JJR Construction - Sidewalk and Curb Ramp Improvements - Change Order No. 2 />,orG!(f'... ,j~' 0 .. r-:. .-L. . , l' ". J ~*.. City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO.2 To contract for: at}! of Gilroy Curb Ramp Improvement Proiect City Project No. 09-CDD-165 Contractor: JJR Construction, Inc. Contract Date: 5/612010 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This Change Order provides for the following: Location: Fourth @ Hanna St., Fifth @ Dowdy St., Fifth @ Princevalle St. Scope of Extra Work added to Contract; Additional Ramps Total Additional Work = $57,650.00 Total Cost to City an Add of $57,650.00 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Olange Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Olange Order, Contractor aclcnowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Olange Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of effICiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $57,650.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Qw $29,941.00 $20,400.00 $50,341.00 $57,650.00 $78,050.00 $107,991.00 Percentage InItiaJ 68.13% 1!:\ 260.68% ~ ..T .J.I<.. c.fflS""'VC ri~/.z;,c. CO~ By: ~./~ .. ~ Date: ~/~~ co RECOMMENDED BY: ACCEP'IED BY: City~ CLc-- City_ * Proi"" _ A &-~'i-I() Date ! tZLJ/lo I Date J.J.R. CONSTRUCTION, INC. City of Gilroy Artn: Al Signorotti Re: Curb Ramp Improvement Project - Project No. 09-CDD-165 Directive Change Order # 2 Per agreed upon price. The cost of additional ramps is as follows: Location of additional ramps added to contract locations 1) Fourth at Hanna = All four comers added with double ramps at each. 2) Fifth at Dowdy = Two comers added with double ramps at each. 3) Fifth at Princevalle = Three comers added with double ramps at each. Total Agreed Cost of Added Comers with Double Ramps = $57,650.00 Cost Breakdown for Ramps Above is as follows: Saw = $1,560.00 Concrete = $10,563.30 Asphalt = $2,315.40 Base-Rock = $2,220.00 Debris = $2,070.00 Demo Crew = $7,506.45 Prep Crew = $5,712.30 Pour Crew = $9,720.06 Asphalt Crew = $3,810;00 Strip and Backfill = $3,480.00 Total Cost Breakdown = $48,957.51 + 15% OH = $7,743.63 + Profit = $948.86 = $57,650.00 1120 NINTH AVE. SAN MATEO, CA. 94402 PH.650-343-6109 FX.650-343-6207