Loading...
Calstate Construction - San Ysidro Park Rec. Building Remodel - Change Order No. 10Citp of Oilrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 10 To contract for: San Ysidro Park City Project No.: Contractor: Calstate Construction Inc, Contract Date: 12 -PW -194 1/6/2012 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work As per the COG Fire Marshall request, Calstate is to upgrade the FA system as follows in the Recreation Building. 1.)Supply and Install a new horn strobe located in the new bathroom. 2.) Supply and install a new pull station. 3.)Supply and Install a new smoke detector located above the new fire alarm cabinet. To install anti graffiti paint to the new seat wall as directed by the Architect. Supply and Install an additional skylight to match existing in the activities room. As requested by the COG building inspector Calstate is to remove and replace an addition 210 sf of sidewalk near the handicap ramp to meet ADA code requirements of a 2% cross slope. Curb and gutter to remain. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 10. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $6,841.43. Calstate Construction, Inc. By: RECOMMENDED BY: ACCEPTED BY: Construction City Administrator Cost Percentage Initial Original Contract Price $771,744.00 Previous Change Orders $115,257.32 14.93% Total to Date $887,001.32 This Change Order $6,841.43 Total Change Orders to Date $122,098.75 15.82% Revised Contract Price $893,842.75 Date: May 22, 2 01 2 ate Date Da t 12-- San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12 -001 DATE: 6110/2012 San Ysldro Park #12 -PW -194 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL* 25 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: To remove and replace an addition 21 sr of sidewalk near the handkmp ramp to meet ADA code requirement of a 2% cross slope 188 Curb and putter to remain Option A MATERIAL + 15% $0.00 LABOR + 15% $188.60 EQUIPMENT + 15% $0.00 PRIME CONTRACTOR TOTAL 1 ;138.60 Sub Contractor Costs from Attached Cost Proposals) SUBCONTRACTOR SUBTOTAL DIRECT COSTS $1,400.0 PRIMARY 5% FEE ON SUBCONTRACTORS COST 70.00 SUBCONTRACTOR TOTAL FEE $1,470.00 PRIME TOTAL $188.60 SUBTOTAL COR $1,658.60 BOND ( not to exceed 2% of sub total) $ 33.17 TOTAL 1 $1,691.77 PREPARED & SUBMITTED BY: Jim Lyons _ COMPANY: Calstate Construction, Inc. TITLE: PM Cost Proposal San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12.001 DATE: 5/10/2012 San Ysldro Park #12 -PW -194 CONTRACTOR: Calstaie Construction, Inc. CONTRACTOR COST PROPOSAL #. 25 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: To remove and replace an addition 21 of of sidewalk near the hwWimp ramp to meet ADA code requVemert of a 2% cross slope. Curb and putter to remain MATERIAL LABOR EQUIPMENT SUBTOTAL DIRECT COSTS FEE ON DIRECT COSTS (15 %) SUBCONTRACTOR SUBTOTAL Third and Fourth Tier Sub Contractor Coats from Attached Cost Proposal SUBCONTRACTOR SUBTOTAL TOTAL PREPARED & SUBMITTED BY: Jim Lvons - CSCI COMPANY: Universal TITLE: CPtion d $0.00 $0.00 $0.00 $0.00 $0.00 51,400.00 118,924.20 Proposed Cost Proposal Subcontractor Project Name: San Ysidro Park Recreation Building FIELD ORDER City Of Gilroy 7387 Rosanna Street Gilroy, CA 95020 FIELD ORDER NO. 16 Project Name: San Ysidro Park Recreation Contract Date: 01/06/2012 To Contractor: Calstate Construction Inc Address: 4165 Business Center Dr. Fremont CA 94538 DESCRIPTION OF WORK: Project No: 12 -PW -194 5/3/12/12 To remove and replace an addition 21sf of sidewalk near the handicap ramp to meet ADA code requirements of a 2% cross