PIA No. 99-24 - Hanson Concrete Products
RECORDING REQUESTED BY
Cit\' or Gilrov
- -
WHEN RECORDED, MAli. TO
Rhonda Pellin
City of Gilroy
7351 Rosanna Street
Gilrov, CA C)5020
DOCUMENT: 14879197
II11I11111111111111
_e13148791Sf7_
Titles 1/ Pages 17
Fees
Taxes
Copies
AMT PAID
55 00
55 00
BRENDA DAVIS
SANTA CLARA COUNTY RECORDER
Recorded at the request of
City
RDE ** 016
7/01/1999
9 37 AM
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
Property Improvement Agreement #99-'24
Commcrcial , Industrial, Institutional
I lanson Concrete Products, lne
Southsidc Drivc Improvcmcnts
PROPERTY IMPROVEMENT AGREEMENT #99-24
COMMERCIAL, INDUSTRIAL, INSTITllTIONAL
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS
IMPROVEMENT OF STREETS INSTALLATION OF SEWERS, STORM DRAINS AND
OTHER PUBLIC WORKS FACILITIES
PROJECT NUMBER 1+99-'24
This agreement is made and entered into this 2cL{dayof ~ 1999, hy aod
between the City of Gilroy, a municipal eorporation, hercin ealled e "City" and Hanson
Conerete Produets, Inea real property owner, developer or subdivider, herein ealled the
" Developer"
WHEREAS, a final map of subdivision, reeord of surveyor building permit (Site Clearanee)
application has now been submitted to thc City for approval and aeccptancc, covcring ccrtain rcal
estate known as and called:
and, SOl!thSld~_Drive Imrrovemenl~JrSlmQjJ~1l:l\V(lYJ~590' 1 ~(lst of Rossi Lllrl~___________
WHEREAS, the Developer requires eertain utilities and public works facilities in order to
scrvice the property under the minimum standards established by the City and,
WHEREAS, the City, by and through its City Council, has enacted eertain Codes,
Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning
the subject matter or this agreement and,
WHEREAS, the City has eertain responsibilities for maintenanee and operation of such
utilitics and public scrvicc facilitics after acccptanec by City, and for providing the ncccssary
eonnecting system, general plant and appurtenances, and the City is agreeing to diseharge those
rcsponsibilities, provided that Dcvelopcr has faithfully and fully complied with all of the terms,
covenants, conditions to be performed by Developer pursuant to this agrccment
NOW THEREFORE, in eonsideration of the foregoing premises and in order to carryon the
intcnt and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and
bet\veen the parties as follows
SECTION I
That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of
the City and the laws of the State of California and the United States of America concerning the
subject matter of this agreement are hereby referred to and incorporated herein to the same efreet
as if they were set out at length herein Said Codes, Ordinanees, Resolutions, Rules and
Regulations include, but are not limited to, the following the Code of the City of Gilroy, the
current Zoning Ordinancc, and thc currently adopted Uniform Building Codc
'1
SECTION :::
The Dcveloper agrees
a. To perform each and every provision required by the City to be performed by the
Developer in each and everyone of said Codes, Ordinances, Resolutions, Rules and
other Rcgulations and to comply with the foregoing and all applicablc laws.
