Loading...
PIA No. 99-16 - Eagle Ridge Development CompanyRECORDING REQUESTED BY: City of Gilroy WHEN RECORDED, MAIL TO: Rhonda S. Pellin City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 DOCUMENT: 14747441 111111111111111111111111 BRENDA DAVIS SANTA CLARA COUNTY RECORDER Recorded at the request of City (SPACE ABOVE THIS LINE FOR RECORDER'S USE) Property Improvement Agreement No, 99 -16 Tract 8965, Phase 2B, Eagle Ridge A.P.N.s 810 -22 -010, 810 -41 -003, 841 -44 -005, 006 & 007 Eagle Ridge Development Company, LLC Property Improvement Agreement - Residential DOCUMENT TITLE 1 Titles:] / Pages 22 Fees.... 70.00 Taxes... Copies.. AMT PAID 70.00 RDE # 008 4/12/1999 11:36 AM PROPERTY IMPROVEMENT AGREEMENT RESIDENTIAL AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS: IMWROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS AND OTHER PUBLIC WORKS FACILITIES AND PERFORMANCE OF PROJECT CONDITIONS OF APPROVAL No. 99 -16 This agreement is made and entered into this 5th day of April , 1999 , by and between the City of Gilroy, a municipal corporation, herein called the "City" and Eagle Ridge Development Company, LLC , a real property owner, developer or subdivider, herein called the "Developer ". WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate known as and called: Tract No. 8965 Phase 2B Eagle Ridge, A.P.N.s 810 -22 -010, 810 -41 -003, 841 -44 -005, 006 & 007 and, WHEREAS, the Developer requires certain utilities and public works facilities in order to service the property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided that Developer has faithfully and fully complied with all of the terms, covenants, and conditions to be performed by Developer pursuant to this agreement and, RECITALS WHEREAS, the Tentative Map for the real property covered by this Agreement and the Master Project of which such property is a part was approved by the City, subject to certain mitigation measures, mitigation monitoring programs and other conditions of approval. NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between the parties as follows: 4 SECTION 1 That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California and the United States of America concerning the subject matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances, Resolutions, Rules and Regulations include, but are not limited to, the following: the Code of the City of Gilroy, the current Zoning Ordinance, and the currently adopted Uniform Building Code. SECTION 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances, Resolutions, Rules and other Regulations and to comply with the foregoing and all applicable laws.. b. To grant to the City without charge, free and clear of encumbrances, any and all easements and rights of way in and to said real property necessary for the City in order that its water, electricity, and /or sewer lines in or to said real property may be extended. c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and expenses (including without limitation attorneys' fees) incurred by City in connection with (i) any damage done to any utility, public facility or other material or installation of the City which the Developer or any contractor or subcontractor of the Developer, or any employee of the foregoing, shall do in grading or otherwise performing any work in connection with this agreement, or (ii) arising or resulting directly or indirectly from any act or omission of Developer or Developer's contractors, or subcontractors, or any employee of the foregoing in connection with the work performed by them in connection with this agreement, including without limitation all claims relating to injury or death of any person or damage to any property. d. To construct and improve all public works facilities and other improvements described in this agreement in accordance with all standards established in the Codes, Ordinances, Resolutions, Rules and Regulations, all applicable laws and this agreement, and in accordance with the grades, plans, and specifications therefore approved by the City Engineer. Developer shall furnish two good and sufficient bonds, in form and content and issued by a bonding company acceptable to City as follows: (i) a performance bond to be executed in the face amount of not less than Two Hundred Thirty -One Thousand Eight Hundred Dollars ($231,800.00), and (ii) a payment bond to be executed in the face amount of not less than Fifty percent (50 %) of the performance bond described in (i) immediately above, both