PIA No. 99-05 - Jiffy Lube International
RECORDING REQUESTED BY
DOCUMENT: 14726375
11111111 " m 11I111111 II
"'0014726375'"
[) !
Tit I es: 1 1 Pages: 1 8
Fees, 58,00
Taxes,
Copies,
AMT PAID 5800
City of Gilroy
BRENDA DAVIS
SANTA CLARA COUNTY RECORDER
Recorded at the request of
City
WHEN RECORDED, MAIL TO:
Rhonda Pellin
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
RDE j:I 008
3/29/1999
8:38 AM
(SP ACE ABOVE THIS LINE FOR RECORDER'S USE)
~i1
DOCUMENT TITLE
Property Improvement Agreement No. 99-05
Commercial, Industrial, Institutional
Jiffy Lube International of Maryland, Inc,
701 First Street, Gilroy, CA
AP.N. 790-23-027
PROPERTY IMPROVEMENT AGREEMENT
COMMERCIAL. INDUSTRIAL. INSTITUTIONAL
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS:
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS AND
OTHER PUBLIC WORKS FACILITIES
PROJECT NUMBER 99-05
This agreement is made and entered into this ,l..5..t.b- day of' March 1999, by and
between the City of Gilroy, a municipal corporation, herein called the "City" land Jiffy Lube
International of Maryland. Inc.. a real property owner, developer or subdivider, herein called the
"Developer" .
WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance)
application has now been submitted to the City for approval and acceptance, covering certain real
estate known as and called:
and, 701 First Street. AP.N. 790-23-027
WHEREAS, the Developer requires certain utilities and public works facilities in order to
service the property under the minimum standards established by the City and,
WHEREAS, the City, by and through its City Council, has enacted certain Codes,
Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning
the subject matter of this agreement and,
WHEREAS, the City has certain responsibilities for maintenance and operation of such
utilities and public service facilities after acceptance by City, and for providing the necessary
connecting system, general plant and appurtenances, and the City is agreeing to discharge those
responsibilities, provided that Developer has faithfully and fully complied with all of the terms,
covenants, conditions to be performed by Developer pursuant to this agreement,
NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the
intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and
between the parties as follows:
SECTION 1
That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of
the City and the laws of the State of California and the United States of America concerning the
subject matter ofthis agreement are hereby referred to and incorporated herein to the same effect
as if they were set out at length herein. Said Codes, Ordinances, Resolutions, Rules and
Regulations include, but are not limited to, the following: the Code of the City of Gilroy, the
current Zoning Ordinance, and the currently adopted Uniform Building Code.
SECTION 2
The Developer agrees:
a. To perform each and every provision required by the City to be performed by the
Developer in each and every one of said Codes, Ordinances, Resolutions, Rules and
other Regulations and to comply with the foregoing and all applicable laws.
b, To grant to the City without charge, free and clear of encumbrances, any and all
easements and rights of way in and to his said real property necessary for the City in
order that its water, electricity, and/or sewer lines in or to said real property may be
extended.
c. To indemnify, defend with counsel of City's choice and hold the City free and harmless
from all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities
and expenses (including without limitation attorneys' fees) incurred by City in
connection with (i) any damage done to any utility, public facility or other material or
installation of the City on said real estate which the Developer or any contractor or
subcontractor of the Developer, or any employee of the foregoing, shall do in grading
or working upon said real estate; or (ii) arising or resulting directly or indirectly from
any act or omission of Developer or Developer's contractors, or subcontractors, or any
employee of the foregoing in connection with the work performed by them in
connection with this agreement, including without limitation all claims relating to injury
or death of any person or damage to any property.
