PIA No. 2005-08 (Revised) - Camino Enterprise Corp.
RECORDING REQUESTED BY:
DOCUMENT: 18843540
111111111111111111111111
Pages: 1 9
City of Gilroy
Fees * No Fees
Taxes.
Copies.
AMT PAID
WHEN RECORDED, MAIL TO:
Rhonda Pellin
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
BRENDA DAVIS
SANTA CLARA COUNTY RECORDER
Recorded at the request of
City
RDE j:\ 009
3/14/2006
2:06 PM
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
Revised Property Improvement Agreement No: 2005-08
Tract 9678, Rancho Meadows Two
Sprig Way and Rodeo Drive
APN: 783-20-015
Camino Enterprise Corporation
-1-
4/29/05
PROPERTY IMPROVEMENT AGREEMENT RESIDENTIAL
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS:
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM
DRAINS AND OTHER PUBLIC WORKS FACILITIES
Property Improvement Agreement No. 2005-08
This agreement is made and entered into this 23rd day of January, 2006 by
and between the City of Gilroy; a municipal corporation herein called the "City" and
Camino Enterprise Corporation, by a real property owner, developer or subdivider, herein
called the "Developer".
WHEREAS, a parcel map of subdivision, record of surveyor building permit (Site
Clearance) application has now been submitted to the City for approval and acceptance, covering
certain real estate known as and called: Tract 9678, Rancho Meadows Two, at Sprig Way and
Rodeo Drive, APN: 783-20-015.
WHEREAS, the Developer requires certain utilities and public works facilities in order to
service the property under the minimum standards established by the City and,
WHEREAS, the City, by and through its City Council, has enacted certain Codes,
Ordinances and Resolutions and certain Rules and Regulations have been promulgated
concerning the subject matter of this agreement and,
WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities
and public service facilities after acceptance by City, and for providing the necessary connecting system,
general plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided
that Developer has faithfully and fully complied with all of the terms, covenants, conditions to be
performed by Developer pursuant to this agreement.
NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the
intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between
the parties as follows:
SECTION 1
That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the
City and the laws of the State of California and the United States of America concerning the subject
matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were
set out at length herein. Said Codes, Ordinances, Resolutions, Rule and Regulations include, but are not
limited to, the following: the Code of the City of Gilroy, the current Zoning Ordinance, and the currently
adopted Uniform Building Code.
-2-
4/29/05
SECTION 2
The Developer agrees:
a. To perform each and every provision required by the City to be performed by the Developer
in each and everyone of said Codes, Ordinances, Resolutions, Rules and other Regulations
and to comply with the foregoing and all applicable laws.
b. To grant to the City without charge, free and clear of encumbrances, any and all easements
and rights of way in and to his said real property necessary for the City in order that its water,
electricity, and/or sewer lines in or to said real property may be extended.
c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from
all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and
expenses (including without limitation attorneys' fees) incurred by City in connection with (i)
any damage done to any utility, public facility or other material or installation of the City on
said real estate which the Developer or any contractor or subcontractor of the Developer, or
any employee of the foregoing, shall do in grading or working upon said real estate; or (ii)
arising or resulting directly or indirectly from any act or omission of Developer or
Developer's contractors, or subcontractors, or any employee of the foregoing in connection
with the work performed by them in connection with this agreement, including without
limitation all claims relating to injury or death of any person or damage to any property.
d. To construct and improve all public works facilities and other improvements described in
this agreement in accordance with all standards established in the Codes, Ordinances,
Resolutions, Rules and Regulations, all applicable laws and this agreement, and in
accordance with the grades, plans, and specifications approved by the City Engineer.
Developer shall furnish two good and sufficient bonds, a Payment Bond on a form
provided by the City and a Faithful Performance Bond, both of which shall be secured
from a surety company admitted to do business in California. Each bond shall set forth a
time period for performance by the contractor of its obligations and the terms and
conditions on which the City may obtain the proceeds of the bond.
The Faithful Performance Bond shall be in an amount not less than one hundred percent
(100%) of the total estimated amount payable for the improvements described in this
agreement, and shall secure payment to City and the Developer of any loss due to the
default of the contractor or its inability or refusal to perform its contract. The
performance bond shall by its terms remain in full force and effect for a period of not less
than one year after completion of the improvements by Developer and acceptance of the
improvements by City, to guarantee the repair and replacement of defective material and
faulty workmanship. Upon completion of the improvements by Developer and
acceptance of the improvements by City, Developer may substitute for the performance
-3-
4/29/05
bond securing maintenance described above, a separate maintenance bond issued by an
admitted surety in the amount of ten percent (10%) of the total contract price of the
improvements (provided that the amount of said bond shall not be less than One
Thousand Dollars ($1,000) to cover the one-year maintenance period.
