SV Propertiesx
,?
PROPERTY DEVELOPMENT AGREEMENT
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS:
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM
DRAINS AND OTHER PUBLIC WORKS FACILITIES
This agreement made and entered into this 6th day of June
19 83 , by and between the City of Gilroy, a municipal corporation, herein called the
"City" and SV PROPERTIES '82 a California Limited , a real property owner
Partnership.
develper or subdivider, herein called the "Developer ".
WHEREAS, a final map of subdivision, record of survey or building permit (Site
Clearance) application has now been submitted to the City for approval and acceptance,
covering certain real estate known as and called:
"Solis Rancho" Tract No. 7406 and,
WHEREAS, the Developer requires certain utilities and public works facilities in
order to service the property under the minimum standards established by the City and,
WHEREAS, the City, by and through its City Council, has enacted certain Codes,
Ordinances and Resolutions and certain Rules and Regulations have been promulgated
concerning the subject matter of this agreement and
WHEREAS, the City, by and through its City Council, has enacted certain Codes,
Ordinances and Resolutions and certain Rules and Regulations have been promulgated
concerning the subject matter of this agreement and,
WHEREAS, the City has certain responsibilities for maintenance and operation of
such utilities and public service facilities after acceptance by City, and for
providing the necessary connecting system, general plant and appurtenances, and the
City is agreeing to discharge those responsibilities.
NOW THEREFORE, in consideration of the premises and in order to carry on the
intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed
by and between the parties as follows:
SECTION 1
That all Codes, Ordinances, Resolutions, Rules and Regulations and established
policies of the City and the laws of the State of California concerning the subject
matter of this agreement are hereby referred to and incorporated herein to the same
effect as if they were set out at length herein. Said Codes, Ordinances and
Regulations include, but are not limited to, the following: the Code of the City of
Gilroy (including but not limited to Chapters 12A, 19, 20, 21 Res. 80 -58 and 76 -47,
thereof pertaining to local improvement procedures in subdivision or development
respectfully): Ordinance No. 711 (Zoning Ord.): Resolution 81 -17 (1979 Uniform
Building Code): Rules and Regulations. Included in the above are all of the above
referred to Codes, Ordinances, Resolutions, Regulations and Substitutions thereof, as
amended to the time of execution of this agreement.
i
SECTION 2
The Developer agrees:
a. To perform each and every provision required by the City to be
performed by the Developer in each and every one of said Codes,
Ordinances and other Regulations.
b. To grant to the City without charge, free and clear of
encumbrances, any and all stipulated easements and rights of way
in and to his said real property necessary for the City in order
that its water, electricty, and /or sewer lines in or to said
real property may be extended.
C. To indemnify and hold the City harmless and free from all damage
and liability done to any utility, public facility or other
material or installation of the City on said real estate which
the Developer or any contractor or subcontractor of the
Developer, or any employee thereof, shall do in grading or working
upon said real estate.
d. To construct and improve all public works facilities and other
improvements as set out herein, according to the standards
heretofore established, and according to the grades, plans and
specifications thereof, all as approved by the City Engineer, and
shall furnish two (2) good and sufficient bonds. One shall be
executed in the face amount of no less than $ 607,679.00 , and
the other shall be executed in an amount no less than 50% of the
above mentioned bond and shall secure payment to the contractor,
his subcontractors and to persons renting equipment or furnishing
labor or materials to them for the improvement hereunder,
and as provided for in Section 4200 -4210 of the Government Code
of the State of California, the Codes, Ordinances, Resolutions,
and Regulations of the City, and this agreement.
The faithful performance bond hereinabove provided for, shall by the
terms remain in full force and effect for a period of one (1) year after the
completion and acceptance of said work, to guarantee the repair and
replacement of defective material and faulty workmanship.
