PIA No. 99-34 - Gagliardi PropertiesRECORDING REQUESTED BY
City of Gilroy
WHEN RECORDED, MAIL TO:
Rhonda Pellin
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
DOCUMENT: 14939446
111111111111111111111111
BRENDA DAVIS
SANTA CLARA COUNTY RECORDER
Recorded at the request of
City
Titles:] / Pages: 18
Fees.... 58.00
Taxes...
Copies..
AMT PAID 58.00
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
711 First Street
Gagliardi Properties, Inc.
Portion of APN 790 -23 -052
Property Improvement Agreement #99 -34
Commercial , Industrial, Institutional
RIDE # 009
8/13/1999
11:48 AM
_Q_F .4' -4 � i4
PRUMD-RERC-1-V Fryl-AP R 10-2 N T E-NXI P. N-'-' � A 1G, F m M F.Am-, T
Tr
_U T
RIAL, INSTY W—AL
NIERCIAL.-IN-j- IN I - Z —
, – L�.
A C_ Ulk4 XT F
--M C). cT - 1 " . . 1 0 N D
1-q v A
-.,,VfE!
-D-T T Trl IXTf�nT�Q A f,
JBT
-L U 1,1%- VV UPIrl- -FACYLITIES
J."U✓r-L 1 iN UIVII-PI-Ia!
Th. 1090, by and
10 ac ajj .-
y
6 i reementis, made a d enf,l g.,4 iji� fj,;� 2nd d-yof August -
.7
bev.-wen t' p +v nl �• rnv In 'y n i mg i,! [ire_
a munic-pal mrporaminn, n----I-- a
-p-pin C-Horl c- "--w—
v nvmer, fic Annfy r .. ..... i in F
Properties, Inc. n nremort
71ce"
-P-P AC i#
bi ilding pc mit i'S" —ffm
-7
C. -ec
nt;mre rnvenn- ce ain ! al
jr. P en. oi, n -M I + t P d RD t P
nw, n --,,--n n jiv +nr -.nnrn'....
..nn
LaL I-,LjOWn a3 anu -.,aIICU'
q_A 711 -F;--t Street, C, p TAI
11— Develop— requires, cemain +;1;+; ."d- public wor s fheiliti- in 01-d-
L4aimlL_. 4A.1- F oiks dhtie_s
q - __1 'h_ --A
iC'O—Ap, +Ic, —;nimm '42 f—'+ 11
L i i i- r!' y ----"?imam
iA REA Q fb. hno MWO Crt' - Odes
D remccmmcr
D-1.1+; n -+2 n nfpn nrn'
qJrn.n.jnrclq ,,nn M_n K_
nn
rity has cervfin respomsim.ifitimess. Iffir
and ot et ahon
+v --y +hp
y
�74v 10 q
clonna.ctixn-g system general plant and appurtenances, and
'h,, -qMv nli T� -H11 -11 n+
A looln
d L --- !!u� --j r- -
n-nov, n., H"I y ............
()n at Deve
r
- _fat__ purquan+ +n
NT(-IAAT rT-T R -punp-P ;n i
consill --ton of +t, re;ncr nre-;QPF-, anal in nrde- +0 cjrry on the
-
;nt-.ni -md mirnnSe. nf---in' .Corics, (D.-rdinances, Reso-hons and U,,Pl-ndq.-innq, i- p,,_rjjn nv nnn
he+vvee,n +hp na ics az
T1,a COA,s, ■Oradina �_S — -f
Rcsoliltions Puleg -nA Replations and establ, jaiw-
1 ..at all I 11'eA r"'Ut-4
n 1%.C'.L-- onnr�-rnirwr Tn(-
F "c's
f, 'a; n - a a n 11 + c- n; oF mod
n(I 2- th ta e o f 1. T 1) n I n
1 _n I n p 1 C! VVS -0 1 L
n,.f+,--,- ()F.f qgement are herchky referred to and incorpor-Med a7 . -.°.in 4i the same of
nn D i
n n_ in nfc,
lot nt al
_- +
A-
the. Code of the rit" Orld-0-Y,
Regulatimi's, i-Cluide, but car,C not linnited to, }Ni R0110wing I
—A q to
_!inn n jj.Tn&a ti,. n (i nnr-
SECTION 2
The Developer agrees:
a. To perform each and every provision required by the City to be performed by the
Developer in each and every one of said Codes, Ordinances, Resolutions, Rules and
other Regulations and to comply with the foregoing and all applicable laws.