b_ To grant to the City without charge, free and clear of encumbrances, any and all
easements and rights of way in and to his said real propelty necessary for the City in
order that its water, electricity, and/or sewer lines in or to said real property may be
extended_
c_ To indemnify, defend with counsel of City's choice and hold the City free and harmless
from all suits, fees, claims, dcmands, causes of action, costs, losscs, damages, liabilities
and expenses (including without limitation attorneys' fees) incurred by City in
connection with (i) any damage done to any utility, public facility or other material or
installation of the City on said real estate which the Developer or any contractor or
subcontractor of the Developer, or any employee of the foregoing, shall do in grading
or working upon said real estate; or (ii) arising or resulting directly or indirectly from
any act or omission of Developer or Developer's contractors, or subcontractors, or any
employee of the foregoing in connection with the work performed by them in
connection with this agreement, including without limitation all claims relating to injury
or death of any person or damage to any property
d To construct and improve all public works facilities and other improvements described
in this agreement in accordance with all standards established in the Codes, Ordinances,
Resolutions, Rules and Regulations, all applicable laws and this agreement, and in
accordance with the grades, plans, and specifications therefore approved by the City
Engineer Developer shall furnish two good and sufficient bonds, in form and content
and issued by a bonding company acceptable to City as follows (i) a performance
bond to be executed in the face amount of not less than Two Hundred Thirty-Three
Thousand Three Hundred Dollars ($233,300.00), and (ii) a payment bond to be
exeeuted in the face amount of not less than Fitly pereent (50%) of the performance
bond described in (i) immediately above, both such bonds being issued for the
improvements deseribed in this agreemcnt The pcrformanee bond shall seeure
payment to City and thc Developcr of any loss duc to thc default of the contraetor or its
inability or refusal to perform its eontraet The payment bond shall secure payment to
thc subcontractors and persons renting equipmcnt for thc furnishing of labor or
materials for the improvements, as provided in Seetions 66499 ~t~~g of the
Govcrnmcnt Codc of the State of California, the Codes, thc Ordinances, Resolutions,
Rules and thc Rcgulations ofthc City, and this agreement Each bond shall set forth a
time period for pcrformance by the contractor of its obligations and the terms and
conditions on \vhich thc City may obtain the proceeds of the bond The pcrformance
-'
bond shall by its terms remain in full force and affect for a period of not less than one
year after completion of the improvement by Developer and acceptance of said
improvements by City, to guarantee the repair and replacement of defective material
and faulty workmanship. Upon completion of the improvements by Developer and
acceptance of the improvements by City, Developer may substitute for the performance
bond securing maintenance described above, a separate maintenance bond in the
amount of 10% of the total contract price of the improvements (provided that the
amount of said bond shall not be less than One Thousand Dollars ($1,000)) to cover the
one year maintenance.
e. That upon approval of the final map of the subdivision, the record of surveyor the
building permit covering the real estate to be improved and before any work is done
therein, the Developer shall pay to the City all sums, shown in Section 9 thereof to be
due under the terms and provisions of this agreement.
f At all times during the term of this agreement and until the improvements constructed
by Developer are accepted by City, Developer shall, at no cost to City obtain and
maintain (a) a policy of general liability and property damage insurance in the minimum
amount of One Million Dollars ($1,000,000), combined single limit for both bodily
injury and property damage; (b) workers' compensation insurance as required by law;
and (c) broad form "Builder's Risk" property damage insurance with limits of not less
than 100% of the estimated value of the improvements to be constructed by Developer
pursuant to this agreement. All such policies shall provide that thirty (30) days written
notice must be given in advance to City prior to termination, cancellation or
modifieation The insurance specified in (a) above shall name City as an additional
insured and the insurance specified in (c) shall name City as a loss payee" and shall
provide that City, although an additional insured or loss payee, may recover for any loss
suffered by reason of the acts or omissions of Developer or Developer's contractors or
subcontractors or their respective employees. Developer hereby waives, and Developer
shall cause each of its contractors and subcontractors to waive, all rights to recover
against City for any loss or damage arising from a cause covered by the insurance
required to be carried pursuant to this agreement or actually carried by Developer in
connection with the work described in this agreement, and will cause each insurer to
waive all rights of subrogation against City in eonnection therewith_ All policies shall
be written on an occurrence basis and not on a claims made basis and shall be issued by
insurance companies acceptable to City Prior to commencing any work pursuant this
agreement, Developer shall deliver to City the insurance company's certificate
evidencing the required coverage, or if required by City a copy of the policies obtained.
SECTION 3
That except as otherwise expressly provided in this Agreement, all sums shown herein to be
payable by the Developer to the City are due and payable to the City upon the execution of this
agreement.
4
SECTION 4
That all the provisions of this agreement and all work to be done pursuant to the terms of this
agreement are to be completed to City's Satisfaction within one year from and after the date and
year first above written. Developer shall maintain such public works facilities and other
improvements described in this agreement at Developer's sole cost and expense at all times prior
to acceptance by City in a manner which will preclude any hazard to life or health or damage to
property_
SECTION 5
That the special provisions concerning the particular real estate referred to above, being
attached hereto, are hereby incorporated herein and expressly made a part of this agreement.
