Loading...
JF Pacific Liners - Agreement for Monterey Street Storm Drain Lining ProjectP . I SECTION 00500 AGREEMENT Monterey Street Storm Drain Lining Project, Project No. 05 -CDD -106 THIS AGREEMENT, made this /g day of &,L--IZ) be r- , a, by and between the City of Gilroy , hereinafter called the "City," and JP Pacific Liners, Inc., hereinafter called the "Contractor." WITNESSETH: WHEREAS, the City has caused the Contract Documents to be prepared comprised of bidding and contract requirements and technical specifications and drawings for the construction of the Monterey Street Storm Drain Lining Project, Project No. 05 -CDD -106, as described therein, and WHEREAS, the Contractor has offered to perform the proposed work in accordance with the terms of the Contract Documents. NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties herein contained and to be performed, the City and Contractor agree as follows: Article 1. Work. Contractor shall complete the Work as specified or indicated in the Contract Documents. Article 2. Contract Time. The Work shall be completed by the Contractor in accordance with the Contract Documents within the time period required by Paragraph 00810 -2.0, Time Allowed for Completion, subject to extension as expressly provided in the Contract Documents. Article 3. Liquidated Damages. THE CITY AND THE CONTRACTOR RECOGNIZE THAT THE CITY WILL SUFFER SUBSTANTIAL DAMAGES AND SIGNIFICANT FINANCIAL LOSS AS A RESULT OF THE CONTRACTOR'S DELAYS IN PERFORMANCE OF THE WORK DESCRIBED Monterey Street Storm Drain Lining Project, Project No. 05 -CDD -106 SECTION 00500 -1 IN THE CONTRACT DOCUMENTS. THE CITY AND THE CONTRACTOR HEREBY ACKNOWLEDGE AND AGREE THAT THE DAMAGES AND FINANCIAL LOSS SUSTAINED AS A RESULT OF ANY SUCH DELAYS IN PERFORMANCE WILL BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN. THEREFORE, THE CITY AND CONTRACTOR HEREBY AGREE THAT IN THE EVENT OF SUCH DELAYS IN PERFORMANCE, THE CITY SHALL BE ENTITLED TO COMPENSATION BY WAY OF LIQUIDATED DAMAGES (AND NOT PENALTY) FOR THE DETRIMENT RESULTING THEREFROM IN ACCORDANCE WITH PARAGRAPH 00700 -6.5, LIQUIDATED DAMAGES, OF THE CONTRACT DOCUMENTS. THE CITY AND THE CONTRACTOR FURTHER AGREE THAT THE AMOUNTS DESIGNATED AS LIQUIDATED DAMAGES ARE A REASONABLE ESTIMATE OF THE CITY'S DAMAGES AND FINANCIAL LOSS IN THE EVENT OF ANY SUCH DELAYS IN PERFORMANCE CONSIDERING ALL OF THE CIRCUMSTANCES EXISTING AS OF THE DATE OF THIS AGREEMENT, INCLUDING THE RELATIONSHIP OF SUCH AMOUNTS TO THE RANGE OF HARM TO THE CITY WHICH REASONABLY COULD BE ANTICIPATED AS OF THE DATE OF THIS AGREEMENT AND THE EXPECTATION THAT PROOF OF ACTUAL DAMAGES WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL. BY INITIALING THIS PARAGRAPH BELOW, THE PARTIES HERETO SIGNIFY THEIR APPROV --. CONSENT TO THE TERr4S OF THIS ARTICLE 3. Citv'Y itia ,s Contractors Initials Akltgle 4,- Contract Price. In consideration of the Contractors performance of the Work in accordance with the Contract Documents, the City shall pay the Contract Price set forth in the Contract Documents. Article 5. Contract Documents. The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of this Agreement (Section 00500 of the Contract Documents) and the following, all of which are hereby incorporated into this Agreement by reference with the same force and effect as if set forth in full. Notice to Prospective Bidders Instructions to Bidders Bid Documents Designation of Subcontractors Bid Guaranty Bond Agreement Monterey Street Storm Drain Lining Project, Project No. 05 -CDD -106 SECTION 00500 -2 Acknowledgements Performance Bond Payment Bond City of Gilroy Specifications General Conditions Supplementary Conditions General Requirements Standard Specifications Technical Specifications Drawings Addenda, if any Executed Change Orders, if any Notice of Award Notice to Proceed Article 6. Miscellaneous. Capitalized terms used in this Agreement which are defined in Section 01090, References, of the Contract Documents will have the meanings set forth in Section 