Wattis Construction - Traffic Signal Modification at Church & Tenth Streets - Change Order No. 2
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO.2
Contractor:
Contract Date:
To contract for: Traffic Signal Modification at Church and Tenth Street, Project No 09-CDD-159
6/25/2008
Wattis Construction
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
COR #3 - Pothole Utilities not shown on plans on 8-15-08 (EWO dated 8-27-08)
COR #3A - Corrected foreman's wage rate for pothole utilities extrawork on 8-15-08
(EWO dated 9-29-08)
COR #5 - Per designer, change opticom's Emergency Vehicle Preemption (EVP)
detector from Model 722 to 721
COR #6 - Ped Push Button and Ped Signal - Manufacturer change from Novax to
Polara Navigator
COR #7 - Replace 2 inch conduit with 3 inch conduit from PGE splice box to signal
controller.
EWO - Move Existing Traffic Signal Box at locations G & E (11-12-08) and A (11-
13-08)
TOTAL
$1,999.02
$622.52
$1,557.79
$4,518.90
$6,340.28
$8,252.34
$23,290.85
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained
herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses
associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit,
delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the
Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after
completion of the Contract associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $23,290.85
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
~
CONTRACTOR
~:MfCHAEl LAND
Date: J .- r;j~cJ'I
RECOMMENDED BY:
ACCEPTED BY:
1-11-- eli
Date
P.M.
Cost Percentage Initial
$457,590.90 60
$8,990.00 1.96%
$466,580.90
$23,290.85 W
$32,280.85 7.05%
$489,871.75
RECEIVED
JAN 0 8 2009
WATTIS CONSTRUCTION CO. INC.
==<=
- -
<t co r-
- -' 0::
o
C.
w
0::
!::2
:r:
l-
..J
Cot
l-
o
l-
~' ~
~- ~
"
r-
Z
W
:2
>-
<(
a..
(IJ
(IJ
W
0:::
G
o
0:::
a..
0:::
o
u..
o
W
r-
a..
W
o
o
<(
r-
(IJ
o
o
:,::
0:::
o
S
o
Z
<(
.-J
:'f
a::
W
r-
<(
:2
~
z
W
:2
e::
::J
o
W
z
o
a..
::J
:,::
a::
<(
\:2
cl'
III
'\
\ '
<J
'0'<
(T")
(T")
0:::
o
CD
<(
.-J
Z
o
a..
::J
:,::
a::
<(
:2
~
~
@
.:::d
CO
~
\'r':::
>:0:)
~
"'"
:,::
0:::
o
S:
o
Z
<(
(IJ
.-J
:'f
a::
W
r-
<(
:2
r--
Z
W
:2
e::
::J
o
W
u..
o
r-
(IJ
o
o
.-J
<(
r-
o
r-
(IJ
r-
(IJ
:J
<(
U
W r-
a.. (IJ
(IJ 0
>- 0
CD r-
::::Cz
O:::::J
Or-
SZ
::J
I ,
1-0
ZZ
w
2
CL
:J
1-0
zW
UJo
~w ~
0.. I- "-
5 Z ~l\
awz
~ ~ ~ ,J
o .....l e:: l~
I-<{a::r]
(0 rY g ,J
o u.. W \'.
() W 0 "-
I- ~
<{ n
2 JI
~,
" \)
!~
!~
a..
So
oz
W
't5
ctl
'-
-
c:
o
()
o
Z
W
G W
~ (IJ
== Ul Z
OOW
0::: Z a..
::JWX
(IJ r- W
0::: ~ uJjO:::
O(J)>Ul
OJ OJ <( :r:
<( ::J a:: r-
.-J(J)r-O
o
1
~
0:::
o
CD
<{
.....l
oN
~
"-
\~
w~
1
fl'.
-Q.
I
0:::
o
CD
<(
.-J
u..
o
r-
(IJ
o
o
.-J
~
o
r-
010
z z
\j
II
~
~~
~ -0 ,
<1l 0
~~ z
~ c. ~
'~ i= <1l
\ o.c
rY..,'I, 0 (j)
\./t{,) ~ .:::z::. .
. ~ '- 0
o 0 " z
$$cit
. 'I >- Z 0
<1l <1l_
.............-.00..
252525-S5~
@)!@)
(IJ
0:::
::J
o
==
<t
...J
~
~II~
OJ
::J
(lJ1I ~l~
>-
.-Jw
O:::r-
::J<(
00:::
==
'~~I
Wr-
Oz
Z::J
Wo
II r- :2
Q<(
~113
'DNI'O~ NOll~n~lSNOD SlllVM
600Z 8 0 Nvr
O-e
(.') 0
0..
t: (J)
.2 a:
... v'
u;::
- 0
Es
~ OJ
C I-
o X
UW
t.n >.
