PIA No. 2007-10 - 11th Street Commons Investors
DOCUMENT: 19553401
RECORDING REQUESTED BY:
1111111111111111111111111
City of Gilroy
Fees.
Taxes.
Copies.
AMT PAID
Pages:
18
58.00
58.00
WHEN RECORDED, MAIL TO:
Shawna Freels
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
REGINA ALCOMENDRAS
SANTA CLARA COUNTY RECORDER
Recorded at the request of
Recording Service
RDE ** 006
8/16/2007
11: 22 AM
(SP ACE ABOVE THIS LINE FOR RECORDER'S USE)
Property Improvement Agreement No: 2007-10
Tract 9916 - Eleventh Street Commons
APN: 799-33-045 & 047
11 th Street Commons Investors, Inc.
-1-
6/27/2007
PROPERTY IMPROVEMENT AGREEMENT
RESIDENTIAL
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS:
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM
DRAINS AND OTHER PUBLIC WORKS FACILITIES
Property Improvement Agreement No. 2007-10
This agreement is made and entered into this /fiifJL day of -:JU.~ ,'(}[t;7 by and
between the City of Gilroy, a municipal corporation, herein called the" Ity" and 11 th Street Commons
Investors, Inc., a real property owner, developer or subdivider, herein called the "Developer".
WHEREAS, a final map of subdivision, record of surveyor building permit (Site Clearance)
application has now been submitted to the City for approval and acceptance, covering certain real estate
known as and called:
Tract 9916 - Eleventh Street Commons
WHEREAS, the Developer requires certain utilities and public works facilities in order to service the
property under the minimum standards established by the City and,
WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and
Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of
this agreement and,
WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and
public service facilities after acceptance by City, and for providing the necessary connecting system, general
plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided that Developer
has faithfully and fully complied with all of the terms, covenants, conditions to be performed by Developer
pursuant to this agreement.
NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the intent and
purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between the parties as
follows:
SECTION 1
That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and
the laws of the State of California and the United States of America concerning the subject matter of this
agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length
herein. Said Codes, Ordinances, Resolutions, Rule and Regulations include, but are not limited to, the
following: the Code of the City of Gilroy, the current Zoning Ordinance, and the currently adopted Uniform
Building Code.
-2-
6/27/2007
SECTION 2
The Developer agrees:
a. To perform each and every provision required by the City to be performed by the Developer in each
and every one of said Codes, Ordinances, Resolutions, Rules and other Regulations and to comply
with the foregoing and all applicable laws..
b. To grant to the City without charge, free and clear of encumbrances, any and all easements and
rights of way in and to his said real property necessary for the City in order that its water, electricity,
and/or sewer lines in or to said real property may be extended.
c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from all
suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and expenses
(including without limitation attorneys' fees) incurred by City in connection with (i) any damage
done to any utility, public facility or other material or installation of the City on said real estate
which the Developer or any contractor or subcontractor of the Developer, or any employee of the
foregoing, shall do in grading or working upon said real estate; or (ii) arising or resulting directly or
indirectly from any act or omission of Developer or Developer's contractors, or subcontractors, or
any employee of the foregoing in connection with the work performed by them in connection with
this agreement, including without limitation all claims relating to injury or death of any person or
damage to any property.
d. To construct and improve all public works facilities and other improvements described in this
agreement and the improvement plans on file with the City of Gilroy. All construction and
improvements shall be completed in accordance with all standards established in the Codes,
Ordinances, Resolutions, Rules and Regulations, all applicable laws and this agreement, and in
accordance with the grades, plans, and specifications approved by the City Engineer. Developer
shall furnish two good and sufficient bonds, a Payment Bond on a form provided by the City and
a Faithful Performance Bond, both of which shall be secured from a surety company admitted to
do business in California. Each bond shall set forth a time period for performance by the
contractor of its obligations and the terms and conditions on which the City may obtain the
proceeds of the bond.
The Faithful Performance Bond shall be in an amount not less than one hundred percent (100%)
of the total estimated amount payable for the improvements described in this agreement, and
shall secure payment to City and the Developer of any loss due to the default of the contractor or
its inability or refusal to perform its contract. The performance bond shall by its terms remain in
full force and effect for a period of not less than one year after completion of the improvements
by Developer and acceptance of the improvements by City, to guarantee the repair and
replacement of defective material and faulty workmanship. Upon completion of the
improvements by Developer and acceptance of the improvements by City, Developer may
substitute for the performance bond securing maintenance described above, a separate
maintenance bond issued by an admitted surety in the amount of ten percent (10%) of the total
contract price of the improvements (provided that the amount of said bond shall not be less than
One Thousand Dollars ($1,000) to cover the one-year maintenance period.