such bonds being issued for the public to be constructed in connection with Tract No. 8965, Eagle Ridge, which are improvements described in this agreement (the "Public Improvements). The performance bond shall secure payment to City and the Developer of any loss due to the default of the contractor or its inability or refusal to perform its contract. The payment bond shall secure payment to the subcontractors and persons renting equipment for the furnishing of labor or materials for the Public Improvements, as provided in Sections 66499 et se of the Government Code of the State of California, 3 the Codes, the Ordinances, Resolutions, Rules and the Regulations of the City, and this agreement. Each bond shall set forth a time period for performance by the contractor of its obligations and the terms and conditions on which the City may obtain the proceeds of the bond. The performance bond shall by its terms remain in full force and affect for a period of not less than one year after completion of the Public Improvement by Developer and acceptance of said improvements by City, to guarantee the repair and replacement of defective material and faulty workmanship. Upon completion of the Public Improvements by Developer and acceptance of the Public Improvements by City, Developer may substitute for the performance bond securing maintenance described above, a separate maintenance bond in the amount of 10% of the total contract price of the Public Improvements (provided that the amount of said bond shall not be less than One Thousand Dollars ($1,000)) to cover the one year maintenance. e. That upon approval of the final map of the subdivision, the record of survey or the building permit covering the real estate to be improved and before any work is done therein, the Developer shall pay to the City all sums, shown in Section 9 thereof to be due under the terms and provisions of this agreement. f. At all times during the term of this agreement and until the Public Improvements constructed by Developer are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a policy of general liability and property damage insurance in the minimum amount of One Million Dollars ($1,000,000), combined single limit for both bodily injury and property damage; (b) workers' compensation insurance as required by law; and (c) broad form "Builder's Risk" property damage insurance with limits of not less than 100% of the estimated value of the Public Improvements to be constructed by Developer pursuant to this agreement. All such policies shall provide that thirty (30) days written notice must be given in advance to City prior to termination, cancellation or modification. The insurance specified in (a) above shall name City as an additional insured and the insurance specified in (c) shall name City as a loss payee„ and shall provide that City, although an additional insured or loss payee, may recover for any loss suffered by reason of the acts or omissions of Developer or Developer's contractors or subcontractors or their respective employees. Developer hereby waives, and Developer shall cause each of its contractors and subcontractors to waive, all rights to recover against City for any loss or damage arising from a cause covered by the insurance required to be carried pursuant to this agreement or actually carried by Developer in connection with the work described in this agreement, and will cause each insurer to waive all rights of subrogation against City in connection therewith. All policies shall be written on an occurrence basis and not on a claims made basis and shall be issued by insurance companies acceptable to City. Prior to commencing any work pursuant this agreement, Developer shall deliver to City the insurance company's certificate evidencing the required coverage, or if required by City a copy of the policies obtained. SECTION 3 That except as otherwise expressly provided in this Agreement, all sums shown herein to be payable by the Developer to the City are due and payable to the City upon the execution of this agreement. SECTION 4 That all the provisions of this agreement and all work to be done pursuant to the terms of this 0 agreement in connection with Phase I (defined below) are to be completed to City's satisfaction within one year from and after the date and year first above written. Developer shall maintain such public works facilities and other improvements described in this agreement at Developer's sole cost and expense at all times