PIA No. 95-08 - Kaufman and Broad
r7
RECORDING REQUESTED BY:
city of Gilroy
WHEN RECORDED, MAIL TO:
Susanne E. steinmetz
ci ty of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
N 8 9 9 Pi' GE I 787
r~.- LI')
rt=(o;~ l~ ~
(: ~~:~~~~J _~ ~
'\Yi~::~\=__.; ~
. 0>', I
.... '.' . ','" '-"'~-J
., ~ ,-;"-" ~
~?_L...~.!.- ~
12930725
Ii
f",tEU .': ~;:'.'~c PD
i.lt T r ~'1 U E T l) F' -
9:9 /"
/ _)....7
c /~/ ~ Gc (r()j
,-.."- 1; it,
2 8 r.~, 1 t : U '3
':.;..J d' !
O'T:~
SA N1,! ACI,A R A (..:
b;~ .
"
(---;;" \1
1:-: j,
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
PROPERTY IMPROVEMENT AGREEMENT
Tract 8663, The Vineyards, Phase I
DOCUMENT TITLE
photographic image may be
poor due to condition of
original document.
SEPARATE PAGE PURSUANT TO GOVT. CODE 27361.6
N 8 9 9 p~ GE I 788
RECORDING REQUESTED BY:
ci ty of Gilroy
WHEN RECORDED, MAIL TO:
city of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
PROPERTY IMPROVEMENT AGREEMENT
RESIDENTIAL
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS:
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM
DRAINS AND OTHER PUBLIC WORKS FACILITIES
No. 95-08
This agreement made and entered into this 19th day of June ,
1995, by and between the city of Gilroy, a municipal corporation, herein called
the "city" and Kaufman & Broadr Inc. , a real
property owner developer or subd~vider, herein called the "Developer".
WHEREAS, a final map of subdivision, record of surveyor building permit
(Site Clearance) application has now been submitted to the city for approval and
acceptance, covering certain real estate known as and called:
Tract 8663, The Vineyards - phase I
and,
WHEREAS, the Developer requires certain utilities and public works
facilities in order to service the property under the minimum standards established
by the city and,
WHEREAS, the city, by and through its city Council, has enacted certain
codes, Ordinances and Resolutions and certain Rules and Regulations have been
promulgated concerning the subject matter of this agreement and,
WHEREAS, the city has certain responsibilities for maintenance and operation
of such utilities and public service facilities after acceptance by city, and for
providing the necessary connecting system, general plant and appurtenances, and the
city is agreeing to discharge those responsibilities.
NOW THEREFORE, in consideration of the premises and in order to carrr on the
intent and purpose of said codes, Ordinances, Resolutions and Regulations, ~t is
agreed by and between the parties as follows:
SECTION 1
That all codes, Ordinances, Resolutions, Rules and Regulations and
established policies of the city and the laws of the State of California concerning
the subject matter of this agreement are hereby referred to and incorporated herein
to the same effect as if they were set out at length herein. Said codes,
Ordinances and Regulations include, but are not limited to, the following: the code
of the city of Gilroy, the current zoning ordinance, and the currently adopted
Uniform Building Code.
SECTION 2
The Developer agrees:
a. To perform each and every prov~s~on required by the city to be performed
by the Developer in each and everyone of said Codes, Ordinances and
other Regulations.
b. To grant to the city without charge, free and clear of encumbrances, any
and all stipulated easements and rights of way in and to his said real
property necessary for the citr in order that its water, electricty,
and/or sewer lines in or to sa~d real property may be extended.
-1-
N 8 9 9 p~ GE ! 789
c. To indemnify and hold the city harmless and free from all damage and
liability done to any utility, public facility or other material or
installation of the city on said real estate which the Developer or any
contractor or subcontractor of the Developer, or any employee thereof,
shall do in grading or working upon said real estate.
d. To construct and improve all public works facilities and other
improvements as set out herein, according to the standards heretofore
established, and according to the grades, plans and specifications
thereof, all as approved by the city Engineer, and shall furnish two (2)
good and sufficient bonds. One shall be executed in the face amount of
no less than $1,336,558.00, and the other shall be executed in an
amount no less than 50% of the above mentioned bond and shall secure
payment to the contractor, his subcontractors and to persons renting
equipment or furnishin9 labor or materials to them for the improvement
hereunder, and as prov~ded for in section 4200-4210 of the Government
code of the state of California, the codes, ordinances, Resolutions, and
Regulations of the city, and this agreement.