-3-
6/27/2007
The Payment Bond shall be in an amount not less than one hundred percent (100%) of the total
estimated amount payable for the improvements described in this agreement. The Payment
Bond shall secure the payment of those persons or entities to whom the Developer may become
legally indebted for labor, materials, tools, equipment or services of any kind used or employed
by the contractor or subcontractor in performing the work, or taxes or amounts to be withheld
thereon~ The Payment Bond shall provide that the surety will pay the following amounts should
the Contractor or a Subcontractor fail to pay the same, plus reasonable attorneys' fees to be fixed
by the court if suit is brought upon the bond: (1) amounts due to any of the persons named in
California Civil Code Section 3181; (2) amounts due under the Unemployment Insurance Code
with respect to work or labor performed for the improvements described in this agreement; and
(3) any amounts required to be deducted, withheld, and paid over to the Employment
Development Department from the wages of employees of the Contractor and Subcontractors
pursuant to Section 13020 of the Unemployment Insurance Code with respect to the work and
labor. The Payment Bond shall, by its terms, inure to the benefit of any of the persons named in
Civil Code Section 3181 so as to give a right of action to those persons or their assigns in any
suit brought upon the bond.
Simultaneously with the submission of its building permit application (Site Clearance), the
Developer shall submit the following for both the surety that furnishes the Payment Bond and
the surety that furnishes the Faithful Performance Bond: (1) a current printout from California
Department ofInsurance's website (www.insurance.ca.gov) showing that the surety is admitted
to do business in the State; or (2) a certificate from the Clerk of the County of Santa Clara that
the surety's certificate of authority has not been surrendered, revoked, canceled, annulled, or
suspended or in the event that it has, that renewed authority has been granted.
e. That upon approval of the final map of the subdivision, the record of surveyor the building permit
covering the real estate to be improved and before any work is done therein, the Developer shall pay
to the City all sums, shown in Section 9 thereof to be due under the terms and provisions of this
agreement.
f. At all times during the term of this agreement and until the improvements constructed by Developer
are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a policy of general
liability and property damage insurance in the minimum amount of One Million Dollars
($1,000,000), combined single limit for both bodily injury and property damage; (b) workers'
compensation insurance as required by law; and (c) broad form "Builder's Risk" property damage
insurance with limits of not less than 100% of the estimated value of the improvements to be
constructed by Developer pursuant to this agreement (Builders Risk Insurance is not required when
only mass grading and roadway-related improvements consisting of no structures are to be
constructed) .
All such policies shall provide that thirty (30) days written notice must be given in advance to City
prior to termination, cancellation or modification. The insurance specified in (a) above shall name
City as an additional insured and the insurance specified in (c) shall name City as a loss payee" and
shall provide that City, although an additional insured or loss payee, may recover for any loss
suffered by reason of the acts or omissions of Developer or Developer's contractors or
subcontractors or their respective employees. Developer hereby waives, and Developer shall cause
each of its contractors and subcontractors to waive, all rights to recover against City for any loss or
damage arising from a cause covered by the insurance required to be carried pursuant to this
-4-
6/27/2007
agreement or actually carried by Developer in connection with the work described in this agreement,
and will cause each insurer to waive all rights of subrogation against City in connection therewith.
All policies shall be written on an occurrence basis and not on a claims made basis and shall be
issued by insurance companies acceptable to City. Prior to commencing any work pursuant this
agreement, Developer shall deliver to City the insurance company's certificate evidencing the
required coverage, or if required by City a copy of the policies obtained.
SECTION 3
That except as otherwise expressly provided in this Agreement, all sums shown herein to be payable
by the Developer to the City are due and payable to the City upon the execution of this agreement.
SECTION 4
That all the provisions of this agreement and all work to be done pursuant to the terms of this
agreement are to be completed to City's satisfaction within one year from and after the date and year
first above written. Developer shall maintain such public works facilities and other improvements
described in this agreement at Developer's sole cost and expense at all times prior to acceptance by City
in a manner which will preclude any hazard to life or health or damage to property.
SECTION 5
That the special provisions concerning the particular real estate referred to above, being attached
hereto, are hereby incorporated herein and expressly made a part of this agreement.
SECTION 6
That the faithful and prompt performance by the Developer of each and every term and condition
contained herein is made an express condition precedent to the duty of the City to perform any act in
connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to
pay any monies due hereunder when due shall release the City from any and all obligations hereunder
and the City, at its election, may enforce the performance of any provision herein, or any right accruing
to the City or may pursue any remedy whatsoever it may have under applicable laws or the Codes,
Ordinances, Resolutions, Rules and Regulations ofthe City, in the event of any such default by
Developer.
