PIA No. 2001-09 - MarRad Group
DOCUMENT:
RECORDING REQUESTED BY:
City of Gilroy
WHEN RECORDED, MAIL TO:
Rhonda Pellin
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
BRENDA DAVIS
SANTA CLARA COUNTY RECORDER
Recorded at the request of
City
Titles: 1/ Pages: 21
Fees.
Taxes. .
Copies.
AMT PAID
67.00
67.00
RDE ** 005
1 2/27/2002
2:59 PM
(SP ACE ABOVE THIS LINE FOR RECORDER'S USE)
DOCUMENT TITLE
Property Improvement Agreement No. 2001-09
Commercial, Industrial, Institutional
Southside Industrial Park
AP.N.841-15-157
Tract No. 9342
PROPERTY IMPROVEMENT AGREEMENT
COMMERCIAL. INDUSTRIAL. INSTITUTIONAL
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS:
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS AND
OTHER PUBLIC WORKS FACILITIES
PROJECT NUMBER: 2001-09
This agreement is made and entered into this 16th day of December, 2002, by and
between the City of Gilroy, a municipal corporation, herein called the "City" and i-iarRad
Group, In~, a real nrooerty owner, developer or subdivider, herein called the "Developer".
WHEREAS, a final map of subdivision, record of surveyor building permit (Site Clearance)
application has now been submitted to the City for approval and acceptance, covering certain real
estate known as and called:
and,
WHEREAS, the Developer requires certain utilities and public works facilities in order to
service the property under the minimum standards established by the City and,
WHEREAS, the City, by and through its City Council, has enacted certain Codes,
Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning
the subject matter of this agreement and,
WHEREAS, the City has certain responsibilities for maintenance and operation of such
utilities and public service facilities after acceptance by City, and for providing the necessary
connecting system, general plant and appurtenances, and the City is agreeing to discharge those
responsibilities, provided that Developer has faithfully and fully complied with all of the terms,
covenants, conditions to be performed by Developer pursuant to this agreement.
NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the
intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and
between the parties as follows:
SECTION 1
That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of
the City and the laws of the State of California and the United States of America concerning the
subject matter of this agreement are hereby referred to and incorporated herein to the same effect
as if they were set out at length herein. Said Codes, Ordinances, Resolutions, Rules and
Regulations include, but are not limited to, the following: the Code of the City of Gilroy, the
current Zoning Ordinance, and the currently adopted Uniform Building Code.
SECTION 2
The Developer agrees:
a. To perform each and every provision required by the City to be performed by the
Developer in each and every one of said Codes, Ordinances, Resolutions, Rules and
other Regulations and to comply with the foregoing and all applicable laws.
b. To grant to the City without charge, free and clear of encumbrances, any and all
easements and rights of way in and to his said real property necessary for the City in
order that its water, electricity, and/or sewer lines in or to said real property may be
extended.
c. To indemnify, defend with counsel of City's choice and hold the City free and harmless
from all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities
and expenses (including without limitation attorneys' fees) incurred by City in
connection with (i) any damage done to any utility, public facility or other material or
installation of the City on said real estate which the Developer or any contractor or
subcontractor of the Developer, or any employee of the foregoing, shall do in grading
or working upon said real estate; or (ii) arising or resulting directly or indirectly from
any act or omission of Developer or Developer's contractors, or subcontractors, or any
employee of the foregoing in connection with the work performed by them in
connection with this agreement, including without limitation all claims relating to injury
or death of any person or damage to any property.
d. To construct and improve all public works facilities and other improvements described
in this agreement in accordance with all standards established in the Codes, Ordinances,
Resolutions, Rules and Regulations, all applicable laws and this agreement, and in
accordance with the grades, plans, and specifications approved by the City Engineer.
