JJR Construction - Citywide Sidewalk Rehabilitation Project No. 09-CDD-171 - Change Order No. 3 ,'-, Oty ofGdro7 Engineering Division 7351 Rosanna Sl. Gilroy. CA 95020 Phone (408) 848.Q450; Fax (408) 848.Q429 F!t~~ ! -_.'-,-,,- -., =B7 '. .. _.-::-,--".7.-::;'~ CHANGE ORDER NO.3 ContrllCtor: Gilroy CityWide Sidewalk Rehabilitation Federal Proiect No. ESPL-503M0201 1JR Constn1ction.lnc. CitY Project No. 09-CDD-171 To connet for : Contract Date: 9/1412009 This order shall become effective when it has been signed by the City Administrator, City Ensineer, Project Enainccr, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled ouL Upon acceptance by the City, the Contractor's copy will be returned to him as his authority toprocced with the work. Descri.Ption of Work This chanae order provides for the following: Addition8l mnovallrcplaccmcnt of curb, lUtter, sidewalk, driveway approaches, and curb ramps along Westwood Drive, Mmttelli Drive, Welbum Avenue, and Wren Avenue. (Specific pan:el numbcni IS shown below) Traffic Conbol measures wercrequircd to accommodate the additional surface improvement work. All requirements of tile original Contract Documents shall apply to the above work except as specifically modified by this Chanae Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the tcnns of this Change Order for the NET INCREASE of S126,494.20 Original Contract Price Previous Chuge Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price c.vn Pen:entHe ~ S387,208.94 5135,110.54 35% 5522,319.48 II $126,494.20 5261.604.74 68% 5648,813.68 v'IT.~. ~"~ucrl.;)llIIc. Contractor BY:~~~~~ U/ Ifl~ fJtd:^~ ofh~s-/9 don Manaa'tlf 0 Date ~# RECOMMENDED BY: i r ~~ --- Date ACCEPTED BY: City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone(40B)B46-0450; Fax (40B) 846-0429 CHANGE ORDER NO.3 (Supplemental Information) To contract for: Gilroy Citywide Sidewalk Rehabilitation Federal Proiect No. ESPL-5034(020) JJR Construction, Inc. Contract Date: Contractor: Description OfWOIK This change order provides for the following: Additional removal/replacement of curb, gutter, sidewalk, driveway approaches, and curb ramps along Westwood Drive, Mantelli Drive, Welbum Avenue, and Wren Avenue. (Specific parcel numbers as shown below) Additional traffic measures were necessary for public safety pertinent to accommodate the additional surface improvement wOIk Breakdown of additional worlc Improvement costs for parcels noted below: Total chanat In cost to Bid Set APNa ahown below = I $60,884.471 APN APN APN 790 19 021 790 20 084 783 35 067 808 02 025 79022018 790 20 043 783 22 060 808 03 038 79020017 790 26 047 808 03 009 808 10045 79020018 790 23 001 79024015 808 10 050 790 24 001 790 22 001 790 25 019 790 25 030 790 22 051 79024011 790 24 028 790 22 050 790 24 027 790 24 061 790 40 022 790 24 024 790 20 040 790 25 031 790 24 023 79019045 808 03 024 790 24 020 790 19046 808 03 008 79024019 79019069 783 22 068 783 35 069 790 18002 80810017 783 22 067 790 24 031 808 10 044 79024018 80810034 79024010 80810035 6Oi609l78 APN ; c183~ ,,057 .c .SOM0016 9/14/2009