b. To grant to the City without charge, free and clear of encumbrances, any and all
easements and rights of way in and to his said real property necessary for the City in
order that its water, electricity, and /or sewer lines in or to said real property may be
extended.
c. To indemnify, defend with counsel of City's choice and hold the City free and harmless
from all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities
and expenses (including without limitation attorneys' fees) incurred by City in
connection with (i) any damage done to any utility, public facility or other material or
installation of the City on said real estate which the Developer or any contractor or
subcontractor of the Developer, or any employee of the foregoing, shall do in grading
or working upon said real estate; or (ii) arising or resulting directly or indirectly from
any act or omission of Developer or Developer's contractors, or subcontractors, or any
employee of the foregoing in connection with the work performed by them in
connection with this agreement, including without limitation all claims relating to injury
or death of any person or damage to any property.
d. To construct and improve all public works facilities and other improvements described
in this agreement in accordance with all standards established in the Codes, Ordinances,
Resolutions, Rules and Regulations, all applicable laws and this agreement, and in
accordance with the grades, plans, and specifications therefore approved by the City
Engineer. Developer shall furnish two good and sufficient bonds, in form and content
and issued by a bonding company acceptable to City as follows: (1) a performance
bond to be executed in the face amount of not less than Thirty -One Thousand
Dollars ($31,000.00), and (ii) a payment bond to be executed in the face amount of not
less than Fifty percent (50 %) of the performance bond described in (i) immediately
above, both such bonds being issued for the improvements described in this agreement.
The performance bond shall secure payment to City and the Developer of any loss due
to the default of the contractor or its inability or refusal to perform its contract. The
payment bond shall secure payment to the subcontractors and persons renting
equipment for the furnishing of labor or materials for the improvements, as provided in
Sections 66499 et sec of the Government Code of the State of California, the Codes,
the Ordinances, Resolutions, Rules and the Regulations of the City, and this agreement.
Each bond shall set forth a time period for performance by the contractor of its
obligations and the terms and conditions on which the City may obtain the proceeds of
the bond. The performance bond shall by its terms remain in full force and affect for a
period of not less than one year after completion of the improvement by Developer and
acceptance of said improvements by City, to guarantee the repair and replacement of
defective material and faulty workmanship. Upon completion of the improvements by
Developer and acceptance of the improvements by City, Developer may substitute for
the performance bond securing maintenance described above, a separate maintenance
bond in the amount of 10% of the total contract price of the improvements (provided
that the amount of said bond shall not be less than One Thousand Dollars ($1,000)) to
cover the one year maintenance.
e. That upon approval of the final map of the subdivision, the record of survey or the
building permit covering the real estate to be improved and before any work is done
therein, the Developer shall pay to the City all sums, shown in Section 9 thereof to be
due under the terms and provisions of this agreement.
f. At all times during the term of this agreement and until the improvements constructed
by Developer are accepted by City, Developer shall, at no cost to City obtain and
maintain (a) a policy of general liability and property damage insurance in the minimum
amount of One Million Dollars ($1,000,000), combined single limit for both bodily
injury and property damage; (b) workers' compensation insurance as required by law;
and (c) broad form "Builder's Risk" property damage insurance with limits of not less
than 100% of the estimated value of the improvements to be constructed by Developer
pursuant to this agreement. All such policies shall provide that thirty (30) days written
notice must be given in advance to City prior to termination, cancellation or
modification. The insurance specified in (a) above shall name City as an additional
insured and the insurance specified in (c) shall name City as a loss payee„ and shall
provide that City, although an additional insured or loss payee, may recover for any loss
suffered by reason of the acts or omissions of Developer or Developer's contractors or
subcontractors or their respective employees. Developer hereby waives, and Developer
shall cause each of its contractors and subcontractors to waive, all rights to recover
against City for any loss or damage arising from a cause covered by the insurance
required to be carried pursuant to this agreement or actually carried by Developer in
connection with the work described in this agreement, and will cause each insurer to
waive all rights of subrogation against City in connection therewith. All policies shall
be written on an occurrence basis and not on a claims made basis and shall be issued by
insurance companies acceptable to City. Prior to commencing any work pursuant this
agreement, Developer shall deliver to City the insurance company's certificate
evidencing the required coverage, or if required by City a copy of the policies obtained.