The Payment Bond shall be in an amount not less than one hundred percent (100%) of
the total estimated amount payable for the improvements described in this agreement.
The Payment Bond shall secure the payment of those persons or entities to whom the
Developer may become legally indebted for labor, materials, tools, equipment or services
of any kind used or employed by the contractor or subcontractor in performing the work,
or taxes or amounts to be withheld thereon. The Payment Bond shall provide that the
surety will pay the following amounts should the Contractor or a Subcontractor fail to
pay the same, plus reasonable attorneys' fees to be fixed by the court if suit is brought
upon the bond: (1) amounts due to any of the persons named in California Civil Code
Section 3181; (2) amounts due under the Unemployment Insurance Code with respect to
work or labor performed for the improvements described in this agreement; and (3) any
amounts required to be deducted, withheld, and paid over to the Employment
Development Department from the wages of employees of the Contractor and
Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with
respect to the work and labor. The Payment Bond shall, by its terms, inure to the benefit
of any of the persons named in Civil Code Section 3181 so as to give a right of action to
those persons or their assigns in any suit brought upon the bond.
Simultaneously with the submission of its building permit application (Site Clearance),
the Developer shall submit the following for both the surety that furnishes the Payment
Bond and the surety that furnishes the Faithful Performance Bond: (1) a current printout
from California Department of Insurance's website (www.insurance.ca.gov) showing
that the surety is admitted to do business in the State; or (2) a certificate from the Clerk
of the County of Santa Clara that the surety's certificate of authority has not been
surrendered, revoked, canceled, annulled, or suspended or in the event that it has, that
renewed authority has been granted.
e. That upon approval of the final map of the subdivision, the record of surveyor the building
permit covering the real estate to be improved and before any work is done therein, the
Developer shall pay to the City all sums, shown in Section 9 thereof to be due under the
terms and provisions of this agreement.
f. At all times during the term of this agreement and until the improvements constructed by
Developer are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a
policy of general liability and property damage insurance in the minimum amount of One
Million Dollars ($1,000,000), combined single limit for both bodily injury and property
damage; (b) workers' compensation insurance as required by law; and (c) broad form
"Builder's Risk" property damage insurance with limits of not less than 100% of the
-4-
4/29/05
estimated value of the improvements to be constructed by Developer pursuant to this
agreement. All such policies shall provide that thirty (30) days written notice must be given
in advance to City prior to termination, cancellation or modification. The insurance specified
in (a) above shall name City as an additional insured and the insurance specified in (c) shall
name City as a loss payee" and shall provide that City, although an additional insured or loss
payee, may recover for any loss suffered by reason of the acts or omissions of Developer or
Developer's contractors or subcontractors or their respective employees. Developer hereby
waives, and Developer shall cause each of its contractors and subcontractors to waive, all
rights to recover against City for any loss or damage arising from a cause covered by the
insurance required to be carried pursuant to this agreement or actually carried by Developer
in connection with the work described in this agreement, and will cause each insurer to waive
all rights of subrogation against City in connection therewith. All policies shall be written on
an occurrence basis and not on a claims made basis and shall be issued by insurance
companies acceptable to City. Prior to commencing any work pursuant this agreement,
Developer shall deliver to City the insurance company's certificate evidencing the required
coverage, or if required by City a copy of the policies obtained.
SECTION 3
That except as otherwise expressly provided in this Agreement, all sums shown herein to be
payable by the Developer to the City are due and payable to the City upon the execution of this
agreement.
SECTION 4
That all the provisions of this agreement and all work to be done pursuant to the terms of this
agreement are to be completed to City's satisfaction within one year from and after the date and
year first above written. Developer shall maintain such public works facilities and other
improvements described in this agreement at Developer's sole cost and expense at all times prior
to acceptance by City in a manner which will preclude any hazard to life or health or damage to
property.
SECTION 5
That the special provisions concerning the particular real estate referred to above, being
attached hereto, are hereby incorporated herein and expressly made a part of this agreement.
SECTION 6
That the faithful and prompt performance by the Developer of each and every term and condition
contained herein is made an express condition precedent to the duty of the City to perform any
act in connection with this transaction, and the failure, neglect or refusal of the Developer to so
perform, or to pay any monies due hereunder when due shall release the City from any and all
obligations hereunder and the City, at its election, may enforce the performance of any provision
-5-
4/29/05
herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under
applicable laws or the Codes, Ordinances, Resolutions, Rules and Regulations of the City, in the
event of any such default by Developer.