SECTION 6
That the faithful and prompt performance by the Developer of each and every term and
condition contained herein is made an express condition precedent to the duty of the City to
perform any act in connection with this transaction, and the failure, neglect or refusal of the
Developer to so perform, or to pay any monies due hereunder when due shall release the City
from any and all obligations hereunder and the City, at its election, may enforce the performance
of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it
may have under the applicable or the Codes, Ordinances, Resolutions, Rules and Regulations of
the City, in the event of any such default by Developer.
SECTION 7
That this agreement, together with the attached stipulations, is an instrument affecting the
title or possession of the real property described in Exhibit A All the terms, covenants and
eonditions herein imposed shall be binding upon and inure to the benefit of City, Developer and
the successors in interest of Developer. Upon the sale or division of the property described in
Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of
each parcel shall succeed to the obligations imposed on Developer by this agreement
SECTION 8
The Developer will pay for a daily sewer and water allocation. The allocation limits are as
follows:
Sewer capacity not to exceed: NI A
Peak water use not to exceed: NI A
The City will attempt to provide additional eapacity at the then current rate. If additional
5
capacity is not available, the Developer agrees to maintain sewer and water use at or below the
amounts purchased
The Developer shall have the option of measuring sewer effluent by:
a_ Installing and maintaining a sewer effluent meter. Said meter shall
meet City Standards and specifications, or
b. Measuring the building's water consumption through the water meter.
Irrigation meters are required.
PENAL TY:
Overuse of sewer and water allocations shall be penalized under the Rules and Regulations
adopted by the Gilroy City Council.
SECTION 9
That the following General Stipulations and the attached stipulations shall be completed
subject to the approval of the Director of Community Development.
1. Locate and properly dispose of any wells, septic tanks and underground fuel storage
facilities NOTE: The capping of any well will require inspection by the Santa
Clara Valley Water District.
2_ Schedule the construction of improvements along existing public roads so that the work
affecting vehicular traffic is completed with a minimum intenuption to traffic.
3_ All work within the public right-of-way shall be subject to the approval of the City
Engineer.
4_ Before construction utilizing combustible materials may proceed, an all weather access
must be provided to within ISO feet of the building site; and at least one in service fire
hydrant must be available within 500 feet of each portion of the site wherein this
construction is to take place. Location of the fire hydrants will be determined by the
Fire Chief
5. All improvements per the "plans for the Improvement of Southside Drive, Obata Way
to Rossi, Lands of Shriner's Hospital", as designed by Garcia and Henry Engineers,
shall be installed and accepted by the City of Gilroy_
6
SECTION 10
That the attached Development Cost Schedule enumerates all fees and their extensions.
TOT AL AMOUNT DUE CITY
$24.717.63
IN WITNESS WHEREOF, said parties have caused these presents to be executed the date
and year first above written.
ATTE~- ~
t::-A. .. " 7~(" .:cu~ '
, Rhonda Pellin, City Clerk
FORM APPROVED:
~t:.~
City Attorney
Linda A Callon
DATE ~/~/J?7
! /
B,Cl~~~
Clive Hanson, President
Hanson Concrete Products, Inc_
DATE
~ . ci-. ct C'\
NOTE: If Developer is a corporation, the complete legal name and corporate seal of the
corporation and the corporate titles of the persons signing for the corporation shall appear above.
7
ST ATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
On June 21, 1999, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa
personally known to me to be the person whose name is subscribed to the within instrument and
acknowledged to me that he executed the same in his authorized capacity, and that by his
signature on the instrument the person or the entity upon behalf of which the person acted,
executed the instrument
WITNESS my hand and official seaL
~ .~
I. P .- .- ~~;A ;~N - -I
~ CommISSlOO # 1142623
i.. Notay Public - CaJifcrnia ~
J___~~~;:~lt
per GC Sec 40814; CC Sec 1181
(Notary Seal)
STATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
On ~/ 1/11, before me, 'Cf3if;-k [&It}, JIofCLnj fJat!u,
_, personally appeared ~ f(A,:J sfS}.j
personally known to me (or proved to me SA the basis ef 3Mi~f4ctory eyiaeRG@) to be the
~rson~ whose name~~ subscribed to the within instrument and acknowled~to me that
~ executed the same i~heit authorized capacity~, and that b~~
signature~ on the instrument the person~or the entity upon behalf of which the perso~
acted, executed the instrument
Signature r~ ~
per GC Sec. 40814; CC Sec 1181
t -.....- ~. ... -....,.A. .... ....A .~ - "'1
€t.-...... KELLVlANG
:;;:'-:'. . Commlstlon#1070061 z
~ ;':~ . Notary Plbllc - CaUfomla ~
. ~ . Santo Claro COlXltv
'., ,. My Comm. ExplresAug 23.1999
WITNESS my hand and official seal.