SECTION 3
That except as otherwise expressly provided in this Agreement, all sums shown herein to be
payable by the Developer to the City are due and payable to the City upon the execution of this
agreement. -
11
SECTION 4
That all the provisions of this agreement and all work to be done pursuant to the terms of this
agreement are to be completed to City's Satisfaction within one year from and after the date and
year first above written. Developer shall maintain such public works facilities and other
improvements described in this agreement at Developer's sole cost and expense at all times prior
to acceptance by City in a manner which will preclude any hazard to life or health or damage to
property.
SECTION 5
That the special provisions concerning the particular real estate referred to above, being
attached hereto, are hereby incorporated herein and expressly made a part of this agreement.
SECTION 6
That the faithful and prompt performance by the Developer of each and every term and
condition contained herein is made an express condition precedent to the duty of the City to
perform any act in connection with this transaction, and the failure, neglect or refusal of the
Developer to so perform, or to pay any monies due hereunder when due shall release the City
from any and all obligations hereunder and the City, at its election, may enforce the performance
of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it
may have under the applicable or the Codes, Ordinances, Resolutions, Rules and Regulations of
the City, in the event of any such default by Developer.
SECTION 7
That this agreement, together with the attached stipulations, is an instrument affecting the
title or possession of the real property described in Exhibit A. All the terms, covenants and
conditions herein imposed shall be binding upon and inure to the benefit of City, Developer and
the successors in interest of Developer. Upon the sale or division of the property described in
Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of
each parcel shall succeed to the obligations imposed on Developer by this agreement.
SECTION 8
The Developer will pay for a daily sewer and water allocation. The allocation limits are as
follows:
Sewer capacity not to exceed: 1,500 gpd
Peak water -use not to exceed: 2,000 gpd
The City will attempt to provide additional capacity at the then current rate. If additional
capacity is not available, the Developer agrees to maintain sewer and water use at or below the
amounts purchased.
The Developer shall have the option of measuring sewer effluent by:
a. Installing and maintaining a sewer effluent meter. Said meter shall
meet City Standards and specifications, or
b. Measuring the building's water consumption through the water meter.
Irrigation meters are required.
PENALTY:
Overuse of sewer and water allocations shall be penalized under the Rules and Regulations
adopted by the Gilroy City Council.
SECTION 9
That the following General Stipulations shall be completed subject to the approval of the
Director of Community Development.
Locate and properly dispose of any wells, septic tanks and underground fuel storage
facilities. NOTE: The capping of any well will require inspection by the Santa
Clara Valley Water District.
2. Schedule the construction of improvements along existing public roads so that the work
affecting vehicular traffic is completed with a minimum interruption to traffic.
3. All work within the public right -of -way shall be subject to the approval of the City
Engineer.
4. Before construction utilizing combustible materials may proceed, an all weather access
must be provided to within 150 feet of the building site; and at least one in service fire
hydrant must be available within 500 feet of each portion of the site wherein this
construction is to take place. Location of the fire hydrants will be determined by the
Fire Chief.
0
SECTION 10
That the attached Development Cost Schedule enumerates all fees and their extensions.
TOTAL AMOUNT DUE CITY
$ 65,956.33
IN WITNESS WHEREOF, said parties have caused these presents to be executed the date
and year first above written.
ATTEST:
Rhonda Pellin
CITY CLERK
APPROVED AS TO FORM:
Linda A. Callon
CITY ATTORNEY
DATE: F — a- 77
DATE: 131-2- -if
NOTE: If Developer is a corporation, the complete legal name and corporate seal of the
corporation and the corporate titles of the persons signing for the corporation shall appear above.
7
STATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
On August 3, 1999, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa
personally known to me to be the person whose name is subscribed to the within instrument and
acknowledged to me that he executed the same in his authorized capacity, and that by his
signature on the instrument the person or the entity upon behalf of which the person acted,
executed the instrument.
WITNESS my hand and official seal.