SECTION 7
That this agreement, together with the attached stipulations, is an instrument affecting the title or
possession of the real property described in Exhibit A. All the terms, covenants and conditions herein
imposed shall be binding upon and inure to the benefit of City, Developer and the successors in interest
of Developer. Upon the sale or division of the property described in Exhibit A, the terms of this
agreement shall apply separately to each parcel and the Developer of each parcel shall succeed to the
obligations imposed on Developer by this agreement.
-5-
6/27/2007
SECTION 8
That the following General Stipulations and the attached stipulations shall be completed subject to
the approval of the Community Development Director.
1. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilities.
NOTE: The capping of any well will require inspection by the Santa Clara Valley Water
District.
2. Schedule the construction of improvements along existing public roads so that the work affecting
vehicular traffic is completed with a minimum interruption to traffic.
3. All work within the public right-of-way shall be subject to the approval of the City Engineer.
4. Before construction utilizing combustible materials may proceed, an all weather access must be
provided to within 150 feet of the building site; and at least one in service fire hydrant must be
available within 150 feet of each portion of the site wherein this construction is to take place.
Location of the fire hydrants will be determined by the Fire Chief.
5. All construction work shall be coordinated so that the existing residents have access to their
properties.
6. Off-site public improvements shall be installed per the approved Improvement Plans.
7. The Developer shall provide to the City of Gilroy electronic copy of the final map as an
AutoCAD drawing file (DWG format, AutoCAD 2002 maximum).
8. Before issuance of any building permit, all roadway infrastructures shall be in place and covered
with an all weather road subject to the approval of the City Engineer.
9. Any reimbursements due the Developer, unless specified otherwise in writing in this agreement,
will expire ten (10) years after the date of execution of this agreement.
-6-
6/27/2007
SECTION 9
That the attached Development Cost Schedule enumerates all fees and their extensions.
TOTAL AMOUNT DUE CITY
$ 299.416.66
IN WITNESS WHEREOF, City has executed this agreement as of
. . .
APPROVED AS TO FORM:
dp1i~~
'~CITY ATTORNEY
IN WITNESS WHEREOF Owner has executed this agreement as of 7 - ,~.......,
BY:
~
Greg Pinn, Vice President of land Development
11th Street Commons Investors, Inc.
NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation and
the corporate titles of the persons signing for the corporation shall appear above.
-7-
6/27/2007
STATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
I~ IJ. /} /1 \
o'C,lfp I;)''',~efore mel ~/lt.-c ~ /Iii ~ /j/~ J-1~ N;;; ,
personafly appeared (1A~!:h A I I J111 . . It"/ .
personally known to me (oriloved to me on the basIs of satIsfactory eVIdence) to be the person( s)
whose name(s) is/are subsetlbed to the within instrument and acknowledged to me that he/she/they
executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the
instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument.
per GC Sec. 40814; CC Sec. 1181
)~.. :=#~ "I
i_Notary PubIc . CaIfomIa
~ - - - ~~~~~~I
-8-
6/27/2007
STATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
TITLE OF DOCUMENT: Property Improvement Agreement Residential- Agreement for
Extensions of Water Distribution Systems: Improvement of
Streets: Installation of Sewers, Storm Drains and Other Public
Works Facilities
Property Improvement Agreement No. 2007-10
On August 14,2007, before me, Susan R. Johnson, Notary Public, personally appeared Jay Baksa
personally known to me to be the person whose name is subscribed to the within instrument and
acknowledged to me that he executed the same in his authorized capacity, and that by his
signature on the instrument the person or the entity upon behalf of which the person acted,
executed the instrument.
b~~.~
. Signature of No ublic
~~~~~~~ML~~~~~~
fj SUSAN R. JOHNSON
- Commission # 1543104
~ . .. Notary Public. California ~
J Santa Clara County d
~ _ _ ~:o:m,;..Ex~~~~2
WITNESS my hand and official seal.
