O'Grady Paving, Inc. - 2012 Agreement - Project No. 12-PW-196 - Change Order No. 2(tCitp of Oilrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 2 To contract for: Wren Avenu & Church St Resurfacing City Project No Contractor: O'Grady Construction Contract Date: 12 -PW -196 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This CCO is used to reconcile the quantities of the contract Items to a Lump Sum value as shown. A. Item 8 should show a credit of ($500.00). B. Item 11 should show an addition of $40,402.56. C. Item 12 should show a credit of ($29,495.00). D. Item 13 should show and addition of $19,845.00. E. Item 14 should show an addition of $29,672.16. Final cost of the reconciled items is $59,942.72. Note: The additional costs of Items No's 11, 12, 13, and 14 was the added paving, spread across these Items. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 2. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $59,942.72. vlti By: RECOMMENDED BY: 6>-` .- - Cons ruction Manager ACCEPTED BY: quo 4-75d& City 0 1 Working Days Cost Percentage Initial Original Contract Price $1,144,020.00 Previous Change Orders $24,727.44 2.16% AFIS Total to Date $1,168,747.44 This Change Order $59,942.72 Total Change Orders to Date $84,670.16 7.40 %_f Revised Contract Price $1,228,690.16 Date: Date < < q, l Z J��te � at Date O'GRADY PAVING, INC. License #201696 "12513 Wyandotte Street MOUNTAIN VIEW, CALIFORNIA 94043 (650) 966 -1926 FAX (650) 966 -1946 To City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 -6197 Invoice # 12271 [DATE 11/28/2012 I ORDER NO. 12015 1 "I" Wren Ave. & Church St. Resurf Project No. 12 -PW -196 RETENTION Billing SALESPERSON. DATE SHIPPED SHIPPED VIA F.O.B. POINT TERMS QUANTITY DESCRIPTION Original Contract Amount $1,144,020.00 UNIT PRICE TOTAL Change Order #1 24,727.44 Change Order #2 59,942.72 Revised Contract Amount $1,228,690.16 100% Complete Of Revised Contract Amount $1,228,69 .16 Less Previously Invoiced -$1,105,821.14 Net Amount Due $122,W.02 7LJqf 4&