Developer shall furnish two good and sufficient bonds, a Payment Bond on forms
provided by the City and a Faithful Performance Bond, both of which shall be secured
from a surety company satisfactory to City with a minimum "AVII" rating with Best's
Rating Guide. Each bond shall set forth a time period for performance by the
contractor of its obligations and the terms and conditions on which the City may obtain
the proceeds of the bond. The Faithful Performance Bond shall be in an amount not
less than one hundred percent (100%) of the total estimated amount payable for the
improvements described in this agreement, and shall secure payment to City and the
Developer of any loss due to the default of the contractor or its inability or refusal to
perform its contract. The performance bond shall by its terms remain in full force and
affect for a period of not less than one year after completion of the improvements by
Developer and acceptance of the improvements by City, to guarantee the repair and
replacement of defective material and faulty workmanship. Upon completion of the
improvements by Developer and acceptance of the improvements by City, Developer,
at the City's discretion, may substitute for the performance bond securing maintenance
described above, a separate maintenance bond in the amount of 10% of the total
contract price of the improvements (provided that the amount of said bond shall not be
3
less than One Thousand Dollars (~1,000) to cover the one-year maintenance period.
The Payment Bond shall be in an amount not less than: (1) One hundred percent
(100%) of the total estimated amount payable for the improvements described in this
agreement when the total estimated amount does not equal or exceed five million
dollars ($5,000,000); (2) Fifty percent (50%) of the total estimated amount payable for
the improvements described in this agreement when the total amount is not less than
five million dollars ($5,000,000) and does not exceed ten million dollars ($10,000,000);
and (3) Twenty-five percent of the total estimated amount payable for the
improvements described in this agreement when the total amount exceeds ten million
dollars ($10,000,000). The Payment Bond shall secure the payment ofthose persons or
entities to whom the Developer may become legally indebted for labor, materials, tools,
equipment or services of any kind used or employed by the contractor or subcontractor
in performing the work, or taxes or amounts to be withheld thereon. The Payment
Bond shall provide that the Surety or Sureties will pay the following amounts should
the Contractor or a Subcontractor fail to pay the same, plus reasonable attorneys' fees
to be fixed by the court if suite is brought upon the bond: (1) amounts due to any of
the persons named in California Civil Code Section 3181; (2) amounts due under the
Unemployment Insurance Code with respect to work or labor performed for the
improvements described in this agreement; and (3) any amounts required to be
deducted, withhold, and paid over to the Employment Development Department from
the wages of employees of the Contractor and Subcontractors pursuant to Section
13020 of the Unemployment Insurance Code with respect to the work and labor. The
Payment Bond shall, but its terms, insure to the benefit of any of the persons named in
Civil Code Section 3181 so as to give a right of action to those persons or their assigns
in any suit brought upon the bond. Simultaneously with the submission of its building
permit application (Site Clearance), the Developer shall furnish the name, address and
telephone number of the surety or sureties that the Developer proposes to furnish the
Payment Bond and: (1) the original, or a certified copy, of the unrevoked appointment,
power of attorney, bylaws, or other instrument entitling or authorizing the person who
executed the bond to do so; (2) a certified copy of the certificate of authority of the
insurer issued by the Insurance Commissioner; (3) a certificate from the Clerk of the
County of Santa Clara that the insurer's certificate of authority has not been
surrendered, revoked, canceled, annulled, or suspended or, in the event that it has, that
renewed authority has been granted; and (4) copies of the insurer's most recent annual
statement and quarterly statement filed with the Department ofInsurance.
e. That upon approval of the final map of the subdivision, the record of surveyor the
building permit covering the real estate to be improved and before any work is done
therein, the Developer shall pay to the City all sums, shown in Section 9 thereof to be
due under the terms and provisions of this agreement.
