Loading...
PIA No. 2001-40 - Almeida, Alfonso RECORDING REQUESTED BY: City of Gilroy WHEN RECORDED, MAIL TO: Rhonda Pellin City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Tit \ es. \ / Pages. \ 9 \\\\\\\\ii\i\I\~\\,\ii\i\li\\i~ ;:;0(1161:11:>1,:,':'1:1;:; Fees. Taxes. . . Cop i es. . AMT PAID 61.00 61.00 ROE l:* 006 1 / 17 /2002 803 AM BRENDA DAVIS SANTA CLARA COUNTY RECORDER Recorded at the request of Cont rador (SP ACE ABOVE THIS LINE FOR RECORDER'S USE) Property Improvement Agreement No. 2001-40 AP.N. 841-07-035 Tract No. 9331 Alfonso Almeida 1 PROPERTY IMPROVEMENT AGREEMENT RESIDENTIAL AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS: IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS AND OTHER PUBLIC WORKS FACILITIES No. 2001-40 ,J - ;200 I This agreement is made and entered into this ~ day of D ece ~bt7' ,by and between the City of Gilroy, a municipal corporation, herein called the "City" and Alfonso Almeida. a real property owner, developer or subdivider, herein called the "Developer". WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate known as and called: Tract 8331, APN 841-07-035 and. WHEREAS, the Developer requires certain utilities and public works facilities in order to service the property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided that Developer has faithfully and fully complied with all of the terms, covenants, conditions to be performed by Developer pursuant to this agreement. NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between the parties as follows: SECTION 1 That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California and the United States of America concerning the subject matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances, Resolutions, Rule and Regulations include, but are not limited to, the following: the Code of the City of Gilroy, the current Zoning Ordinance, and the currently adopted Uniform Building Code. 2 SECTION 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances, Resolutions, Rules and other Regulations and to comply with the foregoing and all applicable laws.. b. To grant to the City without charge, free and clear of encumbrances, any and all easements and rights of way in and to his said real property necessary for the City in order that its water, electricity, and/or sewer lines in or to said real property may be extended. c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and expenses (including without limitation attorneys' fees) incurred by City in connection with (i) any damage done to any utility, public facility or other material or installation of the City on said real estate which the Developer or any contractor or subcontractor of the Developer, or any employee of the foregoing, shall do in grading or working upon said real estate; or (ii) arising or resulting directly or indirectly from any act or omission of Developer or Developer's contractors, or subcontractors, or any employee of the foregoing in connection with the work performed by them in connection with this agreement, including without limitation all claims relating to injury or death of any person or damage to any property. d. To construct and improve all public works facilities and other improvements described in this agreement in accordance with all standards established in the Codes, Ordinances, Resolutions, Rules and Regulations, all applicable laws and this agreement, and in accordance with the grades, plans, and specifications approved by the City Engineer. Developer shall furnish two good and sufficient bonds, a Payment Bond on forms provided by the City and a Faithful Performance Bond, both of which shall be secured from a surety company satisfactory to City with a minimum "AVlI" rating with Best's Rating Guide. Each bond shall set forth a time period