PIA No. 95-09 - Silicon Valley Diversified
N 8 3 7 p~ GE I 904
/"
,
~
12876603
RECORDING REQUESTED BY:
city of Gilroy
1"1:.':0 fO:': nECOHD
ATREOUESTOf <---
REG FEE
Cli-y t{ GI(N Y
95MAY-1 AM 9:20
OFF1C!J\ :G~:DS
C I"" ~. t' II U T "
S ANT A!Jld~ l".l n~ I
8 R E t\~ll) 1\ tJ l~.V .~ S
!1ECO ni
WHEN RECORDED, MAIL TO:
Susanne E. steinmetz
city of Gilroy
7351 Rosanna street
Gilroy, CA 95020
AMF
ffilCrn
!rfl':~
'.:~_--J._
!.J:::"~ i
~....,-_.__....-.-"",,-..L
L~;_..[~~f.5.:d~__.
~
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
PROPERTY IMPROVEMENT AGREEMENT
Tract 8691 - 'Ilfle-C~tl.!!es Park Commons
DOCUMENT TITLE
SEPARATE PAGE PURSUANT TO GOVT. CODE 27361.6
N8 3 7PAGE 1905
RECORDING REQUESTED BY:
city of Gilroy
WHEN RECORDED, MAIL TO:
city of Gilroy
7351 Rosanna street
Gilroy, CA 95020
12876603
PROPERTY IMPROVEMENT AGREEMENT
RESIDENTIAL
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS:
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM
DRAINS AND OTHER PUBLIC WORKS FACILITIES
No. 95-09
This agreement made and entered into this 24th day of April ,
19 ~, by and between the city of Gilroy, a municipal corporation, herein called
the "city" and silicon valleS Diversified, Inc. , a real
property owner developer or su divider, herein called the "Developer".
WHEREAS, a final map of subdivision, record of surveyor building permit
(site clearance) application has now been submitted to the city for approval and
acceptance, covering certain real estate known as and called:
Tract 8691 -~1l!~:a~ Park Commons
and,
WHEREAS, the Developer requires certain utilities and public works
facilities in order to service the property under the minimum standards established
by the city and,
WHEREAS, the city, by and through its city council, has enacted certain
codes, Ordinances and Resolutions and certain Rules and Regulations have been
promulgated concerning the subject matter of this agreement and,
WHEREAS, the city has certain res~onsibilities for maintenance and operation
of such utilities and public service fac~lities after acceptance by city, and for
providing the necessary connecting system, ~eneral plant and appurtenances, and the
city is agreeing to discharge those respons~bilities.
NOW THEREFORE, in consideration of the premises and in order to carrr on the
intent and purpose of said codes, ordinances, Resolutions and Regulations, ~t is
agreed by and between the parties as follows:
SECTION 1
That all Codes, ordinances, Resolutions, Rules and Regulations and
established policies of the city and the laws of the state of california concerning
the subject matter of this agreement are hereby referred to and incorporated herein
to the same effect as if they were set out at length herein. said codes,
Ordinances and Regulations include, but are not limited to, the following: the code
of the city of Gilroy, the current zoning ordinance, and the currently adopted
Uniform Building Code.
SECTION 2
The Developer agrees:
a. To perform each and every provision required by the city to be performed
by the Developer in each and everyone of said codes, ordinances and
other Regulations.
b. To grant to the city without charge, free and clear of encumbrances, any
and all stipulated easements and rights of way in and to his said real
property necessary for the citr in order that its water, electricty,
and/or sewer lines in or to sa~d real property may be extended.
-1-
N 8 3 7 p~ GE I 906
c. To indemnify and hold the city harmless and free from all damage and
liability done to any utility, public facility or other material or
installation of the city on said real estate which the Developer or any
contractor or subcontractor of the Developer, or any employee thereof,
shall do in grading or working upon said real estate.
d. To construct and improve all public works facilities and other
improvements as set out herein, according to the standards heretofore
established, and according to the grades, plans and specifications
thereof, all as approved by the city Engineer, and shall furnish two (2)
good and sufficient bonds. One shall be executed in the face amount of
no less than $415,000.00 , and the other shall be executed in an
amount no less than 50% of the above mentioned bond and shall secure
payment to the contractor, his subcontractors and to persons renting
equipment or furnishin~ labor or materials to them for the improvement
hereunder, and as prov~ded for in section 4200-4210 of the Government
code of the state of california, the codes, ordinances, Resolutions, and
Regulations of the city, and this agreement.