slope. Curb and gutter to remain. Estimated Adjustment of Contract Sum: Ron Barri / PM (Name of Construction Manager/Title - typed or printed) By: (Signature) Date: 513/2012 Jared Perry / Project Manager (Name of Contractor Representativelritle - typed or printed) (Signature) Date: Estimated Adjustment of Contract Time: Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the scope of the change in the Work and any actual adjustments of the Contract Sum. San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12-001 DATE: 5/10/2012 San Ysidro Park #12 -PW -194 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL #: 26 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: Fumish and Install one Velux Skylight per Ron Barr! ITEM DESCRIPTION MATERIAL salsa tax included LABOR ffulIvy encumbered QUANTITY UNIT UNIT COST EXTENSION QUANTITY HOURS RATE EXTENSION QUANTITY UNIT COST EXTENSION Sunm~uWxordnate work/Subs 0 0 2 $82.00 $164.00 0 $0.00 Laborer 4 $W.42 S237. 68 Cementer 8 $62.00 658.00 S I ht w/ flashing kit SUBTOTAL $ 500.00 $ 1,057.68 $ - MARK -UP $ 75.00 $ 158.65 $ - TOTALS $ 575.00 $ 1,216.93 $ Option A MATERIAL + 15% $575.00 LABOR + 15% $1,216.33 EQUIPMENT + 15% $0.00 PRIME CONTRACTOR TOTAL 1 $1,791.39 Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS 1 $0.00 PRIMARY 5% FEE ON SUBCONTRACTORS COST 1 $0,00 SUBCONTRACTOR TOTAL FEE $0.00 PRIME TOTAL $1,791.33 SUBTOTAL COR $1,791.33 BOND ( not to exceed 2 % of sub total) $ 35,83 TOTAL 1 $1,827.1$ PREPARED & SUBMITTED BY. Jim Lyons COMPANY: Calstate Construction, Inc. TITLE: PM Cost Proposal San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12 -001 DATE: 51140012 San Ysidro Park #12 -PW -194 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL #: 27 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR " DESCRIPTION OF CHANGE: Calstate in suppty and install nwi ti coating at the wetweli per FOM Option A MATERIAL + 15 °k $0.00 LABOR + 15% $188.60 EQUIPMENT + 15% $0.00 PRIME CONTRACTOR TOTAL Sub Contractor Costs from Attached Cost Proposals) SUBCONTRACTOR SUBTOTAL DIRECT COSTS I $1,694 PRIMARY 5% FEE ON SUBCONTRACTORS COST L $84,70 SUBCONTRACTOR TOTAL FEE $1,778,70 PRIME TOTAL $188.60 SUBTOTAL COR $1,967.90 BOND ( not to exceed 2% of sub total] $ IV. Im TOTAL 1 $2,006.65 PREPARED 8 SUBMITTED BY: Jim Lions COMPANY: Calstate Construction, Inc. TITLE: PM Cost Proposal i Option A MATERIAL + 15 °k $0.00 LABOR + 15% $188.60 EQUIPMENT + 15% $0.00 PRIME CONTRACTOR TOTAL Sub Contractor Costs from Attached Cost Proposals) SUBCONTRACTOR SUBTOTAL DIRECT COSTS I $1,694 PRIMARY 5% FEE ON SUBCONTRACTORS COST L $84,70 SUBCONTRACTOR TOTAL FEE $1,778,70 PRIME TOTAL $188.60 SUBTOTAL COR $1,967.90 BOND ( not to exceed 2% of sub total] $ IV. Im TOTAL 1 $2,006.65 PREPARED 8 SUBMITTED BY: Jim Lions COMPANY: Calstate Construction, Inc. TITLE: PM Cost Proposal Project No. 12 -001 San Ysidro Park 012 -PW -194 San Yzidro Park Recreation Bldg Remodel # 12 -PW -194 DATE: 5/14/2012 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL #: 27 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: Supply and Ut W anti-gral0tl coating at the seatwaN per kwn ITEM DESCRIPTION MATERIAL Galas tax Intl LABOR ancumbar40aEMIO.N EQllIP11ENT W I Invaioa QUANTITY UNIT UNrTCOST EXTENSION QUANTITY RATE QUA NTITY I UNITCOST EXTENSION Painter 18 .00 S 1040.00 J5OD,01 S SUBTOTALS: $ 1040.00 MATERIAL LABOR EQUIPMENT SUBTOTAL DIRECT COSTS FEE ON DIRECT COSTS (10%) SUBCONTRACTOR SUBTOTAL Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal SUBCONTRACTOR SUBTOTAL TOTAL PREPARED & SUBMITTED BY: Jim L - CSCI