Loading...
PIA No. 99-05 - Jiffy Lube International RECORDING REQUESTED BY DOCUMENT: 14726375 11111111 " m 11I111111 II "'0014726375'" [) ! Tit I es: 1 1 Pages: 1 8 Fees, 58,00 Taxes, Copies, AMT PAID 5800 City of Gilroy BRENDA DAVIS SANTA CLARA COUNTY RECORDER Recorded at the request of City WHEN RECORDED, MAIL TO: Rhonda Pellin City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 RDE j:I 008 3/29/1999 8:38 AM (SP ACE ABOVE THIS LINE FOR RECORDER'S USE) ~i1 DOCUMENT TITLE Property Improvement Agreement No. 99-05 Commercial, Industrial, Institutional Jiffy Lube International of Maryland, Inc, 701 First Street, Gilroy, CA AP.N. 790-23-027 PROPERTY IMPROVEMENT AGREEMENT COMMERCIAL. INDUSTRIAL. INSTITUTIONAL AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS: IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS AND OTHER PUBLIC WORKS FACILITIES PROJECT NUMBER 99-05 This agreement is made and entered into this ,l..5..t.b- day of' March 1999, by and between the City of Gilroy, a municipal corporation, herein called the "City" land Jiffy Lube International of Maryland. Inc.. a real property owner, developer or subdivider, herein called the "Developer" . WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate known as and called: and, 701 First Street. AP.N. 790-23-027 WHEREAS, the Developer requires certain utilities and public works facilities in order to service the property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided that Developer has faithfully and fully complied with all of the terms, covenants, conditions to be performed by Developer pursuant to this agreement, NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between the parties as follows: SECTION 1 That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California and the United States of America concerning the subject matter ofthis agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances, Resolutions, Rules and Regulations include, but are not limited to, the following: the Code of the City of Gilroy, the current Zoning Ordinance, and the currently adopted Uniform Building Code. SECTION 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances, Resolutions, Rules and other Regulations and to comply with the foregoing and all applicable laws. b, To grant to the City without charge, free and clear of encumbrances, any and all easements and rights of way in and to his said real property necessary for the City in order that its water, electricity, and/or sewer lines in or to said real property may be extended. c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and expenses (including without limitation attorneys' fees) incurred by City in connection with (i) any damage done to any utility, public facility or other material or installation of the City on said real estate which the Developer or any contractor or subcontractor of the Developer, or any employee of the foregoing, shall do in grading or working upon said real estate; or (ii) arising or resulting directly or indirectly from any act or omission of Developer or Developer's contractors, or subcontractors, or any employee of the foregoing in connection with the work performed by them in connection with this agreement, including without limitation all claims relating to injury or death of any person or damage to any property. d. To construct and improve all public works facilities and other improvements described in this agreement in accordance with all standards established in the Codes, Ordinances, Resolutions, Rules and Regulations, all applicable laws and this agreement, and in accordance with the grades, plans, and specifications therefore approved by the City Engineer. Developer shall furnish two good and sufficient bonds, in form and