JJR Construction - Sidewalk and Curb Ramp Improvements - Change Order No. 2
/>,orG!(f'...
,j~' 0
.. r-:. .-L. .
, l' ". J
~*..
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0451; Fax (408) 846-0429
CHANGE ORDER NO.2
To contract for: at}! of Gilroy Curb Ramp Improvement Proiect
City Project No. 09-CDD-165
Contractor:
JJR Construction, Inc.
Contract Date:
5/612010
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This Change Order provides for the following:
Location: Fourth @ Hanna St., Fifth @ Dowdy St., Fifth @ Princevalle St.
Scope of Extra Work added to Contract;
Additional Ramps
Total Additional Work = $57,650.00
Total Cost to City an Add of $57,650.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Olange Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Olange Order, Contractor aclcnowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Olange Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of
effICiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any
right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the
Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $57,650.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Qw
$29,941.00
$20,400.00
$50,341.00
$57,650.00
$78,050.00
$107,991.00
Percentage InItiaJ
68.13% 1!:\
260.68% ~
..T .J.I<.. c.fflS""'VC ri~/.z;,c.
CO~
By: ~./~ .. ~ Date: ~/~~
co
RECOMMENDED BY:
ACCEP'IED BY:
City~ CLc--
City_ *
Proi"" _ A
&-~'i-I()
Date !
tZLJ/lo
I
Date
J.J.R. CONSTRUCTION, INC.
City of Gilroy
Artn: Al Signorotti
Re: Curb Ramp Improvement Project - Project No. 09-CDD-165
Directive Change Order # 2
Per agreed upon price. The cost of additional ramps is as follows:
Location of additional ramps added to contract locations
1) Fourth at Hanna = All four comers added with double ramps at each.
2) Fifth at Dowdy = Two comers added with double ramps at each.
3) Fifth at Princevalle = Three comers added with double ramps at each.
Total Agreed Cost of Added Comers with Double Ramps = $57,650.00
Cost Breakdown for Ramps Above is as follows:
Saw = $1,560.00
Concrete = $10,563.30
Asphalt = $2,315.40
Base-Rock = $2,220.00
Debris = $2,070.00
Demo Crew = $7,506.45
Prep Crew = $5,712.30
Pour Crew = $9,720.06
Asphalt Crew = $3,810;00
Strip and Backfill = $3,480.00
Total Cost Breakdown = $48,957.51 + 15% OH = $7,743.63 + Profit = $948.86
= $57,650.00