The faithful performance bond hereinabove provided for, shall by the terms
remain in full force and effect for a period of one (1) year after the
completion and acceptance of said work, to guarantee the repair and
replacement of defective material and faulty workmanship.
In lieu of said faithful performance bond for maintenance, the Developer may
furnish a maintenance bond in the amount of 10% of the total contract price
(with a minimum amount of one thousand dollars $1,000.00) to cover the one
(1) year maintenance period.
e. That upon approval of the final map of the subdivision, the record of
surveyor the building permit covering the real estate to be improved
and before any work is done therein, the Developer shall pay to the city
all sums, shown in section 9 thereof to be due under the terms and
provisions of this agreement.
SECTION 3
That all sums shown herein to be payable by the Developer to the city are
due and payable to the city upon the execution of this agreement.
SECTION 4
That all the provisions of this agreement and all work to be done pursuant
to the terms of this agreement are to be completed within one year from and after
the date and year first above written.
SECTION 5
That the special provisions concernin~ the particular real estate referred
to above, being attached hereto, are hereby ~ncorporated herein and expressly made
a part of this agreement.
SECTION 6
That the faithful and prom~t ~erformance by the Develo~er of each and every
term and condition contained here~n ~s made an express condit~on precedent to the
dutr of the city to perform any act in connection with this transaction, and the
fai ure, neglect or refusal of the Developer to so perform, or to pay any monies
due hereunder when due shall release the city from any and all obligations
hereunder and the city, at its election, may enforce the performance of any
provision herein, or any right accruing to the city or mar pursue any remedy
whatsoever it may have under the laws of the state of cal~fornia or the codes,
ordinances, Resolutions of the city, in the event of any such default by Developer.
SECTION 7
That this agreement, together with the attached stipulations, is an
instrument affecting the title or possession of the real property described in
Exhibit A. All the terms, covenants and conditions herein imposed shall be binding
upon and inure to the benefit of the successors in interest of Developer. Upon the
sale or division of the property described in Exhibit A, the terms of this
agreement shall apply separately to each parcel and the Developer of each parcel
shall succeed to the obligations imposed on Developer by this agreement.
-2-
~ 8 3 7 p~ GE ! 907
SECTION 8
That the following General stipulations and the attached stipulations shall
be completed subject to the approval of the Director of Public Works.
1. Locate and properlr dispose of any wells, septic tanks and underground
fuel storage facil~tes.
NOTE: The capping of any well will require inspection by the Santa
clara valley Water District.
2. schedule the construction of im~rovements alon~ existing public roads
so that the work affecting veh~cular traffic ~s completed with a
minimum interruption to traffic.
3. All work within the public right-of-way shall be subject to the approval
of the city Engineer.
4. Before construction utilizing combustible materials may proceed, an all
weather access must be provided to within 150 feet of the building site;
and at least one in service fire hydrant must be available within 500
feet of each ~ortion of the site wherein this construction is to take
place. Locat~on of the fire hydrants will be determined by the Fire
chief.
SECTION 9
That the attached Development Cost Schedule enumerates all fees and their
extensions.
TOTAL AMOUNT DUE CITY $216,330.75
IN WITNESS WHEREOF, city has executed as of
ATTEdT: "" /
;/-~~./JcvYVVI~~' (L>~
/tITY CLERK / - ,
.v Susanne E. steinmetz l ,: ",
APPROVED AS TO FORM:
~ ~ Jay Baksa
&t.~~{j"M /I.~otJ
IN WITNESS WHEREOF OWner has executed this agreement as of ~~...:.\... \'- .\~~ S
c::27:)3~~'#"::~'"~""~~ ~ ~,
.. "-
DATE ~'<.~, \... \~ \ "\ "\ S
NOTE: If Developer is a corporation, the complete legal name and corporate seal of
the corporation and the corporate titles of the persons signing for the corporation
shall appear above.
-3-
N 8 3 7 p~ GE I 908
STATE OF CALIFORNIA )
)ss.