content and issued by a bonding company acceptable to City as follows: (i) a performance bond to be executed in the face amount of not less than Twenty-Nine Thousand Four Hundred Dollars ($29,400.00), and (ii) a payment bond to be executed in the face amount of not less than Fifty percent (50%) ofthe performance bond described in (i) immediately above, both such bonds being issued for the improvements described in this agreement, The performance bond shall secure payment to City and the Developer of any loss due to the default of the contractor or its inability or refusal to perform its contract. The payment bond shall secure payment to the subcontractors and persons renting equipment for the furnishing of labor or materials for the improvements, as provided in Sections 66499 et seq of the Government Code of the State of California, the Codes, the Ordinances, Resolutions, Rules and the Regulations ofthe City, and this agreement. Each bond shall set forth a time period for performance by the contractor of its obligations and the terms and conditions on which the City may obtain the proceeds of the bond. The performance bond shall by its terms remain in full force and 3 affect for a period of not less than one year after completion of the improvement by Developer and acceptance of said improvements by City, to guarantee the repair and replacement of defective material and faulty workmanship. Upon completion ofthe improvements by Developer and acceptance of the improvements by City, Developer may substitute for the performance bond securing maintenance described above, a separate maintenance bond in the amount of 10% of the total contract price of the improvements (provided that the amount of said bond shall not be less than One Thousand Dollars ($1,000)) to cover the one year maintenance. e. That upon approval of the final map ofthe subdivision, the record of surveyor the building permit covering the real estate to be improved and before any work is done therein, the Developer shall pay to the City all sums, shown in Section 9 thereof to be due under the terms and provisions of this agreement. f At all times during the term of this agreement and until the improvements constructed by Developer are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a policy of general liability and property damage insurance in the minimum amount of One Million Dollars ($1,000,000), combined single limit for both bodily injury and property damage; (b) workers' compensation insurance as required by law; and (c) broad form "Builder's Risk" property damage insurance with limits of not less than 100% of the estimated value of the improvements to be constructed by Developer pursuant to this agreement. All such policies shall provide that thirty (30) days written notice must be given in advance to City prior to termination, cancellation or modification. The insurance specified in (a) above shall name City as an additional insured and the insurance specified in (c) shall name City as a loss payee" and shall provide that City, although an additional insured or loss payee, may recover for any loss suffered by reason of the acts or omissions of Developer or Developer's contractors or subcontractors or their respective employees. Developer hereby waives, and Developer shall cause each of its contractors and subcontractors to waive, all rights to recover against City for any loss or damage arising from a cause covered by the insurance required to be carried pursuant to this agreement or actually carried by Developer in connection with the work described in this agreement, and will cause each insurer to waive all rights of subrogation against City in connection therewith, All policies shall be written on an occurrence basis and not on a claims made basis and shall be issued by insurance companies acceptable to City. Prior to commencing any work pursuant this agreement, Developer shall deliver to City the insurance company's certificate evidencing the required coverage, or if required by City a copy of the policies obtained. SECTION 3 That except as otherwise expressly provided in this Agreement, all sums shown herein to be payable by the Developer to the City are due and payable to the City upon the execution of this agreement. 