The faithful performance bond hereinabove provided for, shall by the terms
remain in full force and effect for a period of one (1) year after the
completion and acceptance of said work, to guarantee the repair and
replacement of defective material and faulty workmanship.
In lieu of said faithful performance bond for maintenance, the Developer may
furnish a maintenance bond in the amount of 10% of the total contract price
(with a minimum amount of one thousand dollars $1,000.00) to cover the one
(1) year maintenance period.
e. That upon approval of the final map of the subdivision, the record of
surveyor the building permit covering the real estate to be improved
and before any work is done therein, the Developer shall pay to the city
all sums, shown in section 9 thereof to be due under the terms and
provisions of this agreement.
SECTION 3
That all sums shown herein to be payable by the Developer to the city are
due and payable to the city upon the execution of this agreement.
SECTION 4
That all the provisions of this agreement and all work to be done pursuant
to the terms of this agreement are to be completed within one year from and after
the date and year first above written.
SECTION 5
That the special provisions concernin9 the particular real estate referred
to above, being attached hereto, are hereby ~ncorporated herein and expressly made
a part of this agreement.
SECTION 6
That the faithful and prom~t ~erformance by the Develo~er of each and every
term and condition contained here~n ~s made an express condit~on precedent to the
duty of the city to perform any act in connection with this transaction, and the
failure, neglect or refusal of the Developer to so perform, or to pay any monies
due hereunder when due shall release the city from any and all obligations
hereunder and the city, at its election, may enforce the performance of any
provision herein, or any right accruing to the City or mar pursue any remedy
whatsoever it may have under the laws of the State of Cal~fornia or the codes,
ordinances, Resolutions of the city, in the event of any such default by Developer.
SECTION 7
That this agreement, together with the attached stipulations, is an
instrument affecting the title or possession of the real property described in
Exhibit A. All the terms, covenants and conditions herein imposed shall be binding
upon and inure to the benefit of the successors in interest of Developer. Upon the
sale or division of the property described in Exhibit A, the terms of this
agreement shall apply separately to each parcel and the Developer of each parcel
shall succeed to the obligations imposed on Developer by this agreement.
-2-
N 8 9 9 pn GE 790
SECTION 8
That the following General stipulations and the attached stipulations shall
be completed subject to the approval of the Director of public Works.
1. Locate and properly dispose of any wells, septic tanks and underground
fuel storage facilites.
NOTE: The capping of any well will require inspection by the Santa
Clara valley Water District.
2. schedule the construction of im~rovements alon9 existing public roads
so that the work affecting veh~cular traffic ~s completed with a
minimum interruption to traffic.
3. All work within the public right-of-way shall be subject to the approval
of the city Engineer.
4. Before construction utilizing combustible materials may proceed, an all
weather access must be provided to within 150 feet of the building site;
and at least one in service fire hydrant must be available within 500
feet of each ~ortion of the site wherein this construction is to take
place. Locat~on of the fire hydrants will be determined by the Fire
chief.
SECTION 9
That the attached Development Cost Schedule enumerates all fees and their
extensions.
TOTAL AMOUNT DUE CITY
$255,263.55
this agreement as of June 19, 1995
. ~,
~~
IN WITNESS WHEREOF Owner has executed this agreement as of
Kaufman & Broad - Monterey Bay, Lie.
NOTE: If Developer is a corporation, the complete legal name and corporate seal of
the corporation and the corporate titles of the persons signing for the corporation
shall appear above.
-3-
N 8 9 9 PA GE I 7 9 I
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
No, 5907
State of
County of
C nil fDflr'l l_
YYl u r\. t-e Nv"
On 6pr-L~{ II I (~' ('/ '> before me, 6,")..t; \orlr<c- Sy.~_@('~[>~jO fl_t\'"L-, .V 1:/ to..'11 Fv'01,
DATE I , NAME, T1TL7 OF OFFICER. E,G" "JANE DOE, NOtARY PUBLIC"
personally appeared 30 h 0 H. B rc lUll 0," J ,
NAME(S) OF SIGNER(S)
~. personally known to me - OR - D proved to me on the basis of satisfactory evidence
to be the person(s) whose name(s) is/are
subscribed to the within instrument and ac-
knowledged to me that he/she/they executed
the same in his/her/their authorized
capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s),
or the entity upon behalf of which the
person(s) acted, executed the instrument.
t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ .Ll
~ BARBARA SHEPARD-ORTIZ
< ~." .t..~~..:,. ~~,.~. COMM, # 1014885 ~
~ ; ~~_,; ': ; Notary Public - California ~
'-';", "V' SAN BENITO COUNlY I
J ~ My Comm. Expires JAN 20. 1998
.................................................................................................
