Calstate Construction - San Ysidro Park Rec. Building Remodel - Change Order No. 13Cite of Oilrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 13 To contract for: San Ysidro Park City Project No.: Contractor: Calstate Construction Inc, Contract Date: 12 -PW -194 1/6/2012 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Calstate to repair fractures to handball court corners as directed by COG. Per the request of the Gilroy Fire Marshal, Calstate to replace the exit signs with Lithonia emergency LHQM Led exit lights with green lettering color. Fixture housing color to be white. To remove the emergency exit sign within the temporary trailer and install into the utility storage room. Install two new Chinese Pistache trees behind seatwall as per plan. Install additional landscaping as per Aitken & Associates Landscape drawing dated 7- 27 -12. Repair sprinkler head, infill sanitation tank hole, soil prep and resod area following the removal of the temporary trailer. Grind down tree stump and remove baserock at base of stairs at temporary trailer. (a no cost time extension of 12 days will be added to the duration of the contract) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Cost Percentage Initial ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 13. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $25,861.29. Calstate Construction, Inc. By: RECOMMENDED BY: ACCEPTED BY: Original Contract Price $771,744.00 Previous Change Orders $160,964.37 Total to Date $932,708.37 This Change Order $25,861.29 Total Change Orders to Date $186,825.66 Revised Contract Price $958,569.66 Date: August 16, 2012 Construction MarAger ' Date L CVs E 20.86% 24.21% San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12 -001 DATE: 8/1/2012 San Ysktro Park #12-PW 194 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL* 7.3 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: Soll prep and re -sod the area where the office portables all rrEM DESCRIPTION ;�. • Option A MATERIAL + 15% $0.00 LABOR + 150A $188.60 EQUIPMENT + 15% $0.00 PRIME CONTRACTOR TOTAL l $188.80 Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS $3 290.00 PRIMARY 5% FEE ON SUBCONTRACTORS COST � 164.50 SUBCONTRACTOR TOTAL FEE $3.454.50 PRIME TOTAL $188.60 SUBTOTAL CDR $3,643.10 BOND ( not to exceed 2% of sub total) $ 72.86 TOTAL $3,715.96 PREPARED & SUBMITTED BY: Jim Lyons COMPANY: Calstate Construction, Inc. TITTLE: PM Cost Proposal San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12-001 DATE: 8/112012 San Ysidro Park IM2 -PW -194 CONTRACTOR: Cakdate Construction, Inc. CONTRACTOR COST PROPOSAL #: 7.8 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: Sol prep and resod the area where the dke podal ies st MATERIAL as lax Inoludxl LABOR Ifift ancumbared EQUIPMENT attach Invoice REM DESCRIPTION QUANTITY UNIT UNITCOST EXTENSION QUANTITY RATE EXTENSION QUANTITY UNITCOST EXTENSION S SUBTOTALS: S Option B MATERIAL $0,00 LABOR $0.00 EQUIPMENT $0.00 SUBTOTAL DIRECT COSTS $0.00 FEE ON DIRECT COSTS (IS%) $0.00 SUBCONTRACTOR SUBTOTAL Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal SUBCONTRACTOR SUBTOTAL TOTAL $3,290.00 PREPARED & SUBMITTED BY: Jim Lvans - CSCI COMPANY: Universal TITLE: Proposed Cost Pmposal Subcontractor Zrai LANDSCAPE, INC. July 31, 2012 Re: San Ysidro Park Landscape Attention: Jared Perry 0 Calstate Construction The cost to repair the sprinklers, soil prep & re -sod the area where the office trailers sit Is $3,290. Our standard exclusions are: Traffic & pedestrian control Temporary fencing Clearing, grubbing and grading Removal, trimming or protection of existing trees Protection & maintenance of existing landscape areas to remain