Loading...
PIA No. 99-24 - Hanson Concrete Products RECORDING REQUESTED BY Cit\' or Gilrov - - WHEN RECORDED, MAli. TO Rhonda Pellin City of Gilroy 7351 Rosanna Street Gilrov, CA C)5020 DOCUMENT: 14879197 II11I11111111111111 _e13148791Sf7_ Titles 1/ Pages 17 Fees Taxes Copies AMT PAID 55 00 55 00 BRENDA DAVIS SANTA CLARA COUNTY RECORDER Recorded at the request of City RDE ** 016 7/01/1999 9 37 AM (SPACE ABOVE THIS LINE FOR RECORDER'S USE) Property Improvement Agreement #99-'24 Commcrcial , Industrial, Institutional I lanson Concrete Products, lne Southsidc Drivc Improvcmcnts PROPERTY IMPROVEMENT AGREEMENT #99-24 COMMERCIAL, INDUSTRIAL, INSTITllTIONAL AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS IMPROVEMENT OF STREETS INSTALLATION OF SEWERS, STORM DRAINS AND OTHER PUBLIC WORKS FACILITIES PROJECT NUMBER 1+99-'24 This agreement is made and entered into this 2cL{dayof ~ 1999, hy aod between the City of Gilroy, a municipal eorporation, hercin ealled e "City" and Hanson Conerete Produets, Inea real property owner, developer or subdivider, herein ealled the " Developer" WHEREAS, a final map of subdivision, reeord of surveyor building permit (Site Clearanee) application has now been submitted to thc City for approval and aeccptancc, covcring ccrtain rcal estate known as and called: and, SOl!thSld~_Drive Imrrovemenl~JrSlmQjJ~1l:l\V(lYJ~590' 1 ~(lst of Rossi Lllrl~___________ WHEREAS, the Developer requires eertain utilities and public works facilities in order to scrvice the property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted eertain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter or this agreement and, WHEREAS, the City has eertain responsibilities for maintenanee and operation of such utilitics and public scrvicc facilitics after acccptanec by City, and for providing the ncccssary eonnecting system, general plant and appurtenances, and the City is agreeing to diseharge those rcsponsibilities, provided that Dcvelopcr has faithfully and fully complied with all of the terms, covenants, conditions to be performed by Developer pursuant to this agrccment NOW THEREFORE, in eonsideration of the foregoing premises and in order to carryon the intcnt and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and bet\veen the parties as follows SECTION I That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California and the United States of America concerning the subject matter of this agreement are hereby referred to and incorporated herein to the same efreet as if they were set out at length herein Said Codes, Ordinanees, Resolutions, Rules and Regulations include, but are not limited to, the following the Code of the City of Gilroy, the current Zoning Ordinancc, and thc currently adopted Uniform Building Codc '1 SECTION ::: The Dcveloper agrees a. To perform each and every provision required by the City to be performed by the Developer in each and everyone of said Codes, Ordinances, Resolutions, Rules and other Rcgulations and to comply with the foregoing and all applicablc laws. b_ To grant to the City without charge, free and clear of encumbrances, any and all easements and rights of way in and to his said real propelty necessary for the City in order that its water, electricity, and/or sewer lines in or to said real property may be extended_ c_ To indemnify, defend with counsel of City's choice and hold the City free and harmless from all suits, fees, claims, dcmands, causes of action, costs, losscs, damages, liabilities and expenses (including without limitation attorneys' fees) incurred by City in connection with (i) any damage done to any utility, public facility or other material or installation of the City on said real estate which the Developer or any contractor or