PIA No. 2005-12 - Gilroy Country Oaks Estates, LLC
:"
DOCUMENT: 18519390
RECORDING REQUESTED BY:
II! II \I! 11111\111111\11 '1\11111
City of Gilroy
BRENDA DAVIS
SANTA CLARA COUNTY RECORDER
Recorded at the request of
City
WHEN RECORDED, MAIL TO:
Rhonda Pellin
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
Fees
Taxes.
Copies.
AMT PAID
Pages: i 6
52 00
52.00
RDE ** 004
8/ I 1/2005
1: 36 PM
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
Property Improvement Agreement No: 2005-12
Tract 9473, Country Estates III @ Crest Hill Way
APN: 783-47-004,783-46-010
Gilroy Country Oaks Estates, LLC
A California Limited Liability Company
-1-
7/21/05
PROPERTY IMPROVEMENT AGREEMENT RESIDENTIAL
AGREEMENT FOR EXTENSIONS OF WATER DISTRIDUTION SYSTEMS:
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM
DRAINS AND OTHER PUBLIC WORKS FACILITIES
Property Improvement Agreement No. 2005-12
This agreement is made and entered into this 1St day of /-1 L12 t< .5 f , 2005, by
and between the City of Gilroy; a municipal corporation herein cal d the "CIty" and
Gilroy Country Oaks Estates, LLC, by a real property owner, developer or subdivider, herein
called the "Developer".
WHEREAS, a parcel map of subdivision, record of surveyor building permit (Site
Clearance) application has now been submitted to the City for approval and acceptance, covering
certain real estate known as and called: Tract 9473, Country Estates III at Crest Hill Way,
APN: 783-47-004, 783-46-010.
WHEREAS, the Developer requires certain utilities and public works facilities in order to
service the property under the minimum standards established by the City and,
WHEREAS, the City, by and through its City Council, has enacted certain Codes,
Ordinances and Resolutions and certain Rules and Regulations have been promulgated
concerning the subject matter of this agreement and,
WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities
and public service facilities after acceptance by City, and for providing the necessary connecting system,
general plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided
that Developer has faithfully and fully complied with all of the terms, covenants, conditions to be
performed by Developer pursuant to this agreement.
NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the
intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between
the parties as follows:
SECTION 1
That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the
City and the laws of the State of California and the United States of America concerning the subject
matter of this agreement are hereby referred to and incorporated herein to the same effect as if they were
set out at length herein. Said Codes, Ordinances, Resolutions, Rule and Regulations include, but are not
limited to, the following: the Code of the City of Gilroy, the current Zoning Ordinance, and the currently
adopted Uniform Building Code.
-2-
7/21/05
SECTION 2
The Developer agrees:
a. To perform each and every provision required by the City to be performed by the Developer
in each and every one of said Codes, Ordinances, Resolutions, Rules and other Regulations
and to comply with the foregoing and all applicable laws.
b. To grant to the City without charge, free and clear of encumbrances, any and all easements
and rights of way in and to his said real property necessary for the City in order that its water,
electricity, and/or sewer lines in or to said real property may be extended.
c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from
all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and
expenses (including without limitation attorneys' fees) incurred by City in connection with (i)
any damage done to any utility, public facility or other material or installation of the City on
said real estate which the Developer or any contractor or subcontractor of the Developer, or
any employee of the foregoing, shall do in grading or working upon said real estate; or (ii)
arising or resulting directly or indirectly from any act or omission of Developer or
Developer's contractors, or subcontractors, or any employee of the foregoing in connection
with the work performed by them in connection with this agreement, including without
limitation all claims relating to injury or death of any person or damage to any property.
d. To construct and improve all public works facilities and other improvements described in
this agreement in accordance with all standards established in the Codes, Ordinances,
Resolutions, Rules and Regulations, all applicable laws and this agreement, and in
accordance with the grades, plans, and specifications approved by the City Engineer.