SECTION 7
That this agreement, together with the attached stipulations, is an instrument affecting the
title or possession of the real property described in Exhibit A. All the terms, covenants and
conditions herein imposed shall be binding upon and inure to the benefit of City, Developer and
the successors in interest of Developer. Upon the sale or division of the property described in
Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of
each parcel shall succeed to the obligations imposed on Developer by this agreement.
SECTION 8
That the following General Stipulations and the attached stipulations shall be completed
subject to the approval of the Community Development Director.
1) Locate and properly dispose of any wells, septic tanks and underground fuel storage
facilities. NOTE: The capping of any well will require inspection by the Santa Clara
Valley Water District.
2) Schedule the construction of improvements along existing public roads so that the work
affecting vehicular traffic is completed with a minimum interruption to traffic.
3) All work within the public right-of-way shall be subject to the approval of the City
Engineer.
4) Before construction utilizing combustible materials may proceed, an all weather access
must be provided to within 150 feet of the building site; and at least one in service fire
hydrant must be available within 150 feet of each portion of the site wherein this
construction is to take place. Location of the fire hydrants will be determined by the Fire
Chief.
5) All work shall be coordinated so that the existing residents have access to their properties.
6) The Developer shall submit to the City of Gilroy an electronic copy of the final map as an
Autocad drawing file (DWG format, Autocad 2002 maximum).
7) The developer shall pay to the City of Gilroy reimbursement amounts as shown on the
attached final cost schedule to cover improvements installed under the Rancho Meadows
Tract 9034 Property Improvement Agreement that benefited this property.
-6-
4/29/05
8) The City has requested the Developer to complete the roadway and install curb, gutter,
sidewalk and fence along the frontage of APN 783-63-017 at Sprig Way and to construct
sidewalk along the frontage of the same APN 783-63-017 at Sunrise Drive. A
reimbursement amount based on actual costs of $19,739.20 will be granted to the
Developer.
Reimbursement Estimate Table
Roadway, Curb, Gutter and Sidewalk
Fence
Design
Reimbursement
$17,243.20
$1,490.00
$1,006.00
$19,739.20
-7-
4/29/05
SECTION 9
That the attached Development Cost Schedule No: 2005-08 enumerates all fees and their
extensions.
TOTAL AMOUNT DUE THE CITY OF GILROY: $145,849.91.
IN WITNESS WHEREOF, City has executed this agreement as of ~t,0n,uV'...<-\ (3 ,wt()?
~:)
\ -/ ~/(f:;:i/~~ '
Rhonda Pellin
CITY CLERK
APPROVED AS TO FORM:
~r:,~
-
CITY ATTORNEY
IN WITNESS WHEREOF Owner has executed this agreement as of -:f'~_2 ~I la:J.t;
Owner: Camino Enterprises Corporation
A California Corporation
~W~
Steph n Kao
NOTE: If Developer is a corporation, the complete legal name and corporate seal of the
corporation and the corporate titles of the persons signing for the corporation shall appear above.
-8-
4/29/05
STATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
TITLE OF DOCUMENT: Revised Property Improvement Agreement No. 2005-08, Tract
9678, Rancho Meadows Two, Sprig Way and Rodeo Drive, APN:
783-20-015, Camino Enterprise Corporation
On February 13,2006, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa
personally known to me to be the person whose name is subscribed to the within instrument and
acknowledged to me that he executed the same in his authorized capacity, and that by his
signature on the instrument the person or the entity upon behalf of which the person acted,
executed the instrument.
WITNESS m. Y hand an~d 02ffi . 1 seal.
7 ... I ...
.1d j/ I / /! / ..'
, f'r U>L ^ ~/"LA:,,/t...( 1'-
. Signature of Notary Public
~---
R~~l;' - ~
i@' C_.'5I'0S6 J
~. Notary Public . CaIIfornla j
j Santa Clara COWlty ~
~ _ _ ~~:...~~1~
per GC Sec. 40814; CC Sec. 1181
(Notary Seal)
Property Improvement Agreement No. 2005-08
ST A TE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
00 O,/Z::;!tio, before me, ~Lynefk Bry~ fVofo..Y'j ?uh/J~
personally appeared Sfephen K~o
personally known to m or proved e on the basis of satisfactory evidence) to be the
~rson(s) whose name( i are-sUb. scribed to the within instrument and acknowledged to me that
CheJ3he/thcy executed the same in~authorized capacity(ies), and that b~r
signature(s) on the instrument th{perso~) or the entity upon behalf of which the person(s)
acted, executed the instrument.