COMPANY: Universal TITLE: Lwion B 5500.00 $1,040.00 $0.00 $1,540.00 $154.00 S1,s94.00 31,8!4.910 Proposed Cost Proposal Subcontractor JqFlrlrL�� DE MARTINEZ T=AINTING, INc. EXTRA VV RK ORDER 407 REYNOLDS CIRCLE, SAN JOSE, CA 95112 TEL 408 392 -9886 FAX 408 392 -9915 NO: DATE: I' CONTRACT NO. CUSTOMER 1wlS rni S Arim TEL STREET CITY %t{# +-- STATE _ 4& • 74A,0= iC�IP'�l�a•T� rIr • R K4 T W 7W F .0 UR't VATR WWAT 1 V 1 AL L.P.DVK: I -ANT i — SRA FF M PAo j T .r--l- ----- -1—.._ V67 a Q TOTAL ADDITTONAL CHARGE FOR ABOVE: o We labor alxmu=Ws — complete with the above spet35 a above price.T I o l P & O A _ Dated Q� . e 3♦ (j Accepted — e ovt an gvons of this Faim rack O,�ier are satisfactory and me babey accepted. ! — I Above inkier same conditions as sped6ed in oegiinal cosltratx tmiess otbeteaise sBpuLroed. Autbce Soanre Dmd °iiriiiG° 110110mm, mmmmlllmmw� 1 V 1 AL L.P.DVK: I -ANT i — SRA FF M PAo j T .r--l- ----- -1—.._ V67 a Q TOTAL ADDITTONAL CHARGE FOR ABOVE: o We labor alxmu=Ws — complete with the above spet35 a above price.T I o l P & O A _ Dated Q� . e 3♦ (j Accepted — e ovt an gvons of this Faim rack O,�ier are satisfactory and me babey accepted. ! — I Above inkier same conditions as sped6ed in oegiinal cosltratx tmiess otbeteaise sBpuLroed. Autbce Soanre Dmd Project Name: San Ysidro Park Recreation Building Project No: 12 -PW -194 DESCRIPTION OF WORK: Calstatc in supply and install anti - graffiti coating at the seatwall. Estimated Adjustment of Contract Sum: Ron Barri / PM (Name of Construction Manager/Title - typed or printed) By: (Signature) Date: 5/10/2012 Jared Perry / Project Manager (Name of Contractor Representative/Title - typed or printed) (Signature) Date: Estimated Adjustment of Contract Time: Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the scope of the change in the Work and any actual adjustments of the Contract Sian. FIELD ORDER City Of Gilroy 5/10/12 7387 Rosanna Street Gilroy, CA 95020 FIELD ORDER NO. 22 Project Name: San Ysidro Park Recreation Contract Date: 01106/2012 To Contractor: Calstate Construction Inc Address: 4165 Business Center Dr. Fremont CA 94538 DESCRIPTION OF WORK: Calstatc in supply and install anti - graffiti coating at the seatwall. Estimated Adjustment of Contract Sum: Ron Barri / PM (Name of Construction Manager/Title - typed or printed) By: (Signature) Date: 5/10/2012 Jared Perry / Project Manager (Name of Contractor Representative/Title - typed or printed) (Signature) Date: Estimated Adjustment of Contract Time: Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the scope of the change in the Work and any actual adjustments of the Contract Sian. San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12 -001 DATE: 5/16/2012 San Ysidro Park #12 -PW -194 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL #. 28 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: Supply and install 4 new hems for Flre Alarm per FON20 Ophon A MATERIAL + 15% $0.00 LABOR + 15% $188.60 EQUIPMENT+ 15% $0.00 PRIME CONTRACTOR TOTAL 1 $188.60 Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS $1,049.00 PRIMARY 5% FEE ON SUBCONTRACTORS COST 45 SUBCONTRACTOR TOTAL FEE $1,101.45 PRIME TOTAL $188.60 SUBTOTAL COR $1,290.05 BOND ( not to exceed 2% of sub total) $ 25.80 TOTAL 1 $1,315.85 PREPARED & SUBMITTED BY: Jim Lyons COMPANY: Calstate Construction, Inc. TITLE: PM Cost Proposal San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12-M DATE: 5/16=12 Son Ysidro Park Iwl2 -PW -194 CONTRACTOR; Caistate Construction, Inc. CONTRACTOR COST PROPOSAL #: 28 