Developer shall furnish two good and sufficient bonds, a Payment Bond on a form
provided by the City and a Faithful Performance Bond, both of which shall be secured
from a surety company admitted to do business in California. Each bond shall set forth a
time period for performance by the contractor of its obligations and the terms and
conditions on which the City may obtain the proceeds of the bond.
The Faithful Performance Bond shall be in an amount not less than one hundred percent
(100%) of the total estimated amount payable for the improvements described in this
agreement, and shall secure payment to City and the Developer of any loss due to the
default of the contractor or its inability or refusal to perform its contract. The
performance bond shall by its terms remain in full force and effect for a period of not less
than one year after completion of the improvements by Developer and acceptance of the
improvements by City, to guarantee the repair and replacement of defective material and
faulty workmanship. Upon completion of the improvements by Developer and
acceptance of the improvements by City, Developer may substitute for the performance
-3-
7121/05
bond securing maintenance described above, a separate maintenance bond issued by an
admitted surety in the amount of ten percent (10%) of the total contract price of the
improvements (provided that the amount of said bond shall not be less than One
Thousand Dollars ($1,000) to cover the one-year maintenance period.
The Payment Bond shall be in an amount not less than one hundred percent (100%) of
the total estimated amount payable for the improvements described in this agreement.
The Payment Bond shall secure the payment of those persons or entities to whom the
Developer may become legally indebted for labor, materials, tools, equipment or services
of any kind used or employed by the contractor or subcontractor in performing the work,
or taxes or amounts to be withheld thereon. The Payment Bond shall provide that the
surety will pay the following amounts should the Contractor or a Subcontractor fail to
pay the same, plus reasonable attorneys' fees to be fixed by the court if suit is brought
upon the bond: (1) amounts due to any of the persons named in California Civil Code
Section 3181; (2) amounts due under the Unemployment Insurance Code with respect to
work or labor performed for the improvements described in this agreement; and (3) any
amounts required to be deducted, withheld, and paid over to the Employment
Development Department from the wages of employees of the Contractor and
Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with
respect to the work and labor. The Payment Bond shall, by its terms, inure to the benefit
of any of the persons named in Civil Code Section 3181 so as to give a right of action to
those persons or their assigns in any suit brought upon the bond.
Simultaneously with the submission of its building permit application (Site Clearance),
the Developer shall submit the following for both the surety that furnishes the Payment
Bond and the surety that furnishes the Faithful Performance Bond: (1) a current printout
from California Department of Insurance's website (www.insurance.ca.gov) showing
that the surety is admitted to do business in the State; or (2) a certificate from the Clerk
of the County of Santa Clara that the surety's certificate of authority has not been
surrendered, revoked, canceled, annulled, or suspended or in the event that it has, that
renewed authority has been granted.
e. That upon approval of the final map of the subdivision, the record of surveyor the building
permit covering the real estate to be improved and before any work is done therein, the
Developer shall pay to the City all sums, shown in Section 9 thereof to be due under the
terms and provisions of this agreement.
f. At all times during the term of this agreement and until the improvements constructed by
Developer are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a
policy of general liability and property damage insurance in the minimum amount of One
Million Dollars ($1,000,000), combined single limit for both bodily injury and property
damage; (b) workers' compensation insurance as required by law; and (c) broad form
"Builder's Risk" property damage insurance with limits of not less than 100% of the
-4-
7/21/05
estimated value of the improvements to be constructed by Developer pursuant to this
agreement. All such policies shall provide that thirty (30) days written notice must be given
in advance to City prior to termination, cancellation or modification. The insurance specified
in (a) above shall name City as an additional insured and the insurance specified in (c) shall
name City as a loss payee" and shall provide that City, although an additional insured or loss
payee, may recover for any loss suffered by reason of the acts or omissions of Developer or
Developer's contractors or subcontractors or their respective employees. Developer hereby
waives, and Developer shall cause each of its contractors and subcontractors to waive, all
rights to recover against City for any loss or damage arising from a cause covered by the
insurance required to be carried pursuant to this agreement or actually carried by Developer
in connection with the work described in this agreement, and will cause each insurer to waive
all rights of subrogation against City in connection therewith. All policies shall be written on
an occurrence basis and not on a claims made basis and shall be issued by insurance
companies acceptable to City. Prior to commencing any work pursuant this agreement,
Developer shall deliver to City the insurance company's certificate evidencing the required
coverage, or if required by City a copy of the policies obtained.