prior to acceptance by City in a manner which will preclude any hazard to life or health or damage to property. SECTION 5 That the special provisions concerning the particular real estate referred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. The Stipulation Sheet attached hereto identifies work and other obligations to be performed in connection with Tract No. 8965, Eagle Ridge, as well as other work and obligations to be performed in connection with subsequent phases of the Master Project. Final charges and fees for subsequent phases of the Master Project will be set for in the Improvement Agreements entered into for such Phases. SECTION 6 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under applicable laws or the Codes, Ordinances, Resolutions, Rules and Regulations of the City, in the event of any such default by Developer. SECTION 7 That this agreement, together with the attached stipulations, is an instrument affecting the title or possession of the real property described in Exhibit A. All the terms, covenants and conditions herein imposed shall be binding upon and inure to the benefit of City, Developer and the successors in interest of Developer. Upon the sale or division of the property described in Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of each parcel shall succeed to the obligations imposed on Developer by this agreement. SECTION 8 That the following General Stipulations and the attached stipulations shall be completed subject to the approval of the Community Development Director. 1. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilities. NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. 2. Schedule the construction of improvements along existing public roads so that the work affecting vehicular traffic is completed with a minimum interruption to traffic. 5 3. All work within the public right -of -way shall be subject to the approval of the City Engineer. 4. Before construction utilizing combustible materials may proceed, an all weather access must be provided to within 150 feet of the building site; and at least one in service fire hydrant must be available within 500 feet of each portion of the site wherein this construction is to take place. Location of the fire hydrants will be determined by the Fire Chief. SECTION 9 That the attached Development Cost Schedule enumerates all fees and their extensions. TOTAL AMOUNT DUE CITY $1,178,256.42 IN WITNESS WHEREOF, City has executed this agreement as of -% .S0 ! ATT CITY CITY CLERK Rhonda S. Pellin APPROVED AS TO FORM: Y�' '/ - "��� CITY ATTORNEY Linda A. Callon IN WITNESS WHEREOF Owner ha OWNER I Shapell Industries, Inc., Managing Partner Eagle Ridge Development Company, LLC DATE 3 -29 -99 NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation G and the corporate titles of the persons signing for the corporation shall appear above. STATE OF CALIFORNIA ) )ss. COUNTY OF SANTA CLARA ) OnMar.29 before me Linda A. Fluken, a Notary Public personally appeared Daniel W. Hancock personally known to me ) to be the persons) whose names} is /-afe subscribed to the within instrument and acknowledged to me that heAheAhey executed the same in hisAten4heir authorized capacity(ies), and that by his/let signature(} on the instrument the person(4 or the entity upon behalf of which the personH acted, executed the instrument. WITNESS my hand and official seal. Signatu per GC Sec. 40814; CC Sec. 1181 VA LINDA A. FLUKEN `i Commission # 1159356 .r Notary Public - California ur to Clara County *Camm.Bes0ct23,U STATE OF CALIFORNIA ) )ss. COUNTY OF SANTA CLARA ) On April 5, 1999, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal. RHONDAPELLIN ` Commission # 1142623 Notary Public - Colifomia z Santa Clora County My Comm. Expies Jun 19,?DOl Signature of Notary Public per GC Sec. 40814; CC Sec. 1181 (Notary Seal) STIPULATION SHEET Tract 8965 (Phase IIB) Improvement Agreement No. 99 -16 The following are stipulations to Improvement Agreement No. 99 -16 for Tract 8965: 1) The Developer is responsible for completing all improvements for Tract 8965 as shown on the plan by Ruggeri- Jensen -Azar & Associates. (Phase IIB) 2) Developer shall comply with all EIR mitigation measures, monitoring programs, conditions of approval, and other requirements imposed pursuant to City Council Resolution 96 -55 passed and adopted by the City Council on September 3, 1996, approving the Vesting Tentative Map for Eagle Ridge (collectively, the "Vesting Tentative Map Conditions "). In the event of any conflict between this Agreement and the Vesting Tentative Map Conditions, the Vesting Tentative Map Conditions shall control. (Phase I and Subsequent Phase). 