per GC Sec. 40814; CC Sec. 1181
(Notary Seal)
6(27/2007 8:23 AM
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
COST ESTIMATE
ALL PUBLIC FACILITY, SEWER, WATER & TRAFFIC FEES ARE DEFERED
ENCOMPASS NO
DATE:
NUMBER
PROJECT LOCATION:
PARCEL NUMBER
OWNERJDEVELOPER
MAILING ADDRESS
TELEPHONE NO
PREPARED BY
Account No. Key Code
100-2601-0000-3625 4904
100-2601-0000-3605 4702
420-2600-0000-3660 4501
432-2600-0000-3660 3301
433-2600-0000-3660 4905
435-2600-0000-3660 4509
436-2600-0000-3660 4510
440-2600-000O-3660 4515
720-0433-0000-3620 2202
801-2601-PVI.1JO-3899 4703
801-2601-PWDQ-3899 4703
Payment Bond
Performance Bond
COST SCHEDULE
Fees Last Revised July 1, 2006
,
Revised:
Revision Number:
Revision By:
E1
13.Jun..o7
9916
11th street Commons. Monterey Road (no physical address)
799-33-045, 799-33-047
Plnn Brothers Fine Homes
(408) 252-9131
Lisa Moreno
Fee: Credits: Amount Due: Account Description: Paid on Invoice #
$4,513.60 $0.00 $4,513.60 Special Public VVorks Serv
$280,310.00 $0.00 $280,310.00 Engring Plan Check & Insp
$10,74290 $0.00 $10,742.90 Storm Development Fee
$32880 $0.00 $328.80 Str Tree Development Fee
DEFERED TO
$1,103,99600 $0.00 BUILDING PERMIT Traffic Impact Fee
DEFERED TO
$2,181,832.00 $0.00 BUILDING PERMIT Sewer Development Fee
DEFERED TO
$470,240.80 $0.00 BUILDING PERMIT Water Development Fee
DEFERED TO
$1,738,872.00 $0.00 BUILDING PERMIT Public Facility Impact Fee
$3,521.36 $0.00 $3,521.36 Cons! Water Use Fee
$0. 00 $0.00 $0.00 Reimbursements
$0.00 $0.00 $0.00 other Reimbursements
Total $299,416.66
$3,428,875
$3,428,875
(1)
G:lCOMDEVlENGIFEESIProject Cost ScheduleslTract 9916 - 11th Street Commons
6/2712007 8:23 AM
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
COST ESTIMATE
ALL PUBLIC FACILITY, SEWER, WATER & TRAFFIC FEES ARE DEFERED
ENCOMPASS NO
DATE:
NUMBER:
PROJECT LOCATION
PARCEL NUMBER:
OVltNERIDEVELOPER:
MAILING ADDRESS
TELEPHONE NO:
PREPARED BY
E1 I
13.Jun-2007
9916
11th Street Commons - Monterey Road (no physical address)
799-33-045, 799-33-047
Plnn Brothers Fine Homes
(408) 252-9131
Lisa Moreno
FINAL ENGINEERING
COST SCHEDULE TYPE: COST ESTIMATE? Y PLAN CHECK? N INCENTIVE AGREEMENT FEES ONLY? N
IDEFER PUBLIC FACILITY FEE? TO PERMIT? Y TO FINAL? N
DEFER SEV'vER, WATER, TRAFFIC FEES? TO PERMIT? Y TO FINAL? N
NOTE: This Preliminary Cost Schedule is an estimate and will be adjusted to the rates in effect at the time permits are issued.
Site Information: Gross Acres: Lots: Units: Sq Ft:
Residential-Low ? 0.000 0 0
Residential-High? 3.725 13 94
Commercial-Low? 3.725 4 18,000
Commercial-High? 0.000 0 0
Industrial-General ? 0.000 0 0
Industrial-Warehouse ? 0000 0 0
Assembly Hall? 0.000 0 0
Common Area? 0.000 0
Commercialflndustrial Allocations: Sewer GPD: Water GPD:
40,100 40,100
Reimbursements and credits:
N Country Estates Water System? N Southeast Quadrant Hydrology Study? N Obata Industrial Park Credtt?
Front Footage/Square Footage Charges and Construction Water:
street Tree FF:
822.0
Water FF:
0.0
Sewer FF:
0.0
Sidewalk SF:
0.0
Storm FF:
0.0
CurblGutter FF:
0.0
Const Water Acres to be Developed:
7.450
Construction Water FF:
822.0
Pavement SF:
0.0
Median SF:
0.0
SPECIAL PUBLIC WORKS SERVICES
100-2601-0000-3625
$4,513.60
Maps:
Final Map
$2,285.00 +
$15.00 I lot
Y
$2,54000 Fee ID NO-FINALM
Parcel Map
$2,485.00 +
$15.00 I lot
N
$000 Fee ID NO-PARCELM
Re-assessment Map (Assessment District Parcels)
$270.00 +
$30.00 I lot
N
$0.00 Fee ID N-ASSESM
Administration Fees:
Southeast Quadrant Hydrology Study
(Not Included)
N
$0.00 Fee ID N-SD-OUADA
Scanning Fee (For Improvement Plans, muttiply # of sheets by 2 - scanning to be done at the beginning and end of the project)
~ # of Sheets for Map and $8.00 I sheet Y $240.00 Fee ID NO-SCAN
Improvement Plans
COST SCHEDULE (2)
Fees Last Revised July 1, 2006
G:\COMDEV\ENGIFEES\Project Cost Schedules\Tract 9916 - 11th Street Commons
6f2712oo7 823 AM
Miscellaneous Engineering Services:
(Cost Schedules, Agreements, RNI/ Reviews and other Misc. Services)
-1Q. hr Misc Services $173.36 / hr.