SECTION 3
That except as otherwise expressly provided in this Agreement, all sums shown herein to be
payable by the Developer to the City are due and payable to the City upon the execution of this
agreement.
SECTION 4
That all the provisions of this agreement and all work to be done pursuant to the terms of this
agreement are to be completed to City's satisfaction within one year from and after the date and
year first above written. Developer shall maintain such public works facilities and other
improvements described in this agreement at Developer's sole cost and expense at all times prior
to acceptance by City in a manner which will preclude any hazard to life or health or damage to
property.
SECTION 5
That the special provisions concerning the particular real estate referred to above, being
attached hereto, are hereby incorporated herein and expressly made a part of this agreement.
SECTION 6
That the faithful and prompt performance by the Developer of each and every term and condition
contained herein is made an express condition precedent to the duty of the City to perform any
act in connection with this transaction, and the failure, neglect or refusal of the Developer to so
perform, or to pay any monies due hereunder when due shall release the City from any and all
obligations hereunder and the City, at its election, may enforce the performance of any provision
-5-
7/21/05
herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under
applicable laws or the Codes, Ordinances, Resolutions, Rules and Regulations of the City, in the
event of any such default by Developer.
SECTION 7
That this agreement, together with the attached stipulations, is an instrument affecting the
title or possession of the real property described in Exhibit A. All the terms, covenants and
conditions herein imposed shall be binding upon and inure to the benefit of City, Developer and
the successors in interest of Developer. Upon the sale or division of the property described in
Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of
each parcel shall succeed to the obligations imposed on Developer by this agreement.
SECTION 8
That the following General Stipulations and the attached stipulations shall be completed
subject to the approval of the Community Development Director.
1) Locate and properly dispose of any wells, septic tanks and underground fuel storage
facilities. NOTE: The capping of any well will require inspection by the Santa Clara
Valley Water District.
2) Schedule the construction of improvements along existing public roads so that the work
affecting vehicular traffic is completed with a minimum interruption to traffic.
3) All work within the public right-of-way shall be subject to the approval of the City
Engineer.
4) Before construction utilizing combustible materials may proceed, an all weather access
must be provided to within 150 feet of the building site; and at least one in service fire
hydrant must be available within 150 feet of each portion of the site wherein this
construction is to take place. Location of the fire hydrants will be determined by the Fire
Chief.
5) All work shall be coordinated so that the existing residents have access to their properties.
6) The Developer shall submit to the City of Gilroy an electronic copy of the final map as an
Autocad drawing file (DWG format, Autocad 2002 maximum).
7) Off-site public improvements shall be installed per the approved improvement plans.
8) The developer shall pay to the City reimbursement amounts as shown on the attached
final cost schedule to cover improvements installed under the country Estate Tract 8136
Property Improvement Agreement that benefited this property.
-6-
7/21/05
" 9) Before issuance of any building permit, all roadway infrastructures shall be in place and
covered with an all weather road; subject to approval of the City Engineer.
SECTION 9 .
That the attached Development Cost Schedule No: 2005-12 enumerates all fees and their
extensions.
TOT AL AMOUNT DUE THE CITY OF GILROY: $625,446.69.
ATTEST:
/) -
" .'
. .//1
ulc. L {J~
. ~ .
IN WITNESS WHEREOF, City has executed this agreement as of
i';,i,' .
......- \. .Lt JL:' /
." ",>, \' i/ l. L/\..
Rhonda Pellin
CITY CLERK
, APP~RM:
~CITY ATIORNEY
IN WITNESS WHEREOF Owner has executed this agreement as of
Owner: Gilroy Country Oaks Estates, LLC
A California Limited Liability Company
By:
eece
Representative
NOTE: If Developer is a corporation, the complete legal name and corporate seal of the
corporation and the corporate titles of the persons signing for the corporation shall appear above.