01090, References. Contractor shall not assign any rights, obligations, duties or responsibilities under or interest in the Contract Documents without the prior written consent of the City, which consent may be withheld by the City in its sole discretion. No assignment by the Contractor of any rights, obligations, duties or responsibilities under or interests in the Contract Documents will be binding on the City without the prior written consent of the City (which consent may be withheld in City's sole discretion); and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, executed by the City, no assignment will release or discharge the assignor from any liability, duty, obligation, or responsibility under the Contract Documents. Subject to the foregoing, the Contract Documents shall be binding upon and shall inure to the benefit of the parties hereto and their respective successors and assigns. Nothing contained in the Contract Documents shall in any way constitute a personal obligation of or impose any personal liability on any employees, officers, directors, agents or representatives of the City or its successor and assigns. In accordance with California Business and Professions Code Section 7030, the Contractor is required by law to be licensed and regulated by the Contractors' State License Board which has jurisdiction to investigate complaints against Contractors if a complaint regarding a patent act or omission is filed within four years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within 10 years of the date of Monterey Street Storm Drain Lining Project, Project No. 05 -CDD -106 SECTION 00500 -3 i the alleged violation. Any questions concerning the Contractor may be referred to the Registrar, Contractors' State License Board, P.O. Box 26000, Sacramento, California 95826. lj � IN WITNESS WBEREOF, this agreement has been executed on this If day of &A-a w", , 2-0c Y JF Pacific Liners, Inc. Name of Contractor d, OV4 qmm POOP of • • Kenneth C. Detrick Vice President Title of Signator ATTEST: 77� Signature Donna Fox, Secretary Title of Signator Approved as to form: City Attorney Signature of Title of Signator ATT�ST: i Signature Title of ignator ** *END OF SECTION * ** Monterey Street Storm Drain Leung Project, Project No. 05 -CDD -106 SECTION 00500 -4 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 1 To contract for: Monterey Street Storm Drain Lining Project Project No. 05 -CDD -106 Contractor: JF Pacific Liners Contract Date: 10/18/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work One third the cost of material for 30" liner $2,533.90 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Cost I (We) agree to make the above change Original Contract Price $54,835.00 subject to the terms of this Change Order Previous Change Orders to Date $0.00 for the NET INCREASE of $2,533.90 Total to Date $54,835.00 This Change Order $2,533.90 Total Change Orders to Date $2,533.90 Revised Contract Price $57,368.90 Contra r *Requires emergency authorization if greater than 25 %. By: te: ,&OXIOW— ill P�t3/i�c tr Percentage 0% 5%-,,,,,/4 14 -1 z -°s- Project Engineer Date City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 2 To contract for : Monterey Street Storm Drain Lining Project Project No. 05 -CDD -106 Contractor: JF Pacific Liners Contract Date: 10/18/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work (Balancing Chan eg Order) Additional 10.5 ft. storm drain lining One less lateral reconnection (from 6 to 5) $904.49 - $200.00 $704.49 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Cost Percentage I (We) agree to make the above change Original Contract Price $54,835.00 subject to the terms of this Change Order Previous Change Orders to Date $2,533.90 5% for the NET INCREASE of $704.49 Total to Date $57,368.90 This Change Order $704.49 Total Change Orders to Date $3,238.39 6% Revised Contract Price $58,073.39 Contractor *Requires emergency authorization if greater than 25 %. Date: S� S RECOMMENDF ACCEPTED BY Project Engineer Date