Loading...
Wattis Construction - Traffic Signal Modification at Church & Tenth Streets - Change Order No. 3 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO.3 To contract for: Traffic Signal Modification at Church and Tenth Street, Project No 09-CDD-159 Contractor: Wattis Construction Contract Date: 6/25/2008 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Increase quantity for Bid Item 55 (Remove & Replace Pavement Along New Gutter Pan) by 312 SF @ $15.75/SF Increase quantity for Bid Item 56 (Asphalt Concrete Pavement Resurfacing) by 2436 SF @ $2.25/SF $4,914.00 $5,481.00 TOTAL $10,395.00 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $10,395.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $457,590.90 $32,280.85 $489,871.75 $10,395.00 $42,675.85 $500,266.75 P.M. Percentage Initial 7.05% ~ 9.33% M WATTIS CONSTRUCTION CO. INe &~o~/cr By. ';/Ai;~~ Date: /-/-77-d f ACCEPTED BY: RECEIVED RECOMMENDED BY: :::i: " VAnlS CONSTRUCTION GO. lNG,