for performance by the contractor of its obligations and the terms and conditions on which the City may obtain the proceeds of the bond. The Faithful Performance Bond shall be in an amount not less than one hundred percent (100%) of the total estimated amount payable for the improvements described in this agreement, and shall secure payment to City and the Developer of any loss due to the default ofthe contractor or its inability or refusal to perform its contract. The performance bond shall by its terms remain in full force and affect for a period of not less than one year after completion of the improvements by Developer and acceptance of the improvements by City, to guarantee the repair and replacement of defective material and faulty workmanship. Upon completion of the improvements by Developer and acceptance of the improvements by City, Developer, at the City's discretion, may substitute for the performance bond securing maintenance described above, a separate maintenance bond in the amount of 10% of the total contract price of the improvements (provided that the amount of said bond shall not be less than One Thousand Dollars ($1,000) to cover the one-year maintenance period. The Payment Bond shall be in an amount not less than: (1) One hundred percent (100%) of the total estimated amount payable for the improvements described in this agreement when the total estimated amount does not equal or exceed five million dollars ($5,000,000); (2) Fifty percent (50%) ofthe total estimated amount payable for the improvements described in this agreement when the total 3 amount is not less than five million dollars ($5,000,000) and does not exceed ten million dollars ($10,000,000); and (3) Twenty-five percent of the total estimated amount payable for the improvements described in this agreement when the total amount exceeds ten million dollars ($10,000,000). The Payment Bond shall secure the payment ofthose persons or entities to whom the Developer may become legally indebted for labor, materials, tools, equipment or services of any kind used or employed by the contractor or subcontractor in performing the work, or taxes or amounts to be withheld thereon. The Payment Bond shall provide that the Surety or Sureties will pay the following amounts should the Contractor or a Subcontractor fail to pay the same, plus reasonable attorneys' fees to be fixed by the court if suite is brought upon the bond: (1) amounts due to any of the persons named in California Civil Code Section 3181; (2) amounts due under the Unemployment Insurance Code with respect to work or labor performed for the improvements described in this agreement; and (3) any amounts required to be deducted, withhold, and paid over to the Employment Development Department from the wages of employees of the Contractor and Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to the work and labor. The Payment Bond shall, but its terms, insure to the benefit of any of the persons named in Civil Code Section 3181 so as to give a right of action to those persons or their assigns in any suit brought upon the bond. Simultaneously with the submission of its building permit application (Site Clearance), the Developer shall furnish the name, address and telephone number of the surety or sureties that the Developer proposes to furnish the Payment Bond and: (1) the original, or a certified copy, of the unrevoked appointment, power of attorney, bylaws, or other instrument entitling or authorizing the person who executed the bond to do so; (2) a certified copy of the certificate of authority ofthe insurer issued by the Insurance Commissioner; (3) a certificate from the Clerk ofthe County of Santa Clara that the insurer's certificate of authority has not been surrendered, revoked, canceled, annulled, or