Import and export of soils Trenching & boring through paved areas Permits, fees and bonds If you have any questions, feel free to call. Thank you, Robert Samaniego Contractor's License # 463280 Phone 408 - 682 -0100 P.O. Box 70 Fax 408- 682 -0109 San Martin, CA 95046 San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12.001 DATE: 7/16/2012 San Ysidro Park 912 -PW -194 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL #: 38 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: This direcbve Is for Celsole to supply pricing to repair fractures to handball court comers as directed by COG, David Stubchaw. M DESCRIPTION- 7-ymom -W, MATERIAL + 15% LABOR + 15% EQUIPMENT + 15% PRIME CONTRACTOR TOTAL Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS PRIMARY 5% FEE ON SUBCONTRACTORS COST SUBCONTRACTOR TOTAL FEE PRIME TOTAL SUBTOTAL COR BOND ( not to exceed 2% of sub total) TOTAL DPW A $0.00 $936.10 $0.00 $938.f0 00 $0.00 $936.10 $936.10 $ 18.72 $955.00 PREPARED 81 SUBMITTED BY: Jim Lyons COMPANY: Calstate Construction, Inc. TITLE: PM Cost Proposal Maria Ramirez nena96924@att.net Jul 13 (3 days ago) Dear Jared the total amount for this Field Order # 29 is $ 650.00 please advise. PIT. - Project Name: San Ysidro Park Recreation Building Project No: 12 -PW -194 FIELD ORDER City Of Gilroy 7/2112 7387 Rosanna Street Gilroy, CA 95020 FIELD ORDER NO. 29 Project Name: San Ysidro Park Recreation Contract Date: 01/06/2012 To Contractor: CaNtate Construction Inc Address: 4165 Business Center Dr. Fremont CA 94538 DESCRIPTION OF WORK: This directive is for Calstate supply pricing to repair fractures to handball court corners as directed by COG, David Stubchaer. Estimated Adjustment of Contract Sum Ron Barri I PM (Name of Construction Manager /title - typed or printed) By: (Signature) Date: 7/2/2012 Jared Perry / Project Manager (Name of Contractor Representativdfitle - typed or printed) (Signature) Date: Estimated Adjustment of Contract Time: Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the scope of the change in the Work and any actual adjustments of the Contract Sum. 1 San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12.001 DATE: 7/1912012 San Ysildro Park 012 -PW -194 CONTRACTOR: Caistate Construction, Inc. CONTRACTOR COST PROPOSAL #: 39 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: Fumish and install (3) ens Mericy lights 0"On A MATERIAL + 15% $0.00 LABOR + 15% $188.80 EQUIPMENT + 16% $0.00 PRIME CONTRACTOR TOTAL C $18x.80 Sub Contractor Costs from Attached Cost Proposel(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS r $897.31 PRIMARY 8% FEE ON SUBCONTRACTORS COST r $34.87 SUBCONTRACTOR TOTAL FEE $732.18 PRIME TOTAL $188.80 SUBTOTAL COR $920.78 BOND ( not to exceed 2% of sub totes 1872 TOTAL 1 $939.20 PREPARED & SUBMITTED BY: Jim Lyons COMPANY: Calstate Construction. Inc. TITLE: PM Cost Proposal San Ysklro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12.001 DATE: 7/19/2012 San Ysidro Park 012-PW -194 CONTRACTOR: Calstats Construction, Inc. CONTRACTOR COST PROPOSAL #: 39 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: Fm*h wW kwW (3) emergency Iptas SUBCONTRACTOR SUBTOTAL TOTAL $097.31 PREPARED & SUBMITTED BY: Jim Lyons - CSCI COMPANY: Universal TITLE: Proposed Cost Proposal Subcontractor upu0na MATERIAL $341.30 LABOR $356.01 EQUIPMENT $0.00 SUBTOTAL DIRECT COSTS $697.31 FEE ON DIRECT COSTS (1S %) $0.00 SUBCONTRACTOR SUBTOTAL Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal 1� SUBCONTRACTOR SUBTOTAL TOTAL $097.31 PREPARED & SUBMITTED BY: Jim Lyons - CSCI COMPANY: Universal TITLE: Proposed Cost Proposal Subcontractor ADEPT ELECnUCAL SERWCE 330 SAN TROPEZ DR. HOLLISTER, CA 95023 PH: 