WITNESS my hand and official seal.
Signatur~o(j~~
per GC Sec. 40814; CC Sec. 1181
-9-
4/29/05
ENCOMPASS NO:
DATE:
NUMBER:
PROJECT LOCATION:
PARCEL NUMBER:
OWNER/DEVELOPER:
MAILING ADDRESS:
TELEPHONE NO:
PREPARED BY:
Account No.
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
FINAL COST SCHEDULE
ALL PUBLIC FACILITY, SEWER, WATER & TRAFFIC FEES ARE DEFERED
E1
50100361
Revised:
Revision Number:
23-Feb-2005
TRACT 9678 RANCHO MEADOWS I
SIW CORNER SPRIG WAY & RODEO DR.
783-20-015
CAMINO ENTERPRISE CORPORATION
5/6/2005
20-Apr-2005
Rosanna Pellin
650-961-5600 BILL SAMPSON RUTH AND GOING ENG.
JIM MAESTRI 408-846-0450
Fee: Credits: Amount Due: Account Description: Paid on Invoice #
$7,144.50 $0.00 $7,144.50 Special Public Works Serv
$48,000.00 $0.00 $48,000.00 Engring Plan Check & Insp
$2,422.62 $0.00 $2,422.62 Storm Development Fee
$468.03 $0.00 $468.03 Str Tree Development Fee
DEFERED TO
$154,836.00 $0.00 BUILDING PERMIT Traffic Impact Fee
DEFERED TO
$193,834.00 $0.00 BUILDING PERMIT Sewer Development Fee
DEFERED TO
$58,905.00 $0.00 BUILDING PERMIT Water Development Fee
DEFERED TO
$333,914.00 $0.00 BUILDING PERMIT Public Facility Impact Fee
$4,269.06 $0.00 $4,26906 Const Water Use Fee
$0.00 $0.00 $0.00 Reimbursements
$0.00 $0.00 $0.00 Other Reimbursements
Total $62,304.21
Key Code
100-2601-0000-3625
4904
100-2601-0000-3605
420-2600-0000-3660
432-2600-0000-3660
433-2600-0000-3660
435-2600-0000-3660
436-2600-0000-3660
440-2600-0000-3660
720-0433-0000-3620
801-2601 -PWDO-3899
801-2601 -PWDO-3899
Payment Bond
Performance Bond
COST SCHEDULE
4702
4501
3301
4905
4509
4510
4515
2202
4703
4703
$525,000
$525,000
(1)
Fees Last Revised January 1, 2005
TRACT 9678 RANCHO MEADOWS II
5/6/2005
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
FINAL COST SCHEDULE
ALL PUBLIC FACILITY, SEWER, WATER & TRAFFIC FEES ARE DEFERED
ENCOMPASS NO:
DATE:
NUMBER:
PROJECT LOCATION:
PARCEL NUMBER:
OWNER/DEVELOPER:
MAILING ADDRESS:
TELEPHONE NO:
PREPARED BY:
E1 l 50100361
23-Feb-2005
TRACT 9678 RANCHO MEADOWS I
sm CORNER SPRIG WAY & RODEO DR.
783-20-015
CAMINO ENTERPRISE CORPORATION
650-961-5600 BILL SAMPSON RUTH AND GOING ENG.
JIM MAESTRI 408-846-0450
COST SCHEDULE TYPE: PRELIMINARY ESTIMATE? N
IDEFER PUBLIC FACILITY FEE?
DEFER SEWER, WATER, TRAFFIC FEES?
NOTE: This Final Cost Schedule has been adjusted to the rates currently in effect.
FINAL FEES? Y INCENTIVE AGREEMENT FEES ONLY? N
TO PERMIT? Y TO FINAL? N
- -
TO PERMIT? Y TO FINAL? N
Site Information: Gross Acres: Lots: Units: Sq Ft:
Residential-Low? Y 3.870 17 17
Residential-High? 0.000 0 0
Commercial-Low? 0.000 0 0
Commercial-High? 0.000 0 0
Industrial-General? 0.000 0 0
industrial-Warehouse? 0.000 0 0
Assembly Hall? 0.000 0 0
Common Area? 0.000 0
Commercial/Industrial Allocations: Sewer GPD: Water GPD:
0 0
Reimbursements and credits:
N Country Estates Water System? N Southeast Quadrant Hydrology Study? N Obata Industrial Park Credit?
