Top Grade Construction - Agreement for Lions Creek Trail Project - Change Order No. 1 (11-CDD-182 Kern to Wren)City of Oilrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 1 To contract for: Lions Creek Trail Project # 14 City Project No.: 11-CDMM Contractor: Top Grade Construction Contract Date: 4/11/2011 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Descriotion of Work See Attachment 2 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Cost Percentage Initial ► All Extra Work authorized under this Change Order Original Contract Price $558,247.00 d/a,ll, must be billed separately from the original contract. All Previous Change Orders $0.00 0.00% 101QF bills for work done under this Change Order shall Total to Date $558,247.00 reference this Change Order No. 1. This Change Order $16,468.23 Total Change Orders to Date $16,468.23 2.95% Revised Contract Price $574,715.23 I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $16,468.23. CO By: John A. C ri iza - VP, Estimating RECOMMENDED BY: C�- �YVI Manager ACCEPTED BY: CA*" City Administrator 14- Mar -12 Date 3lS12 D /4//Z to Da � j 1� I Z Date 0 Lions Creek Trail Project - Wren to Kern Attachment 2 Lions Creek Trail Projects - Kern to Wren 2010 Item I Description Amount Additional Working Days Granted Bid Line Item 1 Added Safety Cutain Walls per City's request $7,300.00 None 18 2 Additional Collapsible Bollards $910.00 None 25 3 Additional Coconut Fiber Matting for erosion control per SCCWD $2,642.79 None 15 4 Additional Safety Chain Link Fencing (SW and NW corner of Wren Bridge) per City's request $1,433.50 None 15 5 Added Cost for Additional Trash Receptacles shown on Plans $967.00 None New Item 6 Retaining Wall conflict w/ existing Storm Drain due to unforseen Site Conditions $1,059.30 None 18 7 Added Safety Chain Link Fence on NE corner of Wren Bridge per City's request $940.64 None 23 8 BRIDGE DRAINAGE PIPE (Item reduced) ($3,240.00) None 21 9 TEMPORARY ACTIVE TREATMENT SYSTEM (Item Deleted) ($2,200.00) None 1 10 CLASS 2 AGGREGATE BASE ROCK $5,336.00 None 16 11 CHAIN LINK FENCE TYPE CL4 $675.00 None 23 12 CHAIN LINK FENCE TYPE CL6 $644.00 None 24 TOTAL $16,468.23 Zero