:: 'm
1i1o
$
:'
U
!::
o
Z
o
:.:J
co
C')
C'\I
OJ
i'-
~
<t
I-
a
I-
I-
a:::
a
a.
w
0::
S!2
:I:
I-
..J
.:;:j- f!
'ti'0
~~
Cl; 5-:<:
~
I-
2
W
:2
>-
<(
e..
V)
V)
W
Cl::
CJ
o
Cl::
e..
0::
o
u..
o
W
l-
e..
W
o
o
<(
~
n::
o
S
o
z
<(
U)
...J
I
l-
V)
o
o
~
Cl::
o
S
o
2
<(
-'
::;;
0::
W
I-
<(
:2
1--
2
W
:2
e..
:3
a
w
2 2
o 0
e.. e..
::) ::)
~ ~
Cl:: Cl::
<( <(
:2 :2
~ ~
(") '\
\~
0::
o
cr:l
:s
- -
<: CO
- -
1,\
~
'"
~
}'-l"-
~
<rm
~
Cl::
o
S
o
2
<(
V)
-'
::;;
0::
W
I-
<(
:2
1--
2
W
:2
9::
::)
a
w
u..
o
l-
V)
o
o
-'
~
o
I-
-l
!~
d
!~
'-"-
,-
rJ'
~
~\I
^
''.J
"':;)
.....
~'
~i
~
/.
)\)
'\
-..
'I,,)
\j
-
\~
w
CJ
0::
<(
:r: w
o 0
0:: 2
::) W
V) I-
0:: ~ 0::
o V) ~
c:o fD ..l;.
<( ::)
-' V)
0::
o
o:J
<(
-l
u..
o
l-
V)
o
o
~
o
I-
010
2 2
@)!@)
~IW-
,
I
V)
I-
(f)
:::i
::;;
o
LU l-
e.. V)
V) 0
>- 0
!Ill-
V -
...... 2
0::::::)
011-
Sz
I ::)
f-jO
Z2
W
~
CL
~
1-0
zW
UJO
~W
9::f-
::lZ
Ow j-
w 0:::: 2 -.i
Li. I Q V
o -l b: \.-
I- <:( 0:: \.
Cf) - o~"
OO:::f:C
UWo
f-
<:(
~
I
-'
<(
I-
~ll,~
o:J
::)
(f)
II
I I I I
I
!
LL
I
I
>-
-'w
0::1-
::)<(
00::
:r:
o
Z
-
(.)
t1l
'-
c:
--
o
o c:
I- ..0
C:.;:;
<l.lL;Oo.
.~ Q.):;:'~
o c: t1l (.)
> 3: (.) (J)
EO.sc3
e..
50
02
W
0::::
o
CO
<:(
-l
V)
0::
::)
o
:c
I
~~
\S~..
~J IJ) c:i
\i'> Q) Z
~~*
I o.c::
\A' 0 (f).
.lo:: "
.lo::, c:i
QO..Z
SSO-e
"I >, Z 0
<!) <!)-
<<i <<i 'm -g 21
OOO-:>~
600l 80 NVf
laB~
WI-
02
2::)
Wo
1-:2
@<(
'DNI'O:) NOllonH1SNOO S/l1\fM
o t
U 0
0.
t: <D
00:::
+: v
t..'l -.::
::;j 0
';$
tIl
t: ~
o X
UW
IIJ >.
;;: 'm
ceO
~
t..'l
l::
o
Z
,!:2
-1
CD
C')
C'\J
CO
l'--
"'"""
<~-~'J-9/10/2008 15: 41
4089294905
SIGNAL ELECTRIC
PAGE 01/01
SAN JOSE SIGNAL ELECTRIC CONSTRUCTION, INC.
P.O. BOX 611525 SAN JOSE CA 951S1-1525
PH. 408 929-4900 FAX 408 929-4905
CHARGE TO; WATTIS CONSTRUCTION
PROJECT: TRAFFIC SIGNAL MODIFICATION
AT CHURCH STREET & TENTH STREET
DESCRIPTION OF WORK: Pot hole location A & G for utility (gas)
in way of future traffic pole foundatIon.