Front Footage/Square Footage Charges and Construction Water:
Street Tree FF: Water FF:
1,311.0 0.0
Pavement SF: Median SF:
0.0 0.0
Sewer FF:
0.0
Sidewalk SF:
0.0
Storm FF:
0.0
Curb/Gutter FF:
0.0
Const Water Acres to be Developed:
3.870
Construction Water FF:
1,311.0
Special Public Works Services
100-2601 -0000-3625
$7,144.50
Maps:
$1,735.00 Fee ID NO-FINALM
Final Map
$1,565.00 +
$10.00 / lot
Y
Parcel Map
$1,630.00 +
$10.00 / lot
N
$0.00 Fee ID NO-PARCELM
Re-assessment Map (Assessment District Parcels)
$175.00 +
$0.00 Fee ID N-ASSESM
$20.00 / lot
N
Administration Fees:
Southeast Quadrant Hydrology Study
(Not Included)
$0.00 Fee ID N-SD-QUADA
N
Scanning Fee
10
$80.00
Fee ID NO-SCAN
# of Map &
Improvement Plan sheets
$8.00 / sheet
Y
COST SCHEDULE
(2)
Fees Last Revised January 1, 2005
TRACT 9678 RANCHO MEADOWS II
5/6/2005
Miscellaneous Engineering Services:
(Cost Schedules, Agreements, R!W Reviews and Other Misc. Services)
50 hr Misc Services $106.59 he. Y $5,329.50 Fee ID N-MISC
Engring Plan Check and Inspection 100-2601 -0000-3605 $48,000.00
(Based on total cost of public right-of-way improvements)
~ hr Site grading and $106.59 / he. N $0.00 Fee ID NO-GRADINS
reinspection charges
'updated revisions dated 3/25/05
. Estimated Cost of Public improvements $525,000 Fee ID NO-PLANCHK
12% $0 $100,000 y $12,000.00
10% $100,000 $200,000 y $10,000.00
8% over $200,000 y $26,000.00
Payment Bond Amount for Offsite Improvements $525,000
Performance Bond Amount for Offsite Improvements $525,000
Impact Fees:
Storm Drain Impact Fee 420-2600-0000-3660 $2,422.62
a.Residential-Low $626.00 acre y $2,422.62 Fee ID NO-SD-LD
b.Residential-High $983.00 acre y $0.00 Fee ID NO-SD-HD
c.Commercial $1,696.00 acre y $0.00 Fee ID NO-SD-C
d.lndustrial $1,252.00 acre y $0.00 Fee ID NO-SD-I
e.Assembly Hall $626.00 acre y $0.00 Fee ID NO-SD-AH
Obata Industrial Park Credits
(Based on reimbursements due from oversized storm facilities)
Obata Fee Credit $1,170.00 / acre y $0.00 Fee ID N-SD-OBATA
Street Tree Fee 432-2600-0000-3660 $468.03
Front Footage
a.City Planting and Replacement
$2.56 / f.f. x N 0.0 $0.00 Fee ID NO-TREEPLT
b.lnspection and Replacement
$0.36 / f.f. x y 1,311.0 $468.03 Fee ID NO-TREEINS
Traffic Impact Fee 433-2600-0000-3660 DEFERED TO BUILDING PERMIT
a.Residential-Low $9,108.00 unit Y $154,836.00 Fee ID N1-TRAF-LD
b.Residential-High $7,383.00 unit Y $0.00 Fee ID N2-TRAF-HD
c.Commercial-Low Traffic
(< 10.75trips/1000 sf) $10,076.00 k.s.f. Y $0.00 Fee ID N3-TRAF-CL
d.Commercial-High Traffic
(>= 10.75 trips/1000 sf) $20,354.00 k.s.f. Y $0.00 Fee ID N3-TRAF-CH
e.lndustrial-General $3,994.00 k.s.f. y $0.00 Fee ID N4-TRAF-IG
!'Industrial-Warehouse $2,895.00 k.s.f. Y $0.00 Fee ID N4-TRAF-IW
COST SCHEDULE (3)
Fees Last Revised January 1, 2005
TRACT 9678 RANCHO MEADOWS II
Sewer Impact Fee
a.Residential-Low
b.Residential-High
435-2600-0000-3660
$11,402.00 1 unit Y
$6,170.00
unit
$3,608.00
cgpd
c. Com mercial/l ndustrial
Obata Industrial Park Credits
(Based on reimbursements due from oversized sewer facilities)
Obata Fee Credit $531.00 1 acre
Water Impact Fee
a.Residential-Low
b.Residential-High
436-2600-0000-3660
$3,465.00 1 unit Y
$1,401.00
unit
c.Commerclalllndustrial $5,431.00 1 kgpd
Obata Industrial Park Credits
(Based on reimbursements due from oversized water facilities)
Obata Fee Credit $154.00 acre
Public Facilities Impact Fee
a.Residential-Low
b.Residential-High
c.Commercial
d.lndustrial
Water User Fee (Construction)
$2.76 1 f.1.