f At all times during the term of this agreement and until the improvements constructed
by Developer are accepted by City, Developer shall, at no cost to City obtain and
maintain (a) a policy of general liability and property damage insurance in the minimum
amount of One Million Dollars ($1,000,000), combined single limit for both bodily
injury and property damage; (b) workers' compensation insurance as required by law;
4
and (c) broad form "Build~r's Risk." property damage insurance with limits of not less
than 1 00% of the estimated value of the improvements to be constructed by Developer
pursuant to this agreement. All such policies shall provide that thirty (30) days written
notice must be given in advance to City prior to termination, cancellation or
modification. The insurance specified in (a) above shall name City as an additional
insured and the insurance specified in (c) shall name City as a loss payee, and shall
provide that City, although an additional insured or loss payee, may recover for any loss
suffered by reason ofthe acts or omissions of Developer or Developer's contractors or
subcontractors or their respective employees. Developer hereby waives, and Developer
shall cause each of its contractors and subcontractors to waive, all rights to recover
against City for any loss or damage arising from a cause covered by the insurance
required to be carried pursuant to this agreement or actually carried by Developer in
connection with the work described in this agreement, and will cause each insurer to
waive all rights of subrogation against City in connection therewith. All policies shall
be written on an occurrence basis and not on a claims made basis and shall be issued by
insurance companies acceptable to City. Prior to commencing any work pursuant this
agreement, Developer shall deliver to City the insurance company's certificate
evidencing the required coverage, or if required by City a copy of the policies obtained.
SECTION 3
That except as otherwise expressly provided in this Agreement, all sums shown herein to be
payable by the Developer to the City are due and payable to the City upon the execution of this
agreement.
SECTION 4
That all the provisions of this agreement and all work to be done pursuant to the terms of this
agreement are to be completed to City's Satisfaction within one year from and after the date and
year first above written. Developer shall maintain such public works facilities and other
improvements described in this agreement at Developer's sole cost and expense at all times prior
to acceptance by City in a manner which will preclude any hazard to life or health or damage to
property.
SECTION 5
That the special provisions concerning the particular real estate referred to above, being
attached hereto, are hereby incorporated herein and expressly made a part of this agreement.
SECTION 6
That the faithful and prompt performance by the Developer of each and every term and
condition contained herein is made an express condition precedent to the duty of the City to
5
perform any act in connection with this transaction, and the failure, neglect or refusal of the
Developer to so perform, or to pay any monies due hereunder when due shall release the City
from any and all obligations hereunder and the City, at its election, may enforce the performance
of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it
may have under the applicable or the Codes, Ordinances, Resolutions, Rules and Regulations of
the City, in the event of any such default by Developer.
SECTION 7
That this agreement, together with the attached stipulations, is an instrument affecting the
title or possession of the real property described in Exhibit A. All the terms, covenants and
conditions herein imposed shall be binding upon and inure to the benefit of City, Developer and
the successors in interest of Developer. Upon the sale or division of the property described in
Exhibit A, the terms of this agreement shall apply separately to each parcel and the Developer of
each parcel shall succeed to the obligations imposed on Developer by this agreement.
SECTION 8
The following fees are due, but are deferred to be collected with the Building Permit fees:
Park Development fee
Traffic Impact fee
Police Development fee
Sewer Development fee
Water Development fee
Fire Development fee
Public Facilities fee
These fees will be charged at the rate in effect when an application is made for a Building
Permit.
Sewer and Water allocations will be determined with the Building Permit application. Fees
would be the then current rate and will require a separate agreement.
PENALTY:
Overuse of sewer and water allocations shall be penalized under the Rules and Regulations
adopted by the Gilroy City Council.
SECTION 9
That the following General Stipulations shall be completed subject to the approval of the
Director of Community Development.
1. Locate and properly dispose of any wells, septic tanks and underground fuel storage
facilities. NOTE: The capping of any well will require a permit and inspection by
6
the Santa Clara Valley Water District.
. .
2. Schedule the construction of improvements along existing public roads so that the work
affecting vehicular traffic is completed with a minimum interruption to traffic.
3. All work within the public right-of-way shall be subject to the approval of the City
Engineer.
4. Before construction utilizing combustible materials may proceed, an all weather access
must be provided to within 150 feet of the building site; and at least one in service fire
hydrant must be available within 500 feet of each portion of the site wherein this
construction is to take place. Location of the fire hydrants will be determined by the
Fire Chief
5. All improvements per Tract 9342 Improvement Plans as prepared by Creegan and
D' Angelo are to be completed by the Developer and accepted by the City of Gilroy.
6. Pay all applicable fees.
7
SECTION 10
That the attached Development Cost Schedule enumerates all fees and their extensions.
TOT AL AMOUNT DUE CITY
$159.785.71
IN WITNESS WHEREOF, said parties have caused these presents to be executed the date
and year first above written.