3) The Homeowners Association shall be responsible for the maintenance of all private open space, private streets and the storm water systems on the properties/facilities which are owned by the Association. The Association shall conform to the approved weed abatement plan. All the above items shall be defined in the project CC &R's. The developer shall be responsible for maintenance and implementation of the above - mentioned items until such time as the property /facility is turned over to the Homeowners Association, and shall continue to be responsible for non - Homeowner Association parcels throughout the buildout phases of the project. 4) A golf maintenance(operation) plan shall be submitted as part of the Development Plan approval for the golf course. The plan shall identify strategies addressing the management of the recycled water, including groundwater monitoring of the recycled water ponds, maintenance of the drainage channels, monitoring the effectiveness of the detention ponds, and shall include provisions for system modification, if necessary. The plan shall provide for a Department of Health Services certified recycled water officer. (Golf Course Phase) 5) The developer shall be responsible for the implementation of the "Eagle Ridge California Tiger Salamander Plan prepared by LSA, dated August 8, 1996, including submittal of the yearly monitoring report. The developer shall remain responsible for the Plan implementation until the California Tiger Salamander mitigation areas become part of the Homeowner Association properties, at which time the Homeowners Association shall become the responsible party. The project CC &R's shall include the Homeowners Association's responsibility for the Plan implementation. (Phase I and subsequent phases) 6) Annexation of the entire project to Maintenance District No. 1 shall be completed prior to the finalization of the first building permit. Following Final Map recordation for subsequent phases, the developer shall amend the District to reflect the new parcels. The developer shall be responsible for the cost of annexing to the District, including the cost of advertising, formation and attorney's fees. (Phase I and subsequent phases) 7) The City will be conducting a city -wide traffic monitoring program. This program will incorporate the monitoring for the Eagle Ridge Project. Any areas which require monitoring for Eagle Ridge only will be paid for by the developer. The developer shall be responsible for installing, or participation in the installation of improvements, if the monitoring program identifies the need for one of the improvements stated in the Traffic analysis report (KBH & Associates, July 1996), as. a result of the Eagle Ridge development. The resulting requirements, including funding, credits and reimbursements, shall be itemized in the improvement agreement for the phase in which the improvement is required. (Phase I and subsequent phases) 8) The developer shall pay a one -time, $30,000 payment for the Castro Valley/Highway 101 Intersection as outlined in the Traffic Analysis Report. The payment is due with the last phase of the project. (subsequent phases) 9) The golf course owners/operators shall formulate an agreement with SCRWA and /or the City as required to connect to the reclaimed water system, and shall pay the applicable fees and charges for connection to the reclaimed water system, upon implementation of the golf course development plan. The plans for construction of the proposed reclaimed water ponds shall include a ground water monitoring program which shall be subject to the review and approval of the City Engineer. Future phases of this project may be subject to participating in the recycled water program, payment of impact fees, and pro -rata reimbursement for work performed on the system by the developer. (Phase I and subsequent phases) 10) Prior to the approval of a Final Map for Phase III, the developer will pay the costs of Master Planning and construction the Class I Trail segment as shown in the approved Planned Development documents, according to the City" specification from the western terminus of the Uvas Creek Trail to Santa Teresa boulevard (in Lieu of providing a 35 -foot Uvas Creek Trail easement with tow access points along the Eagle Ridge frontage). The