Property Improvement Agreement No. 2005-12
-7-
7/21105
STATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
TITLE OF DOCUMENT: Property Improvement Agreement No. 2005-12, Tract 9473,
Country Estates III @ Crest Hill Way, APN: 783-47-004, 783-46-
010, Gilroy Country Oaks Estates, LLC, A California Limited
Liability Company
On August 2,2005, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa
personally known to me to be the person whose name is subscribed to the within instrument and
acknowledged to me that he executed the same in his authorized capacity, and that by his
signature on the instrument the person or the entity upon behalf of which the person acted,
executed the instrument.
WITNESS my hand and official seal.
I ,/1 d
;{ /; ~ ~
\. i / ( / Jc.f{ /... \ "- ~ -<- (c /'
Signature of Notary PuWic
la~ ~ - ~ :=~~~- J
I Notary PublIc - CalIfornIa I
i 8anIa Clara COunty d
_ _ _ ~~_~~1~
per GC Sec. 40814; CC Sec. 1181
(Notary Seal)
STATE OF CALIFORNIA )
)ss
COUNTY OF SANTA CRUZ )
On, July 21,2005, before me, K. Schamberg, Notary Public,
personally appeared ~ ft ~.., H, -=K (2- ~ G.- e.-
o personally known to me - OR -
r@~~, - K. S~HAMBE~G 1
~ . Comm. 1365406 ~
!!l ' NOTARV PUBUC-CAUFORNIA ~
t " SANTA CRUZ COUNTY J
l-,,:_~:~MMISSlON EXPIRES :ULV 192006
Name(s) ofSigner(s)
o proved to me on the basis of satisfactory evidence to be the
person(s) whose name(s) is/are subscribed to the within
instrument and acknowledged to me that he/she/they
executed the same in hislher/their authorized
capacity(ies), and that by his/her/their signature( s) on the
instrument the person( s) or the entity upon behalf of
which the person( s) acted, executed the instrument.
WITNESS my hand
C-
per GC Sec. 40814; CC Sec. 1181
-8-
7/21/05
ENCOMPASS NO:
DATE:
PROJECT LOCATION:
DEVELOPMENT AGREEMENT NUMBER
PARCEL NUMBER:
OWNER/DEVELOPER:
MAILING ADDRESS:
TELEPHONE NO:
PREPARED BY:
Account No.
100-2601-0000-3625
100-2601-0000-3605
420-2600-0000-3660
432-2600-0000-3660
433-2600-0000-3660
435-2600-0000-3660
436-2600-0000-3660
440-2600-0000-3660
720-0433-0000-3620
801-2601-PWDO-3899
801-2601-PWDO-3899
Payment Bond
Performance Bond
COST SCHEDULE
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
FINAL COST SCHEDULE
ALL PUBLIC FACILITY, SEWER, WATER & TRAFFIC FEES ARE DEFERED
E1
4080025
Revised:
Revision Number:
17-May';2005
2005-12
End of Crest Hill Way
783-47.004,783-46-010
7/7/2005
Gilroy\c()untry Oaks Estates, LLC
5403ScottsVlllleyDr., Ste D, Scotts Valley CA. 95066
(831) 438-7422
Rosanna Pallin
Key Code Fee:
4904 $6,741.65
4702 $406,993.92
4501 $37,847.96
3301 $0.00
4905 $610,236.00
4509 $763,934.00
4510 $232,155.00
4515 $1,316,014.00
2202 $54,049.74
4703 $119,813.42
4703
Credits:
Amount Due: Account Description:
Paid on Invoice #
$6,741.65 Special Public Works Serv
$0.00 $406,993.92 Engring Plan Check & Insp
$0,00 $37,847.96 Storm Development Fee
$0.00 $0.00 Str Tree Development Fee
DEFERED TO
$0.00 BUiLDING PERMIT Traffic Impact Fee
DEFERED TO
BUILDING PERMIT Sewer Development Fee
DEFERED TO
BUILDING PERMIT Water Development Fee
DEFERED TO
$0.00 BUILDING PERMIT Public Facility Impact Fee
$0.00 $54,049.74 Const Water Use Fee
$0.00 $119,813.42 Reimbursements
$0.00 Other Reimbursements
Totai
$625,446.69
$5,012,424
$5,012,424
(1)
Fees Last Revised January 1, 2005
TRACT 9473-CEill
717/2005
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
FINAL COST SCHEDULE
ALL PUBLIC FACILITY, SEWER, WATER & TRAFFIC FEES ARE DEFERED
ENCOMPASS NO:
DATE:
NUMBER:
PROJECT LOCATION:
PARCEL NUMBER:
OWNER/DEVELOPER:
MAILING ADDRESS:
TELEPHONE NO:
PREPARED BY:
COST SCHEDULE TYPE: PRELIMINARY ESTIMATE? N FINAL FEES?