suspended or, in the event that it has, that renewed authority has been granted; and (4) copies ofthe insurer's most recent annual statement and quarterly statement filed with the Department of Insurance. e. That upon approval of the final map ofthe subdivision, the record of surveyor the building permit covering the real estate to be improved and before any work is done therein, the Developer shall pay to the City all sums, shown in Section 9 thereofto be due under the terms and provisions of this agreement. f At all times during the term of this agreement and until the improvements constructed by Developer are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a policy of general liability and property damage insurance in the minimum amount of One Million Dollars ($1,000,000), combined single limit for both bodily injury and property damage; (b) workers' compensation insurance as required by law; and (c) broad form "Builder's Risk" property damage insurance with limits of not less than 100% of the estimated value of the improvements to be constructed by Developer pursuant to this agreement. All such policies shall provide that thirty (30) days written notice must be given in advance to City prior to termination, cancellation or modification. The insurance specified in (a) above shall name City as an additional insured and the insurance specified in (c) shall name City as a loss payee" and shall provide that City, although an additional insured or loss payee, may recover for any loss suffered by reason of the acts or omissions of Developer or Developer's contractors or subcontractors or their respective employees. Developer hereby waives, and Developer shall cause each of its contractors and subcontractors to waive, all rights to recover against City for any loss or damage arising from a cause covered by the insurance required to be 4 carried pursuant to this agreement or actually carried by Developer in connection with the work described in this agreement, and will cause each insurer to waive all rights of subrogation against City in connection therewith. All policies shall be written on an occurrence basis and not on a claims made basis and shall be issued by insurance companies acceptable to City. Prior to commencing any work pursuant this agreement, Developer shall deliver to City the insurance company's certificate evidencing the required coverage, or if required by City a copy of the policies obtained. SECTION 3 That except as otherwise expressly provided in this Agreement, all sums shown herein to be payable by the Developer to the City are due and payable to the City upon the execution of this agreement. SECTION 4 That all the provisions of this agreement and all work to be done pursuant to the terms of this agreement are to be completed to City's satisfaction within one year from and after the date and year first above written. Developer shall maintain such public works facilities and other improvements described in this agreement at Developer's sole cost and expense at all times prior to acceptance by City in a manner which will preclude any hazard to life or health or damage to property. SECTION 5 That the special provisions concerning the particular real estate referred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. SECTION 6 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under applicable laws or the Codes, Ordinances, Resolutions, Rules and Regulations of the City, in the event of any such default by Developer. SECTION 7 That this agreement, together with the attached stipulations, is an instrument affecting the title or possession of the real property described in Exhibit A. All the terms, covenants and conditions herein imposed shall be binding upon and inure to the benefit of City, Developer and the successors in interest of Developer. Upon the sale or division of the property described in Exhibit A, the terms ofthis agreement shall apply separately to each parcel and the Developer of each parcel shall succeed to the obligations imposed on Developer by this agreement. 