4 SECTION 4 That all the provisions of this agreement and all work to be done pursuant to the terms of this agreement are to be completed to City's Satisfaction within one year from and after the date and year first above written. Developer shall maintain such public works facilities and other improvements described in this agreement at Developer's sole cost and expense at all times prior to acceptance by City in a manner which will preclude any hazard to life or health or damage to property. SECTION 5 That the special provisions concerning the particular real estate referred to above, being attached hereto, are hereby incorporated herein and expressly made a part of this agreement. SECTION 6 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under the applicable or the Codes, Ordinances, Resolutions, Rules and Regulations of the City, in the event of any such default by Developer. SECTION 7 That this agreement is an instrument affecting the title or possession of the real property described in Exhibit A. All the terms, covenants and conditions herein imposed shall be binding upon and inure to the benefit of City, Developer and the successors in interest of Developer. Upon the sale or division of the property described in Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of each parcel shall succeed to the obligations imposed on Developer by this agreement. SECTION 8 The Developer will pay for a daily sewer and water allocation, The allocation limits are as follows: Sewer capacity not to exceed: 500 gpd Peak water use not to exceed: 500 gpd The City will attempt to provide additional capacity at the then current rate. If additional capacity is not available, the Developer agrees to maintain sewer and water use at or below the 5 amounts purchased. The Developer shall have the option of measuring sewer e:ffiuent by: a. Installing and maintaining a sewer e:ffiuent meter. Said meter shall meet City Standards and specifications, or b. Measuring the building's water consumption through the water meter. Irrigation meters are required. PENALTY: Overuse of sewer and water allocations shall be penalized under the Rules and Regulations adopted by the Gilroy City Council. SECTION 9 That the following General Stipulations shall be completed subject to the approval of the Director of Community Development. 1. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilities. NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. 2. Schedule the construction of improvements along existing public roads so that the work affecting vehicular traffic is completed with a minimum interruption to traffic. 3. All work within the public right-of-way shall be subject to the approval of the City Engineer. 4. Before construction utilizing combustible materials may proceed, an all weather access must be provided to within 150 feet of the building site; and at least one in service fire hydrant must be available within 500 feet of each portion of the site wherein this construction is to take place. Location ofthe fire hydrants will be determined by the Fire Chief. 