Front Foot Charges:
(Used to charge and reimburse fees for existing infrastructure)
Water
Water Mains, including fire hydrants, valves and box:
(Developer is responsible for up to and including 12" mains)
Half Pipe
6 inch Main $41.00 LF x
8 inch Main $43.00 1 LF x
10 inch Main $49.00 LF x
12 inch Main $54.00 LF x
14 inch Main $60.00 LF x
16 inch Main $65.00 LF x
18 inch Main $71.00 LF x
24 inch Main $79.00 1 LF x
30 inch Main $86.00 LF x
36 inch Main $111.00 1 LF x
Country Estates Water System
(Not Included)
COST SCHEDULE
440-2600-0000-3660
$19,642.00 unit Y
$16,639.00 unit Y
$2,856.00 k.s.f. Y
$1,268.00 k.s.f. Y
720-0433-0000-3620
+ $168.14 1 a.c.
801 -2601-PWDO-3899
Lineal Footage
N 0.0
Y 0.0
N 0.0
N 0.0
N 0.0 =
N 0.0
N 0.0
N 0.0
N 0.0
N 0.0 =
Y
(4)
Fees Last Revised January 1, 2005
5/6/2005
Y
DEFERED TO BUILDING PERMIT
$193,834.00 Fee ID N1-SS-LD
$0.00 Fee ID N2-SS-HD
$0.00 Fee ID N5-SS-C/I
$0.00 Fee ID N-SS-OBATA
DEFERED TO BUiLDING PERMIT
$58,905.00 Fee ID N1-WATR-LD
$0.00 Fee ID N2-WATR-HD
$0.00 Fee ID N5-WTR-C/I
$0.00 Fee ID N-WR-OBATA
DEFERED TO BUILDING PERMIT
$333,914.00 Fee ID N1-PF-LD
$0.00 Fee ID N2-PF-HD
$0.00 Fee ID N3-PF-C
$0.00 Fee ID N4-PF-1
Y $4,269.06
Fee ID NO-CONWTFF and NO-CONWTAC
$0.00
Y
Y
Y
Y
Y
$0.00 Fee ID N-WR06-1/2
$0.00 Fee ID N-WR08-1/2
$0.00 Fee ID N-WR10-1/2
$0.00 Fee iD N-WR12-1/2
$0.00 Fee ID N-WR14-1/2
$0.00 Fee ID N-WR16-1/2
$0.00 Fee ID N-WR18-1/2
$0.00 Fee ID N-WR24-1/2
$0.00 Fee ID N-WR30-1/2
$0.00 Fee iD N-WR36-1/2
$0.00 Fee ID N-WR-RESCE
TRACT 9678 RANCHO MEADOWS II
5/6/2005
Front Foot Charges:
Sewer 801 -2601 -PWDO-3899 $0.00
Sewer Mains, including manhole:
(Developer is responsible for up to and including 12" mains)
Half Pipe Lineal Footage
6 inch Main $76.00 1 LF x N 0.0 $0.00 Fee ID N-SS06-1/2
8 inch Main $78.00 1 LF x Y 0.0 $0.00 Fee ID N-SS08-1/2
10 inch Main $85.00 LF x N 0.0 $0.00 Fee ID N-SS10-1/2
12 inch Main $87.00 LF x N 0.0 $0.00 Fee ID N-SS12-1/2
15 inch Main $91.00 LF x N 0.0 = $0.00 Fee ID N-SS15-1/2
18 inch Main $98.00 LF x N 0.0 = $0.00 Fee ID N-SS18-1/2
21 inch Main $107.00 LF x N 0.0 $0.00 Fee ID N-SS21-1/2
24 inch Main $111.00 LF x N 0.0 $0.00 Fee ID N-SS24-1/2
27 inch Main $128.00 LF x N 0.0 $0.00 Fee ID N-SS27-1/2
30 inch Main $150.00 LF x N 0.0 $0.00 Fee ID N-SS30-1/2
33 inch Main $165.00 LF x N 0.0 $0.00 Fee ID N-SS33-1/2
36 inch Main $187.00 LF x N 0.0 $0.00 Fee ID N-SS36-1/2
39 inch Main $221.00 LF x N 0.0 $0.00 Fee ID N-SS39-1/2
42 inch Main $277.00 1 LF x N 0.0 = $0.00 Fee ID N-SS42-1/2
Street Improvements 801-2601 -PWDO-3899 $0.00