5 SECTION 8 That the following General Stipulations and the attached stipulations shall be completed subject to the approval of the Community Development Director. 1. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilities. NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. 2. Schedule the construction of improvements along existing public roads so that the work affecting vehicular traffic is completed with a minimum interruption to traffic. 3. All work within the public right-of-way shall be subject to the approval of the City Engineer. 4. Before construction utilizing combustible materials may proceed, an all weather access must be provided to within 150 feet of the building site; and at least one in service fire hydrant must be available within 500 feet of each portion of the site wherein this construction is to take place. Location of the fire hydrants will be determined by the Fire Chief 5. Construct outfall in accordance with Santa Clara Valley District permit. 6 SECTION 9 That the attached Development Cost Schedule enumerates all fees and their extensions. TOT AL AMOUNT DUE CITY $17.966.14 IN WITNESS WHEREOF, City has executed this agreeme ATTEJT: l-^~jf.di,- I ~~--<-+- v "', Rhonda Pellin CITY CLERK APPROVED AS TO FORM: ~~~~ CITY ATTORNEY IN WITNESS WHEREOF Owner has executed this agreement as of J 1- :z (p -;L 00 ) OWNER ~1~f~-u~ Alfonso Almeida NOTE: If Developer is a corporation, the complete legal name and corporate seal ofthe corporation and the corporate titles of the persons signing for the corporation shall appear above. 7 ST ATE OF CALIFORNIA ) )ss. COUNTY OF SANTA CLARA ) TITLE OF DOCUMENT: Property Improvement Agreement No. 2001-40 AP.N. 841-07-035, Tract No. 9331, Alfonso Almeida On January 11,2002, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person or the entity upon behalf of which the person acted, executed the instrument. WITNES S my hand and official seal. J" )"- ":47/ " J ' \ .-' ............[()I(...z/(tZ!. " {~.~ \ Signature of Notary Public 1------------ .... CoIm~:=15 J Nobuy Public. CaIfomIa t Santa Clara CounlJ - 1IyCamm. E'xpir8I.bI19, 2D05 per GC Sec. 40814; CC Sec. 1181 (Notary Seal) Property Improvement Agreement 2001-40 ST ATE OF CALIFORNIA ) )ss. COUNTY OF SANTA CLARA ) \ On /I-,Jt -0 I, before me, Pt1rIZI~/11 J( J3exJT6cJJ.J, ,va T7f1Z.1.j ;?f} &/e- , personally appeared AI h IV ~ b Ii /l11e'/l~A personally known to me (or proved to me on the basis of satisfactory evidence) to be the person( s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. ~ Sig~re ---------;-1 PArRICIA K. BENTSON ~ eo 0 . eommission:lf 1219111 z ~. Notay Public - Califania ~ :z _,' Santo Claro County 1 i- _",~~,~:~.;~~J~:~ per GC Sec. 40814; CC Sec. 1181 I:\FORMS\AGRMENTS\520 Lewis tr9331.doc 8 (Page Intentionally Left Blank) , ~ J CITY OF GILROY COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION FINAL COST SCHEDULE (ALL PARK, POLICE, FIRE & PUBLIC FACILITY DEVELOPMENT FEES HAVE BEEN DEFER ED TO BUILDING PERMI1) (ALL SEW DATE: 18-Jul,2001 NUMBER: 2001-40 PROJECT LOCATION: TRACT 9331 ROGERS LANE SUBDIVISIONS PARCEL NUMBER: 841-07-035 OWNER/DEVELOPER. ALFONSO ALMEIDA MAILING ADDRESS: 10290 SILVA CIRCLE,GILROY,CA.95020 TELEPHONE NO: 408-848-6033 PREPARED BY: JIM MAESTRI 408-846-0244 Account No. Key Code Fee: Credns: Amount Due. Account Description. 