APPROVED AS TO FORM:
d7tiLtW~"JDA:\
~/ C' a A. Callon
r \" CITY ATTORNEY
I~
OWNER
- :;z-o~
IN WITNESS WHEREOF Owner has execute
NOTE: If Developer is a corporation, the complete legal name and corporate seal of the
corporation and the corporate titles of the persons signing for the corporation shall appear above.
8
STATE OF CALIFORNIA)
)ss.
COUNTY OF SANTA CLARA)
...-,
~;c.I./L L - All'KJ1>~
.......--- A
JO r~-A-j .. N\ h ICC~ de z-
personally known to me (or proved to me on the ha~l" of satisfactory evidence) to be the
p~rson(t.) whose name(s)@/ar-€ subscribed to the within instrument and acknowledged to me that
(he/she4hey executed the same inhis/her/their authorized capacity(~), and that b)(his/hWthcir-
signature(~.) on the instrument the person($) or the entity upon behalf of which the person(lS')
acted, executed the instrument.
On q -!~-c~J...., before me,
personally appeared
WITNESS my hand and official seal.
"
Signature (~tf ,/)'L,L d-or
>,
per GC Sec. 40814; CC Sec. 1181
9
STATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
TITLE OF DOCUMENT: Property Improvement Agreement No. 2001-09
Commercial, Industrial, Institutional
Southside Industrial Park
AP.N.841-15-157
Tract No. 9342
On December 19, 2002, before me, Rhonda Pellin, Notary Public, personally appeared Jay Baksa
personally known to me to be the person whose name is subscribed to the within instrument and
acknowledged to me that he executed the same in his authorized capacity, and that by his
signature on the instrument the person or the entity upon behalf of which the person acted,
executed the instrument.
WITNESS my hand and official seal.
per GC Sec. 40814; CC Sec. 1181
(Notary Seal)
1----------------
18 ec:::15 f
NaIary Public - CaIfomIa I
Santa CI8ra CountJ -
_ _ _ ~~_~~1~~f
THIS PAGE lNTENTIONALL Y LEFT BLANK
DATE:
10-May-2001
NUMBER:
2001-09
PROJECT LOCATION:
PARCEL NUMBER:
OWNER/DEVELOPER:
MAILING ADDRESS:
TELEPHONE NO:
PREPARED BY:
Account No. Key Code
100-2601-0000.3625 4904
100-2601-0000-3605 4702
410-2600-0000-3660 3302
420-2600.0000-3660 4501
431-2600-0000-3660 5001
432-2600-0000-3660 3301
433-2600-0000.3660 4905
434-2600.0000-3660 4402
435.2600.0000-3660 4509
436-2600-0000-3660 4510
437-2600.0000-3660 4511
436.2600-0000-3660 4512
720-0433.0000.3620 2202
601.2601-0000.3699 4703
601-2601-0000.3699 4703
601-2601-0000-3699 4703
601-2601-0000-3699 4703
Totals................
Bonds and Securnies
SERVICE CHARGES
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
FINAL
COST SCHEDULE
Rossi Ln. and Southside Dr. (S.W. Corner)
841-15-157 (Tract 9342)
HarRad Group, Inc.
1'.0. Box 1767,
Morgan Hill, CA
95038
408-778-17.17
Fax
40B-778-183.7
Don Nunes, (406) 646.0450
Fee: Credns: Amount Due: Account Description:
$3,675.00 $0.00 $3,675.00 Special Public Works Serv
$92,400.00 $0.00 $92,400.00 Engrlng Plan Check & Insp
$0.00 DEFERED TO BLOG PERMIT Park Development Fee
$46,362.56 $0.00 $46,362.56 Storm Development Fee
$0.00 $0.00 $0.00 Utility Undergrounding Fee
$0.00 $0.00 $0.00 Str Tree Development Fee
$0.00 DEFER ED TO BLOG PERMIT Traflic Impact Fee
$0.00 DEFERED TO BLDG PERMIT Police Development Fee
$0.00 DEFER ED TO BLOG PERMIT Sewer Development Fee
$0.00 DEFERED TO BLDG PERMIT Water Development Fee
$0.00 DEFER ED TO BLDG PERMIT Fire De~elopment Fee
$0.00 DEFER ED TO BLDG PERMIT Public Facilnies Impact Fee
$15,346.13 $0.00 $15,346.13 Const Water Use Fee
$0.00 $0.00 $0.00 Reimbursements
$0.00 $0.00 $0.00 X
$0.00 $0.00 $0.00 X
$0.00 $0.00 $0.00 X
$159,765.71 $0.00 $159.785.71
$2,175,000
----------------------
(1)
FEES9342.xls
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
FINAL
ALL PARK COST SCHEDULE
HAVE BEEN DEFER ED TO BUILDING PERMIT.