In lieu of said faithful performance bond for maintenance, the
Developer may furnish a maintenance bond in the amount of 10% of the total
contract price (with a minimum amount of one thousand dollars $1,000.00) to
cover the one year (1) maintenance period.
e. That upon approval of the final map of the subdivision, the record of
survey or the building permit covering the real estate to be improved
and before any work is done therein, the Developer shall pay to the City
all sums, except cost to be borne by the City, shown in Section 7
thereof to be due under the terms and provisions of this agreement.
gRrTTnN I
That all sums shown herein to be payable by the Developer to the City are due
and payable to the City upon the execution of this agreement.
SECTION 4
That all the provisions of this agreement and all work to be done pursuant to
the terms of this agreement are to be completed within one year from and after the
date and year first above written.
SECTION 5
That the special provisions concerning the particular real estate referred to
above, being attached hereto, are hereby incorporated herein and expressly made a
part of this agreement.
-2-
SECTION 6
The faithful and prompt performance by the Developer of each and every term and
condition contained herein is made an express condition precedent to the duty of the
City to perform any act in connection with this transaction, and the failure,
neglect or refusal of the Developer to so perform, or to pay any monies due
hereunder when due shall release the City from any and all obligations
hereunder and the City, at its election, may enforce the performance of any
provision herein, or any right accruing to the City or may pursue any remedy
whatsoever it may have under the laws of the State of California or the Codes,
Ordinances, Resolutions of the City, in the event of any such default by
Developer.
SECTION 7
That the following are the estimated amounts of costs to be borne by the
respective parties hereto, and it is further understood and agreed that said
amounts are estimated only and are subject to final determination upon
completion of the work.
FACILITY
Engineering Map Checks
a) Subdivisons $208.00+ $ 3.00(n)
Parcel Maps $ + $ (n)
n- Number of lots
n = 68 lots
b) Engineering Plan Check
and inspection
5% x $ 591, 847.00
c) Miscellaneous Engineer
Service
No. of hours x $ 31.00
4 hours
d) Public Works Microfilming
$5 /Sheet Maps and Plans
10 sheets
-3-
DEVELOPMENT COST
$ 412.00
$ 29,592.00
$ 124.00
$ 50.00
e) Fire Hydrant Location Fee
$ 33.00for first five hydrants
+ 3.00for each additional
7 hydrants
f) Area Water Charge
15.012 Acres @ $ 1,768.0O/Acre = $26,541.00
$26,541.00 - $13,104.00 = $13,437.00
(See Calculations and Stip. No. 9)
g) Construction Water
3420 LF @ $0.37/LF + 15.012 Acres @ $13.72 /Acre
h) Off -Site Storm Drainage
15.012 Acres @ $981.00 /Acre= $14,727.00
Acres @ /Acre
$14,727.00_- $37,854.00 = - 23,127.00
(See Calculations and Stip. No. 11)
i) Front Foot Water Fee
LF @ LF
J) Front Foot Sewer Fee
LF @ LF
k) Front Foot Storm Drain Fee
551.90 LF @ $16.99 / LF = $9,377.00
1) Street Paving
SF @ /SF
m) Curb and Gutter
LF @ /LF
39.00
$ 13,437.00
$ 1,471.00
$ By Developer
$ By Developer
$ 9,377.00
$ By Developer
$ By Developer
n) Galvanized Pole Electroliers
LF @ $ /LF
o) Electrolier Conduit
LF @ $ /LF
p) Fire Hydrants
LF @ $
/LF
q) Utility Pole Mounted Electrolier
LF @ $ /LF
r) Easements and Rights of Way
"On Site"
s) Easements and Rights of Way
t) Other
-5-
$ By Developer
$ By Developer
$ By Developer
$ n/a
DUE CITY BY DEVELOPER $
DUE DEVELOPER BY CITY $
NET DUE CITY S
100%
100%
54,502.00
-0-
54,502.00
IN WITNESS WHEREOF, said parties have caused these presents to be executed
the date and year first above written.
ATTEST:
City Clerk
VAUM ADDU/ IMn
CITY OF GILROY
yl� Z'
Mayor
. re� DJ'*I�
UIT—yAd tor Protempore
DEVELOPER
BY
BY
DA
NOTE: If Developer is a corporation, the complete legal name and corporate seal of the
corporation and the corporate titles of the persons signing for the corporation
shall appear above.