I DEFER PUBLIC FACILITY FEE?
DEFER SEWER, WATER, TRAFFIC FEES?
NOTE: This Final Cost Schedule has been adjusted to the rates currently In effect.
INCENTIVE AGREEMENT FEES ONLY ?N
TO PERMIT? Y TO FINAL ?N
- -
TO PERMIT?Y TO FINAL? N
Reimbursements and credits:
Y Country Estates Water System?
Gross Acres: Lots:
60.460 67 67
0.000 0 0
0.000 0
0.000
0.000
0
Sewer GPD: Water GPD:
0 0
N Southeast Quadrant Hydrology Study? N Obata Industrial Park Credit?
Sq Ft:
Site Information:
Residential-Low?
Residential-High?
Commercial-Low?
Commercial-High?
Industrial-General?
Industrial-Warehouse?
Assembly Hall?
Common Area?
o
o
Commercial/lndustrial Allocations:
Front Footage/Square Footage Charges and Construction Water:
Street Tree FF: Water FF:
Pavement SF: Median SF:
0.0 010
Sewer FF:
0.0
Sidewalk SF:
0.0
Storm FF:
0.0
Curb/Guller FF:
0.0
Canst Water Acres to be
Construction Water FF:
Special Public Works Services
(Includes Administration Fee(s) for Reimbursements)
Maps:
100-2601-0000-3625
$6,741.65
Final Map $1,565.00 + $10.00 1 lot Y $2,235.00 Fee ID NO-FINALM
Parcel Map $1,630.00 + $10.00 1 lot N $0.00 Fee ID NO-PARCELM
Re-assessment Map (Assessment District Parcels)
$175.00 + $20.00 1 lot N $0.00 Fee ID N-ASSESM
Administration Fees:
Southeast Quadrant Hydrology Study N $0.00 Fee ID N-SD-QUADA
(Not Included)
Scanning Fee
97
# of Map & $8.00 1 sheet Y $776.00 Fee ID NO-SCAN
Improvement Plan sheets # 42 pages X 2
NOTE: For Improvement Plan Sheets, multiply by two (scanning to be done at the beginning and end of the project)
Fees Last Revised January 1, 2005
TRACT 9473-CEIII
7/7/2005
Miscellaneous Engineering Services:
(Cost Schedules, Agreements, RIW Reviews and Other Misc. Services)
Mise Services $106.59 / hr.