8
DATE
01-Jun-99
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
FINAL CHARGES
NUMBER 99-24
PROJECT LOCATION
Southside Drive Improvements
PARCEL NUMBER
Southside Drive
OWNERIDEVELOPER
Hanson Concrete Products, Inc
MAILING ADDRESS
1 Hanson Court, Milpitas, Ca. 95035
TELEPHONE NO
f6't> U'V IDCi (
PREPARED BY
Mark Fachin
Account No Key Code Fee: Credits: Amount Due: Account Description:
100-2oo1-3-EaXXXJ 4004 $1,097.19 $0.00 $1,097.19 Special Public Works Serv
100-2oo1-3-&Xl412 4702 $20,331 .00 $0.00 $20,331.00 Engring Plan Check & Insp
410-2E00-3-68(XXX) 3302 $0.00 $0.00 $0.00 Park Development Fee
420-26OO-3-68CXXXl 4501 $0.00 $0.00 $0.00 Storm Development Fee
431-2aD-3-68(XXX) 5001 $000 $0.00 $0.00 Utility Undergrounding Fee
432-2aD-3-68(XXX) 3301 $399.84 $0.00 $39984 Str Tree Development Fee
433-2aD-3-68(XXX) 4005 $0.00 $0.00 $0.00 Traffic Impact Fee
434-26OO-3-68CXXXl 4402 $0.00 $0.00 $0.00 Police Development Fee
435-2aD-3-68(XXX) 4500 $0.00 $0.00 $0.00 Sewer Development Fee
436-2aD-3-68(XXX) 4510 $0.00 $0.00 $0.00 Water Development Fee
437-2aD-3-68(XXX) 4511 $0.00 $0.00 $0.00 Fire Development Fee
438-26OO-3-68CXXXl $0.00 $0.00 $0.00 Public FaCIlities Impact Fee
720-0433-3-652aXl 2202 $2,88900 $0.00 $2,889.00 Const Water Use Fee
801-a:x::o-2-220015 4703 $0.00 $0.00 $0.00 Reimbursements
801-a:x::o-2-220015 4703 $0.00 $0.00 $0.00 XXXf,)
801-a:x::o-2-220015 4703 $0.00 $0.00 $0.00 XXXf,)
801-a:x::o-2,220015 4703 $0.00 $0.00 $0.00 XXXf,)
TotalsH $24,717.63 $0.00 $24,717.63
Bonds and Securities $349,950
-----------
-----------
SERVICE CHARGES (1)
DATE
01-Jun-99
NUMBER
99-24
CITY OF GILROY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
FINAL COST SCHEDULE
Southside Drive Improvements
Southside Drive
Hanson Concrete Products, Inc
1 Hanson Court, Milpitas, Ca. 95035
{O~ U-1... - lDvt \
PROJECT LOCATION:
PARCEL NUMBER
OWNER/DEVELOPER
MAILING ADDRESS:
TELEPHONE NO
PREPARED BY: Mark Fachin
DEFER PARK, POLICE & FIRE DEVELI MENT FEES? n
NOTE: This 100 % cost schedule has been adjusted to the rates in effect at the time building permits were
issued
Site Information:
N Residential-Low?
N Residential-High?
N Commercial-Low?
N Commercial-High?
N Industrial-General?
N Industrial-Warehouse?
N Assembly Hall?
Common Area?
Commercialllndustrial Allocations:
Reimbursements and credits:
N Country Estates Water System?
N Country Estates Sewer System?
N Obata Industrial Park Credit?
Acres:
OCXXJ
OCXXJ
OCXXJ
OCXXJ
OCXXJ
OCXXJ
OCXXJ
OCXXJ
Lots: Units Sq Ft
0 0
0 0
0 0
0 0
0 . 0
0 0
0 0
0
Sewer GPO Water GPO:
0 0
N Southeast Quadrant Hydrology Study?