100-2601-0000-3625 4904 $4.519.10 $0.00 $4,519.10 Special Public Works Serv 100-2601-0000-3605 4702 $10,999.65 $0.00 $10,999.65 Engring Plan Check & Insp 410-2600,0000-3660 3302 $57,883.00 $24,807.00 BUILDING PERMIT Park Development Fee 420-2600-0000-3660 4501 $1,319.89 $0.00 $1,319.89 Storm Development Fee 431-2600-0000-3660 5001 $0.00 $0.00 $0.00 Utility Undergrounding Fee 432-2600-0000-3660 3301 $96.60 $0.00 $96.60 Str Tree Development Fee 433-2600-0000,3660 4905 $30,667.00 $13,143.00 BUILDING PERMIT TraffIC Impact Fee 434,2600-0000-3660 4402 $13,783.00 $5,907.00 BUILDING PERMIT Police Development Fee 435-2600-0000-3660 4509 $37.597.00 $16,113.00 BUILDING PERMIT Sewer Development Fee 3 $14,245.00 $6,105.00 BUILDING PERMIT Water Development Fee 437-2600-0000,3660 4511 $1,148.00 $492.00 BUILDING PERMIT Fire Development Fee 438-2600-0000-3660 4512 $7.357.00 $3,153.00 BUILDING PERMIT Public Facilnies Impact Fee 720-0433-0000-3620 2202 $1.030.90 $0.00 $1,030.90 Canst Water Use Fee 801-2601-0000,3899 4703 $0.00 $0.00 $0.00 Reimbursements 801-2601-0000-3899 4703 $0.00 $0.00 $0.00 Other Reimbursements Totals................ $180.646.14 $69.720.00 $17 ,966.14 Bonds and Securnies $188,882 SERVICE CHARGES (1) TRACT 9331 MAP.xls CllY OF GILROY COMMUNllY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION FINAL COST SCHEDULE (ALL PARK. POLICE, FIRE & PUBLIC FACILllY DEVELOPMENT FEES HAVE BEEN DEFER ED TO BUILDING PERMIT) (ALL SEWER, WATER & TRAFFIC DEVELOPMENT FEES HAVE BEEN DEFERED TO BUILDING PERMIT) DATE: 18,Jul-2001 NUMBER 2001-40 PROJECT LOCATION: PARCEL NUMBER OWNER/DEVELOPER: MAILING ADDRESS: TELEPHONE NO: PREPARED BY. TRACT 9331 ROGERS LANE SUBDIVISIONS 841-07 -035 ALFONSO ALMEIDA 10290 SILVA CIRCLE,GILROY,CA95020 408-848-6033 JIM MAESTRI 408-846-0244 DEFER PARK, POLICE, FIRE & PUBLIC FACILllY FEES? TO PERMIT? Y TO FINAL? N DEFER SEWER, WATER. TRAFFIC FEES? TO PERMIT? Y TO FINAL ? ~ NOTE: This 100 % cost schedule has been adjusted to the rates currently in effect at the time permns are issued. All Park, Police & Fire development impact fees have been defered and will be collected wnh building permns, Lots: Unns: Sq Ft: 9 7 0 0 0 0 0 0 0 0 0 0 0 0 0 Sewer GPD. Water GPD: 0 0 Sne Information: Y Residential-Low? N Residential-High? N Commercial-Low? N Commercial-High? N Industrial-General? N Industrial,Warehouse ? N Assembly Hall? Common Area? Acres: 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CommerciaVlndustrial Allocations: Reimbursements and credns: N CountlY Estates Water System? N CountlY Estates Sewer System? N Southeast Quadrant Hydrology Study? N Obata Industrial Park Credn? Front Footage for Front Foot Charges and Construction Water: Street Tree FF: Water FF: 270.6 0.0 Sewer FF: 0.0 Storm FF: 0.0 Construction Water FF: 270.6 100% $4,519.10 $4,519.10 Special Public Works SelVices 100-2601-0000,3625 Maps. Final $3.495.00 + $15.00 lot Y $3.630.00 Fee ID N-FINALM Parcel $1,350.00 + Reapportionment (Assessment District Parcels) $2,190.00 + $15.00 lot N $0.00 Fee ID N-PARCELM Plus Customer assessment consullant $0.00 $0.00 Fee ID N-ASSESM $20.00 lot N Administration Fees: CountlY Estates Water System (Not Included) CountlY Estates Sewer Trunk Main (Not Included) Southeast Quadrant Hydrology Study (Not Included) Y $0.00 Fee ID N-WR,RESAD Y $0.00 Fee ID N,SS-RESAD or N-SS,C/IAD Y $0.00 Fee ID N-SD-QUADA COST SCHEDULE (1) TRACT 9331 MAP.xls Miscellaneous Engineering Services. (Cost Schedules, Agreements, RIW Reviews and Other Misc. Services) 10 hr Mlsc Services $88.91 I hr. y $889.10 Fee ID N-MISC or N-MISCF Engring Plan Check and Inspection 100-2601-0000-3605 $10,999.65 (Based on total cost of public 100% $10.999.65 right-of-way Improvements) -2.. hr Sne grading and $88.91 I hr. Y $266.73 Fee ID N-GRADINSP or N-GRADINSF reinspect Ion charges Actual Cost of Public Improvements $94,441 Fee ID N,PLANCK or N,PLANCKF per fax 10-03,01 0% of first $5,000 12% $5,000 $100,000 y $10,732.92 10% $100,000 $200,000 y $0.00 8% over $200,000 y $0.00 Offsite Improvements to be Bonded $94,441 Park Impact Fee 410-2600-0000-3660 DEFER ED TC BUILDING PERMIT 100% $57,883.00 a.Residential-Low $8,269.00 I unn Y $57,883.00 Fee ID N-PARK-DLD b.Residential-Hlgh $5,906.00 I unn Y $0.00 Fee ID N-PARK-DHD storm Drain Impact Fee 420-2600-0000-3660 $1,319.89 100% $1,319.89 a.Residential-Low $781.00 I acre Y $1.319.89 Fee ID N-SD-RLD b.Residential,High $1,172.00 I acre y $0.00 Fee ID N-SD-RHD c.Commercial $1,563.00 I acre Y $0.00 Fee ID N-SD-COM d.lndustrial $1,758.00 I acre Y $0.00 Fee ID N-SD-IND e.Assembly Hall $781.00 I acre Y $0.00 Fee ID N-SD-AH Obata I ndustrial Park Credns (Based on reimbursements due from oversized storm facllnles) Obata Fee Croon $1.170.00 I acre y $0.00 Fee ID N-SD-OBATA COST SCHEDULE (2) TRACT 9331 MAP.xls 100% $0.00 $0.00 Utility Underground Fee 431-2600-0000-3660 Front Footage $126.09 / U. x N 0.0 Fee ID N-UTUND or N-UTUND-SF 100% $96.60 $96.60 street Tree Fee 432-2600-0000-3660 Front Footage a.City Planting and Replacement $2.56 / U. x N 0.0 $0.00 Fee ID N-TREEPLNT b.lnspection and Replacement $0.36 / f.f. x Y ---------------------------------------------------- 270.6 $96.60 Fee ID N-TREEINSP Traffic Impact Fee 433-2600-0000-3660 DEFER ED TC BUILDING PERMIT 100% $30,667.00 a.Residential,Low $4,381.00 / unn Y $30,667.00 Fee ID N-TRAF-DLD b.Residential-High $3,551.00 / unn Y $0.00 Fee ID N-TRAF-DHD c.Commercial-Low Traffic (<= 4 trips/1 000 sf) $4,846.00 / k.s.f. Y $0.00 Fee ID N-TRAF-CL T d.Commercial-High Traffic (> 4 trips/1 000 sf) $9,791.00 / k.s.f. Y $0.00 Fee ID N-TRAF-CHT e.lndustrial-General $1,892.00 / k.sJ. Y $0.00 Fee ID N-TRAF-IG f.lndustrial-Warehouse $1,394.00 / k.s.f. Y $0.00 Fee ID N-TRAF-IW Police Impact Fee 434-2600-0000-3660 DEFERED TC BUILDING PERMIT 100% $13,783.00 a. Residential-Low $1,969.00 / unn Y $13,783.00 Fee ID N,POLC-DLD b.Residential-High $3,003.00 / unn Y $0.00 Fee ID N-POLC-DHD c.Commercial $2,821.00 / k.s.f. Y $0.00 Fee ID N-POLC-COM d.lndustrial $117.00 / k.sJ. Y $0.00 Fee ID N-POLC-IND COST SCHEDULE (3) TRACT 9331 MAP.xls Sewer Impact Fee 435,2600-0000-3660 OEFEREO TC BUILOING PERMIT 100% $37,597.00 a.Residential-Low $5,371.00 unn y $37,597.00 Fee 10 N-SS-OLO b.Residential-High $3.836.00 unn y $0.00 Fee 10 N-SS-OHO c.CommerciaVlndustrial $1.724.00 cgpd Y $0.00 Fee 10 N-SS-C/I Country Estates Sewer Trunk Main y $0.00 Fee 10 N-SS-RESCG or N,SS-CIICG (Not Included) Obata Industrial Park Credns (Based on reimbursements due from oversized sewer facilnies) Obata Fee Credn $531.00 I acre Y $0.00 Fee 10 N-SS-OBATA Water Impact Fee 436-2600-0000-3660 OEFEREO TC BUILOING PERMIT 100% $14.245.00 a.Residential-Low $2,035.00 unn y $14,245.00 Fee 10 N,WATR-OLO b.Residential-High $1,453.00 unn y $0.00 Fee 10 N-WATR-OHO c. CommerciaVlndustrial $3,092.00 kgpd Y $0.00 Fee 10 N-WATR-CII Obata Industrial Park Credns (Based on reimbursements due from oversized water facilnies) Obata Fee Credn $154.00 I acre Fire Impact Fee a. Residential-Low b.Residential-High c.Commercial d.lndustrial Public Facilnies Impact Fee a.Residential b.Commercial c,l ndustrial-General d.lndustrial-Warehouse Water User Fee (Construction) COST SCHEOULE y $0.00 Fee 10 N-WR-OBATA 437-2600-0000-3660 $164.00 unn y $234.00 unn y $145.00 k.s.f. y $18.00 k.s.f. Y 438-2600-0000-3660 $1,051.00 unn y $292.00 k.s.f. Y $204.00 k.s.f. Y $204.00 k.s.f. Y 720-0433-0000,3620 $2.76 If.f. + $168.14 I a.c. (4) OEFEREO TC BUILOING PERMIT 100% $1,148.00 Fee 10 N-FIRE-OLO $1.148.00 $0.00 Fee 10 N-FIRE-OHO $0.00 Fee 10 N-FIRE-COM $0.00 Fee 10 N-FIRE-INO OEFEREO TC BUILOING PERMIT 100% $7,357.00 $7,357.00 Fee 10 N-PF,OFRES $0.00 Fee 10 N-PF-COM $0.00 Fee 10 N-PF-IG $0.00 Fee 10 N-PF,IW y 100% $1,030.90 $1,030.90 Fee 10 N-CONWATFF and N-CONWATAC TRACT 9331 MAP.xls Front Foot Charges: (Used to charge and