Rossi Ln. and Southside Dr. (S.W. Corner)
841-15-157 (Tract 9342)
elltltll61HS IRHIIBtriol PSfl1 CSRSISI ParlRllrshifl, a CalifelRla CBRBfal PaRRBf6Rifl MH S ter Ilng G rou p , LLC
~ 1~700 WinchGst@r BLvd. LOG C~t03, 95030
o 10g 354 9777
PREPARED BY: Don Nunes, (408) 846-0450
DEFER PARK, POLICE & FIRE DEVELOPMENT FEES? Y
NOTE: This 100 % cost schedule has been adjusted to the rates in effect at the time building permils were
issued. All Park, Police & Fire development impact fees have been defered and will be collected wilh the building
pefmil fees.
Sile Information:
N Residential-Low?
N Residential-High?
N Commercial-Low?
N Commercial-High?
Y Industrial-General?
N Industrial-Warehouse?
N Assembly Hall?
Common Area?
DATE:
18-May-2001
NUMBER:
2001-09
PROJECT LOCATION:
PARCEL NUMBER:
OWNERIDEVELOPER:
MAILING ADDRESS:
TELEPHONE NO:
CommerciaVlndustrial Allocations:
Reimbursements and credils:
N Country Estates Water System?
N Country Estates Sewer System?
N Obata Industrial Park Credil?
Acres:
Lots:
0.0
0.0
0.0
0.0
27.5
0.0
0.0
0.0
Sewer GPO:
Unils:
Sq Ft:
o
o
o
o
12
o
o
o
o
o
o
412,650
o
o
o
Water GPO:
N Southeast Quadrant Hydrology Study?
o
o
Front Footage for Front Foot Charges and Construction Water:
Street Tree FF: Water FF:
Special Public Works Services
Maps:
Final
$3,495.00 +
Sewer FF:
0.0
0.0
100-2601-0000-3625
$15.00
lot
$15.00
lot
Parcel $1,350.00 +
Reapportionment (Assessment District Parcels)
$2,190.00 +
$20.00
lot
Plus Customer assessment consunant
Administration Fees:
Country Estates Water System
(Not Included)
Country Estates Sewer Trunk Main
(Not Included)
Southeast Quadrant Hydrology Study
(Not Included)
COST SCHEDULE
(1)
Storm FF:
Construction Water FF:
0.0
0.0
3,885.0
100%
$3,675.00
$3,675.00
Y
$3,675.00
N
$0.00
N
$0.00
$0.00
Y
$0.00
Y
$0.00
N
$0.00
FEES9342.xls
Miscellaneous Engineering Services:
(Cost Schedules, Agreements, RIW Reviews and Other Mise. Services)
o hr Mise SelVices $88.91 / hr.