Front Footage for Front Foot Charges and Construction Water
Street Tree-FF Water FF:
1 ,120.00 000
Special Public Works Services
Maps
Final
$3,025.00 +
$50.00
Parcel $1,07000 + $100.00
Reapportionment (Assessment District Parcels)
$1,767.00 + $100.00
Administration Fees
Country Estates Water System
(Not Included)
Country Estates Sewer Trunk Main
(Not Included)
Southeast Quadrant Hydrology Study
(Not Included)
COST SCHEDULE
SewerFF
0.00
Storm FF
0.00
Construction Water FF
1,120.00
100-2001-3-~
$1,097.19
$1,097.19
100%
lot
N
$0.00
lot
N
$O~
lot
N
$0.00
y
$0.00
y
$0.00
y
$0.00
(1)
Miscellaneous Engineering Services:
(Cost Schedules, Agreements, RfN Reviews and Other Misc. Services)
12 hr Misc Services $77.00 I hr.
y
$92400
Public Works Microfilming (Maps and Plans):
1- 6 shts $152.94 + $6.75 sheet y $173.19
7,12 shts $195.68 + $6.75 sheet y $0.00
13-18 shts $238 40 + $6.75 sheet y $0.00
# of Shts 3
Engring Plan Check and Inspection 100-2601,3-€0)412
(Based on total cost of public 100%
right-of-way improvements)
~ hr Site grading and $7700 I hr. N $0.00
reinspection charges
Actual Cost of Public Improvements $233,nJ
10% of first $1oo,00J y $10,00J.00
8% of $1oo,00J - $200,00J y $8,00J.00
7% over $200,00J y $2,331 00
Offsite Improvements to be Bonded $233,nJ
Park Impact Fee 410-2&x)-3-68(XXX)
100%
a.Residential-Low $7,517.00 I unit y $0.00
b Residential-High $5,369.00 I unit y $000
Storm Drain Impact Fee 420-2&x)-3-68CXXXJ
100%
a. Residential-Low $43400 acre y $0.00
b Residential,High $650.00 acre y $0.00
c.Commercial $867.00 acre y $0.00
d.lndustrial $976.00 acre y $000
e.Assembly Hall $434.00 acre y $0.00
$20,33100
$20,331.00
$0.00
$0.00
$000
$0.00
Obata Industrial Pari< Credits
(Based on reimbursements due from oversized storm facilities)
Obata Fee Credit $1,170.00 I acre
y
$0.00
COST SCHEDULE
(2)
100%
$0.00
$0.00
Utility Underground Fee
431-2En:l-3-68(XXX)
Front Footage
$126.09 / U.X
NE
000
Street Tree Fee 432 -2En:l-3-68(XXX) $399.84
100% $399.84
Front Footage
a City Planting and Replacement
$2.56 / f.f.x N 000 $0.00
blnspection and Replacement
$0.36 / U. x y 1,120.00 $39984
Traffic Impact Fee 433-2En:l-3-68(XXX) $0.00
100% $0.00
a. Residential-Low $3,370.00 / unit y $0.00
b. Residential-High $2,732.00 / unit y $0.00
c.Commercial-Low Traffic
(<= 4 trips/1 (XX) sf) $3,727.00 / ksf y $000
d.Commercial,High Traffic
(> 4 trips/1 (XX) sf) $7,53100 / k.sf y $0.00
e.lndustrial-General $1,455.00 / k.sf y $0.00
f.1 ndustrial-Warehouse $1,072.00 / k.s.f. y $0.00
Police Impact Fee 434-2En:l-3-68(XXX) $0.00
100% $000
a. Residential-Low $1,293.00 / unit y $000
b Residential-High $1,94000 / unit y $0.00
c. Commercial $1,00J.00 / k.sf y $000
d.lndustrial $72.00 / ksf y $0.00
COST SCHEDULE (3)
Country Estates Sewer Trunk Main
(Not Included)
43&-2~
100%
$4,349.00 unit y $000
$3,107.00 unit y $0.00
$1,498.00 cgpd y $000
y $0.00
$000
$000
Sewer Impact Fee
a.Residential-Low
b Residential,High
c. Commercial/Industrial
Obata Industrial Park Credits
(Based on reimbursements due from oversized sewer facilities)