subcontractor of the Developer, or any employee of the foregoing, shall do in grading or working upon said real estate; or (ii) arising or resulting directly or indirectly from any act or omission of Developer or Developer's contractors, or subcontractors, or any employee of the foregoing in connection with the work performed by them in connection with this agreement, including without limitation all claims relating to injury or death of any person or damage to any property d To construct and improve all public works facilities and other improvements described in this agreement in accordance with all standards established in the Codes, Ordinances, Resolutions, Rules and Regulations, all applicable laws and this agreement, and in accordance with the grades, plans, and specifications therefore approved by the City Engineer Developer shall furnish two good and sufficient bonds, in form and content and issued by a bonding company acceptable to City as follows (i) a performance bond to be executed in the face amount of not less than Two Hundred Thirty-Three Thousand Three Hundred Dollars ($233,300.00), and (ii) a payment bond to be exeeuted in the face amount of not less than Fitly pereent (50%) of the performance bond described in (i) immediately above, both such bonds being issued for the improvements deseribed in this agreemcnt The pcrformanee bond shall seeure payment to City and thc Developcr of any loss duc to thc default of the contraetor or its inability or refusal to perform its eontraet The payment bond shall secure payment to thc subcontractors and persons renting equipmcnt for thc furnishing of labor or materials for the improvements, as provided in Seetions 66499 ~t~~g of the Govcrnmcnt Codc of the State of California, the Codes, thc Ordinances, Resolutions, Rules and thc Rcgulations ofthc City, and this agreement Each bond shall set forth a time period for pcrformance by the contractor of its obligations and the terms and conditions on \vhich thc City may obtain the proceeds of the bond The pcrformance -' bond shall by its terms remain in full force and affect for a period of not less than one year after completion of the improvement by Developer and acceptance of said improvements by City, to guarantee the repair and replacement of defective material and faulty workmanship. Upon completion of the improvements by Developer and acceptance of the improvements by City, Developer may substitute for the performance bond securing maintenance described above, a separate maintenance bond in the amount of 10% of the total contract price of the improvements (provided that the amount of said bond shall not be less than One Thousand Dollars ($1,000)) to cover the one year maintenance. e. That upon approval of the final map of the subdivision, the record of surveyor the building permit covering the real estate to be improved and before any work is done therein, the Developer shall pay to the City all sums, shown in Section 9 thereof to be due under the terms and provisions of this agreement. f At all times during the term of this agreement and until the improvements constructed by Developer are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a policy of general liability and property damage insurance in the minimum amount of One Million Dollars ($1,000,000), combined single limit for both bodily injury and property damage; (b) workers' compensation insurance as required by law; and (c) broad form "Builder's Risk" property damage insurance with limits of not less than 100% of the estimated value of the improvements to be constructed by Developer pursuant to this agreement. All such policies shall provide that thirty (30) days written notice must be given in advance to City prior to termination, cancellation