d. To construct and improve all public works facilities and other improvements described
in this agreement in accordance with all standards established in the Codes, Ordinances,
Resolutions, Rules and Regulations, all applicable laws and this agreement, and in
accordance with the grades, plans, and specifications therefore approved by the City
Engineer. Developer shall furnish two good and sufficient bonds, in form and content
and issued by a bonding company acceptable to City as follows: (i) a performance
bond to be executed in the face amount of not less than Twenty-Nine Thousand Four
Hundred Dollars ($29,400.00), and (ii) a payment bond to be executed in the face
amount of not less than Fifty percent (50%) ofthe performance bond described in (i)
immediately above, both such bonds being issued for the improvements described in
this agreement, The performance bond shall secure payment to City and the Developer
of any loss due to the default of the contractor or its inability or refusal to perform its
contract. The payment bond shall secure payment to the subcontractors and persons
renting equipment for the furnishing of labor or materials for the improvements, as
provided in Sections 66499 et seq of the Government Code of the State of California,
the Codes, the Ordinances, Resolutions, Rules and the Regulations ofthe City, and this
agreement. Each bond shall set forth a time period for performance by the contractor
of its obligations and the terms and conditions on which the City may obtain the
proceeds of the bond. The performance bond shall by its terms remain in full force and
3
affect for a period of not less than one year after completion of the improvement by
Developer and acceptance of said improvements by City, to guarantee the repair and
replacement of defective material and faulty workmanship. Upon completion ofthe
improvements by Developer and acceptance of the improvements by City, Developer
may substitute for the performance bond securing maintenance described above, a
separate maintenance bond in the amount of 10% of the total contract price of the
improvements (provided that the amount of said bond shall not be less than One
Thousand Dollars ($1,000)) to cover the one year maintenance.
e. That upon approval of the final map ofthe subdivision, the record of surveyor the
building permit covering the real estate to be improved and before any work is done
therein, the Developer shall pay to the City all sums, shown in Section 9 thereof to be
due under the terms and provisions of this agreement.
f At all times during the term of this agreement and until the improvements constructed
by Developer are accepted by City, Developer shall, at no cost to City obtain and
maintain (a) a policy of general liability and property damage insurance in the minimum
amount of One Million Dollars ($1,000,000), combined single limit for both bodily
injury and property damage; (b) workers' compensation insurance as required by law;
and (c) broad form "Builder's Risk" property damage insurance with limits of not less
than 100% of the estimated value of the improvements to be constructed by Developer
pursuant to this agreement. All such policies shall provide that thirty (30) days written
notice must be given in advance to City prior to termination, cancellation or
modification. The insurance specified in (a) above shall name City as an additional
insured and the insurance specified in (c) shall name City as a loss payee" and shall
provide that City, although an additional insured or loss payee, may recover for any loss
suffered by reason of the acts or omissions of Developer or Developer's contractors or
subcontractors or their respective employees. Developer hereby waives, and Developer
shall cause each of its contractors and subcontractors to waive, all rights to recover
against City for any loss or damage arising from a cause covered by the insurance
required to be carried pursuant to this agreement or actually carried by Developer in
connection with the work described in this agreement, and will cause each insurer to
waive all rights of subrogation against City in connection therewith, All policies shall
be written on an occurrence basis and not on a claims made basis and shall be issued by
insurance companies acceptable to City. Prior to commencing any work pursuant this
agreement, Developer shall deliver to City the insurance company's certificate
evidencing the required coverage, or if required by City a copy of the policies obtained.
SECTION 3
That except as otherwise expressly provided in this Agreement, all sums shown herein to be
payable by the Developer to the City are due and payable to the City upon the execution of this
agreement.
4
SECTION 4
That all the provisions of this agreement and all work to be done pursuant to the terms of this
agreement are to be completed to City's Satisfaction within one year from and after the date and
year first above written. Developer shall maintain such public works facilities and other
improvements described in this agreement at Developer's sole cost and expense at all times prior
to acceptance by City in a manner which will preclude any hazard to life or health or damage to
property.
SECTION 5
That the special provisions concerning the particular real estate referred to above, being
attached hereto, are hereby incorporated herein and expressly made a part of this agreement.
SECTION 6
That the faithful and prompt performance by the Developer of each and every term and
condition contained herein is made an express condition precedent to the duty of the City to
perform any act in connection with this transaction, and the failure, neglect or refusal of the
Developer to so perform, or to pay any monies due hereunder when due shall release the City
from any and all obligations hereunder and the City, at its election, may enforce the performance
of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it
may have under the applicable or the Codes, Ordinances, Resolutions, Rules and Regulations of
the City, in the event of any such default by Developer.
SECTION 7
That this agreement is an instrument affecting the title or possession of the real property
described in Exhibit A. All the terms, covenants and conditions herein imposed shall be binding
upon and inure to the benefit of City, Developer and the successors in interest of Developer.
Upon the sale or division of the property described in Exhibit A, the terms of this agreement shall
apply separately to each parcel and the Developer of each parcel shall succeed to the obligations
imposed on Developer by this agreement.
SECTION 8
The Developer will pay for a daily sewer and water allocation, The allocation limits are as
follows:
Sewer capacity not to exceed: 500 gpd
Peak water use not to exceed: 500 gpd
The City will attempt to provide additional capacity at the then current rate. If additional
capacity is not available, the Developer agrees to maintain sewer and water use at or below the
5
amounts purchased.