developer shall master plan the future south and north creekside Class I trail connections that will be needed at Santa Teresa Boulevard. The developer shall pay the estimated cost of the future north side Class I Trail connections (not including any bridge /structure modifications, including the Santa Teresa Boulevard connection, and the trail to the east which will be connected to the existing Class I trail that terminates at Laurel Drive and Uvas Park Drive. The north side trail connection will be constructed by the City of Gilroy as part of the City of Gilroy's Uvas Creek Park Preserve — Phase II project. The south side Class I Trail connection will be a future City improvement (complete with Phase III).) 11) The developer shall prepare a Safe Route to School Plan for each phase of the project prior to the approval of its respective Final Map. The Safe Route to School Plan for Phase I and Phase IIa is complete. (Phase I and subsequent phases) 12) The developer shall provide an irrevocable offer of dedication to the City for areas shown on the Vesting Tentative Map as Public Open Space, as those parcels are created on the project Final Maps. The Phase I Final Map for the project has made an offer of dedication for the first portion of the possible public open space. The offer was not accepted by the City at this time. Prior to City acceptance of the public open space parcels, the issues of operation and maintenance will be addressed by the City Council. The developer shall cooperate with the City and assist in the resolution of issues related to the operation and maintenance of the open space, including solutions for the possible need for funding and related options which may include, but are not limited to: a maintenance district, land trust, endowment or some other type of district acceptable to the City. The developer shall remain responsible for the maintenance of the open space parcels until such time and they become part of the Homeowners Association or the City accepts the offers of dedication. The project CC &R's shall address the maintenance by the Homeowner's Association until such time as the City accepts the open space. (Phase I and subsequent phases) 13) The developer shall record a deed restriction of all Estate parcels (affects future phases) in order to preclude future subdivision of these parcels into smaller lots. The City will require a transfer of development rights from the creek ways and salamander mitigation areas when the parcels for these respective areas are created on future Final Maps. (Phase I and subsequent phases) 14) With the development of the portions of the project adjacent to Miller Road (future phases), the developer shall design and construct, at his expense, the proper realignment and construction of Miller Road to collector street standards, along the development frontage. The developer's obligation shall be one -half the width plus 12 feet of additional pavement. All standard infrastructure is required, including drainage, water, sewer, lighting and landscaping. Design and alignment shall be subject to review and approval by the City Engineer. (subsequent phases) 15) The developer shall design and construct the northbound bus pull out at the time that the respective interim traffic signal is required for each of the following intersections: Eagle Ridge Main Entrance, Eagle Ridge South Entrance, and at Miller Rd. /Santa Teresa Blvd. (Phase I and subsequent phases) 16) The developer shall be responsible for the storm water system maintenance as part of the SWPPP, previously prepared as part of Phase I, until the golf course operation plan is in effect. (subsequent phases) 17) The City engineer will monitor the adequacy of the Eagle Ridge storm drain system. If the City Engineer judges the improvements to be inadequate for the protection of public facilities, based on City design criteria, he may require corrective measures to be designed and constructed by the developer as a condition of approval for subsequent phases. (Phase I and subsequent phases) 18) The developer shall construct a reservoir(s) and pumps at the south Zone II reservoir site before the City accepts the subdivision improvement for the phase which contains the three hundred and first lot, or at an alternative stage to be determined by the City Engineer. 