Signature of Notary Public
per GC Sec. 40814; CC Sec. 1181
v r RHONDA PEWN
LeCommission # 1142623
Notary Public - Califamq
Santa Clara County
Mf' �'o►nm• E Tres Jun 19, 2001
(Notary Seal)
STATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
On 1-:29-1:R, before me, Sharon Cunni n klam ,
personally appeared yoe Ga Q I i ar,4
personally known to me (or proved to me on the basis of satisfactory evidence) to be the
person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that
he /she /they executed the same in his /her /their authorized capacity(ies), and that by his /her /their
signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s)
acted, executed the instrument.
WITNESS my hand and official seal.
Signature
per GC Sec. 40814; CC Sec. 1181
SHARON CUNNINGHAM
COMM. !1067881
NOTARY PUBLIC *CALIFORNIA
SANTA CLARA COUNTY
my Comm. m Au ust 6,1999
Irish 6 'a, n' CT.
llii!il
I c
CLI
.I
I II
r
Ir-►
ii
I
I i I
i I
' I
i I i
i l
Dr
i I i i I I• I
I I
I I' Ci r�;e I I
i,
i I I
E.'i I Tnirc 11 1
Lea IP�slbrnal
.1
�11
Ei i ,C1 erTit0 e,
1
!91TE
co
\ ` zj
�IIIII!���C
\ l jlcia =4
II1.
`8'raeducy
r--- -1G
ot�1
E `
c
ZE
it'' = S C HOCI
��— \,MILLER
' \PARK
I� i I 1 1 ✓ f E L EM.
ECHO(
II I
II N 1
II I
�I I
!� II
�I I
ELEM. I IL ii
SChOaL�
�I
1
1c1
cn
PROPERTY IM' P OVFI%I---NT AGREE:"RNT
711 FIRET STF= ET,POF.TION of A.P.N. 790 -2: -052
GAGLIARDI PROPERTIES, INC.
E.{: =23IT A
DATE:
NUMBER:
PROJECT LOCATION:
PARCEL NUMBER:
OWNER /DEVELOPER:
MAILING ADDRESS:
TELEPHONE NO:
PREPARED BY:
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
30- Jul -99 ENGINEERING DIVISION
FINAL CHARGES
9994 ALL PARK, POLICE & FIRE DEVELOPMENT FEES
HAVE BEEN DEFERED TO BUILDING PERMIT.
711 First Street
Account No. Key Code
100 -2601 - 00003625 4904
100 -2601 - 0000 -3605 4702
• ^ "�•T���•;cT i
• :•• 8888 .:•
:68 8696 =4
4342600- 0000 -3660
435- 2600 - 0000 -3660
436- 2600- 0000 -3660
437- 2600 - 0000 -3660
438-2600-0000-3660
720 - 0433- 0000 -3620
801- 2601 -PW DO-3899
801- 2601 -PW DO3899
801- 2601 -PW DO3899
801- 2601 -PW DO -3899
Totals ................
Bonds and Securities
SERVICE CHARGES
c6
4402
4509
4510
4511
4512
2202
4703
4703
4703
4703
A.P.N. 790 -23 -052
Gagliardi Properties, Inc.
2380 S. Bascom Ave., Campbell, Ca. 95008
Mark Fachin
Fee:
Credits:
Amount Due:
Account Description:
$154.00
$0.00
$154.00
Special Public Works Sery
$3,100.00
$0.00
$3,100.00
Engring Plan Check & Insp
$0.00
DEFERED TO
BLDG PERMIT
Park Development Fee
$867.00
$0.00
$867.00
Storm Development Fee
$0.00
$0.00
$0.00
Utility Undergrounding Fee
$0.00
$0.00
$0.00
Str Tree Development Fee
$30,568.33
$0.00
$30,568.33
Traffic Impact Fee
$7,712.10
DEFERED TO
BLDG PERMIT
Police Development Fee
$25,845.00
$0.00
$25,845.00
Sewer Development Fee
$5,422.00
$0.00
$5,422.00
Water Development Fee
$320.66
DEFERED TO
BLDG PERMIT
Fire Development Fee
$840.21
DEFERED TO
BLDG PERMIT
Public Facilities Impact Fee
$0.00
$0.00
$0.00
Const Water Use Fee
$0.00
$0.00
$0.00
Reimbursements
$0.00
$0.00
$0.00
XXXX)
$0.00
$0.00
$0.00
XXXX)
$0.00
$0.00
$0.00
XXXX)
$74,829.30
$0.00
$65,956.33
$46,500
(1)
CITY OF GILROY
DEPARTMENT OF PUBLIC WORKS
DATE: 30- Jul -99 ENGINEERING DIVISION
FINAL COST SCHEDULE
NUMBER: 9934 ALL PARK, POLICE & FIRE DEVELOPMENT FEES
HAVE BEEN DEFERED TO BUILDING PERMIT.