The Developer shall have the option of measuring sewer e:ffiuent by:
a. Installing and maintaining a sewer e:ffiuent meter. Said meter shall
meet City Standards and specifications, or
b. Measuring the building's water consumption through the water meter.
Irrigation meters are required.
PENALTY:
Overuse of sewer and water allocations shall be penalized under the Rules and Regulations
adopted by the Gilroy City Council.
SECTION 9
That the following General Stipulations shall be completed subject to the approval of the
Director of Community Development.
1. Locate and properly dispose of any wells, septic tanks and underground fuel storage
facilities. NOTE: The capping of any well will require inspection by the Santa
Clara Valley Water District.
2. Schedule the construction of improvements along existing public roads so that the work
affecting vehicular traffic is completed with a minimum interruption to traffic.
3. All work within the public right-of-way shall be subject to the approval of the City
Engineer.
4. Before construction utilizing combustible materials may proceed, an all weather access
must be provided to within 150 feet of the building site; and at least one in service fire
hydrant must be available within 500 feet of each portion of the site wherein this
construction is to take place. Location ofthe fire hydrants will be determined by the
Fire Chief.
6
SECTION 10
That the attached Development Cost Schedule enumerates all fees and their extensions.
TOT AL AMOUNT DUE CITY
$ 2.004.00
IN WITNESS WHEREOF, said parties have caused these presents to be executed the date
and year first above written.
. ..
ATT~Tt ..7
;;;::~w-I0-f'M4--
Rhonda Pellin, City Clerk
FORM APPROVED:
~.~~
City Attorney
Linda A Callon
~
BY ":'~\) ."5.~
'-" .....
DEVELOP
Gregory . assett- Vice President
Jiffy Lube International of Maryland,
---....
Inc.
DATE ,3 - / S- y C;
DATE ,9. \ ~\. c~ ,'.\
...~
( ATT,E,..~.Ir... :/~. '.. //.\
,/ ~A jL
~_)l! 11/ ~f,_
OJ2_ay'M. McNew I
7istant Secretary
_'7 / ,';) ?- (J
DATE: ~ - /~ . /
NOTE: If Developer is a corporation, the complete legal name and corporate seal ofthe
corporation and the corporate titles ofthe persons signing for the corporation shall appear above.
7
ST ATE OF CALIFORNIA )
)ss,
COUNTY OF SANTA CLARA )
On March 16, 1999, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa
personally known to me to be the person whose name is subscribed to the within instrument and
acknowledged to me that he executed the same in his authorized capacity, and that by his
signature on the instrument the person or the entity upon behalf of which the person acted,
executed the instrument.
WITNESS my hand and official seal.
~
I~ ~ ~ ~;A;~N~-
_. Cammission#1l42623 J
i' Notay PubrIC - Colifania ~
Santa Ciao County -
t__...~~~~~l:~lt
per GC Sec. 40814; CC Sec. 1181
(Notary Seal)
ACKNOWLEDGMENT
STATE OF TEXAS
s
s
s
COUNTY OF HARRIS
I, James E. Camacho, a Notary Public, do hereby certify that Gregory D. Bassett,
Vice-President and Joan M. McNew, Assistant Secretary, personally came before me this
day and acknowledged that he is Vice-President and she is Assistant Secretary of Jiffy
Lube International of Maryland, Inc., a corporation, and that, by authority duly given and
as the act of the corporation, the foregoing instrument was signed by its Vice President,
sealed with its corporate seal, and attested by herself as its Assistant Secretary.
WITNESS my hand and official seal this ~ day of /i.Jrtc.4"'7 ' 1999.
Commission Expires: October 19,2001
DATE:
10-Feb-99
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
FINAL CHARGES
NUMBER: 99-05
PROJECT LOCATION:
Jiffy Lube, 701 First Street
PARCEL NUMBER:
A.P .N. 790-23-027
OWNER/DEVELOPER:
Jiffy Lube International of Maryland, Inc.