WITN ESS my hand and official seal.
J3~;2 ~-()I'~
. SIGNATURE OF NOTARY
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent
fraudulent reattachment of this form.
CAPACITY CLAIMED BY SIGNER
D INDIVIDUAL
D CORPORATE OFFICER
DESCRIPTION OF ATTACHED DOCUMENT
TITLE OR TYPE OF DOCUMENT
TITLE(S)
D PARTNER(S)
D LIMITED
D GENERAL
D ATTORNEY-iN-FACT
D TRUSTEE(S)
D GUARDIAN/CONSERVATOR
D OTHER:
NUMBER OF PAGES
DATE OF DOCUMENT
SIGNER IS REPRESENTING:
NAME OF PERSON(S) OR ENTITY(IES)
SIGNER(S) OTHER THAN NAMED ABOVE
@1993 NATIONAL NOTARY ASSOCIATION' 8236 Remmel Ave" P,O, Box 7184' Canoga Park. CA 91309-7184
9 9 PA GE ! 792
q
~
^'
.i /
'( ~~
VICINITY SITE MAP
Tract No. 8663
The Vineyards, Phase I
Thomas Road
N 8 9 9 Pl\ GE I 793
stipulations to Property Development
Agreement No. 95-08
1. The Developer shall perform all improvements per the approved
improvement plans for Tract 8663 as prepared by Greiner, Inc.
2. within sixty (60) days of the execution of this improvement agreement,
the city shall reimburse the developer $88,940.12 from the storm drain
improvement fund.
Breakdown
size
Lenqth
cost Per Foot ($/ft.)
Total Cost
42"
78"
84"
829
1191
33
$62 - $44
$98 - $44
$104 - $44
18
54
60
$14,922.00
64,314.00
1,980.00
Sub-Total
$81,216.00
Previous storm Drain Area Fees
12,373.40
Sub-Total
$93,589.40
Minus Credit on cost schedule
$4,649.28
Total Storm Reimbursement
$88,940.12
3. within sixty (60) days of the execution of this property agreement, the
city shall reimburse the developer $5,408.75 from the utility
Undergrounding Fee.
4. The Traffic Impact Fee has been credited previously paid fees and
allowable credit for Thomas Road.
Thomas Road T.I.F. payback
750 L.F. x 24' wide x 3.15
previously paid amounts
$56,700.00
= 14,170.86
Total Credit as Shown on Cost schedule
$70,870.86
Da
N 8 9 9 P,' GE I 794
DATE:
06-Apr-95
CITY OF GILROY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
FINAL CHARGES
ALL PARK, POLICE & FIRE DEVELOPMENT FEES
HAVE BEEN DEFERED TO BUILDING PERMIT.
Thomas Road (app. 400' SW of Thomas Rd. Bridge)
NUMBER:
95-08
PROJECT LOCATION:
PARCEL NUMBER:
808-20-016
OWNER/DEVELOPER:
Kaufman and Broad Inc.