PROJECT LOCATION:
711 First Street
PARCEL NUMBER:
A.P.N. 790 -23-052
OWNER /DEVELOPER:
Gagliardi Properties Inc
MAILING ADDRESS:
2380 S Bascom Ave., Campbell Ca. 95008
TELEPHONE NO:
0
PREPARED BY:
Mark Fachin
DEFER PARK, POLICE & FIRE DEVEL, MENT FEES ? Y
NOTE: This
100 % cost schedule has been adjusted to the rates in effect at the time building permits were
issued. All Park, Police & Fire development impact fees have been defered and will be collected with the building
permit fees.
Site Information:
Acres: Lots: Units:
Sq Ft:
N Residential -Low ?
0.000 0 0
N Residential -High ?
0.000 0 0
N Commercial -Low ?
0.000 0
0
Y Commercial -High ?
1.000 1
4,059
N Industrial- General ?
0.000 0
0
N Industrial - Warehouse ?
0.000 0
0
N Assembly Hall?
0.000 0
0
Common Area?
0.000
0
CommerciaVIndustrial Allocations:
Reimbursements and credits:
N Country Estates Water System?
N Country Estates Sewer System?
N Obata Industrial Park Credit?
Front Footage for Front Foot Charges and Construction Water:
Street Tree FF: Water FF:
0.00 0.00
Sewer GPD
-'i •
Water GPD:
r •I•
N Southeast Quadrant Hydrology Study?
Sewer FF
0.00
Special Public Works Services 100-2601-00003625
Maps:
Final $3,025.00 + $50.00 / lot N
Parcel $1,070.00 + $100.00 / lot N
Reapportionment (Assessment District Parcels) _
$1,767.00 + $100.00 / lot N
Administration Fees:
Country Estates Water System
(Not Included)
Country Estates Sewer Trunk Main
(Not Included)
Southeast Quadrant Hydrology Study
(Not Included)
COST SCHEDULE (1)
Storm FF:
0.00
100%
$0.00
$0.00
$0.00
Y $0.00
Y $0.00
Y $0.00
Construction Water FF:
••,
$154.00
$154.00
Miscellaneous Engineering Services:
(Cost Schedules, Agreements, RAN Reviews and Other Misc. Services)
2 hr Misc Services $77.00 / hr.
Public Works Microfilming (Maps and Plans):
1- 6 shts $152.94 +
7 -12 shts $195.68 +
13-18 shts $238.40 +
# of Shts 2
Engring Plan Check and Inspection
(Based on total cost of public
right -of -way improvements)
2 hr Site grading and
reinspection charges
Actual Cost of Public Improvements
10% of first
8% of $100,000 -
7% over
Offsite Improvements to be Bonded
Park Impact Fee
a. Residential -Low
b.Residential -High
Storm Drain Impact Fee
$6.75 / sheet
$6.75 / sheet
$6.75 / sheet
Y $154.00
N $0.00
Y $0.00
Y $0.00
$77.00 / hr. N
$31,000
$100,000 Y $3,100.00
$200,000 Y $0.00
$200,000 Y $0.00
$31,000
PARK FEE DEFERED TO BUILDING PERMIT
410 - 2600 - 0000 -3660 $0.00
100% $0.00
$7,517.00 / unit Y $0.00
$5,369.00 / unit Y $0.00
420 - 2600- 0000 -3660
$867.00
$867.00
100%
a.Residential -Low
$434.00
/
acre
Y
$0.00
b.Residential -High
$650.00
/
acre
Y
$0.00
c.Commercial
$867.00
/
acre
Y
$867.00
d.lndustrial
$976.00
/
acre
Y
$0.00
e.Assembly Hall
$434.00
/
acre
Y
$0.00
Obata Industrial Park Credits
(Based on reimbursements due from oversized storm facilities)
Obata Fee Credit
$1,170.00
/
acre
Y
$0.00
COST SCHEDULE
(2)
$867.00
$867.00
Utility Undergr6und Fee
$126.09 / f.f. x
Street Tree Fee
a.City Planting and Replacement
$2.56 / f.f. x
Wnspection and Replacement
$0.36 / f.f. x
Traffic Impact Fee
a.Residential -Low
b. Residential -High
c.Commercial -Low Traffic
( <= 4 trips /1000 sf)
d. Commercial -High Traffic
(> 4 trips /1000 sf)
e. I ndustrial- General
f. I nd u stria I -W areho use
Police Impact Fee
a.Residential -Low
b.Residential -High
c.Commercial
d.lndustrial
COST SCHEDULE
Front Footage
NE 0.00
432- 2600 - 00003660
Front Footage
N 0.00 =
Y 0.00 =
100%
100%
$0.00
•.• ••
433- 2600 - 0000
- 3660
$30,568.33
100%
$30,568.33
$3,370.00 /
unit
Y
$0.00
$2,732.00 /
unit
Y
$0.00
$3,727.00 /
k.s.f.