MAILING ADDRESS:
3109 Bowling Green Drive, Walnut Creek, Ca, 94598
TELEPHONE NO:
925-938-8084
PREPARED BY:
Mark Fachin
Account No. Key Code Fee: Credits: Amount Due: Account Description:
100-2001-3-0CXXXl0 4004 $154,00 $0.00 $154,00 Special Public Works Serv
100-2001-3-&XJ412 4702 $1 ,850,00 $0.00 $1,850.00 Engring Plan Check & Insp
410-2600-3-680000 3302 $0.00 $0,00 $0,00 Park Development Fee
420-2600-3-680000 4501 $0,00 $0.00 $0.00 Storm Development Fee
431-2600-3-680000 5001 $0,00 $0.00 $0.00 Utility Undergrounding Fee
432-2600-3-680000 3301 $0.00 $0,00 $0,00 Str Tree Development Fee
433-2600-3-680000 4905 $0,00 $0,00 $0,00 Traffic Impact Fee
434-2Em-3-680000 44D2 $0.00 $0.00 $0,00 Police Development Fee
435-2600-3-680000 4509 $0.00 $0,00 $0,00 Sewer Development Fee
436-2600-3-680000 4510 $0.00 $0.00 $0.00 Water Development Fee
437-2Em-3-680000 4511 $0.00 $0.00 $0.00 Fire Development Fee
438-2600-3-680000 $0.00 $0,00 $0.00 Public Facilities Impact Fee
720-0433-3-652000 2202 $0,00 $0,00 $0.00 Const Water Use Fee
801-0000-2-229015 4703 $0,00 $0.00 $0.00 Reimbursements
801-0000-2-229015 4703 $0,00 $0.00 $0.00 XXXX)
801-0000-2-229015 4703 $0.00 $0.00 $0.00 XXXX)
801-0000-2-229015 4703 $0.00 $0,00 $0.00 XXXX)
Totals,.""""..... , $2,004.00 $0,00 $2,004.00
Bonds and Securities $44,100
-----------
-----------
SERVICE CHARGES (1 )
PROJECT LOCATION: Jiffy Lube, 701 First Street
PARCEL NUMBER: A.P.N.790-23-027
OWNER/DEVELOPER: Jiffy Lube International of Maryland, Inc.
MAILING ADDRESS: 3109 Bowling Green Drive, Walnut Creek, Ca. 94598
TELEPHONE NO: 925-938-8084
PREPARED BY: Mark Fachin
DEFER PARK, POLICE & FIRE DEVELt MENT FEES ? ~
NOTE: This 1DO % cost schedule has been adjusted to the rates in effect at the time building permits were
issued.
DATE:
10-Feb-99
NUMBER:
99-05
CITY OF GILROY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
FINAL COST SCHEDULE
Site Information:
N Residential-Low?
N Residential-High?
Y Commercial-Low?
N Commercial-High?
N Industrial-General?
N Industrial-Warehouse?
N Assembly Hall?
Common Area?
Acres: Lots: Units: Sq Ft:
0,000 0 0
0.000 0 0
0.000 1 0
0,000 0 0
0,000 0 0
0,000 0 0
0.000 0 0
0.000 0
Commercial/Industrial Allocations:
Reimbursements and credits:
N Country Estates Water System?
N Country Estates Sewer System?
N Obata Industrial Park Credit?
Front Footage for Front Foot Charges and Construction Water:
Street Tree FF: Water FF:
O,DO O,DO
Special Public Works Services
Maps:
Final
$3,025.DO +
$50 .DO
Parcel $1 ,070,DO + $1 DO,DO
Reapportionment (Assessment District Parcels)
$1,767.DO + $1DO,DO
Administration Fees:
Country Estates Water System
(Not Included)
Country Estates Sewer Trunk Main
(Not Included)
Southeast Quadrant Hydrology Study
(Not Included)
COST SCHEDULE
Sewer GPO:
Water GPO:
500
500
N Southeast Quadrant Hydrology Study?
Sewer FF: Storm FF: Construction Water FF:
o ,DO O.DO O.DO
1 00-2001 ~&XXJOO $154.DO
1 DO% $154,DO
lot N $O,DO
lot N $O.DO
lot N $O.DO
Y
$0. DO
Y
$O,DO
Y
$0.00
(1 )
Miscellaneous Engineering Services:
(Cost Schedules, Agreements, RIW Reviews and Other Misc. Services)
2 hr Misc Services $77.00 I hr.