y
$0.00
Engring Plan Check and Inspection 100-2601-0000-3605 $92,400.00
(Based on total cost of public 100% $92,400.00
right-of-way improvements)
--2.. hr Stte grading and $88.91 / hr. N $0.00
reinspection charges
Actual Cost of Public Improvements 1087500
0% of first $5,000
12% $5,000 $100,000 y $11,400.00
10% $100,000 $200,000 y $10,000.00
8% over $200,000 y $71,000.00
Offstte Improvements to be Bonded 1087500
PARK FEE DEFERED TO BUILDING PERMIT
Park Impact Fee 410-2600-0000-3660 $0.00
100% $0.00
a.Residential-Low $8,269.00 / untt Y $0.00
b.Resldential-High $5,906.00 / untt Y $0.00
Storm Drain Impact Fee 420-2600-0000-3660 $48,362.58
100% $48,362.58
a.Resldential-Low $781.00 / acre Y $0.00
b.Resldential-High $1,172.00 / acre Y $0.00
c.Commercial $1,563.00 / acre Y $0.00
d.lndustrial $1.758.00 / acre Y $48,362.58
e.Assembly Hall $781.00 / acre Y $0.00
Obata Industrial Park Credtts
(Based on reimbursements due from oversized storm facilttles)
Obata Fee Credtt $1,170.00 / acre
y
$0.00
COST SCHEDULE
(2)
FEES9342.x1s
Utlflly Underground Fee
431-2600.0000-3660
100%
Front Footage
$126.09 I U. x
N
0.0
street Tree Fee
432-2600-0000.3660
100%
Front Footage
a.City Planting and Replacement
$2.56 I fJ. x
$0.00
0.0
N
b.lnspection and Replacement
$0.36 I U. x
y
0.0 -
$0.00
$0.00
$0.00
$0.00
$0.00
TraffIC Impact Fee 433-2600-0000.3660 $0.00
100% SO.OO
a.Residential-Low $4,381.00 I un~ Y $0.00
b.Residential-High $3,551.00 I unK Y $0.00
c.Commercial-Low Traflic
(<- 4 trips/1 000 sf) $4,846.00 I k.sJ. Y $0.00
d.Commercial-High TraffIC
(> 4 trips/1 000 sf) $9,791.00 I k.sJ. Y $0.00
e.lndustrial-General $1,892.00 I k.sJ. N $0.00
1.1 ndustrlal-Werehouse $1.394.00 I k.s.1. Y $0.00
Police Impact Fee
POLlCE FEE DEFERED TO BUILDING PERMIT
434-2600-0000-3660
100%
a.Residential-Low
$1,969.00 I un. Y $0.00
$3,003.00 I unl Y $0.00
$2,821.00 I k.s.f. Y $0.00
$117.00 I k.s.f. N · $0.00
(3)
b.Residential-High
c.Commercial
d.lndustrlal
COST SCHEDULE
SO.OO
SO.OO
FEES9342.x1s
Sewer Impact Fee 435-2600--0000-3660 SO.OO
100% $0.00
a.Residential-Low $5,371.00 untt y SO.OO
b.Residential-High $3,836.00 untt y SO.OO
c. CommerciaVl ndustrial $1.724.00 cgpd N SO.OO
Country Estates Sewer Trunk Main y SO.OO
(Not Included)
Obata Industrial Park Credtts
(Based on reimbursements due from oversized sewer faciltties)
Obata Fee Credtt $531.00 I acre y SO.OO
Water Impact Fee 436.2600--0000-3660 $0.00
100% SO.OO
a.Residential-Low $2,035.00 untt Y SO.OO
b.Residential-High $1,453.00 untt y $0.00
c. CommerciaVl ndustrial $3,092.00 kgpd N SO.OO
Obata Industrial Park Credtts
(Based on reimbursements due from oversized water faciltties)
Obata Fee Credtt $154.00 I acre Y SO.OO
Fire Impact Fee 437-2600-0000-3660 $0.00
100% $0.00
a.Residential-Low $164.00 untt y SO.OO
b.Residential-High $234.00 untt y SO.OO
c.Commercial $145.00 k.sJ. y $0.00
d.lndustrial $18.00 k.sJ. N SO.OO
Public Facllllies Impact Fee 438.2600-0000--3660 SO.OO
100% SO.OO
a. Residential $1.051.00 unK y $0.00
b.Commercial $292.00 k.sJ. y SO.OO
c.lndustrial-General $204.00 k.sJ. N SO.OO
d.1 ndustriaJ-Warehouse $204.00 k.sJ. y $0.00
Water User Fee (Construction) 720-0433-0000-3620 y $15,348.13
100% $15,348.13
$2.76 If.f. + $168.14 I a.c.
.
