Loading...
JJR Construction - Citywide Sidewalk Rehabilitation Project No. 09-CDD-171 - Change Order No. 1 " City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408)846-0429 CHANGE ORDER NO.1 Contractor: Gilroy Citywide Sidewalk Rehabilitation Federal Proiect No. ESPL-5034(020) JJR Construction, Inc. City Project No. 09-CDD-171 To contract for: Contract Date: 9/14/2009 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This change order provides for the following: Additional removaVreplacement of curb, gutter, sidewalk, driveway approaches, and curb ramps along Murray Avenue, Sixth Street, Princevalle Street, Eighth Street and Forest Street. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $91,054.74 Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date en . 0 Revised Contract Price J l~ R ~ .j;r,et/c.r//J. -", ;he- Contractor Cost Percentage $387,208.94 $0.00 0% $387,208.94 $91,054.74 $91,054.74 24% $478,263.68 By: Date: 97 // ~ t' RECOMMENDED BY: C ~)J~ . Managero D5'- 1'6- 1010 ACCEPTED BY: Date lD Engin r Proj"'tE~ Date j~ 1/(0 Date ..., City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO.1 (Supplemental Information) Contractor: Gilroy Citywide Sidewalk Rehabilitation Federal Proiect No. ESPL-5034(020) JJR Construction, Inc. City Project No. 09-CDD-171 To contract for: Contract Date: 9/14/2009 Descriotion of Work This change order provides for the following: Additional removal/replacement of curb, gutter, sidewalk, driveway approaches, and curb ramps along Murray Avenue, Sixth Street, Princevalle Street, Eighth Street and Forest Street. (Specific parcel numbers as shown below) Breakdown of additional work: Improvement costs for oarcels noted below: Total chanae In cost to Bid Set APNs shown below = $67,937.08 APN APN APN APN APN 835 27 031 841 02 049 799 1 2 033 841 03 053 799 43 003 835 27 030 799 41 001 841 06 049 841 03 032 799 43 004 83527 016 799 2B 017 841 06033 84103 014 799 44 071 835 27 015 799 2B 016 84106 050 799 22 022 ,799 44 070 835 27 001 799 2B 015 841 '06032 79929 023 . 799 44 056 835 03 074 799 44 057 841 06054: 808 16 017 ""~ 799 44 G29 835 03 059 799 37 002. 841 05014 ; 841 03 114 '799 44 020 835 03 058 799 28 014 ' 841 0501& 84103081 .. 799 44 019 835 03 043 799 27054, 84104022 . " ~ 84135999 799 44 07 835 03 014 799 27 05&.. 841.05078 . 841 65 002 79913 031 835 03 001 .79927057 . 841'05 020 .799 37 012 '7991& 014 835 03 042 799 16 013 841 05017 .79929 047 799 29 042 835 03 029 799 16039 841 05018. ~:29 059 799 27 049 835 03028 799 1& 038 841 03071 % i&Ni , ;79929 0&2 ...~ 2B 011 835 03015 .79910.068.. ,84104.024, .. 'fJI929G64;.: 799 28 012 835 04 004 799 09 03B , 841.03 059 799 29 075 . 79928 013 835 04061 799 09 013 841 03057 · 799 37005 841 06034 841 01 062 79915037 841 04 0021 .799 30 005 \. ' ~7992&033 ..84159 019 799 15038 841 03056 . ...C, 799 3000s \799 26032 84159022 799 15014 8410400'1.. 79943~1\ 799 37 008 841 01 079 799 15049 . ,84103013; 799 44:082 799 28 057 841 01 062 799 14001 841 03 058 799 43 002 799 28 055 ~.J'.'. ~AP=:- ITotal cost of work for change order = $67,937.08 + $23,117.66 = $91,054.74