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL. - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: Suppy and install 4 new Fire Alarm items Der F0020 ITEM pESCRIPTION MATERIAL sake tax Includ LABOR ( encun EQUIPMENT attach InvWce QUANTITY UNIT UNIT COST EXTENSION QUANTITY RATE EXTENSION QUANTITY UNIrCOST EXTENSION Conduit and am= $100 $ Labor a $118.67 S 919.96 $ SUBTOTALS: 100.00 $ Is Uptione MATERIAL $100.00 LABOR $949.56 EQUIPMENT $0.00 SUBTOTAL DIRECT COSTS $1,049.36 FEE ON DIRECT COSTS (15%) $0.00 SUBCONTRACTOR SUBTOTAL =1,049.36 Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal SUBCONTRACTOR SUBTOTAL TOTAL 11,049180 PREPARED & SUBMITTED BY: Jim L ns - CSC! COMPANY: Universal TITLE: Proposed Cost Proposal Suboontractor 8EPT ELECRICAL 330 SAN TROPEZ DR. HOLLISTER, CA 95023 PH: 831 -524 -6416 FAX: 877 - 216 -1419 ATTN: JARED PERRY PROJECT: SAN YSIDRO PARK FIELD ORDER #20: ADDITIONAL FIRE ALARM DEVICES STROBE IN BATHROOM, PULL STATION IN BIG ROOM, SMOKE ABOVE THE FACP CONDUIT AND BOXES $100 LABOR 8HRS @ $118.67= $949 JOHNSON ELECTRONICS NEW THE SYSTEM WOULDN'T WORK WITHOUT A FACP AND HAD IT IN THEIR ORIGINAL PROPOSAL, SO NO ADDITIONAL COST FOR IT. TOTAL QUOTE = $1,049 EXCLUSIONS: 1. BONDS OR PREMIUMS 2. PERMITS OR FEES 3. GRADING, STAKING OR SURVEYING 4. UTILITY CO. CHARGES 5. CLEARING OR GRUBBING 6. LIQUIDATED DAMAGES BEYOND OUR CONTROL 7. TEMP POWER (T &M BASIS ONLY) 8. REMOVE OR REPLACE ASPHALT OR CONCRETE 9. SPOIL REMOVAL 10. NIGHT WORK OR OVERTIME 11. WEEKENDS OR HOLIDAYS 12. PAINTING 13. PATCHING 14. PLYWOOD 15. BLOCKING 16. BACKING 17. BRACING CERTIFIED S.B.E. #1688140 LICENSE NO. 961816 GOOD LUCK THOMAS BRINKLEY Project Name: San Ysidro Park Recreation Building Project No: 12 -PW -194 DESCRIPTION OF WORK: Calstate is directed to supply and install the 4 new items listed below to the FA plan. 1. A new horn strobe located in the bathroom inside the Recreation Building. 2. A new pull station located inside the Rec Building on the right side of the double doors. 3. A new smoke detector located above the new FA cabinet. 4. A new FA cabinet to be located in the utility /storage room. Estimated Adjustment of Contract Sum: Ron Barri / PM (Name of Construction Manager/Tide - typed or printed) By: (signature) Date: 5/4/2012 Jared Perry / Project Manaeor (Name of Contractor Representativv Title - typed or printed) (Signal) Date: Estimated Adjustment of Contract Time: Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the scope of the change in the Work and any actual adjustments of the Contract Sum. FIELD ORDER City Of Gilroy 5/10/12 7387 Rosanna Street Gilroy, CA 95020 FIELD ORDER NO. Project Name: San Ysidro Park Recreation Contract Date: 01/06/2012 To Contractor: Calstate Construction Inc Address: 4165 Business Center Dr. Fremont CA 94538 DESCRIPTION OF WORK: Calstate is directed to supply and install the 4 new items listed below to the FA plan. 1. A new horn strobe located in the bathroom inside the Recreation Building. 2. A new pull station located inside the Rec Building on the right side of the double doors. 3. A new smoke detector located above the new FA cabinet. 4. A new FA cabinet to be located in the utility /storage room. Estimated Adjustment of Contract Sum: Ron Barri / PM (Name of Construction Manager/Tide - typed or printed) By: (signature) Date: 5/4/2012 Jared Perry / Project Manaeor (Name of Contractor Representativv Title - typed or printed) (Signal) Date: Estimated Adjustment of Contract Time: Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the scope of the change in the Work and any actual adjustments of the Contract Sum.