MAILING ADDRESS:
1604 N. Main St., Suite 0, Salinas, Ca. 93906
TELEPHONE NO:
408-442-7615
PREPARED BY:
Mark Fachin
Account No. Key Code Fee: Credits: Amount Due: Account Description:
100-2600-3-600400 4904 $7,910.28 $7,857.42 $52.86 Special Public Works Serv
100-2600-3-600412 4702 $97,559.06 $29,449.49 $68,109.57 Engring Plan Check & Insp
410-2400-3-629000 3302 $296,098.00 DEFERED TO BLDG PERMIT Park Development Fee
420-2600-3-680200 4501 $4,649.28 $4,649.28 $0.00 Storm Development Fee
431-2600-3-680300 5001 $0.00 $0.00 $0.00 Utility Undergrounding Fee
432-2400-3-625000 3301 $1,683.00 $0.00 $1,683.00 Str Tree Development Fee
433-2600-3-681000 4905 $117,906.00 $70,870.86 $47,035.14 Traffic Impact Fee
434-1400-3-680000 4402 $15,437.00 DEFERED TO BLDG PERMIT Police Development Fee
435-2600-3-671000 4509 $117,261.00 $27,820.00 $89,441.00 Sewer Development Fee
436-2600-3-695000 4510 $66,779.00 $22,994.75 $43,784.25 Water Development Fee
437-1500-3-680000 4511 $3,397.00 DEFERED TO BLDG PERMIT Fire Development Fee
720-0433-3-690000 2202 $7,500.51 $2,342.78 $5,157.73 Const Water Use Fee
801-0000-2-229015 4703 $0.00 $0.00 $0.00 Reimbursements
801-0000-2-229015 4703 $0.00 $0.00 $0.00
801-0000-2-229015 4703 $0.00 $0.00 $0.00
Totals..... ...... ..... $736,180.13 $165,984.58 $255,263.55
Note: Within sixty days of the execution of this agreement
Bonds and Securities $2,004,837 an amount of $88,940.12 shall be reimbursed from the storm drain f
----------- and $5,408.75 will be reimbursed from the utility undergrounding fun
-----------
SERVICE CHARGES (1)
N 8 9 9 pn GE ! 795
DEFER PARK, POLICE & FIRE DEVELOPMENT FEES? Y
CITYOF GILROY
DEPARTMENT OF PUBLIC WORKS
DATE: 06-Apr-95 ENGINEERING DIVISION
FINAL COST SCHEDULE
NUMBER: 95-08 ALL PARK, POLICE & FIRE DEVELOPMENT FEES
HAVE BEEN DEFERED TO BUILDING PERMIT.
PROJECT LOCATION: Thomas Road (app. 400' SW of Thomas Rd. Bridge)
PARCEL NUMBER:
808-20-016
OWNER/DEVELOPER:
Kaufman and Broad Inc.
MAILING ADDRESS:
1604 N. Main St., Suite 0, Salinas, Ca. 93906
TELEPHONE NO:
408-442-7615
PREPARED BY: Mark Fachin
NOTE: This 100 % cost schedule has been adjusted to the rates in effect at the time building permits wer
issued. All Park, Police & Fire development impact fees have been defered and will be collected with the buildin
permit fees.
Site Information:
N Residential-Low?
N Residential-High?
N Commercial-Low?
N Commercial-High?
N Industrial-General?
N Industrial-Warehouse?
N Assembly Hall?
Common Area?
Commercial/Industrial Allocations:
Reimbursements and credits:
N Country Estates Water System?
N Country Estates Sewer System?
Acres:
13.920
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Lots:
43
o
o
o
o
o
o
Units:
43
o
Sq Ft:
Sewer GPO:
o
o
o
o
o
o
o
Water GPO:
o
N Northwest Quadrant Sewer?
N Obata Industrial Park Credit?
Front Footage for Front Foot Charges and Construction Water:
Street Tree FF: Water FF: Sewer FF: Storm FF:
4,950.00 0.00 0.00 0.00
Special Public Works Services 100-2600-3-600400
Maps:
Final
$3,025.00 +
$50.00 / lot
Parcel $1,070.00 + $100.00 / lot
Reapportionment (Assessment District Parcels)
$1,767.00 + $100.00 / lot
Administration Fees:
Country Estates Water System
(Not Included)
Country Estates Sewer Trunk Main
(Not Included)
Northwest Quadrant Sewer Trunk Main
(Not Included)
COST SCHEDULE (1)
Construction Water FF:
2,000.00
$7,910.28
$7,910.28
100%
Y
$5,175.00
$0.00
$0.00
=
N
=
N
=
Y
$0.00
$0.00
=
Y
=
Y
$0.00
=
N 8 9 9 Pt\ GE , 796
Miscellaneous Engineering Services:
(Cost Schedules, Agreements, RIW Reviews and Other Misc. Services)
32 hr Misc Services $77.00 I hr. Y
$2,464.00
=
Public Works Microfilming (Maps and Plans):
1- 6 shts $149.94 + $6.62 I sheet
=
$0.00
$271.28
Y
7-12 shts
$191.84 +
$6.62 I sheet
Y
=
$0.00
13-18 shts
$233.73 +
$6.62 I sheet
Y
=
# of Shts
12
100%
$97,559.06
$97,559.06
Engring Plan Check and Inspection
(Based on total cost of public
right-of-way improvements)
6 hr Site grading
100-2600-3-600412
Actual Cost of Public Improvements
N
=
$1,336,558
Y
=
Y
=
Y
=
$1,336,558
$0.00
$77.00 I hr.