y
$3,730.65
Fee ID N-MISC
Engring Pian Check and Inspection 100-2601-0000-3605 $406,993.92
(Based on total cost of public right-of-way improvements)
Site grading and $106.59 / hr. N $0.00 Fee ID NO-GRADINS
reinspection charges
Estimated Cost of Public Improvements $5,012;.424 Fee ID NO-PLANCHK
12% $0 $100,000 y $12,000.00
10% $100,000 $200,000 y $10,000.00
8% over $200,000 y $384,993.92
Payment Bond Amount for Offsite Improvements $5,012;.424
Performance Bond Amount for Offsite Improvements $5,012;.424
Impact Fees:
Storm Drain Impact Fee 420-2600-0000-3660 $37,847.96
a.Residential-Low $626.00 / acre Y $37,847.96 Fee ID NO-SD-LD
b.Residentlal-High $983.00 / acre Y $0.00 Fee ID NO-SD-HD
c. Commercial $1,696.00 / acre Y $0.00 Fee ID NO-SD-C
d.lndustrial $1,252.00 / acre Y $0.00 Fee ID NO-SD-I
e.Assembly Hall $626.00 / acre Y $0.00 Fee ID NO-SD-AH
Obata Industrial Park Credits
(Based on reimbursements due from oversized storm facilities)
Obata Fee Credit $1,170.00 / acre Y $0.00 Fee ID N-SD-OBATA
Street Tree Fee 432-2600-0000-3660 $0.00
Front Footage
a.City Planting and Replacement
$2.56 / f.f. x N 0.0 = $0.00 Fee ID NO- TREEPL T
b.lnspection and Replacement
$0.36 / f.f. x Y 0.0 = $0.00 Fee ID NO-TREEINS
Traffic Impact Fee 433-2600-0000-3660 DEFERED TO BUILDING PERMIT
a.Residential-Low $9,108.00 / unit Y $610,236.00 Fee ID Nl-TRAF-LD
b.Residential-High $7,383.00 / unit Y $0.00 Fee ID N2-TRAF-HD
c.Commercial-Low Traffic
(< 10.75 trips/l 000 sf) $10,076.00 / k.s.f. Y $0.00 Fee ID N3-TRAF-CL
d.Commercial-High Traffic
(>= 10.75 trips/l 000 sf) $20,354.00 / k.s.f. Y $0.00 Fee ID N3-TRAF-CH
e.lndustrial-General $3,994.00 / k.s.f. Y $0.00 Fee ID N4-TRAF-IG
f.lndustrial-Warehouse $2,895.00 / k.s.f. Y $0.00 Fee ID N4-TRAF-IW
COST SCHEDULE (3)
Fees Last Revised January 1, 2005
TRACT 9473-CEIII
"
Sewer Impact Fee
a.Residential-Low
b.Residential-High
435-2600-0000-3660
$11,402.00 1 unit Y
$6,170.00 1 unit
$3,608.00 1 cgpd
c.Commercial/lndustrial
Obata Industrial Park Credits
(Based on reimbursements due from oversized sewer facilities)
Obata Fee Credit $531.00 1 acre
Water Impact Fee
a.Residential-Low
b.Residential-High
436-2600-0000-3660
$3,465.00 1 unit Y
$1,401.00 1 unit
c.Commercialllndustrial $5,431.00 1 kgpd
Obata Industrial Park Credits
(Based on reimbursements due from oversized water facilities)
Obata Fee Credit $154.00 1 acre
Public Facilities Impact Fee
a.Residential-Low
b.Residential-High
c.Commercial
d.lndustrial
Water User Fee (Construction)
$2.76 1 1.1.
Front Foot Charges:
(Used to charge and reimburse fees for existing infrastructure)
Water
Water Mains, including fire hydrants, valves and box:
(Developer is responsible for up to and including 12" mains)
Half Pipe
6 inch Main $41.00 1 LF x
8 inch Main $43.00 LF x
10 inch Main $49.00 LF x
12 inch Main $54.00 LF x
14 inch Main $60.00 1 LF x
16 inch Main $65.00 1 LF x
18 inch Main $71.00 1 LF x
24 inch Main $79.00 1 LF x
30 inch Main $86.00 1 LF x
36 inch Main $111.00 1 LF x
Country Estates Water System
(See Attached Worksheet)
COST SCHEDULE
440-2600-0000-3660
$19,642.00 1 unit Y
$16,639.00 1 unit Y
$2,856.00 1 k.s.f. Y
$1,268.00 1 k.s.f. Y
720-0433-0000-3620
+ $168.14 1 a.c.