or modifieation The insurance specified in (a) above shall name City as an additional insured and the insurance specified in (c) shall name City as a loss payee" and shall provide that City, although an additional insured or loss payee, may recover for any loss suffered by reason of the acts or omissions of Developer or Developer's contractors or subcontractors or their respective employees. Developer hereby waives, and Developer shall cause each of its contractors and subcontractors to waive, all rights to recover against City for any loss or damage arising from a cause covered by the insurance required to be carried pursuant to this agreement or actually carried by Developer in connection with the work described in this agreement, and will cause each insurer to waive all rights of subrogation against City in eonnection therewith_ All policies shall be written on an occurrence basis and not on a claims made basis and shall be issued by insurance companies acceptable to City Prior to commencing any work pursuant this agreement, Developer shall deliver to City the insurance company's certificate evidencing the required coverage, or if required by City a copy of the policies obtained. SECTION 3 That except as otherwise expressly provided in this Agreement, all sums shown herein to be payable by the Developer to the City are due and payable to the City upon the execution of this agreement. 4 SECTION 4 That all the provisions of this agreement and all work to be done pursuant to the terms of this agreement are to be completed to City's Satisfaction within one year from and after the date and year first above written. Developer shall maintain such public works facilities and other improvements described in this agreement at Developer's sole cost and expense at all times prior to acceptance by City in a manner which will preclude any hazard to life or health or damage to property_ SECTION 5 That the special provisions concerning the particular real estate referred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. SECTION 6 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under the applicable or the Codes, Ordinances, Resolutions, Rules and Regulations of the City, in the event of any such default by Developer. SECTION 7 That this agreement, together with the attached stipulations, is an instrument affecting the title or possession of the real property described in Exhibit A All the terms, covenants and eonditions herein imposed shall be binding upon and inure to the benefit of City, Developer and the successors in interest of Developer. Upon the sale or division of the property described in Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of each parcel shall succeed to the obligations imposed on Developer by this agreement SECTION 8 The Developer will pay for a daily sewer and water allocation. The allocation limits are as follows: Sewer capacity not to exceed: NI A Peak water use not to exceed: NI A The City will attempt to provide additional eapacity at the then current rate. If additional 5 capacity is not available, the Developer agrees to maintain sewer and water use at or below the amounts purchased The Developer shall have the option of measuring sewer effluent by: a_ Installing and maintaining a sewer effluent meter. Said meter shall meet City Standards and specifications, or b. Measuring the building's water consumption through the water meter. Irrigation meters are required. PENAL TY: Overuse of sewer and water allocations shall be penalized under the Rules and Regulations adopted by the Gilroy City Council. SECTION 9 That the following General Stipulations and the attached stipulations shall be completed subject to the approval of the Director of Community Development. 1. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilities NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. 2_ Schedule the construction of improvements along existing public roads so that the work affecting vehicular traffic is completed with a minimum intenuption to traffic. 3_ All work within the public right-of-way shall be subject to the approval of the City Engineer. 4_ Before construction utilizing combustible materials may proceed, an all weather access must be provided to within ISO feet of the building site; and at least one in service fire hydrant must be available within 500 feet of each portion of the site wherein this construction is to take place. Location of the fire hydrants will be determined by the Fire Chief 5. All improvements per the "plans for the Improvement of Southside Drive, Obata Way to Rossi, Lands of Shriner's Hospital", as designed by Garcia and Henry Engineers, shall be installed and accepted by the City of Gilroy_ 6 SECTION 10 That the attached Development Cost Schedule enumerates all fees and their extensions. TOT AL AMOUNT DUE CITY $24.717.63 IN WITNESS WHEREOF, said parties have caused these presents to be executed the date and year first above written. ATTE~- ~ t::-A. .. " 7~(" .:cu~ ' , Rhonda Pellin, City Clerk FORM APPROVED: ~t:.~ City Attorney Linda A Callon DATE ~/~/J?7 ! / B,Cl~~~ Clive Hanson, President Hanson Concrete Products, Inc_ DATE ~ . ci-. ct C'\ NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation and the corporate titles of the persons signing for the corporation shall appear above. 7 ST ATE OF CALIFORNIA ) )ss. COUNTY OF SANTA CLARA ) On June 21, 1999, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person or the entity upon behalf of which the person acted, executed the instrument WITNESS my hand and official seaL ~ .~ I. P .- .- ~~;A ;~N - -I ~ CommISSlOO # 1142623 i.. Notay Public - CaJifcrnia ~ J___~~~;:~lt per GC Sec 40814; CC Sec 1181 (Notary Seal) STATE OF CALIFORNIA ) )ss. COUNTY OF SANTA CLARA ) On ~/ 1/11, before me, 'Cf3if;-k [&It}, JIofCLnj fJat!u, _, personally appeared ~ f(A,:J sfS}.j personally known to me (or proved to me SA the basis ef 3Mi~f4ctory eyiaeRG@) to be the ~rson~ whose name~~ subscribed to the within instrument and acknowled~to me that ~ executed the same i~heit authorized capacity~, and that b~~ signature~ on the instrument the person~or the entity upon behalf of which the perso~ acted, executed the instrument Signature r~ ~ per GC Sec. 40814; CC Sec 1181 t -.....- ~. ... -....,.A. .... ....A .~ - "'1 €t.-...... KELLVlANG :;;:'-:'. . Commlstlon#1070061 z ~ ;':~ . Notary Plbllc - CaUfomla ~ . ~ . Santo Claro COlXltv '., ,. My Comm. ExplresAug 23.1999 WITNESS my hand and official seal. 8 DATE 01-Jun-99 CITY OF GILROY COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION FINAL CHARGES NUMBER 99-24 PROJECT LOCATION Southside Drive Improvements PARCEL NUMBER Southside Drive OWNERIDEVELOPER Hanson Concrete Products, Inc MAILING ADDRESS 1 Hanson Court, Milpitas, Ca. 95035 TELEPHONE NO f6't> U'V IDCi ( PREPARED BY Mark Fachin Account No Key Code Fee: Credits: Amount Due: Account Description: 100-2oo1-3-EaXXXJ 4004 $1,097.19 $0.00 $1,097.19 Special Public Works Serv 100-2oo1-3-&Xl412 4702 $20,331 .00 $0.00 $20,331.00 Engring Plan Check & Insp 410-2E00-3-68(XXX) 3302 $0.00 $0.00 $0.00 Park Development Fee 420-26OO-3-68CXXXl 4501 $0.00 $0.00 $0.00 Storm Development Fee 431-2aD-3-68(XXX) 5001 $000 $0.00 $0.00 Utility Undergrounding Fee 432-2aD-3-68(XXX) 3301 $399.84 $0.00 $39984 Str Tree Development Fee 433-2aD-3-68(XXX) 4005 $0.00 $0.00 $0.00 Traffic Impact Fee 434-26OO-3-68CXXXl 4402 $0.00 $0.00 $0.00 Police Development Fee 435-2aD-3-68(XXX) 4500 $0.00 $0.00 $0.00 Sewer Development Fee 