COUNTY OF SANTA CLARA )
before me,
J '
k ,I (11 hr,rl ~{j ~l,r+(, n5()
.I
. L -tc?L r~LS
persona y nown to me (or prove to me on t e as~s 0 evidence) to
be the person(s) whose name(s) is/are subscribed to the within instrument and
acknowledged to me that he/she/they in his/her/their authorized capacity(ies), and
that by his/her/their signature(s) on the instrument the person(s) or the entity
upon behalf of which the person(s) acted, executed the instrument.
signature
hand a~d official seal.
J
} ~/, ! ' -
/. , ' 1),1; // " ).: J, \. ", _I
~,j}" Yl)../Lv lL-<-L-1 C \..11-(,,,1.,-,,:,; ("",
J I
per GC Sec. 40814; CC Sec. 1181
j. - :':ER~; A;FO:~ -
:( . COMM.1i951209
~ . -,. Notary PlJbIic.Calilornia
J SANTA CLARA COUNTY
. , My comm. expires oec 25.1995 r
~ .... ..... .... .... .... .... ..... ..... ... ... ........ (
f
~
WITNESS my
-4-
N 8 3 7 p~ GE I 909
stipulations to Property Development
Agreement No. 95-09
Tract 8691 - '1"h'e=~~~ Park Commons
1. The Developer shall install all improvements per the approved set of
development plans titled "Improvement plans for Tract No. 8691",
engineered by Hanna and Brunetti.
2. within six weeks of the execution of this improvement agreement,
the city shall reimburse the developer $6,225.58 from the storm drain
improvement fund.
Breakdown
oversizing for 30", 234' at 50.00 - 44.00 6.00/L.F. 1,404
oversizing for 42", 428' at 62.00 - 44.00 = 18.00/L.F. = 7,704
Sub-total oversizing Reimbursement = 9,108.40
Credit on Cost schedule (2,882.43)
TOTAL DUE DEVELOPER $6,225.58
~~;..~O ~\:,~\\.~ U.~,<.o: ~~~
signed ~C"\.-..::.. ~ re. d? ~ ~
Date \:4 'X ~. \... \::t \ ~~ <:
Title ~\~.L Q~,~~
N 8 3 7 p~ GE I 9 I 0
Willard
"
~
s
,.""
01 .
" -
\
Ave.
II
______--.J L__
.
>
cl
,
-----.., r---
I I
II
W ! II I
Ronan I
/ , 8
c
..
i Ct,
J 7 18 i/S:~
VICINITY SITE MAP
Silicon Valley Diversified, Inc.
Tract No. 8691, Park Commons, APN 790-16-059
DATE:
06-Apr-95
NUMBER:
95-09
PROJECT LOCATION:
PARCEL NUMBER:
OWNER/DEVELOPER:
MAILING ADDRESS:
TELEPHONE NO:
PREPARED BY:
Account No. Key Code
100-2600-3-600400 4904
100-2600-3-600412 4702
410-2400-3-629000 3302
420-2600-3-680200 4501
431-2600-3-680300 5001
432-2400-3-625000 3301
433-2600-3-681000 4905
434-1400-3-680000 4402
435-2600-3-671000 4509
436-2600-3-695000 4510
437-1500-3-680000 4511
720-0433-3-690000 2202
801-0000-2-229015 4703
801-0000-2-229015 4703
801-0000-2-229015 4703
Totals.............. ..
Bonds and Securities
SERVICE CHARGES
N 8 3 7 p~ GE t 9 I I
CITY OF GILROY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
FINAL CHARGES
ALL PARK, POLICE & FIRE DEVELOPMENT FEES
HAVE BEEN DEFERED TO BUILDING PERMIT.