6 SECTION 10 That the attached Development Cost Schedule enumerates all fees and their extensions. TOT AL AMOUNT DUE CITY $ 2.004.00 IN WITNESS WHEREOF, said parties have caused these presents to be executed the date and year first above written. . .. ATT~Tt ..7 ;;;::~w-I0-f'M4-- Rhonda Pellin, City Clerk FORM APPROVED: ~.~~ City Attorney Linda A Callon ~ BY ":'~\) ."5.~ '-" ..... DEVELOP Gregory . assett- Vice President Jiffy Lube International of Maryland, ---.... Inc. DATE ,3 - / S- y C; DATE ,9. \ ~\. c~ ,'.\ ...~ ( ATT,E,..~.Ir... :/~. '.. //.\ ,/ ~A jL ~_)l! 11/ ~f,_ OJ2_ay'M. McNew I 7istant Secretary _'7 / ,';) ?- (J DATE: ~ - /~ . / NOTE: If Developer is a corporation, the complete legal name and corporate seal ofthe corporation and the corporate titles ofthe persons signing for the corporation shall appear above. 7 ST ATE OF CALIFORNIA ) )ss, COUNTY OF SANTA CLARA ) On March 16, 1999, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal. ~ I~ ~ ~ ~;A;~N~- _. Cammission#1l42623 J i' Notay PubrIC - Colifania ~ Santa Ciao County - t__...~~~~~l:~lt per GC Sec. 40814; CC Sec. 1181 (Notary Seal) ACKNOWLEDGMENT STATE OF TEXAS s s s COUNTY OF HARRIS I, James E. Camacho, a Notary Public, do hereby certify that Gregory D. Bassett, Vice-President and Joan M. McNew, Assistant Secretary, personally came before me this day and acknowledged that he is Vice-President and she is Assistant Secretary of Jiffy Lube International of Maryland, Inc., a corporation, and that, by authority duly given and as the act of the corporation, the foregoing instrument was signed by its Vice President, sealed with its corporate seal, and attested by herself as its Assistant Secretary. WITNESS my hand and official seal this ~ day of /i.Jrtc.4"'7 ' 1999. Commission Expires: October 19,2001 DATE: 10-Feb-99 CITY OF GILROY COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION FINAL CHARGES NUMBER: 99-05 PROJECT LOCATION: Jiffy Lube, 701 First Street PARCEL NUMBER: A.P .N. 790-23-027 OWNER/DEVELOPER: Jiffy Lube International of Maryland, Inc. MAILING ADDRESS: 3109 Bowling Green Drive, Walnut Creek, Ca, 94598 TELEPHONE NO: 925-938-8084 PREPARED BY: Mark Fachin Account No. Key Code Fee: Credits: Amount Due: Account Description: 100-2001-3-0CXXXl0 4004 $154,00 $0.00 $154,00 Special Public Works Serv 100-2001-3-&XJ412 4702 $1 ,850,00 $0.00 $1,850.00 Engring Plan Check & Insp 410-2600-3-680000 3302 $0.00 $0,00 $0,00 Park Development Fee 420-2600-3-680000 4501 $0,00 $0.00 $0.00 Storm Development Fee 431-2600-3-680000 5001 $0,00 $0.00 $0.00 Utility Undergrounding Fee 432-2600-3-680000 3301 $0.00 $0,00 $0,00 Str Tree Development Fee 433-2600-3-680000 4905 $0,00 $0,00 $0,00 Traffic Impact Fee 434-2Em-3-680000 44D2 $0.00 $0.00 $0,00 Police Development Fee 435-2600-3-680000 4509 $0.00 $0,00 $0,00 Sewer Development Fee 436-2600-3-680000 4510 $0.00 $0.00 $0.00 Water Development Fee 437-2Em-3-680000 4511 $0.00 $0.00 $0.00 Fire Development Fee 438-2600-3-680000 $0.00 $0,00 $0.00 Public Facilities Impact Fee 720-0433-3-652000 2202 $0,00 $0,00 $0.00 Const Water Use Fee 801-0000-2-229015 4703 $0,00 $0.00 $0.00 Reimbursements 801-0000-2-229015 4703 $0,00 $0.00 $0.00 XXXX) 801-0000-2-229015 4703 $0.00 $0.00 $0.00 XXXX) 801-0000-2-229015 4703 $0.00 $0,00 $0.00 XXXX) Totals,.""""..... , $2,004.00 $0,00 $2,004.00 Bonds and Securities $44,100 ----------- ----------- SERVICE CHARGES (1 ) PROJECT LOCATION: Jiffy Lube, 701 First Street PARCEL NUMBER: A.P.N.790-23-027 OWNER/DEVELOPER: Jiffy Lube International of Maryland, Inc. MAILING ADDRESS: 3109 Bowling Green Drive, Walnut Creek, Ca. 94598 TELEPHONE NO: 925-938-8084 PREPARED BY: Mark Fachin DEFER PARK, POLICE & FIRE DEVELt MENT FEES ? ~ NOTE: This 1DO % cost schedule has been adjusted to the rates in effect at the time building permits were issued. DATE: 10-Feb-99 NUMBER: 99-05 CITY OF GILROY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION FINAL COST SCHEDULE Site Information: N Residential-Low? N Residential-High? Y Commercial-Low? N Commercial-High? N Industrial-General? N Industrial-Warehouse? N Assembly Hall? Common Area? Acres: Lots: Units: Sq Ft: 0,000 0 0 0.000 0 0 0.000 1 0 0,000 0 0 0,000 0 0 0,000 0 0 0.000 0 0 0.000 0 Commercial/Industrial Allocations: Reimbursements and credits: N Country Estates Water System? N Country Estates Sewer System? N Obata Industrial Park Credit? Front Footage for Front Foot Charges and Construction Water: Street Tree FF: Water FF: O,DO O,DO Special Public Works Services Maps: Final $3,025.DO + $50 .DO Parcel $1 ,070,DO + $1 DO,DO Reapportionment (Assessment District Parcels) $1,767.DO + $1DO,DO Administration Fees: Country Estates Water System (Not Included) Country Estates Sewer Trunk Main (Not Included) Southeast Quadrant Hydrology Study (Not Included) COST SCHEDULE Sewer GPO: Water GPO: 500 500 N Southeast Quadrant Hydrology Study? Sewer FF: Storm FF: Construction Water FF: o ,DO O.DO O.DO 1 00-2001 ~&XXJOO $154.DO 1 DO% $154,DO lot N $O,DO lot N $O.DO lot N $O.DO Y $0. DO Y $O,DO Y $0.00 (1 ) Miscellaneous Engineering Services: (Cost Schedules, Agreements, RIW Reviews and Other Misc. Services) 2 hr Misc Services $77.00 I hr. Public Works Microfilming (Maps and Plans): 1- 6 shts $152,94 + $6.75 sheet y $0.00 7-12 shts $195,68 + $6.75 sheet y $0.00 13-18 shts $238.40 + $6,75 sheet y $0.00 # of Shts 0 Engring Plan Check and Inspection (Based on total cost of public right-of-way improvements) --2.. hr Site grading and reinspection charges Actual Cost of Public Improvements 10% of first 8% of $100,000 - 7% over Offsite Improvements to be Bonded Park Impact Fee a,Residential-Low b.Residential-High Storm Drain Impact Fee a.Residential-Low b.Residential-High c,Commercial d.lndustrial e.Assembly Hall y $154.00 100-2001-3-600412 100% $77.00 I hr. N $0,00 $18,500 $100,000 y $1,850.00 $200,000 y $0,00 $200,000 y $0.00 $29,400 410-2600-3-680000 100% $6,949.00 I unit Y $0,00 $4,964,00 I unit Y $0.00 420-2600-3-680000 100% $434,00 acre y $0.00 $650.00 acre y $0.00 $867.00 acre y $0,00 $976.00 acre y $0.00 $434.00 acre y $0.00 $1 ,850.00 $1,850,00 $0.00 $0,00 $0.00 $0,00 Obata Industrial Park Credits (Based on reimbursements due from oversized storm facilities) Obata Fee Credit $1,170,00 I acre COST SCHEDULE y $0.00 (2) 100% $0,00 $0,00 Utility Underground Fee 431-2600-3-68CXXD Front Footage $126,00 / fJ, x ' NE 0.00 Street Tree Fee 432-2600-3-68CXXD $0.00 100% $0,00 Front Footage a.City Planting and Replacement $2.56 / fJ. x N 0.00 $0.00 b.lnspection and Replacement $0.36 / fJ,x Y 0,00 $0.00 Traffic Impact Fee 433-2600-3-68CXXD $0,00 100% $0.00 a,Residential-Low $3,370,00 / unit y $0.00 b,Residential-High $2,732,00 / unit y $0.00 c,Commercial-Low Traffic (<= 4 trips/1 CXXl sf) $3,727.00 / k,sJ. Y $0.00 d.Commercial-High Traffic (> 4 trips/1 CXXl sf) $7,531.00 / k,sJ. y $0.00 e,lndustrial-General $1 ,455,00 / k.sJ, y $0,00 f,lndustrial-Warehouse $1 ,072.00 / k,s.f. Y $0,00 Police Impact Fee 434-2600-3-68CXXD $0.00 100% $0.00 a. Residential-Low $1,293,00 / unit y $0,00 b,Residential-High $1 ,940,00 / unit Y $0,00 c.Commercial $1,900,00 / k.sJ. Y $0.00 d.lndustrial $72.00 / k.sJ. Y $0.00 COST SCHEDULE (3) Sewer Impact Fee 435-2000-3-68OOOJ $0.00 100% $0,00 a. Residential-Low $4,349.00 unit y $0.00 b.Residential-High $3,107.00 unit Y $0,00 c. Commercial/Industrial $1 ,498,00 cgpd y $0.00 Country Estates Sewer Trunk Main y $0.00 (Not Included) Obata Industrial Park Credits (Based on reimbursements due from oversized sewer facilities) Obata Fee Credit $531 ,00 I acre y $0,00 Water Impact Fee 436-2000-3-68OOOJ $0,00 100% $0,00 a.Residential-Low $1,784,00 unit y $0,00 b.Residential-High $1,274.00 unit y $0,00 c, Commercial/Industrial $2,711 ,00 kgpd y $0.00 Obata Industrial Park Credits (Based on reimbursements due from oversized water facilities) Obata Fee Credit $154.00 I acre y $0,00 Fire Impact Fee 437 -2600-3-68OOOJ $0.00 100% $0.00 a, Residential-Low $89.00 unit Y $0.00 b,Residential-High $128,00 unit y $0,00 c,Commercial $79,00 k.sJ. y $0.00 d,lndustrial $10.00 k.sJ, y $0.00 Public Facilities Impact Fee 438-2600-3-68CXXXJ $0.00 100% $0,00 a,Residential $749.00 unit y $0,00 b,Commercial $207.00 k.sJ, Y $0,00 c.lndustrial-General $193.00 k.sJ, y $0,00 d.1 ndustrial-Warehouse $145,00 k.sJ. Y $0.00 Water User Fee (Construction) 720-0433-3-652000 y $0.00 100% $0,00 $2,58 I f.f. + $168,14 I a,c, COST SCHEDULE (4) Front Foot Charges: (Used to charge and reimburse fees for existing infrastructure) Water 801-0000-2-229015 $0.00 Water Mains, including fire hydrants, valves and box: 100% $0.00 (Developer is responsible for up to and including 12" mains) Half Pipe Front Footage 6" Main $12,50 I fJ, x N 0.00 $0.00 8" Main $13.50 fJ,x N 0.00 $0.00 10" Main $15.00 fJ, x N 0.00 $0.00 12" Main $16,50 fJ,x N 0.00 $0.00 14" Main $18.50 fJ, x N 0.00 $0.00 16" Main $21 ,00 f.f. x N 0,00 $0,00 18" Main $25.00 f.f, x N 0,00 $0,00 24" Main $31 .50 f.f. x N 0,00 $0.00 30" Main $37.00 fJ, x N 0.00 $0,00 36" Main $43,50 I fJ. x N 0,00 $0,00 Country Estates Water System y $0.00 (Not Included) Sewer 801-0000-2-229015 $0.00 Sewer Mains, including manhole: 100% $0.00 (Developer is responsible for up to and including 12" mains) Half Pipe Front Footage 6" Main $12,00 fJ, x N 0,00 $0.00 8" Main $12.50 f.f.x N 0,00 $0.00 10" Main $14.00 f.f.x N 0.00 $0,00 12" Main $15.50 fJ, x N 0,00 $0.00 15" Main $19.00 f.f,x N 0,00 $0.00 18" Main $24,00 fJ.X N 0.00 $0.00 21" Main $28,50 fJ. x N 0,00 $0.00 24" Main $33.00 f.f.x N 0.00 $0.00 27" Main $36,50 I f.f. x N 0.00 $0.00 Country Estates Sewer Trunk Main (Not Included) y $0,00 COST SCHEDULE (5) Street Improvements 801-0000-2-229015 $0.00 100% $0.00 Pavement Square Footage 3" AC on 8" AS $2,57 x 0.00 $0.00 3" AC on 10" AS $2.89 x 0,00 $0,00 3" AC on 12" AS $3,18 x 0,00 $0.00 3" AC on 15" AS $3,65 x 0.00 $0.00 Square Footage Sidewalk 4" on 4" $4,72 x 0.00 $0.00 and driveway Front Footage Curb/Gutter on 6" $15,33 x 0.00 $0.00 Storm Drain 801-0000-2-229015 $0.00 100% $0.00 Storm Mains, including manholes and catch basins: (Developer is responsible for up to and including 24" mains) Half Pipe Front Footage 18" Main $20,00 / f.f. x N 0,00 $0.00 21" Main $22.00 fJ, x N 0,00 $0,00 24" Main $23.50 fJ, x N 0.00 $0.00 27" Main $25,00 fJ, x N 0,00 $0.00 3:)" Main $26.50 fJ, x N 0,00 $0.00 33" Main $28,00 f.f,x N 0,00 $0,00 36" Main $29.50 fJ. x N 0.00 $0,00 42" Main $33,00 fJ. x N 0,00 $0.00 48" Main $36,50 fJ.X N 0,00 $0,00 54" Main $39,50 fJ.x N 0.00 $0.00 00" Main $43.00 fJ, x N 0,00 $0,00 00' Main $46.00 fJ.x N 0.00 $0.00 72" Main $49,00 / fJ. x N 0,00 $0,00 COST SCHEDULE (6) NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Site grading and reinspection charges including reinspection of backyard drainage will be billed at the Engineering Division hourly rate in effect at the time of inspection, Accepted by: assett - Vice President ternational of Maryland, Inc. Date: N89012'30'W' 99.48 ~ y~ \ (" 0 ~ ~ <:) /'-. ~o cJ ftJ (Y) ~ ~ .<& 0 (" o. \\~ r' tx GSV\tx 0 (Il ....- ,...-;O\"' ~((- ~ o ~ \\ \\ o~ ~ / 10 ~ \ UJO' /:..-- \ .' ill ~ill-...J <.DC)) - 0 0 : :3 /'-. /'-. ~ <:) <J) <:) CD r--- - \ \ (Y) '<T /'-. :3 '<T 0 <:) <:) (/) 97,89' \ N89012'30'\,/ \ PUBLIC STREET DEDICA TION FIRST STREET 187.14 S.F. \ l Vicinity Site Map Property Improvement Agreement No. 99-05 Jiffy Lube International of Maryland, Inc. 701 First Street, Gilroy A.P.N. 790-23-027 Exhibit "A"