Y
$0.00
$7,531.00 /
k.s.f.
Y
$30,568.33
$1,455.00 /
k.s.f.
Y
$0.00
$1,072.00 /
k.s.f.
Y
$0.00
POLICE FEE DEFERED TO BUILDING PERMIT
434-2600- 0000-3660
$7,712.10
100%
$7,712.10
$1,293.00 /
unit
Y
$0.00
$1,940.00 /
unit
Y
$0.00
$1,900.00 /
k.s.f.
Y
$7,712.10
$72.00 /
k.s.f.
Y
$0.00
(3)
Sewer Impact Fee
435-2600- 0000
-3660
$25,845.00
100%
$25,845.00
a.Residential -Low
$5,001.00 /
unit
Y
$0.00
b.Residential -High
$3,573.00 /
unit
Y
$0.00
c.Commercial /Industrial
$1,723.00 /
cgpd
Y
$25,845.00
Country Estates Sewer Trunk Main
Y
$0.00
(Not Included)
_
Obata Industrial Park Credits
(Based on reimbursements due from oversized sewer facilities)
Obata Fee Credit
$531.00 /
acre
Y
$0.00
Water Impact Fee
436-2600 - 0000-3660
$5,422.00
100%
$5,422.00
a. Residential -Low
$1,784.00 /
unit
Y
$0.00
b. Residential -High
$1,274.00 /
unit
Y
$0.00
c.Commercial /Industrial
$2,711.00 /
kgpd
Y
$5,422.00
Obata Industrial Park Credits
(Based on reimbursements due from oversized water facilities)
Obata Fee Credit
$154.00 /
acre
Y
$0.00
Fire Impact Fee
437-2600-0000-3660
$320.66
100%
$320.66
a.Residential -Low
$89.00 /
unit
Y
$0.00
b.Residential -High
$128.00 /
unit
Y
$0.00
c.Commercial
$79.00 /
k.s.f.
Y
$320.66
d.lndustrial
$10.00 /
k.s.f.
Y
$0.00
Public Facilities Impact Fee
438-2600- 0000
-3660
$840.21
100%
$840.21
a.Residential
$749.00 /
unit
Y
$0.00
b.Commercial
$207.00 /
k.s.f.
Y
$840.21
c.lndustrial- General
$193.00 /
k.s.f.
Y
$0.00
d.lndustrial- Warehouse
$145.00 /
k.s.f.
Y
$0.00
Water User Fee (Construction)
7
0
N
$0.00
100% _
$0.00
$2.58 / f.f.
COST SCHEDULE (4)
+ $168.14 / a.c.