-6-
STIPULATIONS
SV Properties '82
A California Limited Partnership
"Solis Rancho" Tract No. 7406
1. Locate and properly dispose of any wells, septic tanks
and underground fuel facilities.
NOTE: The capping of any well will require inspection by
the Santa Clara Valley Water District.
2. Schedule the construction of improvements along existing
public roads so that the work affecting vehicular traffic is
completed with a minimum interruption to traffic.
3. All work within the public right of way shall be subject
to the approval of the City Engineer.
4. All fees shall be paid at the rates in effect at that
time.
5. Before construction utilizing combustible materials may
proceed, an all weather access must be provided to within
150 feet of the building site; and at least one in service
fire hydrant must be available within 500 feet of each por-
tion of the site wherein this construction is to take place.
6. This agreement shall run with the land and be binding
upon any successors in interest.
7. The assignment of this agreement by the developer to
another party shall require prior approval of the City
Council.
8. Developer agrees to dedicate and improve to city stan-
dards all streets and public improvements as shown on tract
map and plans for Tract No. 7406.
9. The developer will be reimbursed at this time for over -
sizing the water main in Kern Avenue, and all the remaining
water mains in Kern Avenue which are not fronting this tract
by crediting the Area Water Fee. (See Calculation Sheet)
10. The developer will be only reimbursed for 1/2 of an 8"
water main in Kern Avenue at the time of development of the
parcels on the east side of Kern Avenue which are directly
across from this tract, since we are crediting the developer
for all the oversizing and the main which is not fronting
this site at this time. The developer will be reimbursed
only if said parcels are developed within .15 years of this
agreement.
11. The developer will be reimbursed for the installation
of the 42" Storm Main, first by crediting to the Area Storm
Fee and the remainder at the time of acceptance of the tract.
(See Calculation Sheet)
12. As a credit to the School Impact Fees the developer will
install curbs, gutters,electroliers, fire hydrants, water
main, sewer main, one -half plus 10 feet of street improvements,
some sidewalk, and undergrounding utilities, which front the
School Site, and expects no further reimbursement for said
improvements.
13. The developer will be reimbursed for 1/2 of an 8" sewer
main on Kern Avenue which is directly across from this tract
and all the remaining sewer main which is not fronting said
tract at the time of development of adjacent parcels providing
said parcels are developed within 15 years of this agreement.
14. The developer will be reimbursed for the 10 feet of street
improvements on the east side of the center line at the time
of development of the parcels which are directly across from
said tract providing said parcels are developed within 15 years
of this agreement.
15. The developer expects no reimbursement for the improve-
ments installed in front of the 3 foot strip of land on Judge
Hoesch Way.
16. The developer will be reimbursed for the 97 feet of street
improvements, which he will install to the south on Kern Avenue
to tie in to existing improvements, at the time of further
development of the adjacent parcel providing said parcel is
further developed within 15 years of this agreement.
Acce
Date
CALCULATION SHEET
SV Properties 182
A California Limited Partnership
"Solis Rancho" Tract No.7406
Water Main Credits
187 L.F. of 10" DIP @ $19.40 /L.F. _ $3,628.00
1259 L.F. of 8" DIP oversized to
10" DIP or $19.40 /L.F. - $16.50 /L.F.
or 1259 L.F. @ $2.90 /L.F. _ $3,651.00
706 L.F. of z of an 8" DIP fronting
the School Site or 315 L.F. @ 2
$16.50 /L.F. _ $5,825.00
Total Credit = $13,104.00
To be credited to the Area Water Fee
(See Stip. No. 9)
Storm Main Credits
945 L.F. of 42" RCP @ $37.20/L.F. _ $35,154.00
2 manholes @ $850.00 ea. _ $ 1,700.00
Sack Rip Rap (l.s.) _ $ 1,000.00
$37,854.00
- 14,727.00
$23,127.00
To be reimbursed upon acceptance of the
tract (See Stip. No. 11)
Q
N
Z
Q
N
VICINITY SITE MAP
SOLIS RANCHO, TRACT NO. 7406
}
r�
y.