Public Works Microfilming (Maps and Plans):
1- 6 shts $152,94 + $6.75 sheet y $0.00
7-12 shts $195,68 + $6.75 sheet y $0.00
13-18 shts $238.40 + $6,75 sheet y $0.00
# of Shts 0
Engring Plan Check and Inspection
(Based on total cost of public
right-of-way improvements)
--2.. hr Site grading and
reinspection charges
Actual Cost of Public Improvements
10% of first
8% of $100,000 -
7% over
Offsite Improvements to be Bonded
Park Impact Fee
a,Residential-Low
b.Residential-High
Storm Drain Impact Fee
a.Residential-Low
b.Residential-High
c,Commercial
d.lndustrial
e.Assembly Hall
y
$154.00
100-2001-3-600412
100%
$77.00 I hr. N $0,00
$18,500
$100,000 y $1,850.00
$200,000 y $0,00
$200,000 y $0.00
$29,400
410-2600-3-680000
100%
$6,949.00 I unit Y $0,00
$4,964,00 I unit Y $0.00
420-2600-3-680000
100%
$434,00 acre y $0.00
$650.00 acre y $0.00
$867.00 acre y $0,00
$976.00 acre y $0.00
$434.00 acre y $0.00
$1 ,850.00
$1,850,00
$0.00
$0,00
$0.00
$0,00
Obata Industrial Park Credits
(Based on reimbursements due from oversized storm facilities)
Obata Fee Credit $1,170,00 I acre
COST SCHEDULE
y
$0.00
(2)
100%
$0,00
$0,00
Utility Underground Fee
431-2600-3-68CXXD
Front Footage
$126,00 / fJ, x '
NE
0.00
Street Tree Fee 432-2600-3-68CXXD $0.00
100% $0,00
Front Footage
a.City Planting and Replacement
$2.56 / fJ. x N 0.00 $0.00
b.lnspection and Replacement
$0.36 / fJ,x Y 0,00 $0.00
Traffic Impact Fee 433-2600-3-68CXXD $0,00
100% $0.00
a,Residential-Low $3,370,00 / unit y $0.00
b,Residential-High $2,732,00 / unit y $0.00
c,Commercial-Low Traffic
(<= 4 trips/1 CXXl sf) $3,727.00 / k,sJ. Y $0.00
d.Commercial-High Traffic
(> 4 trips/1 CXXl sf) $7,531.00 / k,sJ. y $0.00
e,lndustrial-General $1 ,455,00 / k.sJ, y $0,00
f,lndustrial-Warehouse $1 ,072.00 / k,s.f. Y $0,00
Police Impact Fee 434-2600-3-68CXXD $0.00
100% $0.00
a. Residential-Low $1,293,00 / unit y $0,00
b,Residential-High $1 ,940,00 / unit Y $0,00
c.Commercial $1,900,00 / k.sJ. Y $0.00
d.lndustrial $72.00 / k.sJ. Y $0.00
COST SCHEDULE (3)
Sewer Impact Fee 435-2000-3-68OOOJ $0.00
100% $0,00
a. Residential-Low $4,349.00 unit y $0.00
b.Residential-High $3,107.00 unit Y $0,00
c. Commercial/Industrial $1 ,498,00 cgpd y $0.00
Country Estates Sewer Trunk Main y $0.00
(Not Included)
Obata Industrial Park Credits
(Based on reimbursements due from oversized sewer facilities)
Obata Fee Credit $531 ,00 I acre y $0,00
Water Impact Fee 436-2000-3-68OOOJ $0,00
100% $0,00
a.Residential-Low $1,784,00 unit y $0,00
b.Residential-High $1,274.00 unit y $0,00
c, Commercial/Industrial $2,711 ,00 kgpd y $0.00
Obata Industrial Park Credits
(Based on reimbursements due from oversized water facilities)
Obata Fee Credit $154.00 I acre y $0,00
Fire Impact Fee 437 -2600-3-68OOOJ $0.00
100% $0.00
a, Residential-Low $89.00 unit Y $0.00
b,Residential-High $128,00 unit y $0,00
c,Commercial $79,00 k.sJ. y $0.00
d,lndustrial $10.00 k.sJ, y $0.00
Public Facilities Impact Fee 438-2600-3-68CXXXJ $0.00
100% $0,00
a,Residential $749.00 unit y $0,00
b,Commercial $207.00 k.sJ, Y $0,00
c.lndustrial-General $193.00 k.sJ, y $0,00
d.1 ndustrial-Warehouse $145,00 k.sJ. Y $0.00
Water User Fee (Construction) 720-0433-3-652000 y $0.00
100% $0,00