COST SCHEDULE (4)
FEES9342.x1s
Front Foot Charges:
(Used to charge and reimburse fees for existing infrastructure)
Water 801-2601-0000-3899 SO.OO
Water Mains, including lire hydrants. valves and box: 100% SO.OO
(Developer is responsible for up to and including 12" mains)
Half Pipe Front Foolage
6" Main $12.50 U. x N 0.0 a $0.00
8" Main $13.50 U.X N 0.0 $0.00
10" Main $15.00 U. x N 0.0 . $0.00
12" Main $16.50 f.f. x N 0.0 $0.00
14" Main $18.50 f.f. x N .0.0 . $0.00
16" Main $21.00 U. x N 0.0 $0.00
18" Main $25.00 U. x N 0.0 . $0.00
24" Main $31 .50 f.f.x N 0.0 $0.00
30" Main $37.00 f.f. x N 0.0 . $0.00
36" Main $43.50 f.f.x N 0.0 $0.00
Country Estates Water System y $0.00
(Not Included)
Sewer 801-2601-0000-3899 SO.OO
Sewer Mains, including manhole: 100% SO.OO
(Developer is responsible for up 10 and including 12" mains)
Half Pipe Front Footage
6" Main $12.00 U. x N 0.0 $0.00
8" Main $12.50 f.f. x N 0.0 . $0.00
10" Main $14.00 U. x N 0.0 = $0.00
12" Main $15.50 U. x N 0.0 $0.00
15" Main $19.00 U. x N 0.0 . $0.00
18" Main $24.00 f.f.x N 0.0 $0.00
21" Main $28.50 U. x N 0.0 . $0.00
24" Main $33.00 f.f. x N 0.0 a $0.00
2r Main $36.50 U. x N 0.0 . $0.00
Country Estates Sewer Trunk Main
(Not Included)
y
SO.OO
COST SCHEDULE
(5)
FEES9342.xls
street Improvements 801-2601.Q000-3899 so.OO
100% SO.OO
Pavement Square Footage
3" AC on 8" AS $2.57 x 0.0 . $0.00
3" AC on 10" AS $2.89 x 0.0 SO.OO
3" AC on 12" AS $3.18 x 0.0 . $0.00
3" AC on 15" AS $3.65 x 0.0 SO.OO
Square Footage
Sidewalk 4" on 4" $4.72 x .0.0 = $0.00
and driveway
Front Footage
Curb/Gutter on 6" $15.33 x 0.0 . $0.00
storm Drain 801-2601-0000-3899 SO.OO
100% SO.OO
storm Mains, including manholes and catch basins:
(Developer is responsible for up to and including 24" mains)
Half Pipe Front Footage
18" Main SO.OO U. x N 0.0 = SO.OO
21" Main $22.00 U.x N 0.0 . $0.00
24" Main $23.50 U. x N 0.0 . $0.00
27" Main $25.00 U. x N 0.0 $0.00
30" Main $26.50 U. x N 0.0 . SO.OO
33" Main $28.00 U. x N 0.0 . SO.OO
36" Main $29.50 U. x N 0.0 . SO.OO
42" Main $33.00 U. x N 0.0 $0.00
48" Main $36.50 f.f.x N 0.0 . SO.OO
54" Main $39.50 f.f.x N 0.0 $0.00
60" Main $43.00 U. x N 0.0 . $0.00
66" Main $46.00 u. x N 0.0 = $0.00
72" Main $49.00 U. x N 0.0 SO.OO
COST SCHEDULE
(6)
FEES9342_x1s
NOTE:
All deferred and/or estimated fees will be adjusted to the rates In effect at the time Building Permits are Issued.
The undersigned agrees to provide actual construction costs for recalculation offees and pay any underestimated
fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the
difference. Site grading and relnspectlon charges Including reinspection of backyard drainage will be billed at the
Engineering Division hourly rate in effect at the lime of Inspection.
Accepted by:
Inc.
Date:
7- (g -- 02-
FEES9342.x1s
THIS PAGE lNTENTIONALL Y LEFT BLANK
NORTfI
I
I
VICINITY SITE MAP
Southside Industrial Park, A.P.N. 841-15--157
Tract No. 9342
Exhibit A