ENGRING PLAN CHECK & INSPECTION
(Based on total cost of public right-<>f-way improvements)
----2.. hr Site grading and
reinspection charges
Estimated Cost of Public Improvements
12% $0
10%
$100,000
8%
over
Payment Bond Amount for Offsite Improvements
Performance Bond Amount for Offsite Improvements
IMPACT FEES
Storm Drain Impact Fee
a.Residential-Low
b.Residential-High
c. Commercial
d.lndustrial
eAssembly Hall
Obata Industrial Park Credits
Obata Fee Credit
Street Tree Fee
a.City Planting and Replacement
$3.00 / U x
b.lnspection and Replacement
$040 / U x
Traffic Impact Fee
a.Residential-Low
b.Residential-High
c.Commercial-Low Traffic
(< 10.75 trips/1000 sf)
d.Commercial-High Traffic
(>= 10.75 trips/1000 sf)
e.lndustrial-General
f Industrial-Warehouse
COST SCHEDULE
Fees Last Revised July 1, 2006
y
$1,733.60
Fee ID N-MISC
100-2601-0000-3605 COST ESTIMATE $280,310.00
FINAL ENGINEERING PLAN CHECK $0. 00
$173.36 / hr Y $0.00 Fee ID NO-GRADINS
COST FINAL ENGINEERING
ESTIMATE PLAN CHECK DIFFERENCE ($280,310.00)
$3,428,875 $0 Fee ID NO-PCKINSP
$100,000 Y $12,000.00 Y $0.00
$200,000 Y $10,000.00 Y $0.00
$200,000 Y $258,310.00 Y $0.00
$3,428,875
$3,428,875
420-2600-0000-3660 $10,742.90
$674.00 / acre Y $0.00 Fee ID NO-SD-LD
$1,058.00 / acre Y $3,941.05 Fee ID NO-SD-HD
$1,82600 / acre Y $6,801.85 Fee ID NO-SD-C
$1,347.00 / acre Y $0.00 Fee ID NO-SD-I
$67400 / acre Y $0.00 Fee ID NO-SD-AH
(Based on reimbursements due from oversized storm facilities)
$1,17000 / acre Y $0.00 FeeIDN-SD-OBATA
432-2600-0000-3660 $328.80
N
$0.00 Fee ID NO-TREEPL T
0.0 =
Y
822.0 =
$328.80 Fee ID NO- TREEINS
433-2600-0000-3660 DEFERED TO BUILDING PERMIT
$11,487.00 / unit Y $0.00 Fee ID N1-TRAF-LD
$9,311.00 / unit Y $875,234.00 Fee 10 N2-TRAF-HD
$12.70900 / k.s.f. Y $228,762.00 Fee 10 N3-TRAF-CL
$25,671.00 / k.s.f Y $0.00 Fee ION3-TRAF-CH
$5,03700 / k.s.f Y $0.00 Fee 10 N4- TRAF-IG
$3,651.00 / k.s.f Y $0.00 Fee 10 N4-TRAF-1W
(3)
G:\COMDEV\ENGIFEES\Project Cost Schedules\Tract 9916 - 11th street Commons
Sewer Impact Fee
a.Residential-Low
b.Residential-High
c. Com mercialllndustrial
Obala Industrial Park Credits
Obala Fee Credit
Water Impact Fee
a.Residential-Low
b.Residential-High
c. Com mercial/lndustrial
Obala Industrial Park Credits
Obala Fee Credit
Public Facilities Impact Fee
a.Residential-Low
b.Residential-High
c.Commercial
d.lndustrial
Water User Fee (Construction)
6(27/2007 8:23 AM
435-2600-0000-3660
$12,273.00 I unit Y
OEFEREO TO
$0.00 Fee 10 N1-SS-LO
BUILDING PERMIT
$6,64200 I unit
$624,348.00
Y
Fee 10 N2-SS-HO
$3,884 00 I cgpd
$1,557,484.00
Fee 10 N5-SS-C/I
Y
(Based on reimbursements due from oversized sewer facilities)
$531.00 I acre Y $0.00 Fee 10 N-SS-OBATA
436-2600-0000-3660
$4,662.00 I unit Y
OEFEREO TO
$0.00 Fee 10 N1-WATR-LO
BUILDING PERMIT
$1,885.00 I unit
Y
$177,190.00
Fee 10 N2-WATR-HO
$7,30800 I kgpd
Y
$293,050.80
Fee 10 N5-WTR-C11
(Based on reimbursements due from oversized water facilities)
$15400 I acre Y $0.00 Fee 10 N-V'vR-OBATA
440-2600-0000-3660 OEFEREO TO BUILDING PERMIT
$21,142.00 I unit Y $0.00 Fee 10 N 1-PF-LO