I
DATE: 08115{08
JOS #; 282(;
CHANGE NOTICE NO.:
SUB-TOTAL WAGES
MARK-UP 11%
SUB-TorAL WAGrES
MARK.UP 33%
i-41
T.51
sua.TOTAL
$ 819.10
$ 90.10
$ 909.20
$ 300.04
$1,209.24
:d
T-47
C-~
SU8.TOTAI.EQUIPMENT
MARI<.UP 1E,00%
MATERIALS
SALES TAX
SU!;l-TOTAL MATERIALS
MARK-UP 1~,OO%
$
$
$
$
SUB.TOTAL $
TOTAL THIS REPORT
'i1,50
0.95
12.45
1,87
14.32
$ 14.32
$ 2,496.71
F95f5 !*' Q 'U E [)
RESIDENT ENGINEER OR INS ".R" '- g \l
RECEIVED
Jf\N 0 S 2009
W~ TIIS CONSTRUCTION CO. INC.
SE? 1 (! ZOGe
WAiTlS CONST, co. INC.
11/18/2008 14:07 4082989152
11/18/200S 14:82 4BS929496S
WATTIS CONST CO INC
SIGNAL aECTRIC
PAGE 02/02
PAGE ell/Ell
SIGNAL ELECTRIC CONSTRUCTION INC
408 9.2'"",,900 X-23 FAX 92,..4905
FAX TRANSMITTAL
R.F.C.
DATE: 11-18-08
fROM: BRIAN GREENe X23
NO/PAGES ~ 1-
Project: IOttll Church St
_Improvements
Job #: 2826 RFC # 1 Push buttons I
721 detectors vs. 722 REvrSED
TO: Wattis Construction
AnN: Hal ~
FAX: 298-9152
Dear Hal,
We are pleasr:::d to Stlb:mit price to add changes for COR 5,6, Price mcludes al.11abor and mateti.al
required to complc:te work. I have included back up from supplier and ou:t breakdown. for your
r.eview.
Tlte crdiJ. for rife NOVlaJrwm TtlCtilt1 buttoll$ ihcllUles pttt/ head motIllle, both 8JfJ. 9
""d 12. lie pric~ fi1r PolrutllVlI.viglltt1r aJ.Jo incltllles ~d IfNJdllk. '1M ere. brtlow will U}J1Jrade
tJll Cf11'11PO"enll "~quired ftJr Quihle JMd ~stfl1lf./"""" Nux(lX to Polflf"fL
Chang~ push buttons from Novax to PoJara
$ 4,1 ottO?
Change optieoxns detectors from 722 to 721
Total. change
$ 1.,416.17
S 5,524.26
REC,EIVED
NOV 1 8 2008
WATIIS CONST. CO. ING.
Than~
Brian Greene
RECEIVED
JAN 0 8 2009
WATT/S CONSTRUCTION co. INC.
11/05/2008 14:35
4082989152
WATTIS CONST CO INC
PAGE 04/05
SIGNAL ELECTRIC CONSTRUCTION, INe..
P.O. BOX 611525 $AN JOSE CA 95111-1525
PH.401129-4900: FAX 4G8 829-4905
CI-IA~Oe Tl Wat6fil Constructfon
PROJeCT; Traffic Signal mocllflcden 10th St! ChLlf'<Oh
iYPE OF BILLING: "STIMAT'E6
DE-SCRIP110N OF WORK:
Change pQ9h l1utton ty~ (Novax CD Pol:ara)
DATE:
PROJECT NO,; 281.
CONTI=lACT NO.:
CHANGE NOTICE NO_~
~
~:! ;-i';"''''~''''''''''r'!l;''',. "-~il: I' '
h,i\;' "}~)i,f" ,~!;,'t~,: 'i"~i' , ~~;:"'fW~"~;;" :W: ';~~~~\"!.' ~I~:t,. ,:~:,;:;,. !~
G.F. Electrl~lan .At.DO
f. EJectncian 75.39 0.00
IJnmn. Eledric.':ian 17.95 0.00
GrouMlmen ~. , 3,57 0.00
Labomr D.83 O.Ou
0.00
$UJ.TtlT"~ WP,GP.$ 0.00
MAAI<oUI=l 11% Q,OO
SU~TOTAL WAGts 0.00
MARI<-UF' 93"" 0.00
SlJB-TOTAL .00 so. 00
'''''~'''''''''l.'~ ''''';:''1,(1 r"""~"]~"t' ~ . I ,.: F;:~'~i.~'I.~'l)!,Q:W~
".: ':} .,r:;::~_\ ,I .'t ':.'';:"' ,''':'f". . .' .~..I.: :.~' ,,~oI~~:b II '. ../. .:~~ I .1 1I!1fW,; . . ,.. /~Cr.
