Loading...
JJR Construction - Citywide Sidewalk Rehabilitation Project No. 09-CDD-171 - Change Order No. 4 ~it!' of ~ilro!, Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408)846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 4 City Project No.: 09-CDD-171 Contract Date: Oct. 5,2009 To contract for: Federal Simulus I - City Sidewalk Rehab Project Contractor: J.J.R. Construction. Inc. This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be retumed to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be retumed to him as his authoritv to oroceed with the work. Descriotion of Work REF PO # 100498. Charae Strina: 223-2600-3527-4340 South West & South East comer of Welbum Avenue and Parish Way - Remove existing retums and construct two Ramps, type "A" - Construct 80 LF of curb and gutter with one foot asphalt plug and construct 100 SF of sidewalk. All requirements of the original Contract Documents shall apply. to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Cost Original Contract Price $387,208.94 Previous Change Orders $261,604.74 Total to Date $648,813.68 This Change Order $10,790.00 Total Change Orders to Date $272,394.74 Revised Contract Price $659,603.68 Correction to update as this project split on two purchase order agreements. This portion is for Federal Stimulus funded on PO # 100498. The non-stimulus portion is shown on Change Order No. 4A - PO #110420. ~ All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No.4. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $10,790.00. By: v..j: t<..u"sr'l/cT;(}/),.I;,(~ CONTRACTO'A ;1'~ ~tno- Date:~ /5 / II I . RECOMMENDED BY; ,r>>lu;t J1-f)~#; Construction Manager ACCEPTED BY: Percentaae Initial 67.56% Jf:?: ~ 70.35% ~ 1 of-)7-.~ J/ Date Date Date -,._-_.'~"~'~, "_......~_.~_..~._.__."-_...--........~-----------~~ The original project was funded via a grant for $660K and the bid came in so low that additional work - was added in order to make use of more of the grant funding and to provide additional improvements. This update to the contract/agreement was completed in coordination with and approved by Caltrans ~.._-_. ---.--' ..,---~. -.----------------