$17,910.00 I unit Y $1,683,540.00 Fee 10 N2-PF-HO
$3,074.00 I ks.f. Y $55,332.00 Fee 10 N3-PF-C
$1,365.00 I ks.f. Y $0.00 Fee 10 N4-PF-1
720-0433-0000-3620 Y $3,521.36
$2.76 If.! $2,268.72 Fee 10 NO-CONWTFF
plus
$168.14 I a.c $1,252.64 Fee 10 NO-CONWT AC
FRONT FOOT CHARGES (Used to charge and reimburse fees for existing infrastructure)
Water 801-2601-PWXJ-3899 $0.00
V\later Mains, including fire hydrants, valves and box
(Developer is responsible for up to and induding 12" mains)
Half Pipe Lineal Footaae
6 inch Main $4400 I LFx N 0.0 = $0.00 Fee 10 N-V'vR06-1/2
8 inch Main $4600 I LFx N 0.0 = $0.00 Fee 10 N-V'vR08-1/2
10 inch Main $5300 I LFx N 0.0 = $0.00 Fee 10 N-V'vR1Q-112
12 inch Main $58.00 I LFx N 0.0 = $0.00 Fee 10 N-V'vR12-1/2
14 inch Main $6400 I LFx N 0.0 = $0.00 Fee 10 N-V'vR14-1/2
16 inch Main $70.00 I LFx N 0.0 = $0.00 Fee 10 N-V'vR16-112
18 inch Main $76.00 I LFx N 0.0 = $0.00 Fee 10 N-V'vR16-112
24 inch Main $93.00 I LFx N 0.0 = $0.00 Fee 10 N-V'vR24-1/2
30 inch Main $103.00 I LFx N 0.0 = $0.00 Fee 10 N-V'vR30-1/2
36 inch Main $119.00 I LFx N 0.0 = $0.00 Fee 10 N-V'vR36-112
Country Estates Water System (Not Included) N $0.00 Fee 10 N-V'vR-RESCE
COST SCHEDULE (4)
Fees Last Revised July 1, 2006 G:\COMOEVIENGIFEES\Project Cost Schedules\Tract 9916 - 11th Street Commons
6f2712oo7 8:23 AM
Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure)
Sewer 801-2601-PVIIOO-3899 $0.00
Sewer Mains, including manhole:
(Developer is responsible for up to and including 12" mains)
Half Pipe Lineal Footaae
6 inch Main $82.00 / LFx N 0.0 = $0.00 Fee 10 N-SS06-112
8 inch Main $84.00 / LFx N 0.0 = $0.00 Fee 10 N-SS08-1/2
10 inch Main $91.00 / LFx N 0.0 = $0.00 Fee 10 N-SS10-1/2
12 inch Main $93.00 / LFx N 0.0 = $0.00 Fee 10 N-SS12-112
15 inch Main $98. 00 / LFx N 0.0 = $0.00 Fee 10 N-SS15-112
18 inch Main $105.00 / LFx N 0.0 = $0.00 Fee 10 N-SS18-1/2
21 inch Main $115.00 / LFx N 0.0 = $0.00 Fee 10 N-SS21-112
24 inch Main $119.00 / LFx N 0.0 = $0.00 Fee 10 N-SS24-112
27 inch Main $138.00 / LFx N 0.0 = $0.00 Fee 10 N-SS27-1/2
30 inch Main $162.00 / LFx N 0.0 = $0.00 Fee 10 N-SS3O-1/2
33 inch Main $177.00 / LFx N 0.0 = $0.00 Fee 10 N-SS33-1/2
36 inch Main $201.00 / LFx N 0.0 = $0.00 Fee 10 N-SS36-1/2
39 inch Main $238.00 / LFx N 0.0 = $0.00 Fee 10 N-SS39-1f2
42 inch Main $298.00 / LFx N 0.0 = $0.00 Fee 10 N-SS42-1/2
Street Improvements 801-2601-PVIIOO-3899 $0.00
Pavement Sidewalks & Medians Sauare Footaoe
AClBike path: base $2.48 / SFx N 0.0 = $0.00 Fee 10 N-STR-ACB
AClBike path: pvmt $2.45 / SFx N 0.0 = $0.00 Fee 10 N-STR-ACP
Sidewalk: new $9.50 / SFx N 0.0 = $0.00 Fee 10 N-STR-SNV
Sidewalk replace $12.90 / SFx N 0.0 = $0.00 Fee 10 N-STR-SNvR
Resurfacing $293 / SFx N 0.0 = $0.00 Fee 10 N-STR-RESU
Landscaped Median $20.35 / SFx N 0.0 = $0.00 Fee 10 N-STR-LANM
Hardscaped Median $11.63 / SFx N 0.0 = $0.00 Fee 10 N-STR-HARO
Traffic Sienals (eeuioment onlv) % of Lumo Sum
Traffic Signal-3 leg $128,089.93 / LSx N 0% = $0.00 Fee 10 N-STR-TS3L
Traffic Signal-4 leg $155,987.40 / LSx N 0% = $0.00 Fee 10 N-STR-TS4L