Truck: 25.18 0.00
D....rn/1 Tn.J~ 42..E3 0.00
ICompreuor 27.89 0.00
BObCat with Trailer 42.30 0.00
Ladder TI'tlCk 54,41 0.00
Boom Truck a:uO 0,00
SU6- TOTJI,~ ~UJPMENT
~u" t$,ClI'lf,
!lU1:I-TOTAL $0.00
:,;. ~; ~.~ :;:', ".~~~ .':'.';'~, r""'(;;:.i';~'~~""""~~"1:~],"'lfj~l"!':1J W1,I:~,.~,~~1~~/f', ":':.~ ,l',;.t
. '~I "~.~:~~"'.'. . . '~':""';.:'~':":':'~~I'~""_ I~::::'.' . '~,~t~J ,I'
NoValC Il) T.. buttcr'u!! 8 <3.0400,> <3.400,>
POlllFa Navigator buttons 8 6 700.00 6,700A
0.00
0,00
0.00
0.00
MA'T&:~IA~S 3 300.00
SALES TAX IUS% 272.25-
eua:roT1l1. Mi\-mRIALS 3.57~.25
MAAI(,.l1I" ,&.~ 631ii.64-
SUI).TOTAt $4,108:09 $4,100.09
TOTAL THIS REPORT $4,108.09
CONTRACToR REPRESENTAll~
lVI' ~j~~\
( jf Lj ~ f'~fr:;}i~f. \)
ReSIOErn- ENGINEER ~ECTQR.~" ... 'l\\\J?>
~ r:\j G ~ -
~ ~\j ~C
l;\~1-CO.~ .
RECEIVED \N~\i\SCO
.IAN 0 8 2009
WATTIS CONSTRUCTION CO. INC.
11/05/2008 14:35 4082989152
11/e6/20~B 13:42 4a8929498S
WATTIS CONST CO INC
SIGNAL ELECTRIC
PAGE 05/05
PAGEB2/64
SIGNAL ELECTRIC CONSTRUCTION, INC.
P.O, BOX 61152!i SANJOSEi CA H18M525
PH. _ 129-4900 FAX 408 921904905
CHARGE TC Wo1ttJs COr1l!ltnletion
PROJECT: Traffio Si~gl modification 1Qh Stl Churen
'iVPe OF BilliNG: "ESTIMATE"
D5SCRIPTlON OF WORK:
Rl!place 2.722 det8ctof'ft Wi~ 4 - 72t, add 81ssoeJlted wlrt!! and I:.bor
required.
DATE:
PROJeCT NO.: 2814
CONTRACT NO.:
CHANGf:: NOTICE NO RFC,. 1
SlUB-TOTAL W.&nll~
MARK-UP 11~
ISl./I;l.TOT;,1. WAGES
MARK.UP llII'lI.
M': ~":;'I;.,):,",u.u~':::;;~~,
4.00
51JB.. TOTAl.IlClUI~t.!eNt
I<lARK-1JP 1~.1JM.
..1.(~..tli.~,~'); '\1,'I!,!I~." .~:: ~r;.~ri1:i,~:"~::~>
MATERFAL&
SAlU'tAX .H$%
$U$- TOTAL MA"~IAl,S
!>!ARIe-UP lUfl'lI,
CONTRAC~RREPRESENTA~VE
=5U'H'lTlIll.
TOTAL THIS REPORT
IrJju ~ J'1 f,:,~
(~'1f . 1~5::r7'-1 /.;
RESIDENT ENGINE;ER OR ~Er;::TOR. . ._",_""",,,,'''''
RECEIVED
J/l,N () g 2009
WATItS CONSTRUCTION CO. INC.
RECEiVED
NOV 0 6 200B
WArnS CONST. co. INC.
12/10/2008 10:15 4082989152
12/10/20ae a9:54 4aS929490S
WATTIS CONST CO INC
SIGNAL ELECTRIC
PAGE 03(03
PAGE 82/0'2
SIGNAL ELECTRIC CONSTRUCTION, INe..
P,O. BOX 61'152& SAt-! JOSE CA 9118H525
PH. 408 929-4900 FAX 408 929....05
DATE: 1211D.108
P~OJECT NO-: 2814
CONTRACT NO.:
CHANGE NOTICe NO RFC # :;
:~:F}:;~;i~~!
24.00
W8- 'l'OfAl WAGE~
M.IlRK-UJ!lI,%
SUB-TO'l'AI. WAG!$
MAIllI(-li' a3%
27.55 33O.flO
04$, 1 1 15.04
30.86 123.44
43.91 351.2S
58.18 0.00
88.82 0.00
,. <~).a.~ .':~'" '~';il., ~ ,"'}I', ';" -:..", .:\~. ~.:., ~Ii'" ::~'f'"
u..:lJ~~~
" ~~: ,::j~;(.'~...; ,I . r;~~~.