CITY OF GILROY
DEVELOPMENT COST SCHEDULE
No. 83 -11
Date 4 -7 -83
Initialed S. D. -L.
Location of Property West side of Kern Avenue approximately 250 feet
north of Welburn Avneue.
Assessor's Parcel # 790 -04 -014 and '015
Name of Applicant TED RINGEL, Tract No. 7406
Address 10381 S. DeAnza Blvd. Cupertino, CA 95014
Type of Development Proposed Subdivision P.U.D.
Area 15.012 acres Storm Drain Area "B"
Street Frontage 551.90 feet on Kern Avenue
Engineering Map Check
01- 100 - 1100 - 6004 -11 $ 412.00
Subdivisions $ 208.00 +$ 3.00 (ri)
Parcel Splits $ +$ (n)
n- number of lots = 68 lots
Engineering Plan Check and Inspection 01- 100 - 1100 - 6004 -12
5% of the Cost of Public Improvements
5% x $ 591, 847.00
Miscellaneous Engineering Service 01- 100 - 1100 - 6004 -13
4 hours x ( 31 . 0 0 )
Public Works Microfilming 01 -100- 1100 - 6004 -14
$5.00 per sheet (maps and plans) x 10 sheets
Fire Hydrant Location Fee 07- 720 - 1900 - 8001 -00
$ 33.00 for the first 5 hydrants
+$ 3.00 for each additional hydr
Area Water Charge
15.012 Acres @$1,768.00 /acre
Acres @$ /acre
Construction Water
$ 29,592.00
$ 124.00
$ 50.00
$ 39.00
ants 7 hydrants
03- 300 -1300- 7203 -00 $ 13,437.00
$26,541.00 - $13,104.00
(See Calculations Sheet
& Stip. No. 9)
07- 720 -1900- 8001 -00 $ 1,471.00
3420 LF @$ 0.37 /LF+ 15.012 Acres @ $ 13.72 /acre
-1-
Off-Site Storm Drain Fee
Area
"A"
$
/Acre
Area
"A -1
"$
/Acre
Area
"B"
$
/Acre
Area
"C"
$
/Acre
Area "D" $ /Acre
Area "E" $ /Acre
02 -220- 1300 - 7202 -00 $
02- 220 - 1300 - 7202 -01 $
02- 221 - 1300 - 7202 -00 $ -0- (1)
02- 222 - 1300 - 7202 -00 $
02- 223 - 1300 - 7202 -00• $
02- 224 -1300- 7202 -00 $
Area "F" $ /Acre 02 -225 j300- 7202 -00 $
Area "Q" $ /Acre 02- 226 - 1300 - 7202 -00 $
15.012 Acres @$ 981.00 /Acre = $14,727.00 -+ Per Unit Fee' for the
Interim Drainage Zone
Acres @$ /Acre
Front Foot Charges
Water
LF @$ /LF
Sewer
LF @$ /IF
Storm Drain
.551.90 LF @$ 16. 99 /LF
Street Improvements
02- 230 - 1300 - 7204 -00 $ By .Developer
02- 230 - 1300 - 7205 -00 $ By Developer
02- 230 -1300- 7207 -00 $ 9,377.00
02- 230 - 1300 - 7207 -00 $ By Developer
Pavement
SF-@$
Stipulation
/SF -$ By Developer
Calculation
Curb & Gutter
IF
@$
/LF -$
are payable
Sidewalk
SF
@$
/SF -$
Cal. Pole
Electrolier IF @$ /LF -$
Electrolier.
�r
Conduit LF @$ /LF -$
Fire Hydrant IF @$ /LF -$
Wood Pole Mounted Electrolier 01- 100 - 1100 - 6004 -00 $ ' n/a
LF @$ /LF
Public Works Cash Bonds and Deposits 08- 800 - 1100- 6004 -02 $
Other $
Other
TOTAL $ 54,502.00
(1)
See
Stipulation
No.'ll and
Calculation
Sheet
NOTE:
All
deferred fees
are payable
at the rate in
effect at time of payment.