831 - 524 -6416 FAX: 877- 216 -1419 ATTN: CAL STATE CONSTRUCTION PROJECT: SAN YSIDRO PARK REMOVE EXIT/EM LIGHT IN TEMP TRAILER AND MOVE TO STORAGE ROOM OF PERMANENT BUILDING. REMOVE NEW EXIT LIGHTS AND INSTALL NEW EXIT/EM LIGHTS IN OPEN AREA OF PERMANENT BUILDING. CONDUIT, FITTINGS, AND WIRE IN STORAGE ROOM $50 NEW EXIT/EM LIGHTS 2 @ $145.65EA $291.30 LABOR 3 HRS @$118.67= $356.01 TOTAL $697.31 San Ysidro Park Recreation Bldg Remodel # 12 -PW -194 Project No. 12-001 DATE: 7/30/2012 San Ysidro Paris IM2 -PW -194 CONTRACTOR: Calstate Construction, Inc. CONTRACTOR COST PROPOSAL #. 40 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - PRIME CONTRACTOR DESCRIPTION OF CHANGE: Added Landscaping per mcetlrg on Friday, July 27th, 2012 Option A MATERIAL + 15% $0.00 LABOR + 15% $188.60 EQUIPMENT + 15% $0.00 PRIME CONTRACTOR TOTAL ;188.60 Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS I $18,729750 PRIMARY 5% FEE ON SUBCONTRACTORS COST $938.45 SUBCONTRACTOR TOTAL FEE $19,665.45 PRIME TOTAL $188.80 SUBTOTAL COR $19,854.05 BOND ( not to exceed 2% of sub total) 397.08 TOTAL 1 $20,251.13 PREPARED & SUBMITTED BY: Jim Lyons COMPANY: Celstate Construction, Inc. TITLE: PM Cost Proposal I Option A MATERIAL + 15% $0.00 LABOR + 15% $188.60 EQUIPMENT + 15% $0.00 PRIME CONTRACTOR TOTAL ;188.60 Sub Contractor Costs from Attached Cost Proposal(s) SUBCONTRACTOR SUBTOTAL DIRECT COSTS I $18,729750 PRIMARY 5% FEE ON SUBCONTRACTORS COST $938.45 SUBCONTRACTOR TOTAL FEE $19,665.45 PRIME TOTAL $188.80 SUBTOTAL COR $19,854.05 BOND ( not to exceed 2% of sub total) 397.08 TOTAL 1 $20,251.13 PREPARED & SUBMITTED BY: Jim Lyons COMPANY: Celstate Construction, Inc. TITLE: PM Cost Proposal San Ysldro Park Recreation Bldg Remodel N 12 -PW -194 Project No. 12.001 DATE: 7/30/2012 San Ysldro Park 012 -PW -194 CONTRACTOR: Calstate Constivallon, Inc. CONTRACTOR COST PROPOSAL #. 40 POTENTIAL CHANGE ORDER (PCO) - COST PROPOSAL - SUBCONTRACTOR CONTRACTOR DESCRIPTION OF CHANGE: Added Landscaping per meeft on FrMW Ady 270h, 2012 moor • SUBCONTRACTOR SUBTOTAL TOTAL 118.729.00 PREPARED & SUBMITTED BY: Jim Lyons - CSCI COMPANY: Unlyersal TITLE: Proposed Cost Proposal Subcontractor Option B MATERIAL $0.00 LABOR $0.00 EQUIPMENT $0.00 SUBTOTAL DIRECT COSTS SOHO FEE ON DIRECT COSTS (15%) $0.00 SUBCONTRACTOR SUBTOTAL 518,729.00 Third and Fourth Tier Sub Contractor Costs from Attached Cost Proposal SUBCONTRACTOR SUBTOTAL TOTAL 118.729.00 PREPARED & SUBMITTED BY: Jim Lyons - CSCI COMPANY: Unlyersal TITLE: Proposed Cost Proposal Subcontractor LANDSCAPE, INC. July 29, 2012 Re: San Ysidro Park Landscape Attention: Jared Perry @► Calstate Construction As per our site meeting last Friday & per plan sheet L -1, we propose to furnlsh & install the work described below: 1. Irrigation work per plan sheet L -1 & connect new valves to existing controller in utility room. 2. Soil preparation, fine grade & sod the area between the new Youth Center & the basketball courts and the area adjacent to the south basket ball court. (approx. 2800 SF) 3. Re -seed all other areas in the field that are disturbed by our installation of new PVC pipe & conduit 4. 30 day maintenance for new sod areas only TOTAL BID: $18,729.00 Our standard exclusions are: Traffic & pedestrian control Temporary fencing Clearing, grubbing and grading Removal, trimming or protection of existing trees Protection & maintenance of existing landscape areas to remain Import and export of soils Trenching & boring through paved areas Permits, fees and bonds If you have any questions, feel free to call. Thank you, Robert Samaniego Contractor's License # 463280 Phone 408 - 682 -0100 P.O. Box 70 Fax 408 - 682 -0109 San Martin, CA 95046