~l..IlI-TOT..... EQUI~N"I'
MARK-uP lS.ClO%
M.t,TGPlALS
SI\~eSTAX US'l6
SIJB- "OTAl MAT\'i:RlII.~a
MA~K-UI' 15.00%
510_
4~.Qf.l
S .08
82.81
SUBo. T01A1. $8301.89
TOTAL THJ8 REPORT tJ/'
'0 ()
~
WA-1j'1 ~ W\/~ h ~
CONTRACTOR REPRESEiNT ATIVE
-r-2>-r-ft"'C,..$
RESIDENT ENGINEER OR INSPECTOR
4.89
$! 183.89 r;-:f (p. J 9
~-
$~
hJ LfrJ (if!
REC'EIVED
DEe 1 0 2008
JAN 0 8 2009 .
WATIlS CONST. CO INC
WAnlS CONSTRUCTION co. INC. . .
RECEIVED
~
12/05/2008 09:12
12/05/2B88 G7:51
4082989152
4ElB92949El5
WATTIS CONST CO INC
SIGNAL ELECTRIC
PAGE 02/05
PAGE 03/04
SAN JOSE SIGNAL ELECTRIC CONSTRUCTION~ INC.
P.O. BOX G1~52S SAN JOSE CA 95111.11;28
p.... 408929-4900 FAX 408 829-4905
CHA~GE: TO: WATT'S CONSTRUCTION
PROJECT: TRAFFJC SIGNAL MODIFICATION
AT CHURCH STREET a TENTH STREET
DESCRIPTJON OF WORK: M01t8 exfsting trafflc slgnll bo~ ~
10000lDn "G'; &. "15" per City Inspector (Sb!ve) to mIke room for I1I1!W
traffic pole foun.tioMl.
DATE: 11"2/08
JOB 'AI: 21128
CHANGE NOTICE NO.:
SI./l!I.TOTAL WA=~
M"RK-UP 11'"
SUI!I.TOTAl WA~!S
MMIC-UP ;~..
sue. T01'A~
6.00
a.OD
8.00
8_00
8.00
SW.TQTAL EQUIPMeNT
MARK-UP 1 S.llll'l!.
MAlER/AlS
SALeS TAl(
SUB.TOTAl MAT~FlIALt
MA~.UF 1l0~
III rz..lor
$
~UB- TOTAL $
TOTAL THrs REPORT
-+ Wtm A) .sz IV\4I t ~p
.."....... t\J ~J6 r
$
$ 3,751.07 ."" \. i
,'-' ~. "\ ~d \
~-- 'oJ
.
~ ~I?-~' \1'
RESICENT ENGINEER OR INSPECTOR
RECEIVED
JAN 0 8 2009
WATIIS CONSTRUCTION co. INC.
AEce\VED
OEe (\ s 20G8
WA.1l1S CONST. CO. INC.
12/05/2008 09:12 4082989152
22/05/2008 07:51 4089294905
WATTIS CONST CO INC
SIGNAL ELECTRIC
PAGE 04/05
PAGE 61/04
SAN JOSE SIGNAL ELECTRIC CONSTRUCTION, INC.
P.O. BO~ 61152S SAN JOSE CA 95111.1525
PH. 40A g~'..4lQlt FAX 408 929-4905
OHARGE TO; WArns CONSTRUCTION
PROJECT: TRAFFIC SIGNAL MODIFICATION
A.T CHURCH STR~l!T & TENTH STR~ET
DESCRIPTION OF WORK: MoY\! emtlng traffic sign..' bolC at
I008tion "A1tl'Clr C!\, In!lpecotor {Steve} to mak8 room f'>f' nN
traffic pole foundation.
DATE: 11/UIDS
JOB tt. 2&:a1
CHANGe: NOTICE NO,;
$l,l",.TgT/l.~ WAGES
MIIi:ll(olJP 11 %
$lIe.T01Al WA<JE5
MJlRl(oIJP 83..
T48
MAtEi~A~S
9.AU;:STAX
$UI!I-TOTAL MAn;Ill,^~S
~~uP 1~OO%
$
SUB-TOTAL $
TOTAL THIS R~PORT
III "lor
$
$ a 751.07. _..... .~
:5 75' II
+ VJAn'1s ~ MAil-V ~.' . ;
1,,,,01,) -~OTtrt- .d:\S ~~
P'lf '11 8b ./9
Rc610r::NT-ENGINEE~ O~ INSPECfOR
RECEIVED
DEe 0 5 2008
RECEIVED
WAms CONST. co. INC.
JAN 0 8 2009
WATrlS CONSTRUCTION CO. INC.