JJR Construction - Sidewalk and Curb Ramp Improvements - Change Order No. 1 ,--"F G ,~, \../ II ;'~' -"p '-.-) .. 0 " J--i -L. . ,'-';-::- j . ~*. OtyofGiIroy Engineering Division 7351 Rosanna St.. Gilroy, CA 95020 Phone (408)846-0451; Fax (408) 846-0429 CHANGE ORDER NO.1 To contract for: City of Gilroy Sidewalk Improvement Project Contractor: JJR Construction, Inc. City Projccct No. 09-CDD-I66 Contract Date: 5/612010 This order shall become effective when it has been signed by the City Administrator, City Engineer. Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be relumed to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be relumed to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: Location: Old Gilroy at Chestnut St. . Scope of Credit for Work Deleted from Contract; Sidewalk, Driveway, Curb &Gutter Total Credit to City = $5,058.70 . Scope of Extra Work added to Contract; Curb & Gutter Total Additional Work = $8,853.00 Total Cost to City an Add of $3,794.30 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order. Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"). including but not limited to labor, materials, overhead and profit, delay, disruption. loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $3,794.30 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Qm $58,000.00 $0.00 $58,000.00 $3,794.30 $3,794.30 $61,794.30 Percenta2C .!!!!!!!L. 0.00% .dcA 6.54%M .J .,f~. &'r!ir/Z/C.:77I1/)J ..t:';1 c.., CONTRACTOR By: ~J/" #~#te: ~.//r~D Co RECOMMENDED BY: ACCEPTED BY: ~trat9-- a~-:~ . r. PrOject Engmeer Date (Q-.~Y-IO Date b/~lfh 0 , Date J.J.R. CONSTRUCTION, INC. City of Gilroy Att: Al Signorotti Re: Sidewalk Improvement Project - Project No. 09-CDD-166 Directive Change Order # 1 Location: Old Gilroy @ Chestnut Scope of Credit for Work Deleted from Contract; 1) Sidewalk = 312'/square feet @ $8.24/per sf. = $2,570.88 2) Driveway = 137'/square feet @ $ 12.36/per sf. = $1,693.32 3) Curb & Gutter = 14'llinear feet@ $56.75/per If. = $794.50 Total Credit to City = $5,058.70 Scope of Extra Work added to Contract; 1) Curb & Gutter = 156'llinear feet @ $56.75/per If. = $8,853.00 Total Additional Work = $8,853.00 Total Added work = $8,853.00 Total Deleted Work = ($5,058.70) Total Cost to City an Add of $3,794.30 1120 NINTH AVE. SAN MATEO, CA. 94402 PH .650-343-6109 FX.650-343-6207 ~-\ OF G:!~. . U~.. l="--,O.... :!'If"": ,:~...L- \. * '. . .-,1 .. J . ~..*/ City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO.1 To contract for: City of Gilroy Curb Ramp Improvement Proiect City Project No. 09-CDD-165 Contractor: JlR Construction, Inc. Contract Date: 5/612010 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer. and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be retumed to him as his authority to proceed with the work. Descriotion of Work This Change Order provides for the following: .Location: Fourth @ Church St., Fifth @ Rosanna St., Fifth @ Church St, Fifth @ Hanna St. Scope of Extra Work added to Contract; ~dditional~ps Total Additional Work = $20,400.00 Total Cost to City an Add of $20,400.00 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $20.400.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price ~ $29,941.00 $0.00 $29,941.00 $20,400.00 $20,400.00 $50,341.00 Percentue InIlIal 0.00% M. 68.13% ~ J'v.~. L~6ff~CTit7"J p,- CONTRACJ'OR BY:/!..~~P1g~~ Date: ~//~l'J RECOMMENDED BY: ACCEPTED BY: CityJ:~ UL- City Engineer.J Pro~~ -~ Date (,- ;i-L\-\O Date ~/l,qflD , Date J.J.R. CONSTRUCTION, INC. City of Gilroy Attn: AI Signorotti Re: Curb Ramp Improvement Project - Project No. 09-CDD-165 Directive Change Order # 1 Per agreed upon price. The cost of additional ramps is as follows: 1) To 'construct corners with double ramps at a cost of $6,800.00 per corner (two ramps per corner). Total price per additional ramp of $3,400.00 per ramp. Cost Breakdown for Ramps Below is as follows: Saw = $ 520.00 Concrete = $3,521.10 Asphalt = $ 771.80 Base-Rock = $ 740.00 Debris = $ 690.00 Demo Crew = $2,502.15 Prep Crew = $1,904.10 Pour Crew = $3,240.02 Asphalt Crew = $1,270.00 Strip and Backfill = $1,160.00 Total Cost Breakdown = $18,767.05 + 15% OH = $2,815.06 + Profit = $1,182.11 = $20,400.00 Location and cost of additional ramps at contract locations: 1) Fourth @ Church = 1 additional ramp = $3,400.00 2) Fifth @ Rosanna = 2 additional ramps = $6,800.00 3) Fifth @ Church = Ramp per plan was already existing. JJ and Al agreed to cut out landing surface of existing ramp and one additional and place truncated domes at both ramps for the cost of one ramp. = $3,400.00 4) Fifth @ Hanna = 2 additional ramps = 6,800.00 Total Cost of Additional Ramps on Contract = $20,400.00 1120 NINTH AVE. SAN MATEO, CA. 94402 PH.650-343-6109 FX.650-343-6207