CHANGE ORDER NO.3
ContrllCtor:
Gilroy CityWide Sidewalk Rehabilitation
Federal Proiect No. ESPL-503M0201
1JR Constn1ction.lnc.
CitY Project No. 09-CDD-171
To connet for :
Contract Date:
9/1412009
This order shall become effective when it has been signed by the City Administrator, City Ensineer,
Project Enainccr, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled ouL Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority toprocced with the work.
Descri.Ption of Work
This chanae order provides for the following:
Addition8l mnovallrcplaccmcnt of curb, lUtter, sidewalk, driveway approaches, and curb ramps
along Westwood Drive, Mmttelli Drive, Welbum Avenue, and Wren Avenue. (Specific pan:el numbcni IS shown below)
Traffic Conbol measures wercrequircd to accommodate the additional surface improvement work.
All requirements of tile original Contract Documents shall apply to the above work except as specifically
modified by this Chanae Order. The contract time shall not extend unless expressly provided for in this
Change Order.
I (We) agree to make the above change
subject to the tcnns of this Change Order
for the NET INCREASE of S126,494.20
Original Contract Price
Previous Chuge Orders to Date
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
c.vn Pen:entHe ~
S387,208.94
5135,110.54 35%
5522,319.48 II
$126,494.20
5261.604.74 68%
5648,813.68
v'IT.~. ~"~ucrl.;)llIIc.
Contractor
BY:~~~~~
U/ Ifl~
fJtd:^~ ofh~s-/9
don Manaa'tlf 0 Date
~#
RECOMMENDED BY:
i r
~~
---
Date
ACCEPTED BY:
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone(40B)B46-0450; Fax (40B) 846-0429
CHANGE ORDER NO.3 (Supplemental Information)
To contract for:
Gilroy Citywide Sidewalk Rehabilitation
Federal Proiect No. ESPL-5034(020)
JJR Construction, Inc.
Contract Date:
Contractor:
Description OfWOIK
This change order provides for the following:
Additional removal/replacement of curb, gutter, sidewalk, driveway approaches, and curb ramps
along Westwood Drive, Mantelli Drive, Welbum Avenue, and Wren Avenue. (Specific parcel numbers as shown below)
Additional traffic measures were necessary for public safety pertinent to
accommodate the additional surface improvement wOIk
Breakdown of additional worlc
Improvement costs for parcels noted below:
Total chanat In cost to Bid Set APNa ahown below = I $60,884.471
APN APN APN
790 19 021 790 20 084 783 35 067 808 02 025
79022018 790 20 043 783 22 060 808 03 038
79020017 790 26 047 808 03 009 808 10045
79020018 790 23 001 79024015 808 10 050
790 24 001 790 22 001 790 25 019
790 25 030 790 22 051 79024011
790 24 028 790 22 050 790 24 027
790 24 061 790 40 022 790 24 024
790 20 040 790 25 031 790 24 023
79019045 808 03 024 790 24 020
790 19046 808 03 008 79024019
79019069 783 22 068 783 35 069
790 18002 80810017 783 22 067
790 24 031 808 10 044 79024018
80810034 79024010 80810035
6Oi609l78
APN
; c183~ ,,057
.c .SOM0016
9/14/2009