$2,58 I f.f. + $168,14 I a,c,
COST SCHEDULE (4)
Front Foot Charges:
(Used to charge and reimburse fees for existing infrastructure)
Water 801-0000-2-229015 $0.00
Water Mains, including fire hydrants, valves and box: 100% $0.00
(Developer is responsible for up to and including 12" mains)
Half Pipe Front Footage
6" Main $12,50 I fJ, x N 0.00 $0.00
8" Main $13.50 fJ,x N 0.00 $0.00
10" Main $15.00 fJ, x N 0.00 $0.00
12" Main $16,50 fJ,x N 0.00 $0.00
14" Main $18.50 fJ, x N 0.00 $0.00
16" Main $21 ,00 f.f. x N 0,00 $0,00
18" Main $25.00 f.f, x N 0,00 $0,00
24" Main $31 .50 f.f. x N 0,00 $0.00
30" Main $37.00 fJ, x N 0.00 $0,00
36" Main $43,50 I fJ. x N 0,00 $0,00
Country Estates Water System y $0.00
(Not Included)
Sewer 801-0000-2-229015 $0.00
Sewer Mains, including manhole: 100% $0.00
(Developer is responsible for up to and including 12" mains)
Half Pipe Front Footage
6" Main $12,00 fJ, x N 0,00 $0.00
8" Main $12.50 f.f.x N 0,00 $0.00
10" Main $14.00 f.f.x N 0.00 $0,00
12" Main $15.50 fJ, x N 0,00 $0.00
15" Main $19.00 f.f,x N 0,00 $0.00
18" Main $24,00 fJ.X N 0.00 $0.00
21" Main $28,50 fJ. x N 0,00 $0.00
24" Main $33.00 f.f.x N 0.00 $0.00
27" Main $36,50 I f.f. x N 0.00 $0.00
Country Estates Sewer Trunk Main
(Not Included)
y
$0,00
COST SCHEDULE
(5)
Street Improvements 801-0000-2-229015 $0.00
100% $0.00
Pavement Square Footage
3" AC on 8" AS $2,57 x 0.00 $0.00
3" AC on 10" AS $2.89 x 0,00 $0,00
3" AC on 12" AS $3,18 x 0,00 $0.00
3" AC on 15" AS $3,65 x 0.00 $0.00
Square Footage
Sidewalk 4" on 4" $4,72 x 0.00 $0.00
and driveway
Front Footage
Curb/Gutter on 6" $15,33 x 0.00 $0.00
Storm Drain 801-0000-2-229015 $0.00
100% $0.00
Storm Mains, including manholes and catch basins:
(Developer is responsible for up to and including 24" mains)
Half Pipe Front Footage
18" Main $20,00 / f.f. x N 0,00 $0.00
21" Main $22.00 fJ, x N 0,00 $0,00
24" Main $23.50 fJ, x N 0.00 $0.00
27" Main $25,00 fJ, x N 0,00 $0.00
3:)" Main $26.50 fJ, x N 0,00 $0.00
33" Main $28,00 f.f,x N 0,00 $0,00
36" Main $29.50 fJ. x N 0.00 $0,00
42" Main $33,00 fJ. x N 0,00 $0.00
48" Main $36,50 fJ.X N 0,00 $0,00
54" Main $39,50 fJ.x N 0.00 $0.00
00" Main $43.00 fJ, x N 0,00 $0,00
00' Main $46.00 fJ.x N 0.00 $0.00
72" Main $49,00 / fJ. x N 0,00 $0,00
COST SCHEDULE
(6)
NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued.
The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated
fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the
difference. Site grading and reinspection charges including reinspection of backyard drainage will be billed at the
Engineering Division hourly rate in effect at the time of inspection,
Accepted by:
assett - Vice President
ternational of Maryland, Inc.
Date:
N89012'30'W' 99.48 ~
y~
\ ("
0 ~ ~
<:)
/'-. ~o cJ ftJ
(Y) ~ ~
.<& 0 ("
o. \\~
r'
tx
GSV\tx 0
(Il
....-
,...-;O\"'
~((- ~ o ~ \\
\\ o~
~ / 10 ~ \
UJO'
/:..-- \ .' ill
~ill-...J
<.DC))
-
0
0
:
:3 /'-. /'-.
~ <:) <J)
<:) CD r--- - \ \
(Y) '<T
/'-. :3
'<T
0
<:)
<:)
(/)
97,89' \
N89012'30'\,/ \
PUBLIC STREET
DEDICA TION
FIRST STREET 187.14 S.F. \
l
Vicinity Site Map
Property Improvement Agreement No. 99-05
Jiffy Lube International of Maryland, Inc.
701 First Street, Gilroy
A.P.N. 790-23-027
Exhibit "A"