reimburse fees for existing infrastructure) Water 801-2601,0000-3899 $0.00 Water Mains, including fire hydrants, valves and box: 100% $0.00 (Developer is responsible for up to and including 12" mains) Half Pipe Front Footage 6" Main $12.50 f.f.x N 0.0 $0.00 Fee ID N-WR06-1/2 8" Main $13.50 f.f.x N 0.0 $0.00 Fee ID N-WR08,1/2 10" Main $15.00 f.f.x N 0.0 $0.00 Fee ID N-WR10-1/2 12" Main $16.50 U. x N 0.0 $0.00 Fee ID N-WR12,1/2 14" Main $18.50 f.f. x N 0.0 $0.00 Fee ID N-WR14-1/2 16" Main $21.00 U. x N 0.0 $0.00 Fee ID N,WR16-1/2 18" Main $25.00 U. x N 0.0 $0.00 Fee ID N-WR18-1/2 24" Main $31.50 U. x N 0.0 $0.00 Fee ID N-WR24-1/2 30" Main $37.00 f.f.x N 0.0 $0.00 Fee ID N-WR30,1/2 36" Main $43.50 / f.f. x N 0.0 $0.00 Fee ID N-WR36,1/2 Country Estates Water System y $0.00 Fee ID N-WR-RESCE (Not Included) Sewer 801-2601-0000-3899 $0.00 Sewer Mains, including manhole: 100% $0.00 (Developer is responsible for up to and including 12" mains) Half Pipe Front Footage 6" Main $12.00 U. x N 0.0 $0.00 Fee ID N-SS06-1I2 8" Main $12.50 f.f.x N 0.0 $0.00 Fee ID N-SS08-1I2 10" Main $14.00 f.f.x N 0.0 $0.00 Fee ID N-SS10-1/2 12" Main $15.50 U. x N 0.0 $0.00 Fee ID N-SS12-1I2 15" Main $19.00 f.f. x N 0.0 $0.00 Fee ID N-SS15-1I2 18" Main $24.00 U. x N 0.0 $0.00 Fee ID N-SS18-1I2 21" Main $28.50 f.f.x N 0.0 $0.00 Fee ID N-SS21-1/2 24" Main $33.00 f.f. x N 0.0 $0.00 Fee ID N,SS24-1/2 27" Main $36.50 / f.f.x N 0.0 $0.00 Fee ID N-SS27-1/2 Country Estates Sewer Trunk Main (Not Included) y $0.00 Fee ID N-SS-RESNH and N-SS-RESCE or Fee ID N-SS-CIINH and N-SS-CIICE COST SCHEDULE (5) TRACT 9331 MAP.xls Street Improvements 801-2601-0000-3899 $0.00 100% $0.00 Pavement Square Footage 3"ACon 8"AB $2.57 x 0.0 $0.00 Fee 10 N-STR-3/08 3" AC on 10" AB $2.89 x 0.0 $0.00 Fee 10 N-STR-3/10 3" AC on 12" AB $3.18 x 0.0 $0.00 Fee 10 N-STR,3/12 3" AC on 15" AB $3.65 x 0.0 $0.00 Fee 10 N-STR-3/15 Square Footage Sidewalk 4" on 4" $4.72 x 0.0 $0.00 Fee 10 N-STR-SIW and driveway Front Footage Curb/Gutter on 6" $15.33 x 0.0 $0.00 Fee 10 N,STR~C/G Storm Drain 801-2601-0000-3899 $0.00 100% $0.00 Storm Mains, including manholes and catch basins: (Developer is responsible for up to and Including 24" mains) Half Pipe Front Footage 18" Main $20.00 f.f.x N 0.0 $0.00 Fee 10 N-S018-1/2 21" Main $22.00 f.f.x N 0.0 $0.00 Fee 10 N-S021-1/2 24" Main $23.50 U. x N 0.0 = $0.00 Fee 10 N-S024,1/2 27" Main $25.00 f.f.x N 0.0 $0.00 Fee 10 N-S027-1/2 30" Main $26.50 f.f.x N 0.0 $0.00 Fee 10 N-S030-1/2 33" Main $28.00 U. x N 0.0 $0.00 Fee 10 N-S033-1/2 36" Main $29.50 U. x N 0.0 $0.00 Fee 10 N-S036-1/2 42" Main $33.00 U. x N 0.0 $0.00 Fee 10 N,S042-1/2 48" Main $36.50 f.f.x N 0.0 $0.00 Fee 10 N-S048,1/2 54" Main $39.50 f.f.x N 0.0 $0.00 Fee 10 N,S054-1/2 60" Main $43.00 f.f.x N 0.0 $0.00 Fee 10 N-S060-1/2 66" Main $46.00 U. x N 0.0 $0.00 Fee 10 N-S066-1/2 72" Main $49.00 / U. x N 0.0 $0.00 Fee 10 N-S072-1/2 COST SCHEDULE (6) TRACT 9331 MAP.xls 78" Main $52.00 U. x N 0.0 $0.00 Fee 10 N-S078-1/2 84" Main $55.00 f.f. x N 0.0 $0.00 Fee 10 N-S084-1/2 90" Main $58.00 f.f. x N 0.0 $0.00 Fee 10 N-S090-1I2 96" Main $61.00 U. x N 0.0 $0.00 Fee 10 N-S096-1/2 Southeast Quadrant Hydrology Study y $0.00 Fee 10 N-SO-QUAO (Not Included) Bonds and SecurKies 801-2601,0000-3899 $188.882 . Not included in TOTAL DUE (Estimated) NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building PermKs are issued. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. SKe grading and reinspection charges including reinspection of backyard drainage will be billed at the Engineering Division hourly rate in effect at the time of inspection. Accepted by: #/~.olP;~//1 Date: //- 7{;' - ~OO/ COST SCHEDULE (7) TRACT 9331 MAP.xls VICINITY SITE MAP Property Improvement Agreement No. 2001-40 Tract No. 9331, APN 841-07-035 Alfonso Almeida Exhibit A