Loading...
Harley Ellis Devereaux - 2009 Agreement - Library Project - Amendment No. 3 AMlliNDMENTTOTHEAGREEMENTFORSERWCESBETWEEN CITY OF GILROY AND HARLEY ELLIS DEVEREAUX FOR Gll.,ROV LmRARTY DATED AUGUST 3, 2009 AMENDMlliNT NO.3 This Amendment shall become effective when it has been signed by the City Administrator, Project Manager, and Consultant. All copies forwarded to Consultant for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Consultant's copy will be returned to him as his authority to proceed with the work. See attached HED contract Amendment #3 which includes identified tasks that have been requested off performed by Harley Ellis Devereaux during the Construction Phase of the on-going Library Project that are outside the scope of the original contract and subsequent modifications. This Amendment extends the term of the Agreement for Services between the City of Gilroy and Harley Ellis Devereaux, dated August 3, 2009 to April 30, 2013. All requirements of the original Agreement Documents shall apply to the above work except as specifically modified by this Amendment. The contract time shall not extend unless expressly provided for in this Amendment. Harley Ellis Devereaux hereby agrees to make the above changes subject to the terms of this Amendment for ongoing acquisition/relocation services. Consultant: Harley Ellis Devereaux By /)nN/~ ~chards Date (z~ /" ACCEPTED: City Administrator Date AMENDMENT TO THE AGREEMENT ... FOR SERVICES BETWEEN CITY OF GILROY AND HARLELY ELLIS DEVEREAUX FOR THE GILROY LIBRARY DATED AUGUST 2, 2009 AMENDMENT NO.3 II HARLEY ELLIS DEVEREAUX 601 South Figueroa Street Suite 500 los Angeles, C.lifornia 90017 I USA tel 213.542.4500 I fa~ '-13.547...1515 hlirleyellisoevereli uX.com Date: 6/23/2011 New Project: Customer: City of Gilroy Gilroy Library - Construction Phase Kuhn; ] olmson; fde Existing Project: yes Project No: 2009-00015-000-TC60000 Project Name: Distribution: Person Requesting Design Service: Rick Smelser Description of Design Service: The following tasks that have been requested of/performed by Harley Ellis Devereaux during the Constmction Phase of dle on-going Library Project are outside dle scope of the original contract and subsequent modifications. 1. Coordination with City's waterproofmg and roofmg consultants hired after project construction documents were completed, as well as associated modifications to the contract documents, issuance of Bulletins, and additional field meetings and coordination: 48 hours 2. Revisions to and relocation of specified bicycle racks, induding two client meetings and revision of the consttuttion documents: 8 hours. 3. Revisions to and relocation of approved site monument signs, including revision of the construction documents, at request of City: 4 hours. 4. Provision of cAb background drawings for Contractor's submittals (EMS system): 16 hours. 5. Coordination of the Photo Voltaic system and submittal process, including site visit w /manufacturer and processing of multiple construction and permit submittals: 24 hours. 6. Coordination and processing ofmultiple partial/incomplete construction submittals, and multiple resubmittals (i.e. structural concrete, rebar, sheet metal, wood roof, interior finishes). See Specifications, Section 1330 1.5.A.l04.: 100 hours 7. Coordination and processing of multiple unnecess~l1:y, improper and/or incomplete RFI's (to date approximately 128 out of 450). See Specifications, Section13lO -1.7.0.1: 50 hours. 8. Structural and Architectural re-design to accommodate field conditions that deviated from the consttuction documents, including missing concrete openings; connectors and embeds; dimensional coordination of concrete and stmctural connections; Walker Duct revisions: 60 hours. 9. Two additional trips beyond contract maximum for Structural Engineer, at City Request: 16 hours. 10. Additional irrigation scope for temporalY maiAtenance in Rosanna Street: 16 hours. 11. Total additional effort: 342 hours. Design Service Fee: At a blended hourly rate of $ 150/hour for staff time, based on the Contract Hourly Rate chart, the cost of additional time expended to date equates to a lump sum of $51,300 (Fifty One Thousand Three Hundred Dollars). There are no Reimbursable expenses, as defined in d1e original agreement, associated with this request. Design Service Schedule: Conunensurate w / existing project schedule. Design Service Requestdoc (Revised 11-05) IILAX-HAR-FILE01Istudio ProjeclslHlgher EducaUonlCity of Gilfoy\2009-00015.000 Gilroy Ub Base AnalyslsIPfOjMgmllPROPOSALSI3 Add Service fO( CA Phase Scope inoreasesl110623 Design Service Request 3.2 - Additional CA Phasework.doc _I HARLEY ELLIS DEVEREAUX I. Design Service Request ~eY Ellis Devereaux Please acknowledge Customer's acceptance by signing in the space set forth below and return one signed original to our office. Harley Ellis Devereaux will proceed with this Design Service Request upon receipt of this signed document. Upon your approval, this request will be followed up with a formal Contract, Supplemental Agreement and or a Contract Modification. ~ 19 ature l;. I(~ etc;~ ~ Printed Name and It e . D"ff~ il -- ~~IlI~(;/~ . Project No. Errorl Reference source not found. Page 2 of2 Errorl Reference source not found.