Front Foct Charges:
(Used to charge and reimburse fees for existing infrastructure)
Water
801- 2601 -PW D0--'899
Water Mains, including fire hydrants, valves and box:
100%
(Developer is responsible for up to and including 12" mains)
Half Pipe
Front Footage
5' Main $12.50 /
f.f. x
N
0.00 =
$0.00
8" Main $13.50 /
f.f. x
N
0.00 =
$0.00
10" Main $15.00 /
f.f. x
N
0.00 =
$0.00
12" Main $16.50 /
f.f. x
N
0.00 =
$0.00
14' Main $18.50 /
f.f. x
N
0.00 =
$0.00
15' Main $21.00 /
f.f. x
N
0.00 =
$0.00
18" Main $25.00 /
f.f. x
N
0.00 =
$0.00
24' Main $31.50 /
f.f. x
N
0.00 =
$0.00
30" Main $37.00 /
f.f. x
N
0.00 =
$0.00
36' Main $43.50 /
f.f. x
N
0.00 =
$0.00
Country Estates Water System
Y
$0.00
(Not Included)
Sewer
801 - 2601 -PW D0-3899
Sewer Mains, including manhole:
100
(Developer is responsible for up to and including 12" mains)
Half Pipe
Front Footage
5' Main $12.00 /
f.f. x
N
0.00 =
$0.00
8" Main $12.50 /
f.f. x
N
0.00 =
$0.00
10" Main $14.00 /
f.f. x
N
0.00 =
$0.00
12" Main $15.50 /
f.f. x
N
0.00 =
$0.00
1S' Main $19.00 /
f.f. x
N
0.00 =
$0.00
18" Main $24.00 /
f.f. x
N
0.00 =
$0.00
21" Main $28.50 /
f.f. x
N
0.00
$0.00
24' Main $33.00 /
f.f. x
N
0.00 =
$0.00
27' Main $36.50 /
f.f. x
N
0.00 =
$0.00
Country Estates Sewer Trunk Main
(Not Included)
COST SCHEDULE (5)
Y $0.00
.• ••
•.• �•
Street, Improvements
801 -2601 -PWDO-3899
$0.00
100% $0.00
Pavement
Square Footage
3' AC on 8" AB
$2.57
x 0.00 =
$0.00
Half Pipe
3' AC on 10" AB
$2.89
x 0.00 =
$0.00
3' AC on 12" AB
$3.18
x 0.00 =
$0.00
3' AC on 1S' AB
$3.65
x 0.00 =
$0.00
N
0.00 =
$0.00
Square Footage
N
Sidewalk 4' on 4'
$4.72
x 0.00 =
$0.00
and driveway
$0.00
33' Main $28.00 / f.f. x
N
0.00 =
$0.00
Front Footage
N
Curb /Gutter on 5'
$15.33
x 0.00 =
$0.00
Storm Drain
801- 2601- PWDO3899
$0.00
100% $0.00
Storm Mains, including manholes and catch basins:
(Developer is responsible for up to and including 24' mains)
Half Pipe
Front Footage
18" Main $20.00 / f.f. x
N
0.00 =
$0.00
21" Main $22.00 / f.f. x
N
0.00 =
$0.00
24' Main $23.50 / f.f. x
N
0.00 =
$0.00
27' Main $25.00 / f.f. x
N
0.00 =
$0.00
30" Main $26.50 / f.f. x
N
0.00 =
$0.00
33' Main $28.00 / f.f. x
N
0.00 =
$0.00
36' Main $29.50 / f.f. x
N
0.00 =
$0.00
42" Main $33.00 / f.f. x
N
0.00 =
$0.00
48" Main $36.50 / f.f. x
N
0.00 =
$0.00
54' Main $39.50 / f.f. x
N
0.00 =
$0.00
60" Main $43.00 / f.f. x
N
0.00 =
$0.00
65' Main $46.00 / f.f. x
N
0.00 =
$0.00
72" Main $49.00 / f.f. x
N
0.00 =
$0.00
COST SCHEDULE (6)
*' Main $52.00 /
f.f. x
84' Main $55.00 /
f.f. x
90" Main $58.00 /
f.f. x
96' Main $61.00 /
f.f. x
Southeast Quadrant Hydrology Study
N 0.00 =
(Not Included)
Bonds and Securities
$0.00
Not included in TOTAL DUE
N 0.00 =
$0.00
N 0.00 =
$0.00
N 0.00 =
$0.00
N 0.00 =
$0.00
Y
$0.00
801- 2601 -PW D0-3899
NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued.
The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated
fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the
difference. Site grading and reinspection charges including reinspection of backyard drainage will be billed at the
Engineering Division hourly rate in effect at the time of inspection.
Accepted by:
Date: Z /
$46,500
(Estimated)