Top Grade Construction - Agreement for Lions Creek Trail Project - Change Order No. 1 (11-CDD-181 Wren to Farrell)I Citp of Oilrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 1 To contract for: Lions Creek Trail Projects - Wren to Farrell City Project No.: 11 -CDD -181 Contractor: Top Grade Construction Contract Date: 4/11/2011 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work See Attachment 1 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 1. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $61,037.71. By: John qC rlvlza - VP, Estimating RECOMME BY: 4vy ACCEPTED BY: Cost Percentage Initial Original Contract Price $591,493.00 //__ Previous Change Orders $0.00 0.00% 1VJr Total to Date $591,493.00 This Change Order $61,037.71 Total Change Orders to Date $61,037.71 10.32% Revised Contract Price $652,530.71 LO-1 14- Mar -12 ,3-1& -I ConWuction Manager Date City Administrator r Lions Creek Trail Project - Wren to Farrell Attachment 1 2010 Lions Creek Trail Projects - Wren to Farrell - Attachment 1 Item Description Amount Additional Working Days Granted Bid Line Item 1 Added 2 Pedestrian Bridge Load Limit Signs per SCCWD $750 None New Item 2 Added Safety Cutain Walls per City's request $7,300 None 21 3 Additional Collapsible Bollards $2,730 None New Item 4 Added Pedestrian Bridge Utility Support Angles $1,305 None 48 5 Added Drainage Pipe and Inlet due to unforseen Site Conditions (missing DI). $22,593 10 days beyond the December 17, 2011 Contract Finish Date. Revised finish date is now December 31, 2011 New Item 6 Added cost for Additional Trash Receptacles shown on Plans $1,933 None New Item 7 Added Cable Railing Safety Plates at Bridge ends $441 None 29 8 Added Cost for Irrigation Plans revisions per SCCWD $11,855 None 47 9 Added Cost of Decomposed Granite shown on Plans $3,340 None 33 10 Added Private Porperties Fencing per City's request $6,844 5 days beyond the December 31, 2011 revised date of completion. Revised finish date is now January 6, 2012 56 11 TEMPORARY ACTIVE TREATMENT SYSTEM (Item Deleted) ($2,200) None 1 12 PET STATIONS (Additional Items) $2,000 None 8 13 1 CONCRETE BLOCK WALL $2,016 None 22 14 CHAIN LINK FENCE TYPE $132 None 56 TOTAL $ 61,037.71 15 days