10% of first
$100,000
$10,000.00
8% of $100,000 -
$200,000
$8,000.00
7% over
$200,000
$79,559.06
Offsite Improvements to be Bonded
Park Impact Fee
PARK FEE DEFERED TO BUILDING PERMIT
410-2400-3-629000 $296,098.00
100% $296,098.00
a. Residential-Low
$6,886.00 I unit
Y $296,098.00
=
b.Residential-High
$4,918.00 I unit
Y
$0.00
=
a.Residential-Low
$334.00 I acre
100%
Y $4,649.28
=
Y $0.00
=
Y $0.00
=
Y $0.00
=
Y $0.00
=
Y $0.00
=
$4,649.28
$4,649.28
Storm Drain Impact Fee
420-2600-3-680200
b.Residential-High
$501.00 I acre
c.Commercial
$668.00 I acre
d.lndustrial
$751.00 I acre
e.Assembly Hall
$334.00 I acre
Obata Industrial Park Credits
(Based on reimbursements due from oversized storm facilities)
Obata Fee Credit $1,170.00 I acre
COST SCHEDULE
(2)
Utility Underground Fee
$118.36 / f.t. x
Street Tree Fee
a.City Planting and Replacement
$2.45 / fJ. x
b.lnspection and Replacement
$0.34 / f.t. x
Traffic Impact Fee
a.Residential-Low
b.Residential-High
c.Commercial-Low Traffic
(<= 4 trips/1 000 sf)
d.Commercial-High Traffic
(> 4 trips/1 000 sf)
e.lndustrial-General
f.lndustrial-Warehouse
Police Impact Fee
a. Residential-Low
b.Residential-High
c.Commercial
d.lndustrial
COST SCHEDULE
~, 8 9 9 PA GE I 797
431-2600-3-680300 $0.00
100% $0.00
Front Footage
N 0.00
=
432-2400-3-625000 $1,683.00
100% $1,683.00
Front Footage
N 0.00 = $0.00
=
y 4,950.00 = $1,683.00
=
433-2600-3-681000 $117,906.00
100% $117,906.00
$2,742.00 / unit y $117,906.00
=
$2,222.00 / unit Y $0.00
=
$3,032.00 / k.s.f. Y $0.00
=
$6,127.00 / k.s.f. Y $0.00
=
$1,184.00 / k.s.f. Y $0.00
=
$872.00 / k.s.t. Y $0.00
=
POLICE FEE DEFERED TO BUILDING PERMIT
434-1400-3-680000 $15,437.00
100% $15,437.00
$359.00 / unit Y $15,437.00
=
$529.00 / unit Y $0.00
=
$561.00 / k.s.t. Y $0.00
=
$18.00 / k.s.t. y $0.00
=
(3)
N 8 9 9 Pf1 GE i 798
Sewer Impact Fee
435-2600-3-671000
$117,261.00
$117,261.00
b.Residential-High
100% __"_
$2,727.00 I unit Y $117,261.00
=
$1,948.00 I unit Y $0.00
=
100 gals.lday Y $0.00
=
y $0.00
=
a. Residential-Low
c. Commercialll ndustrial
$950.00 I
Country Estates Sewer Trunk Main
(Not Included)
Obata Industrial Park Credits
(Based on reimbursements due from oversized sewer facilities)
Obata Fee Credit $531.00 I acre
$0.00
y
=
b.Residential-High
436-2600-3-695000
100%
$1,553.00 I unit Y $66,779.00
=
$1,109.00 I unit Y $0.00
=
1,000 gals.lday Y $0.00
=
$66,779.00
$66,779.00
Water Impact Fee
a. Residential-Low
c. Commercialll ndustrial
$2,360.00 I
Obata Industrial Park Credits
(Based on reimbursements due from oversized water facilities)
Obata Fee Credit $154.00 I acre
$0.00
y
=
Fire Impact Fee
FIRE FEE DEFERED TO BUILDING PERMIT
437-1500-3-680000 $3,397.00
100% $3,397.00
$2.58 I f.f.
