBTOTAL DIRECT COSTS
$1,095.35
FEE ON DIRECT COSTS (15%)
$164.30
SUBCONTRACTOR SUBTOTAL
:1.259.85
Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal
0
SUBCONTRACTOR SUBTOTAL TOTAL $1,259.85
PREPARED & SUBMITTED BY: Jim Lyons - CSCI
COMPANY: Universal TITLE:
Proposed Cost Proposal
Subcontractor
San Yeldro Park Recreation Bldg Remodel # 12 -PW -194
Project No. 12 -001 DATE: 3/1612012
San Yaldro Park *12-PW -194 CONTRACTOR: Calstate Construction, Inc.
CONTRACTOR COST PROPOSAL M 12
POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR
DESCRIPTION OF CHANGE: Instal new wrcn*e 7 radius pad at 3 each IgN pole booth" CourW for Iargaoaping purposee-
SUBCONTRACTOR SUBTOTAL TOTAL $1,333.113
PREPARED S SUBMITTED BY: Jim Lyons - CSCI
COMPANY: Universal TITLE:
Proposed Cost Proposal
Subcontractor
Option 13
MATERIAL
$375.35
LABOR
$960-00
EQUIPMENT
$0.00
SUBTOTAL DIRECT COSTS
$1,335.35
FEE ON DIRECT COSTS (15%)
$200•30
SUBCONTRACTOR SUBTOTAL
$1,335.65
Third and Fourth Tier Sub Contractor Coats from Attached Cost Proposal
__
-_
SUBCONTRACTOR SUBTOTAL TOTAL $1,333.113
PREPARED S SUBMITTED BY: Jim Lyons - CSCI
COMPANY: Universal TITLE:
Proposed Cost Proposal
Subcontractor
Option 13
MATERIAL
$375.35
LABOR
$960-00
EQUIPMENT
$0.00
SUBTOTAL DIRECT COSTS
$1,335.35
FEE ON DIRECT COSTS (15%)
$200•30
SUBCONTRACTOR SUBTOTAL
$1,335.65
Third and Fourth Tier Sub Contractor Coats from Attached Cost Proposal
SUBCONTRACTOR SUBTOTAL TOTAL $1,333.113
PREPARED S SUBMITTED BY: Jim Lyons - CSCI
COMPANY: Universal TITLE:
Proposed Cost Proposal
Subcontractor
MAR- 15-•2012 13:12 FROM:MARIA 14083371983 TO:15106571810
BEMONTE'S CONCRETE SERVICES, INC.
800 N. 15T STREET
SAN JOSE, CA, 95112
San Ysidro Park Recreation Building Remodel # 12 -PW -194
FIELD ORDER # 9
Description of work:
Remove and replace appx 20 If of damaged concrete mowband at 5E corner of Court #2,
Reinstall new mowband as per A1214, tie the new mowband Into new 88 court #2
Labor
Materials
Concrete
short Id
P.2 ,,7
22 Hrs $60.00 Hr $ 720.00
1 yd $125.35
1 $250.00
V2/
3/15/20x2
San Ysidro Park Feld Order it 9 Page 1
$375.35
$ 375.35
Subtotal
$1,095.35
15% Mark Up
$ 164.30
$1,759.65
Install new concrete 2' radius pad at 3 each fight pole locations Court #2
for landscaping purposes.
Labor
16 Hrs $ 60.00 Hr
$ 960.00
Materials
Concrete
3 cy $12S.35
Short Ld
1 $250.00
$ 375.35
$ 375.35
Subtotal
$1,335.35
15% Mark Up
$ 200.30
Total
$1'
3/15/20x2
San Ysidro Park Feld Order it 9 Page 1