19) The developer shall install, test and make operational, an approved water supply system capable for providing adequate fire flow serving each phase of development, prior to start of combustible construction, subject to approval of the Fire Marshall. (Phase I and subsequent phases) 20) The developer shall provide service connections and meters for recycled water usage by Eagle Ridge, and shall provide for future extensions at location to be determined by the City Engineer. All facilities, backflow devices, and connections shall be designed and constructed by the Developer according to standards specified by the City Engineer. (Phase I and subsequent phases) 21) Throughout all phases of this project, the developer shall operate in accordance with the Tree Protection Plan. Exceptions may be granted by the Planning Division Manager for special circumstances. (Phase I and subsequent phases) 22) The developer is eligible for reimbursement for the non -City reimbursed cost of installation (or a portion thereof) of the sanitary sewer, potable water lines and pressure systems which either front, serve other developable properties or extend through other developable properties. These reimbursements are payable by the respective properties as they develop. Developer is eligible for said reimbursements for up to 10 years from the date of this agreement. (Phase I and subsequent phases) 23) Developer is responsible for all items discussed in Stipulation No. 2 until such items are complete or until the responsibility for said items becomes that of the Home Owner's Association due to land transfer or that of the Golf Course Owners due to land transfer. Any corrective actions borne by the City to implement measures to protect public facilities shall be reimbursed by the developer. (Phase I and subsequent phases) 24) The developer shall be reimbursed by the City for improvements which are part of the Traffic Impact Fund (TIF) and identified in this Stipulation. The reimbursement will be based on construction costs of the agreed upon TIF related items, and will not exceed the dollar amount of the TIF budget for those items. Said reimbursement will be paid in the fiscal year 1999/2000 but not later than upon completion of the improvements. For Phase IIB, this paragraph applies to the following improvements: Club Drive /Santa Teresa signal and accompanying pavement and Ballybunion Drive/Santa Teresa Blvd. signal and accompanying pavement. The amount of TIF reimbursement for the Club Drive /Santa Teresa intersection improvements is $54,169 and the amount of TIF reimbursement for the Ballybunion Drive /Santa Teresa Boulevard intersection is $51,250. These are the final reimbursement amounts based on actual bid prices. Future Phases may have other TIF related improvements, which will be identified at that time. (Phase I and subsequent phases) Accepted by: EAGLE RIDGE DEVELOPMENT COMPANY, LLC BY: SHAPELL INDUSTRIES, INC., MANAGII�q PARTNER AA I 4, TITLE: CE It DATE:i STATE OF CALIFORNIA )ss. COUNTY OF SANTA CLARA ) On 3/29/99 before me Linda A. Fluken, a Notary Public , , personally appeared Daniel W. Hancock personally known to me ) to be the personH whose names 4s/tre subscribed to the within instrument and acknowledged to me that hehhe4fey executed the same his authorized capacity(ies), and that by his wd4hoirsignature(s) on the instrument the person(e) or th entity upon behalf of which the personH acted, executed the instrument. WITNESS my hand and official seal. Sisna per GC Sec. 40814; CC Sec. 1181 7 a! LINDA A. FLUKEN Commission # 115935& z Notary Public - Calitartiio Sottta Clara County MyCamm.l�io'es � 2�1 DATE: NUMBER: 99 -16 PROJECT LOCATION: PARCEL NUMBER: OWNER /DEVELOPER: MAILING ADDRESS: TELEPHONE NO: PREPARED BY: 25- Mar -99 CITY OF GILROY COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION FINAL CHARGES Tract 8965, Phase 2B, Eagle Ridge A.P.N.'s 810 -22 -010, 810-41 -003, 841 -44- 005,006 & 007 Eagle Ridge Development Company, LLC P.O. Box 391169, 100 Milpitas Blvd., Milpitas, Ca. 95035 408 - 946 -1550 Maek Fachin Account No. Key Code Fee: 100- 2601 -3- 600400 4904 $20,845.18 100- 2601 -3- 600412 4702 $20,226.00 410 - 2600 -3- 629000 3302 $639,308.00 420 - 2600 -3- 680200 4501 $10,617.24 431 - 2600 -3- 680300 5001 $0.00 432- 2600 -3- 625000 3301 $0.00 433 - 2600 -3- 680000 4905 $282,532.00 434 - 2600 -3- 680000 4402 $34,960.00 435 - 2600 -3- 671000 4509 $333,408.00 436- 2600 -3- 695000 4510 $154,468.00 437 - 2600 -3- 680000 4511 $8,372.00 720- 0433 -3- 690000 2202 $0.00 801 - 0000 -2- 229015 4703 $0.00 801 - 0000 -2- 229015 4703 $0.00 801 - 0000 -2- 229015 4703 $0.00 Totals ................ XXXX $1,504,736.42 Bonds and Securities $347,700 SERVICE CHARGES (1) Credits: Amount Due: Account Description: $0.00 $20,845.18 Special Public Works Sery $0.00 $20,226.00 Engring Plan Check & Insp $305,756.00 $333,552.00 Park Development Fee $0.00 $10,617.24 Storm Development Fee $0.00 $0.00 Utility Undergrounding Fee $0.00 $0.00 Str Tree Development Fee $0.00 $282,532.00 Traffic Impact Fee $16,720.00 $18,240.00 Police Development Fee $0.00 $333,408.00 Sewer Development Fee $0.00 $154,468.00 Water Development Fee $4,004.00 $4,368.00 Fire Development Fee $0.00 $0.00 Const Water Use Fee $0.00 $0.00 Reimbursements $0.00 $0.00 XXXX $0.00 $0.00 XXXX $326,480.00 $1,178,256.42 DATE: 25- Mar -99 NUMBER: 99 -16 CITY OF GILROY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION FINAL COST SCHEDULE PROJECT LOCATION: Tract 8965 Phase 2B Eagle Ridge PARCEL NUMBER: A.P.N.'s 810-22 -010, 810 -41- 003, 841 -44- 005,006 & 007 OWNER /DEVELOPER: Eagle Ridge Development Company, LLC MAILING ADDRESS: P.O. Box 391169, 100 Milpitas Blvd., Milpitas, Ca. 95035 TELEPHONE NO: 408 -946 -1550 PREPARED BY: Maek Fachin DEFER PARK, POLICE & FIRE DEVEL(MENT FEES ? n NOTE: This 100 % cost schedule has been adjusted to the rates in effect at the time building permits were issued. 0.000 Site Information: Acres: Lots: Units: Y Residential -Low ? 25.770 95 92 N Residential -High ? 0.000 0 0 N Commercial -Low ? 0.000 0 N Commercial -High ? 0.000 0 N Industrial - General ? 0.000 0 N Industrial- Warehouse ? 0.000 0 N Assembly Hall? 0.000 0 Common Area? 0.000 Commercial /Industrial Allocations: Sewer GPD: Water GPD: 0 0 Reimbursements and credits: N Country Estates Water System? N Southeast Quadrant Hydrology Study? N Country Estates Sewer System? N Obata Industrial Park Credit? Front Footage for Front Foot Charges and Construction Water: Street Tree FF: Water FF: Sewer FF: Storm FF: 0.00 0.00 0.00 0.00 Special Public Works Services 100- 2600 -3- 600400 100% Maps: Final $3,025.00 + $50.00 / lot Y $7,775.00 Parcel $1,070.00 + $100.00 / lot N $0.00 Reapportionment (Assessment District Parcels) _ $1,767.00 + $100.00 / lot Y $11,267.00 Administration Fees: Country Estates Water System (Not Included) Country Estates Sewer Trunk Main (Not Included) Southeast Quadrant Hydrology Study (Not Included) COST SCHEDULE (1) Y $0.00 Y $0.00 Y $0.00 Construction Water FF: Sq Ft: 0041 $20,845.18 $20,845.18 Miscellaneous Engineering Services: (Cost Schedules, Agreements, R/W Reviews and Other Misc. Services) 20 hr Misc Services $77.00 / hr. Y $1,540.00 Public Works Microfilming (Maps and Plans): 1- 6 shts $152.94 + $6.75 / sheet Y $0.00 7 -12 shts $195.68 + $6.75 / sheet Y $263.18 13 -18 shts $238.40 + $6.75 / sheet Y $0.00 # of Shts 10 Engring Plan Check and Inspection 100- 2600 -3- 600412 (Based on total cost of public 100% right -of -way improvements) 11 hr Site grading and $77.00 / hr. N $0.00 reinspection charges = Actual Cost of Public Improvements $231,800 10% of first $100,000 Y $10,000.00 8% of $100,000 - $200,000 Y $8,000.00 7% over $200,000 Y $2,226.00 Offsite Improvements to be Bonded $231,800 Park Impact Fee 410- 2400 -3- 629000 100% a.Residential -Low $6,949.00 / unit Y $639,308.00 b.Residential -High $4,964.00 / unit Y $0.00 Storm Drain Impact Fee 420 - 2600 -3- 680200 100% a.Residential -Low $412.00 / acre Y $10,617.24 b.Residential -High $618.00 / acre Y $0.00 c.Commercial $823.00 / acre Y $0.00 d.lndustrial $926.00 / acre Y $0.00 e.Assembly Hall $412.00 / acre Y $0.00 Obata Industrial Park Credits (Based on reimbursements due from oversized storm facilities) Obata Fee Credit $1,170.00 / acre Y $0.00 COST SCHEDULE (2) $20,226.00 $20,226.00 $639,308.00 $639,308.00 $10,617.24 $10,617.24 Utility Underground Fee 431- 2600 -3- 680300 100% Front Footage $123.62 / f.f. x NE 0.00 Street Tree Fee 432 - 2400 -3- 625000 100% Front Footage a.City Planting and Replacement $2.51 / f.f. x N 0.00 = $0.00 b.lnspection and Replacement $0.35 / f.f. x Y 0.00 = $0.00 Traffic Impact Fee 433 - 2600 -3- 681000 100% a.Residential -Low $3,071.00 / unit Y $282,532.00 b.Residential -High $2,490.00 / unit Y $0.00 c.Commercial -Low Traffic ( <= 4 trips /1000 sf) $3,397.00 / k.s.f. Y $0.00 d.Commercial -High Traffic (> 4 trips /1000 sf) $6,864.00 / k.s.f. Y $0.00 e.lndustrial- General $1,326.00 / k.s.f. Y $0.00 f.industrial- Warehouse $977.00 / k.s.f. Y $0.00 Police Impact Fee 434- 1400 -3- 680000 100% a.Residential -Low $380.00 / unit Y $34,960.00 b.Residential -High $588.00 / unit Y $0.00 c.Commercial $581.00 / k.s.f. Y $0.00 d.lndustrial $21.00 / k.s.f. Y $0.00 COST SCHEDULE (3) $0.00 $0.00 $0.00 5 $282,532.00 $282,532.00 $34,960.00 $34,960.00 Sewer Impact Fee 435 - 2600 -3- 671000 $333,408.00 $8,372.00 100% $333,408.00 a.Residential -Low $3,624.00 / unit Y $333,408.00 b.Residential -High $2,589.00 / unit Y $0.00 c. Commercial /Industrial $58.00 / k.s.f. Y $0.00 $1,248.00 / cgpd Y $0.00 Country Estates Sewer Trunk Main Y $0.00 (Not Included) 100% _ Obata Industrial Park Credits + $168.14 / a.c. (Based on reimbursements due from oversized sewer facilities) (4) Obata Fee Credit $531.00 / acre Y $0.00 Water Impact Fee a. Residential -Low b.Residential -High c. CommerciaUl nd ustrial 436- 2600 -3- 695000 $1,679.00 / unit $1,199.00 / unit $2,551.00 / kgpd 100% Y $154,468.00 Y $0.00 Y $0.00 Obata Industrial Park Credits (Based on reimbursements due from oversized water facilities) Obata Fee Credit $154.00 / acre Y Fire Impact Fee a. Residential -Low b. Residential -High c. Commercial d.lndustrial Water User Fee (Construction) $2.58 / f.f. COST SCHEDULE $0.00 $154,468.00 $154,468.00 437 - 1500 -3- 680000 $8,372.00 100% $8,372.00 $91.00 / unit Y $8,372.00 $108.00 / unit Y $0.00 $58.00 / k.s.f. Y $0.00 $8.00 / k.s.f. Y $0.00 720 - 0433 -3- 690000 N $0.00 100% _ $0.00 + $168.14 / a.c. (4) Front Foot Charges: jUsed to charge and reimburse fees for existing infrastructure) Water 801 - 0000 -2- 229015 Water Mains, including fire hydrants, valves and box: 100% (Developer is responsible for up to and including 12" mains) Half Pipe Front Footage 6" Main $12.50 / f.f. x N 0.00 = $0.00 8" Main $13.50 / f.f. x N 0.00 = $0.00 10" Main $15.00 / f.f. x N 0.00 = $0.00 12" Main $16.83 / f.f. x N 0.00 = $0.00 14" Main $18.87 / f.f. x N 0.00 = $0.00 15' Main $21.42 / f.f. x N 0.00 = $0.00 18" Main $24.99 / f.f. x N 0.00 = $0.00 24" Main $31.11 / f.f. x N 0.00 = $0.00 30" Main $36.72 / f.f. x N 0.00 = $0.00 36" Main $43.35 / f.f. x N 0.00 = $0.00 Country Estates Water System Y $0.00 (Not Included) Sewer 801 - 0000 -2- 229015 Sewer Mains, including manhole: 100% (Developer is responsible for up to and including 12" mains) Half Pipe Front Footage 6" Main $12.00 / f.f. x N 0.00 = $0.00 8" Main $12.50 / f.f. x N 0.00 = $0.00 10" Main $14.00 / f.f. x N 0.00 = $0.00 12" Main $15.50 / f.f. x N 0.00 = $0.00 15" Main $19.38 / f.f. x N 0.00 = $0.00 18" Main $23.97 / f.f. x N 0.00 = $0.00 21" Main $28.05 / f.f. x N 0.00 = $0.00 24" Main $32.64 / f.f. x N 0.00 = $0.00 27" Main $36.21 / f.f. x N 0.00 = $0.00 Country Estates Sewer Trunk Main (Not Included) COST SCHEDULE (5) Y $0.00 $0.00 M $0.00 $0.00 Street Improvements 801- 0000 -2- 229015 $0.00 100% $0.00 Pavement Square Footage 3" AC on 8" AB $2.52 x 0.00 = $0.00 3" AC on 10" AB $2.83 x 0.00 = $0.00 3" AC on 12" AB $3.12 x 0.00 = $0.00 3" AC on 15" AB $3.58 x 0.00 = $0.00 Square Footage Sidewalk 4" on 4" $4.63 x 0.00 = $0.00 and driveway Front Footage Curb /Gutter on 6" $15.03 x 0.00 = $0.00 Storm Drain 801 - 0000 -2- 229015 $0.00 100% $0.00 Storm Mains, including manholes and catch basins: (Developer is responsible for up to and including 24" mains) Half Pipe Front Footage 18" Main $19.89 / f.f. x N 0.00 = $0.00 21" Main $21.42 / f.f. x N 0.00 = $0.00 24" Main $22.95 / f.f. x N 0.00 = $0.00 27" Main $24.48 / f.f. x N 0.00 = $0.00 30" Main $26.01 / f.f. x N 0.00 = $0.00 33" Main $27.54 / f.f. x N 0.00 = $0.00 36" Main $29.07 / f.f. x N 0.00 = $0.00 42" Main $33.15 / f.f. x N 0.00 = $0.00 48" Main $35.70 / f.f. x N 0.00 = $0.00 54" Main $38.76 / f.f. x N 0.00 = $0.00 60" Main $41.82 / f.f. x N 0.00 = $0.00 65' Main $44.88 / f.f. x N 0.00 = $0.00 72" Main $47.94 / f.f. x N 0.00 = $0.00 COST SCHEDULE (6) 78" Main 84" Main 90" Main 96" Main $51.00 / f.f. x $54.06 / f.f. x $57.12 / f.f. x $60.18 / f.f. x Southeast Quadrant Hydrology Study (Not Included) Bonds and Securities * Not included in TOTAL DUE N 0.00 = $0.00 N 0.00 = $0.00 N 0.00 = $0.00 N 0.00 = $0.00 Y $0.00 801 - 0000 -2- 229015 NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Site grading and reinspection charges including reinspection of backyard drainage will be billed at the Engineering Division hourly rate in effect at the time of inspection. : 0 Accepted b S :e P Y Date: /,Zcl /9 C, $347,700 (Estimated) up +t i do. ao ew I v { _I i • I 4 f 1 Vicinity Site Map Property Improvement Agreement No. 99 -16 Tract 8965, Phase 2B, Eagle Ridge A.P.N.s 810 -22- 010,810 -41- 003,841 -44- 005,006 & 007 Eagle Ridge Development Company, LLC Exhibit "A"