$79.00 I unit Y $3,397.00
=
$105.00 I unit Y $0.00
=
$70.00 I k.s.f. Y $0.00
=
$9.00 I k.s.f. Y $0.00
=
720-0433-3-690000 Y $7,500.51
100% = $7,500.51
+ $168.14 I a.c.
(4)
a. Residential-Low
b.Residential-High
c.Commercial
d.lndustrial
Water User Fee (Construction)
COST SCHEDULE
Na 9 9PtlGE! 799
Front Foot Charges:
(Used to charge and reimburse fees for existing infrastructure)
Water 801-0000-2-229015 $0.00
100% $0.00
Water Mains, including fire hydrants,
valves and box:
(Developer is responsible for up to
and including 12" mains)
Half Pipe Front Footage
6" Main $12.50 I f.f. x N 0.00 = $0.00
=
8" Main $13.50 I f.f. x N 0.00 = $0.00
=
10" Main $15.00 I f.f. x N 0.00 = $0.00
=
12" Main $16.50 I f.f. x N 0.00 = $0.00
=
14" Main $18.50 I f.f. x N 0.00 = $0.00
=
16" Main $20.50 I f.f.x N 0.00 = $0.00
=
Country Estates Water System Y $0.00
(Not Included) =
Sewer 801-0000-2-229015 $0.00
100% $0.00
Sewer Mains, including manhole:
(Developer is responsible for up to
and including 12" mains)
Half Pipe Front Footage
6" Main $12.00 I f.f. x N 0.00 = $0.00
=
8" Main $12.50 I f.f. x N 0.00 = $0.00
=
10" Main $14.00 I f.f. x N 0.00 = $0.00
=
12" Main $15.50 I f.f. x N 0.00 = $0.00
=
15" Main $19.00 I f.f. x N 0.00 = $0.00
=
Northwest Quadrant Sewer Trunk Main y $0.00
(Not Included) =
Country Estates Sewer Trunk Main y $0.00
(Not Included) =
COST SCHEDULE (5)
~~ 8 9 9 Pl\ GE I 800
Street Improvements 801-0000-2-229015 $0.00
100% $0.00
Pavement Square Footage
3" AC on 8" AS $2.42 x 0.00 = $0.00
3" AC on 10" AS $2.71 x 0.00 = $0.00
3" AC on 12" AS $2.99 x 0.00 = $0.00
3" AC on 15" AS $3.43 x 0.00 = $0.00
Square Footage
Sidewalk 4" on 4" $4.43 x 0.00 = $0.00
and driveway
Front Footage
Curb/Gutter on 6" $14.39 x 0.00 = $0.00
Storm Drain 801-0000-2-229015 $0.00
100% $0.00
Storm Mains, including manholes and catch basins:
(Developer is responsible for up to
and including 24" mains)
Half Pipe Front Footage
18" Main $19.00 / f.f. x N 0.00 = $0.00
=
21" Main $20.50 / f.f. x N 0.00 = $0.00
=
24" Main $22.00 / f.f. x N 0.00 = $0.00
=
27" Main $23.50 / f.f.X N 0.00 = $0.00
=
30" Main $25.00 / f.f. x N 0.00 = $0.00
=
33" Main $26.50 / f.f. x N 0.00 = $0.00
=
36" Main $28.00 / f.f. x N 0.00 = $0.00
=
42" Main $31.00 / f.f. x N 0.00 = $0.00
=
48" Main $34.00 / f.f. x N 0.00 = $0.00
=
54" Main $37.00 / f.f. x N 0.00 = $0.00
=
60" Main $40.00 / f.f. x N 0.00 = $0.00
=
66" Main $43.00 / f.f. x N 0.00 = $0.00
=
72" Main $46.00 / f.f. x N 0.00 = $0.00
=
COST SCHEDULE (6)
N 8 9 9 P/~ GE 801
78" Main $49.00 / f.f. x N 0.00 = $0.00
=
84" Main $52.00 / f.f. x N 0.00 = $0.00
=
90" Main $55.00 / f.f.X N 0.00 = $0.00
=
96" Main $58.00 / f.f.x N 0.00 = $0.00
=
Bonds and Securities
* Not included in TOTAL DUE
801-0000-2-229015
*
$2,004,837
(Estimated)
NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued.
The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimate
fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the
difference.
COST SCHEDULE
(7)