801-2601-PWDO-3899
Lineal Footage
N 0.0 =
N
0.0 =
N
0.0
N
0.0 =
N
0.0 =
N
0.0 =
(4)
Fees Last Revised January 1, 2005
717/2005
Y
DEFERED TO BUILDING PERMIT
$763,934.00 Fee ID N1-SS-LD
$0.00 Fee ID N2-SS-HD
$0.00 Fee ID N5-SS-CII
$0.00 Fee ID N-SS-OBATA
DEFERED TO BUILDING PERMIT
$232,155.00 Fee ID N1-WATR-LD
$0.00 Fee ID N2-WATR-HD
$0.00 Fee ID N5-WTR-CII
$0.00 Fee ID N-WR-OBATA
DEFERED TO BUILDING PERMIT
$1,316,014.00 Fee ID N1-PF-LD
$0.00 Fee ID N2-PF-HD
$0.00 Fee ID N3-PF-C
$0.00 Fee ID N4-PF-1
Y $54,049.74
Fee ID NO-CONWTFF and NO-CONWTAC
$119,813.42
Y
Y
Y
Y
Y
Y
$0.00 Fee ID N-WR06-1/2
$0.00 Fee ID N-WR08-1/2
$0.00 Fee ID N-WR10-1/2
$0.00 Fee ID N-WR12-1/2
$0.00 Fee ID N-WR14-1/2
$0.00 Fee ID N-WR16-1/2
$0.00 Fee ID N-WR18-1/2
$0.00 Fee ID N-WR24-1/2
$0.00 Fee ID N-WR30-1/2
$0.00 Fee ID N-WR36-1/2
$119,813.42 Fee ID N-WR-RESCE
TRACT 9473-CEIII
717/2005
Front Foot Charges:
Sewer 801-2601-PWDO-3899 $0.00
Sewer Mains, including manhole:
(Oeveloper is responsible for up to and including 12" mains)
Half Pipe Lineal Footage
6 inch Main $76.00 1 LF x N 0.0 = $0.00 Fee 10 N-SS06-1/2
8 inch Main $78.00 LF x $0.00 Fee 10 N-SS08-1/2
10 inch Main $85.00 1 LF x N 0.0 = $0.00 Fee 10 N-SS10-1/2
12 inch Main $87.00 1 LF x N 0.0 = $0.00 Fee 10 N-SS12-1/2
15 inch Main $91.00 LF x N 0.0 = $0.00 Fee 10 N-SS15-1/2
18 inch Main $98.00 LF x N 0.0 = $0.00 Fee 10 N-SS18-1/2
21 inch Main $107.00 LF x N 0.0 = $0.00 Fee 10 N-SS21-1/2
24 inch Main $111.00 LF x N 0.0 = $0.00 Fee 10 N-SS24-1/2
27 inch Main $128.00 1 LF x $0.00 Fee 10 N-SS27-1/2
30 inch Main $150.00 1 LF x $0.00 Fee 10 N-SS30-1/2
33 inch Main $165.00 1 LF x N 0.0 = $0.00 Fee 10 N-SS33-1/2
36 inch Main $187.00 1 LF x N 0.0 = $0.00 Fee 10 N-SS36-1I2
39 inch Main $221.00 1 LF x $0.00 Fee 10 N-SS39-1I2
42 inch Main $277.00 1 LF x N 0.0 = $0.00 Fee 10 N-SS42-1/2
Street Improvements 801-2601-PWDO-3899 $0.00
Pavement, Sidewalks & Medians Square Footage
AC/Bike path: base $3.70 1 s.f. x N 0.0 = $0.00 Fee 10 N-STR-ACB
AC/Bike path: pvmt $1.50 1 s.f. x N 0.0 = $0.00 Fee 10 N-STR-ACP
Sidewalk: new $10.60 1 s.f. x N 0.0 = $0.00 Fee 10 N-STR-SIW
Sidewalk: replace $14.80 1 s.f. x N 0.0 = $0.00 Fee 10 N-STR-SIVVR
Resurfacing $3.20 1 s.f. x N 0.0 = $0.00 Fee 10 N-STR-RESU
Landscaped Median $22.25 1 s.f. x N 0,0 = $0.00 Fee 10 N-STR-LANM
Hardscaped Median $12.70 1 s.f. x N 0.0 = $0.00 Fee 10 N-STR-HARO
Traffic Signals (equipment only) % of Lump Sum
Traffic Signal-3 leg $140,000.00 1 I.s. x N 0% = $0.00 Fee 10 N-STR-TS3L
Traffic Signal-4 leg $170,000.00 1 I.s. x N 0% = $0.00 Fee 10 N-STR-TS4L
Curb and Gutter Lineal Footage
Curb/Gutter: new $26.40 1 LF x N 0.0 = $0.00 Fee 10 N-STR-C/G
Curb/Gutter: replace $37.00 1 LF x N 0.0 = $0.00 Fee iO N-STR-C/GR
Curb Ramps $1,161.00 1 LF x N 0.0 = $0.00 Fee 10 N-STR-CR
COST SCHEOULE (5)
Fees Last Revised January 1, 2005
TRACT 9473-CEIII
.'