"Fhe-Gffiteees- Tract No. 8691- Park Commons
790-16-059
Silicon Valley Diversified
851 East Hamilton Ave., Suite 120, Campbell, Ca. 95008
xxxxxxxxxxx
M. Fachin
Fee:
Credits:
Amount Due: Account Description:
$4,860.80
$0.00
$0.00
$4,860.80 Special Public Works Serv
$59,976.90 Engring Plan Check & Insp
$59,976.90
$144,606.00
DEFERED TO BLDG PERMIT Park Development Fee
$2,882.42
$0.00
$0.00
$2,882.42
$0.00
$0.00
$0.00 Storm Development Fee
$0.00 Utility Undergrounding Fee
$0.00 Str Tree Development Fee
$57,582.00
$7,539.00
$0.00
$57,582.00 Traffic Impact Fee
DEFERED TO BLDG PERMIT Police Development Fee
$57,267.00
$32,613.00
$1,659.00
$4,031.05
$0.00
$0.00
$0.00
$0.00
$57,267.00 Sewer Development Fee
$0.00
$32,613.00 Water Development Fee
DEFERED TO BLDG PERMIT Fire Development Fee
$4,031.05
$0.00
$0.00
Const Water Use Fee
$0.00
Reimbursements
$0.00
$0.00
$0.00
$0.00
$373,017.17 $2,882.42 $216,330.75
Within six weeks of the execution of
$622,500 the development agreement, the City
=========== shall reimburse the developer $6225.58
(1) from the storm drain improvement account.
I'
N 8 3 7 p~ GE , 9 I 2
DEFER PARK, POLICE & FIRE DEVELOPMENT FEES? Y
CITYOF GILROY
DEPARTMENT OF PUBLIC WORKS
DATE: 06-Apr-95 ENGINEERING DIVISION
FINAL COST SCHEDULE
NUMBER: 95-09 ALL PARK, POLICE & FIRE DEVELOPMENT FEES
HAVE BEEN DEFERED TO BUILDING PERMIT.
PROJECT LOCATION: .,tu~'euttages- Tract No. 8691 - Park Commons
PARCEL NUMBER:
790-16-059
OWNER/DEVELOPER:
Silicon Valley Diversified
MAILING ADDRESS:
851 East Hamilton Ave., Suite 120, Campbell, Ca. 95008
TELEPHONE NO:
x
PREPARED BY: M. Fachin
NOTE: This 100 % cost schedule has been adjusted to the rates in effect at the time building permits wer
issued. All Park, Police & Fire development impact fees have been defered and will be collected with the build in
permit fees.
Site Information:
N Residential-Low?
N Residential-High?
N Commercial-Low?
N Commercial-High?
N Industrial-General?
N Industrial-Warehouse?
N Assembly Hall?
Common Area?
Commercial/Industrial Allocations:
Reimbursements and credits:
N Country Estates Water System?
N Country Estates Sewer System?
Acres:
8.630
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Lots:
21
o
o
o
o
o
o
Units:
21
o
Sq Ft:
Sewer GPO:
o
o
o
o
o
o
o
Water GPO:
o
N Northwest Quadrant Sewer?
N Obata Industrial Park Credit?
Front Footage for Front Foot Charges and Construction Water:
Street Tree FF: Water FF: Sewer FF: Storm FF:
0.00 0.00 0.00 0.00
Special Public Works Services 100-2600-3-600400
Maps:
Final
$3,025.00 +
$50.00 / lot
Parcel $1,070.00 + $100.00 / lot
Reapportionment (Assessment District Parcels)
$1,767.00 + $100.00 / lot
Administration Fees:
Country Estates Water System
(Not Included)
Country Estates Sewer Trunk Main
(Not Included)
Northwest Quadrant Sewer Trunk Main
(Not Included)
COST SCHEDULE (1)
Construction Water FF:
1,000.00
$4,860.80
$4,860.80
100%
Y
$4,075.00
$0.00
=
N
=
N
$0.00
$0.00
$0.00
$0.00
=
Y
=
Y
=
Y
=
~4 8 3 7 PA GE I 9 I 3
Miscellaneous Engineering Services:
(Cost Schedules, Agreements, R/W Reviews and Other Misc. Services)
8 hr Misc Services $77.00 I hr. Y
Public Works Microfilming (Maps and Plans):
1- 6 shts $149.94 + $6.62 I sheet
7-12 shts
$191.84 +
$6.62 I sheet
13-18 shts
$233.73 +
$6.62 I sheet
# of Shts
3
Engring Plan Check and Inspection
(Based on total cost of public
right-of-way improvements)
4 hr Site grading
100-2600-3-600412
$77 .00 I hr.