Curb and Gutter Lineal Footaae
CurblGutter: new $25.20 / LFx N 0.0 = $0.00 Fee 10 N-STR-CIG
CurblGutter: replace $32.50 / LFx N 0.0 = $0.00 Fee 10 N-STR-C/GR
Curb Ramps $1,057.63 / LFx N 0.0 = $0.00 Fee 10 N-STR-CR
COST SCHEDULE (5)
Fees Last Revised July 1, 2006 G:\COMDEVlENGIFEES\Project Cost Schedules\Tract 9916 - 11th Street Commons
6f2712007 823 AM
Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure)
Stonn Drain 801-2601-PV'vD0-3899 $0.00
storm Mains, including manholes and catch basins:
(Developer is responsible for up to and including 24" mains)
Half Pipe Lineal Footaae
18 inch Main $71.00 I LFx N 0.0 = $0.00 Fee 10 N-S018-1f2
21 inch Main $77. 00 I LFx N 0.0 = $0.00 Fee 10 N-S021-1f2
24 inch Main $79.00 LFx N 0.0 = $0.00 Fee 10 N-S024-1f2
27 inch Main $93.00 I LF x N 0.0 = $0.00 Fee 10 N-S027-112
30 inch Main $100.00 I LFx N 0.0 = $0.00 Fee 10 N-S030-112
33 inch Main $103.00 I LFx N 0.0 = $0.00 Fee 10 N-S033-112
36 inch Main $106.00 I LFx N 0.0 = $0.00 Fee 10 N-SD36-1f2
42 inch Main $110.00 I LFx N 0.0 = $0.00 Fee 10 N-S042-1f2
48 inch Main $131.00 I LFx N 0.0 = $0.00 Fee 10 N-S048-112
54 inch Main $154.00 I LFx N 0.0 = $0.00 Fee 10 N-S054-1f2
60 inch Main $177 00 I LFx N 0.0 = $0.00 Fee 10 N-SD60-1f2
66 inch Main $201 .00 I LFx N 0.0 = $0.00 Fee 10 N-SD66-1f2
72 inch Main $225.00 I LFx N 0.0 = $0.00 Fee 10 N-S072-1f2
78 inch Main $242.00 I LFx N 0.0 = $0.00 Fee 10 N-SD78-112
84 inch Main $259.00 LFx N 0.0 = $0.00 Fee 10 N-SD84-112
90 inch Main $376.00 I LFx N 0.0 = $0.00 Fee 10 N-S090-112
96 inch Main $294.00 I LFx N 0.0 = $0.00 Fee 10 N-SD96-112
Southeast Quadrant Hydrology study (Not Included) N $000 Fee 10 N-SD-QUAO
NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued
The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated
fees prior to final acceptance. If the recalculated fees are less than the estimate, the CITY of . oy i und the
difference. Site grading and reinspection charges including reinspection of backyard drai ge be II ed at the
Engineering Division hourly rate in effect at the time of inspection.
Print Name:
Accepted by:
cti2ilr5f
Date:
COST SCHEDULE
(6)
Fees Last Revised July 1, 2006
G:lCOMDEVlENGIFEESIProject Cost ScheduleslTract 9916 - 11th Street Commons
OVERSIZING SCHEDULE (Used to reimburse oversized infrastructure)
Total Oversized Water, Sewer and Storm Drain Main Reimbursement
Total Oversized Water Main Reimbursement (Developer is responsible for up to and including 12" mains
Oversized Minimum 12" main Oversized
Full Pipe $!foot Full Pipe $!foot Oversized Footage Reimbursement
14 inch Main $128.00 - $117.00 x 0.0 = $0.00 N
16 inch Main $140.00 - $117.00 x 0.0 = $0.00 N
18 inch Main $152.00 - $117.00 X 0.0 = $0.00 N
20 inch Main $170.00 - $117.00 X 0.0 = $0.00 N
24 inch Main $185.00 - $117.00 X 0.0 = $0.00 N
30 inch Main $205.00 - $117.00 X 0.0 = $0.00 N
36 inch Main $238.00 - $11700 X 0.0 = $0.00 N
Total Oversized Sewer Main Reimbursement (Developer is responsible for up to and including 12" mains
Oversized Minimum 12" main Oversized