Pavement, Sidewalks & Medians Square Footage
AC/Bike path: base $3.70 1 s.f. x Y 0.0 $0.00 Fee ID N-STR-ACB
AC/Bike path: pvmt $1.50 1 s.f. x N 0.0 $0.00 Fee ID N-STR-ACP
Sidewalk: new $10.60 1 s.f. x N 0.0 = $0.00 Fee ID N-STR-S/W
Sidewalk: replace $14.80 s.f. x N 0.0 $0.00 Fee ID N-STR-S/WR
Resurfacing $3.20 s.f. x N 0.0 $0.00 Fee ID N-STR-RESU
Landscaped Median $22.25 s.f. x N 0.0 $0.00 Fee ID N-STR-LANM
Hardscaped Median $12.70 1 s.f x N 0.0 $0.00 Fee ID N-STR-HARD
Traffic Signals (equipment only) % of Lump Sum
Traffic Signal-3 leg $140,000.00 1 I.s. x N 0% $0.00 Fee ID N-STR-TS3L
Traffic Signal-4 leg $170,000.00 1 I.s. x N 0% = $0.00 Fee ID N-STR-TS4L
Curb and Gutter Lineal Footage
Curb/Gutter: new $26.40 1 LF x Y 0.0 $0.00 Fee ID N-STR-C/G
Curb/Gutter: replace $37.00 LF x N 0.0 = $0.00 Fee ID N-STR-C/GR
Curb Ramps $1,161.00 LF x N 0.0 = $0.00 Fee ID N-STR-CR
COST SCHEDULE (5)
Fees Last Revised January 1, 2005
TRACT 9678 RANCHO MEADOWS II
5/6/2005
Front Foot Charges:
Storm Drain 801 -260 1 -PWDO-3899 $0.00
Storm Mains, including manholes and catch basins:
(Developer is responsible for up to and including 24" mains)
Half Pipe Lineal Footage
18 inch Main $66.00 I LF x Y 0.0 $0.00 Fee ID N-SD18-1/2
21 inch Main $72.00 LF x N 0.0 $0.00 Fee ID N-SD21-1I2
24 inch Main $74.00 LF x N 0.0 $0.00 Fee ID N-SD24-1/2
27 inch Main $86.00 LF x N 0.0 $0.00 Fee iD N-SD27-1/2
30 inch Main $93.00 LF x N 0.0 $0.00 Fee ID N-SD30-1/2
33 inch Main $96.00 LF x N 0.0 $0.00 Fee ID N-SD33-1/2
36 inch Main $99.00 LF x N 0.0 $0.00 Fee ID N-SD36-1/2
42 inch Main $103.00 LF x N 0.0 $0.00 Fee ID N-SD42-1/2
48 inch Main $122.00 LF x N 0.0 $0.00 Fee ID N-SD48-1/2
54 inch Main $144.00 LF x N 0.0 $0.00 Fee ID N-SD54-1/2
60 inch Main $165.00 LF x N 0.0 $0.00 Fee ID N-SD60-1/2
66 inch Main $187.00 LF x N 0.0 $0.00 Fee ID N-SD66-1/2
72 inch Main $209.00 LF x N 0.0 $0.00 Fee ID N-SD72-1/2
78 inch Main $225.00 LF x N 0.0 $0.00 Fee ID N-SD78-1/2
84 inch Main $241.00 LF x N 0.0 $0.00 Fee ID N-SD84-1/2
90 inch Main $257.00 LF x N 0.0 $0.00 Fee ID N-SD90-1/2
96 inch Main $273.00 I LF x N 0.0 = $0.00 Fee ID N-SD96-1/2
Southeast Quadrant Hydrology Study y $0.00 Fee ID N-SD-QUAD
(Not Included)
NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued.
The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated
fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the
difference. Site grading and reinspeclion charges including reinspection of backyard drainage will be billed at the
Engineering Division hourly rate in effect at the time of inspection.