N
=
$799,670
Y
=
Y
=
Y
=
$415,000
Actual Cost of Public Improvements
10% of first
$100,000
$200,000
8% of $100,000 -
7% over
$200,000
Offsite Improvements to be Bonded
$616.00
=
Y
$169.80
$0.00
$0.00
=
Y
=
Y
=
100%
$59,976.90
$59,976.90
$0.00
$10,000.00
$8,000.00
$41,976.90
Park Impact Fee
PARK FEE DEFERED TO BUILDING PERMIT
410-2400-3-629000 $144,606.00
100% $144,606.00
a. Residential-Low
$6,886.00 I unit
b.Residential-High
$4,918.00 I unit
Storm Drain Impact Fee
420-2600-3-680200
a.Residential-Low
$334.00 I acre
b.Residential-High
$501.00 I acre
c.Commercial
$668.00 I acre
d.lndustrial
$751.00 I acre
e.Assembly Hall
$334.00 I acre
Obata Industrial Park Credits
(Based on reimbursements due from oversized storm facilities)
Obata Fee Credit $1,170.00 I acre
COST SCHEDULE
(2)
Y $144,606.00
=
Y
$0.00
=
100%
Y $2,882.42
=
Y $0.00
=
Y $0.00
=
Y $0.00
=
Y $0.00
=
Y $0.00
=
$2,882.42
$2,882.42
Utility Underground Fee
$118.36 / f.f. x
Street Tree Fee
a.City Planting and Replacement
$2.45 / f.f. x
b.lnspection and Replacement
$0.34 / f.f. x
Traffic Impact Fee
a.Residential-Low
b.Residential-High
c.Commercial-Low Traffic
(<= 4 trips/1 000 sf)
d.Commercial-High Traffic
(> 4 trips/1000 sf)
e.lndustrial-General
f.1 ndustrial-Warehouse
Police Impact Fee
a. Residential-Low
b.Residential-High
c.Commercial
d.lndustrial
COST SCHEDULE
N 8 3 7 rn GE I 9 I 4
431-2600-3-680300 $0.00
100% $0.00
Front Footage
N 0.00
=
432-2400-3-625000 $0.00
100% $0.00
Front Footage
N 0.00 = $0.00
=
y 0.00 = $0.00
=
433-2600-3-681000 $57,582.00
100% $57,582.00
$2,742.00 / unit Y $57,582.00
=
$2,222.00 / unit Y $0.00
=
$3,032.00 / k.s.f. Y $0.00
=
$6,127.00 / k.s.f. Y $0.00
=
$1,184.00 / k.s.f. Y $0.00
=
$872.00 / k.s.f. Y $0.00
=
POLICE FEE DEFERED TO BUILDING PERMIT
434-1400-3-680000 $7,539.00
100% $7,539.00
$359.00 / unit Y $7,539.00
=
$529.00 / unit Y $0.00
=
$561.00 / k.s.f. Y $0.00
=
$18.00 / k.s.f. Y $0.00
=
(3)
N 8 3 7 PA GE I 9 , 5
Country Estates Sewer Trunk Main
(Not Included)
435-2600-3-671000
100%
$2,727.00 / unit Y $57,267.00
=
$1,948.00 / unit Y $0.00
=
100 gals.lday Y $0.00
=
y $0.00
=
$57,267.00
$57 ;267 .00- ."
Sewer Impact Fee
a. Residential-Low
b. Residential-High
c. Commercial/Industrial
$950.00 /
Obata Industrial Park Credits
(Based on reimbursements due from oversized sewer facilities)
Obata Fee Credit $531.00 / acre
y
$0.00
=
b.Residential-High
436-2600-3-695000
100%
$1,553.00 / unit Y $32,613.00
=
$1,109.00 / unit Y $0.00
=
1,000 gals.lday y $0.00
=
$32,613.00
$32,613.00
Water Impact Fee
a. Residential-Low
c. Commercial/Industrial
$2,360.00 /
Obata Industrial Park Credits
(Based on reimbursements due from oversized water facilities)
Obata Fee Credit $154.00 / acre
y
$0.00
=
Fire Impact Fee
FIRE FEE DEFERED TO BUILDING PERMIT
437-1500-3-680000 $1,659.00
100% $1,659.00
$2.58 / f.f.
$79.00 / unit Y $1 ,659.00
=
$105.00 / unit y $0.00
=
$70.00 / k.s.f. Y $0.00
=
$9.00 / k.s.f. y $0.00
=
720-0433-3-690000 Y $4,031.05
100% = $4,031.05
+ $168.14 / a.c.