Full Pipe $!foot Full Pipe $!foot Oversized Footage Reimbursement
15 inch Main $196.00 - $187.00 X 0.0 = $0.00 N
18 inch Main $210.00 - $187.00 X 0.0 = $0.00 N
21 inch Main $229.00 - $187.00 X 0.0 = $0.00 N
24 inch Main $238.00 - $187.00 X 0.0 = $0.00 N
27 inch Main $274.00 - $187.00 X 0.0 = $0.00 N
30 inch Main $323.00 - $187.00 X 0.0 = $0.00 N
33 inch Main $355.00 - $187.00 X 0.0 = $0.00 N
36 inch Main $401.00 - $187.00 X 0.0 = $0.00 N
39 inch Main $476.00 - $187.00 X 0.0 = $0.00 N
42 inch Main $595.00 - $187.00 X 0.0 = $0.00 N
Total Oversized storm Drain Main Relmbnmt (Developer is responsible for up to and including 24" mains
Oversized Minimum 24" main Oversized
Full Pipe $/foot Full Pipe $!foot Oversized Footage Reimbursement
27 inch Main $185.00 - $158.00 X 0.0 = $0.00 N
6f27/2007 823 AM
$0.00
$11700 /LF)
$0.00
$187.00 /LF)
$0.00
$158.00 /LF)
$0.00
30 inch Main $199.00 - $158.00 X 0.0 = $0.00 N
33 inch Main $205.00 - $158.00 X 0.0 = $0.00 N
36 inch Main $213.00 - $158.00 X 0.0 = $0.00 N
42 inch Main $221.00 - $158.00 X 0.0 = $0.00 N
48 inch Main $262.00 - $158.00 X 0.0 = $0.00 N
54 inch Main $308.00 - $158.00 X 0.0 = $0.00 N
60 inch Main $355.00 - $15800 X 0.0 = $000 N
PIPELINE OVERSIZE REIMBURSEMENT SCHEDULE (1)
Fees Last Revised July 1, 2006 G:\COMDEV\ENGIFEES\Project Cost Schedules\Tract 9916 - 11th Street Commons
6(2712007 823AM
Oversizing Schedule Continued
(Used 10 reimburse oversized infrastructure)
Oversized Storm Drain Main Reimbmnt Continued
Oversized Minimum 24" main Oversized
Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement
66 inch Main $0.00 - $15800 X 0.0 = $0.00 N
72 inch Main $450.00 - $15800 X 0.0 = $0.00 N
78 inch Main $485.00 - $15800 X 0.0 = $000 N
84 inch Main $519.00 - $15800 X 0.0 = $0.00 N
90 inch Main $553.00 - $15800 X 0.0 = $0.00 N
96 inch Main $588.00 - $158.00 X 0.0 = $0.00 N
PIPELINE OVERSIZE REIMBURSEMENT SCHEDULE
(2)
Fees Last Revised July 1, 2006
G:\COMDEVlENGIFEES\Project Cost Schedules\Tract 9916 - 11th Street Commons
~
~
"
;,.
.!\
;.
.'
>>
.,
';.
'"
~.~
':
.,
..
,~~ ~..~
,,'
",:i\'" .~.\
',0 I 'f \"\'''',<-,,\\''. .
r-.~ "
"., 1'.-'
,1.\. J
c,\' ,'"
et":~~,~ :~
.,," t.l . " ..-
,~,.' .- ...,,-. ~
.l.
:,j\~\')" 'S'i~'1
~-',
.
-','
'il
~
''''':.~
.-,
..
,,.,
.,.
. .
'"
.,'
10.
.i~.
~
'r.,
.~.
..
.}
;.~
':.,
Fl ut'J
~
I"
~ .
~ ;,,\
..,\.,.\;,,,1
~;J ;,).J. .
"f
,.~ ~
-.;: ~"
."
I_f'
"
'e.
'.~: ~\
. ,
';"
8...,<"\ L.
PROJECT'3MZ','J'"
~\ .S\TE
-"I
."
:". LOl'd?li lit \,..on:Jon PI
;- Ii ,5 ';huH:hilll'l
-;, ;. :z
",. ..
VA"'..,,,,. W .: E
1.,,1., ,. )1 " ..... ~:
..l . ......
'f'it"r~i.d ,'., i: .
.;..'i'j.
. ~.,.:,~
\',~ f1'
<11 ';.,i
.. .~
~ ~
Ji ~,
.. ';?,
...,
.+
'.:,ttf..till :{
ll. ,
..
...
~
T h,"'1'\' Hri :,'
,.,
~....
'O~
,,~
f~..
"
c""-.
~.
.~
!'.l
ii: .!
... ~
e ..
;;; .."
ul ~t:
E ~_ue,~~o1.'~'~~'
..
_.-..
""
7J
VICINITY SITE MAP
Property Improvement Agreement No. 2007-10
Tract 9916 - Eleventh Street Commons
APN: 799-33-045 & 47
11 th Street Commons Investors, Inc.
I':.., i '1; ....' ~ 1" ")
, !~ .1';
\..
.
~,
c
'"
..
..
?
..
-,
~'."" .
Exhibit A