Accepted by:
DLJ.{-e0
,'.
Date:
COST SCHEDULE
(6)
Fees Last Revised January 1, 2005
TRACT 9678 RANCHO MEADOWS II
5/6/2005
Oversizing Schedule (Used to reimburse oversized infrastructure)
Total Oversized Water, Sewer and Storm Drain Main Reimbursement $0.00
Total Oversized Water Main Reimbursement (Developer is responsible lor up to and including 12" mains $108.00 ILF) $0.00
Oversized Minimum 12" main Oversized
Full Pipe $/loot Full Pipe $/loot Oversized Footage Reimbursement
14 inch Main $119.00 - $108.00 X 0.0 $0.00 N
16 inch Main $130.00 - $108.00 X 0.0 $0.00 N
18 inch Main $141.00 - $108.00 X 0.0 $0.00 N
24 inch Main $158.00 - $108.00 X 0.0 $0.00 N
30 inch Main $172.00 - $108.00 X 0.0 $0.00 N
36 inch Main $221.00 - $108.00 X 0.0 = $0.00 N
Total Oversized Sewer Main Reimbursement (Developer is responsible lor up to and including 12" mains $173.00 ILF) $0.00
Oversized Minimum 12" main Oversized
Full Pipe $/loot Full Pipe $/loot Oversized Footage Reimbursement
15 inch Main $182.00 - $173.00 X 0.0 = $0.00 N
18 inch Main $196.00 - $173.00 X 0.0 $0.00 N
21 inch Main $213.00 - $173.00 X 0.0 $0.00 N
24 inch Main $221.00 - $173.00 X 0.0 $0.00 N
27 inch Main $225.00 - $173.00 X 0.0 $0.00 N
30 inch Main $300.00 - $173.00 X 0.0 $0.00 N
33 inch Main $330.00 - $173.00 X 0.0 $0.00 N
36 inch Main $373.00 - $173.00 X 0.0 $0.00 N
39 inch Main $442.00 - $173.00 X 0.0 $0.00 N
42 inch ~ain $553.00 - $173.00 X 0.0 = $0.00 N
Total Oversized Storm Drain Main Reimbmnt (Developer is responsible lor up to and including 24" mains $147.00 ILF) $0.00
Oversized Minimum 24" main Oversized
Full Pipe $/loot Full Pipe $/loot Oversized Footage Reimbursement
27 inch Main $172.00 - $147.00 X 0.0 $0.00 N
30 inch Main $185.00 - $147.00 X 0.0 $0.00 N
33 inch Main $191.00 - $147.00 X 0.0 $0.00 N
36 inch Main $197.00 - $147.00 X 0.0 $0.00 N
42 inch Main $205.00 - $147.00 X 0.0 $0.00 N
48 inch Main $243.00 - $147.00 X 0.0 = $0.00 N
54 inch Main $287.00 - $147.00 X 0.0 $0.00 N
60 inch Main $330.00 - $147.00 X 0.0 $0.00 N
66 inch Main $374.00 - $147.00 X 0.0 $0.00 N
PIPELINE OVERSIZE REIMBURSEMENT SCHEDULE (1)
Fees Last Revised January 1, 2005
TRACT 9678 RANCHO MEADOWS II
Oversizing Schedule Continued (Used to reimburse oversized infrastructure)
Oversized Storm Drain Main Reimbmnt Continued
Oversized Minimum 24" main Oversized
Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement
72 inch Main $418.00 - $147.00 X 0.0 $0.00 N
78 inch Main $450.00 - $147.00 X 0.0 $0.00 N
84 inch Main $482.00 - $147.00 X 0.0 $0.00 N
90 inch Main $514.00 - $147.00 X 0.0 $0.00 N
96 inch Main $546.00 - $147.00 X 0.0 $0.00 N
PIPELINE OVERSIZE REIMBURSEMENT SCHEDULE
(2)
Fees Last Revised January 1, 2005
5/6/2005
TRACT 9678 RANCHO MEADOWS II
,i
.
,I
PROJeCT
SITE
I u
...
I g
I CI>
:;)
Hogan Way I s
... .
Blacksmith ~ ~ I
j D':JW i <~
longrneOdOw~ ~
Drive
~
,.,~
!
.
I
o
--
c
o
VJ
VICINITY SITE MAP
Property Improvement Agreement No. 2005-08
Tract 9678, Rancho Meadows Two
Sprig Way and Rodeo Drive
APN: 783-20-015
Camino Enterprise Corporation
Exhibit A