717/2005
Front Foot Charges:
Storm Drain 801-2601-PWOO-3899 $0.00
Storm Mains, induding manholes and catch basins:
(Developer is responsible for up to and induding 24" mains)
Half Pipe Lineal Footage
18 inch Main $66.00 1 LF x N 0:0 = $0.00 Fee 10 N-S018-1/2
21 inch Main $72.00 1 LF x N 0.0 = $0.00 Fee 10 N-S021-1I2
24 inch Main $74.00 1 LF x N 0.0 = $0.00 Fee 10 N-S024-1/2
27 inch Main $86.00 1 LF x N 0.0 = $0.00 Fee 10 N-S027-1/2
30 inch Main $93.00 1 LF x N 0:0 = $0,00 Fee 10 N-S030-1I2
33 inch Main $96.00 1 LF x N 0.0 = $0.00 Fee 10 N-S033-1/2
36 inch Main $99.00 1 LF x N 0.0 = $0.00 Fee 10 N-S036-1/2
42 inch Main $103.00 1 LF x N 0.0 = $0.00 Fee io N-S042-1/2
48 inch Main $122.00 1 LF x $0.00 Fee 10 N-S048-1/2
54 inch Main $144.00 1 LF x N 0.0 = $0.00 Fee 10 N-So54-1/2
60 inch Main $165.00 1 LF x N 0,0 = $0.00 Fee 10 N-S060-1/2
66 inch Main $187.00 1 LF x N 0.0 = $0.00 Fee 10 N-S066-1/2
72 inch Main $209.00 1 LF x N 0.0 = $0.00 Fee 10 N-So72-1/2
78 inch Main $225.00 1 LF x $0.00 Fee ID N-S078-1I2
84 inch Main $241.00 LF x N 0.0 = $0.00 Fee 10 N-S084-1/2
90 inch Main $257.00 LF x $0.00 Fee 10 N-S090-1/2
96 inch Main $273.00 1 LF x N 0.0 = $0.00 Fee 10 N-S096-1/2
Southeast Quadrant Hydrology Study y $0.00 Fee 10 N-So-QUAo
(Not Induded)
NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued.
The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated
fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the
difference. Site grading and reinspection charges induding reinspection of backyard drainage will be billed at the
Engineering Division houny rate in effect at the time of inspection.
Accepted by:
Date:
COST SCHEDULE
(6)
Fees Last Revised January 1, 2005
TRACT 9473-CEill
~
.~,
PROJECT
. SITE
.........~,~....
}:~f;~%~~~~~
....... .-. .-. ......
~~~~~i
.:..-....-..:...:-:..-:-..:... .
.~~~'~~II~
...
GILROY GOLf
COURSE
I
I
...
\~"
.....\
'.
.
\.
."
,
i
HIGHWAY 152
TO SNIT" 10IESA aw.
~~
L 00Vt
COUllT
(HECKER PASS)
VICINITY MAP
NO SCALE
VICINITY SITE MAP
Property Improvement Agreement No. 2005-12
Tract 9473, Country Estates Phase III
Crest Hill Way
APN 783-47-004,783-46-010
Gilroy Country Oaks Estates LLC
Exhibit A