Obata Fee Credit $531.00 I acre
y
$000
Water Impact Fee 436-2600-3-68<XXXl
100%
a. Residential-Low $1,784.00 unit y $000
bResidential-High $1,274.00 unit y $000
c. Commercial/Industrial $2,71100 kgpd Y $000
$0.00
$0.00
Obata Industrial Park Credits
(Based on reimbursements due from oversized water facilities)
Obata Fee Credit $154.00 I acre
y
$0.00
Fire Impact Fee 437,2600-~
100%
a. Residential-Low $8900 unit y $0.00
b. Residential,High $12800 unit y $0.00
c.Commercial $79.00 k.s.f y $000
d.lndustrial $1000 k.sf y $000
Public Facilities Impact Fee 438-2600-~
100%
a.Residential $749.00 unit y $0.00
b.Commercial $207.00 k.sf y $000
c.lndustrial-General $193.00 k.sf. y $0.00
d.1 ndustrial-Warehouse $14500 k.sf y $0.00
Water User Fee (Construction) 720-0433-3-652ClXl y
100%
$258 I f.f. + $168.14 I a.c
COST SCHEDULE (4)
$0.00
$000
$0.00
$000
$2,889.00
$2,889.00
Front Foot Charges:
(Used to charge and reimburse fees for existing infrastructure)
Water 801-tXXX)-2,229J15 $0.00
Water Mains, including fire hydrants, valves and box: 100% $0.00
(Developer is responsible for up to and including 12" mains)
Half Pipe Front Footage
6" Main $12.50 I f.f. x N 0.00 $000
8" Main $13.50 Ux N 0.00 $0.00
10" Main $15.00 f.f x N 000 $0.00
12" Main $1650 Ux N 000 $0.00
14" Main $18.50 Ux N 0.00 $0.00
16" Main $21 .00 Ux N 0.00 $0.00
18" Main $25.00 f.f. x N 000 $0.00
24" Main $31 .50 f.f. x N 0.00 $0.00
Xl' Main $37.00 Ux N 0.00 $0.00
36" Main $4350 I f.f. x N 000 $0.00
Country Estates Water System y $0.00
(Not Included)
Sewer 801-tXXX)-2-229J15 $0.00
Sewer Mains, including manhole: 100% $0.00
(Developer is responsible for up to and including 12" mains)
Half Pipe Front Footage
6" Main $12.00 f.f x N 0.00 $0.00
8" Main $12.50 f.fx N 0.00 $0.00
10' Main $14.00 Ux N 0.00 $0.00
12" Main $1550 Ux N 000 $000
15" Main $1900 f.fx N 0.00 $0.00
18" Main $2400 f.f. x N 0.00 $0.00
21" Main $2850 ff x N 000 $000
24" Main $33.00 f.f. x N 0.00 $000
27' Main $36.50 I f.f. x N 0.00 $0.00
Country Estates Sewer Trunk Main
(Not Included)
y
$0.00
COST SCHEDULE
(5)
NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued.
The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated
fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the
difference. Site grading and reinspection charges including reinspeclion of backyard drainage will be billed at the
Engineering Division hourly rate in effect at the time of inspection
Accepted by:
Date
G~ tA~.
lo~\D~OlC\
,
\
\
\
---
---
---
,~
"
,
"
,
\ '
,--
---
.--
..'
..'
,/'
/
"
.. "-
"-
---- /
/' /'" /
;I' / "-
( \/2 / / \
;I' I
, o~ /
/' /
/ p4lr /
I
\
/\ \
~'\~, I \"e( \
'~~~~'" .. \ V \1 II \ hr,~c,t(4.
'~~, ,... I ,r"\ \
,~ ' / \ \-10 lit \ \-ltl I;
>;,~, / ~O\C# \ \
'. / \ \
"".~j ---\ \
'~'o;"....--.- \
" <> \
'~,,"', '\
";.. , t-IO 11 '\.
''\
~
\
ro'
~'\
{"
.,-' ?
,'-
,~
<'~
=~ \","
\,'.'::~
" '~
/
.,
~ '
!, ~ ~'
" ,
'il
I{
b:
" '/
//
/
/
!~/
.'
,
... "
VICINITY SITE MAP
Property Improvement Agreement No. 99-24
Hanson Concrete, Products, Inc - Southside Drive Improvements
E:<,ibi t 11.."