(4)
a. Residential-Low
b.Residential-High
c.Commercial
d.lndustrial
Water User Fee (Construction)
COST SCHEDULE
~l 8 3 7 P /\ GEl 9 r 6
Front Foot Charges:
(Used to charge and reimburse fees for existing infrastructure)
Water 801-0000-2-229015 $0.00
100% $0.00
Water Mains, including fire hydrants,
valves and box:
(Developer is responsible for up to
and including 12" mains)
Half Pipe Front Footage
6" Main $12.50 I f.f. x N 0.00 = $0.00
=
8" Main $13.50 I f.f. x N 0.00 = $0.00
=
10" Main $15.00 I f.f. x N 0.00 = $0.00
=
12" Main $16.50 I f.f. x N 0.00 = $0.00
=
14" Main $18.50 I f.f. x N 0.00 = $0.00
=
16" Main $20.50 I f.f.x N 0.00 = $0.00
=
Country Estates Water System y $0.00
(Not Included) =
Sewer 801-0000-2-229015 $0.00
100% $0.00
Sewer Mains, including manhole:
(Developer is responsible for up to
and including 12" mains)
Half Pipe Front Footage
6" Main $12.00 I f.f. x N 0.00 = $0.00
=
8" Main $12.50 I f.f. x N 0.00 = $0.00
=
10" Main $14.00 I f.f. x N 0.00 = $0.00
=
12" Main $15.50 I f.f. x N 0.00 = $0.00
=
15" Main $19.00 I f.f. x N 0.00 = $0.00
=
Northwest Quadrant Sewer Trunk Main y $0.00
(Not Included) =
Country Estates Sewer Trunk Main y $0.00
(Not Included) =
COST SCHEDULE (5)
N 8 3 7 PA GE I 9 T 7
Street Improvements 801-0000-2-229015 $0.00
- -., ..~--.- -....,--. .. 100% "$0.00".-
Pavement Square Footage
3" AC on 8" AS $2.42 x 0.00 = $0.00
3" AC on 10" AS $2.71 x 0.00 = $0.00
3" AC on 12" AS $2.99 x 0.00 = $0.00
3" AC on 15" AS $3.43 x 0.00 = $0.00
Square Footage
Sidewalk 4" on 4" $4.43 x 0.00 = $0.00
and driveway
Front Footage
Curb/Gutter on 6" $14.39 x 0.00 = $0.00
Storm Drain 801-0000-2-229015 $0.00
100% $0.00
Storm Mains, including manholes and catch basins:
(Developer is responsible for up to
and including 24" mains)
Half Pipe Front Footage
18" Main $19.00 / f.f.x N 0.00 = $0.00
=
21" Main $20.50 / f.f. x N 0.00 = $0.00
=
24" Main $22.00 / f.f. x N 0.00 = $0.00
=
27" Main $23.50 / f.f. x N 0.00 = $0.00
=
30" Main $25.00 / f.f.x N 0.00 = $0.00
=
33" Main $26.50 / f.f. x N 0.00 = $0.00
=
36" Main $28.00 / f.f. x N 0.00 = $0.00
=
42" Main $31.00 / f.f.x N 0.00 = $0.00
=
48" Main $34.00 / f.f. x N 0.00 = $0.00
=
54" Main $37.00 / f.f. x N 0.00 = $0.00
=
60" Main $40.00 / f.f. x N 0.00 = $0.00
=
66" Main $43.00 / f.f.X N 0.00 = $0.00
=
72" Main $46.00 / f.f. x N 0.00 = $0.00
=
COST SCHEDULE (6)
t48 3 7 PA GE I 9 'f 8
78" Main $49.00 / f.f. x N 0.00 = $0.00
=
84" Main $52.00 / f.f. x N 0.00 = $0.00
=
90" Main $55.00 / f.f. x N 0.00 = $0.00
=
96" Main $58.00 / f.f. x N 0.00 = $0.00
=
Bonds and Securities
* Not included in TOTAL DUE
801-0000-2-229015
*
$622,500
(Estimated)
NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time Building Permits are issued.
The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimate
fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the
difference.
c::=:.-S")o ~ \:JQ\\<~ U,~_.,,'~ 4---'-
Accepted by:, 0........- ~ -;;t. #. "G r. '"--"-'
Date: ~~'" " '-
\~ \,~S
.
COST SCHEDULE
(7)