436-2aD-3-68(XXX) 4510 $0.00 $0.00 $0.00 Water Development Fee 437-2aD-3-68(XXX) 4511 $0.00 $0.00 $0.00 Fire Development Fee 438-26OO-3-68CXXXl $0.00 $0.00 $0.00 Public FaCIlities Impact Fee 720-0433-3-652aXl 2202 $2,88900 $0.00 $2,889.00 Const Water Use Fee 801-a:x::o-2-220015 4703 $0.00 $0.00 $0.00 Reimbursements 801-a:x::o-2-220015 4703 $0.00 $0.00 $0.00 XXXf,) 801-a:x::o-2-220015 4703 $0.00 $0.00 $0.00 XXXf,) 801-a:x::o-2,220015 4703 $0.00 $0.00 $0.00 XXXf,) TotalsH $24,717.63 $0.00 $24,717.63 Bonds and Securities $349,950 ----------- ----------- SERVICE CHARGES (1) DATE 01-Jun-99 NUMBER 99-24 CITY OF GILROY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION FINAL COST SCHEDULE Southside Drive Improvements Southside Drive Hanson Concrete Products, Inc 1 Hanson Court, Milpitas, Ca. 95035 {O~ U-1... - lDvt \ PROJECT LOCATION: PARCEL NUMBER OWNER/DEVELOPER MAILING ADDRESS: TELEPHONE NO PREPARED BY: Mark Fachin DEFER PARK, POLICE & FIRE DEVELI MENT FEES? n NOTE: This 100 % cost schedule has been adjusted to the rates in effect at the time building permits were issued Site Information: N Residential-Low? N Residential-High? N Commercial-Low? N Commercial-High? N Industrial-General? N Industrial-Warehouse? N Assembly Hall? Common Area? Commercialllndustrial Allocations: Reimbursements and credits: N Country Estates Water System? N Country Estates Sewer System? N Obata Industrial Park Credit? Acres: OCXXJ OCXXJ OCXXJ OCXXJ OCXXJ OCXXJ OCXXJ OCXXJ Lots: Units Sq Ft 0 0 0 0 0 0 0 0 0 . 0 0 0 0 0 0 Sewer GPO Water GPO: 0 0 N Southeast Quadrant Hydrology Study? Front Footage for Front Foot Charges and Construction Water Street Tree-FF Water FF: 1 ,120.00 000 Special Public Works Services Maps Final $3,025.00 + $50.00 Parcel $1,07000 + $100.00 Reapportionment (Assessment District Parcels) $1,767.00 + $100.00 Administration Fees Country Estates Water System (Not Included) Country Estates Sewer Trunk Main (Not Included) Southeast Quadrant Hydrology Study (Not Included) COST SCHEDULE SewerFF 0.00 Storm FF 0.00 Construction Water FF 1,120.00 100-2001-3-~ $1,097.19 $1,097.19 100% lot N $0.00 lot N $O~ lot N $0.00 y $0.00 y $0.00 y $0.00 (1) Miscellaneous Engineering Services: (Cost Schedules, Agreements, RfN Reviews and Other Misc. Services) 12 hr Misc Services $77.00 I hr. y $92400 Public Works Microfilming (Maps and Plans): 1- 6 shts $152.94 + $6.75 sheet y $173.19 7,12 shts $195.68 + $6.75 sheet y $0.00 13-18 shts $238 40 + $6.75 sheet y $0.00 # of Shts 3 Engring Plan Check and Inspection 100-2601,3-€0)412 (Based on total cost of public 100% right-of-way improvements) ~ hr Site grading and $7700 I hr. N $0.00 reinspection charges Actual Cost of Public Improvements $233,nJ 10% of first $1oo,00J y $10,00J.00 8% of $1oo,00J - $200,00J y $8,00J.00 7% over $200,00J y $2,331 00 Offsite Improvements to be Bonded $233,nJ Park Impact Fee 410-2&x)-3-68(XXX) 100% a.Residential-Low $7,517.00 I unit y $0.00 b Residential-High $5,369.00 I unit y $000 Storm Drain Impact Fee 420-2&x)-3-68CXXXJ 100% a. Residential-Low $43400 acre y $0.00 b Residential,High $650.00 acre y $0.00 c.Commercial $867.00 acre y $0.00 d.lndustrial $976.00 acre y $000 e.Assembly Hall $434.00 acre y $0.00 $20,33100 $20,331.00 $0.00 $0.00 $000 $0.00 Obata Industrial Pari< Credits (Based on reimbursements due from oversized storm facilities) Obata Fee Credit $1,170.00 I acre y $0.00 COST SCHEDULE (2) 100% $0.00 $0.00 Utility Underground Fee 431-2En:l-3-68(XXX) Front Footage $126.09 / U.X NE 000 Street Tree Fee 432 -2En:l-3-68(XXX) $399.84 100% $399.84 Front Footage a City Planting and Replacement $2.56 / f.f.x N 000 $0.00 blnspection and Replacement $0.36 / U. x y 1,120.00 $39984 Traffic Impact Fee 433-2En:l-3-68(XXX) $0.00 100% $0.00 a. Residential-Low $3,370.00 / unit y $0.00 b. Residential-High $2,732.00 / unit y $0.00 c.Commercial-Low Traffic (<= 4 trips/1 (XX) sf) $3,727.00 / ksf y $000 d.Commercial,High Traffic (> 4 trips/1 (XX) sf) $7,53100 / k.sf y $0.00 e.lndustrial-General $1,455.00 / k.sf y $0.00 f.1 ndustrial-Warehouse $1,072.00 / k.s.f. y $0.00 Police Impact Fee 434-2En:l-3-68(XXX) $0.00 100% $000 a. Residential-Low $1,293.00 / unit y $000 b Residential-High $1,94000 / unit y $0.00 c. Commercial $1,00J.00 / k.sf y $000 d.lndustrial $72.00 / ksf y $0.00 COST SCHEDULE (3) Country Estates Sewer Trunk Main (Not Included) 43&-2~ 100% $4,349.00 unit y $000 $3,107.00 unit y $0.00 $1,498.00 cgpd y $000 y $0.00 $000 $000 Sewer Impact Fee a.Residential-Low b Residential,High c. Commercial/Industrial Obata Industrial Park Credits (Based on reimbursements due from oversized sewer facilities) Obata Fee Credit $531.00 I acre y $000 Water Impact Fee 436-2600-3-68<XXXl 100% a. Residential-Low $1,784.00 unit y $000 bResidential-High $1,274.00 unit y $000 c. Commercial/Industrial $2,71100 kgpd Y $000 $0.00 $0.00 Obata Industrial Park Credits (Based on reimbursements due from oversized water facilities) Obata Fee Credit $154.00 I acre y $0.00 Fire Impact Fee 437,2600-~ 100% a. Residential-Low $8900 unit y $0.00 b. Residential,High $12800 unit y $0.00 c.Commercial $79.00 k.s.f y $000 d.lndustrial $1000 k.sf y $000 Public Facilities Impact Fee 438-2600-~ 100% a.Residential $749.00 unit y $0.00 b.Commercial $207.00 k.sf y $000 c.lndustrial-General $193.00 k.sf. y $0.00 d.1 ndustrial-Warehouse $14500 k.sf y $0.00 Water User Fee (Construction) 720-0433-3-652ClXl y 100% $258 I f.f. + $168.14 I a.c COST SCHEDULE (4) $0.00 $000 $0.00 $000 $2,889.00 $2,889.00 Front Foot Charges: (Used to charge and reimburse fees for existing infrastructure) Water 801-tXXX)-2,229J15 $0.00 Water Mains, including fire hydrants, valves and box: 100% $0.00 (Developer is responsible for up to and including 12" mains) Half Pipe Front Footage 6" Main $12.50 I f.f. x N 0.00 $000 8" Main $13.50 Ux N 0.00 $0.00 10" Main $15.00 f.f x N 000 $0.00 12" Main $1650 Ux N 000 $0.00 14" Main $18.50 Ux N 0.00 $0.00 16" Main $21 .00 Ux N 0.00 $0.00 18" Main $25.00 f.f. x N 000 $0.00 24" Main $31 .50 f.f. x N 0.00 $0.00 Xl' Main $37.00 Ux N 0.00 $0.00 36" Main $4350 I f.f. x N 000 $0.00 Country Estates Water System y $0.00 (Not Included) Sewer 801-tXXX)-2-229J15 $0.00 Sewer Mains, including manhole: 100% $0.00 (Developer is responsible for up to and including 12" mains) Half Pipe Front Footage 6" Main $12.00 f.f x N 0.00 $0.00 8" Main $12.50 f.fx N 0.00 $0.00 10' Main $14.00 Ux N 0.00 $0.00 12" Main $1550 Ux N 000 $000 15" Main $1900 f.fx N 0.00 $0.00 18" Main $2400 f.f. x N 0.00 $0.00 21" Main $2850 ff x N 000 $000 24" Main $33.00 f.f. x N 0.00 $000 27' Main $36.50 I f.f. x N 0.00 $0.00 Country Estates Sewer Trunk Main (Not Included) y $0.00 COST SCHEDULE (5) NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Site grading and reinspection charges including reinspeclion of backyard drainage will be billed at the Engineering Division hourly rate in effect at the time of inspection Accepted by: Date G~ tA~. lo~\D~OlC\ , \ \ \ --- --- --- ,~ " , " , \ ' ,-- --- .-- ..' ..' ,/' / " .. "- "- ---- / /' /'" / ;I' / "- ( \/2 / / \ ;I' I , o~ / /' / / p4lr / I \ /\ \ ~'\~, I \"e( \ '~~~~'" .. \ V \1 II \ hr,~c,t(4. '~~, ,... I ,r"\ \ ,~ ' / \ \-10 lit \ \-ltl I; >;,~, / ~O\C# \ \ '. / \ \ "".~j ---\ \ '~'o;"....--.- \ " <> \ '~,,"', '\ ";.. , t-IO 11 '\. ''\ ~ \ ro' ~'\ {" .,-' ? ,'- ,~ <'~ =~ \"," \,'.'::~ " '~ / ., ~ ' !, ~ ~' " , 'il I{ b: " '/ // / / !~/ .' , ... " VICINITY SITE MAP Property Improvement Agreement No. 99-24 Hanson Concrete, Products, Inc - Southside Drive Improvements E:<,ibi t 11.."