Bertelone, Mike - PDA No. 86-43Susanne E. Steinmetz,City Clerk
Cityy of Gilroy
7351 Rosanna 5t.
ji Gilroy, CA 95020
PROPERTY
NO FEE per GC Sec 6013
cam -
J 873PAGE12S3
DEVELOPMENT AGREEMENT
RESIDENTIAL
89'73450
FILED M'-11 400RD
AT REQJEST 9F
G f4
Cui 7
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTra$JT.,, C;. ,,'�, COUNTY
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM L..AU'3C::
J8 �3PAGE1284
d. To construct and improve all public works facilities and other
improvements as set out herein, according to the standards
heretofore established, and according to the grades, plans and
specifications thereof, all as approved by the City Engineer, and
shall furnish two (2) good and sufficient bonds. One shall be
executed in the face amount of no less than $ 15,00 0.00 , and
the other shall be executed in an amount no less than 500% of the
above mentioned bond and shall secure payment to the contractor,
his subcontractors and to persons renting equipment or furnishing
labor or materials to them for the improvement hereunder,
and as provided for in Section 4200 -4210 of the Government Code
of the State of California, the Codes, Ordinances, Resolutions,
and Regulations of the City, and this agreement.
The faithful performance bond hereinabove provided for, shall by the
terms remain in full force and effect for a period of one (1) year after
the completion and acceptance of said work, to guarantee the repair and
replacement of defective material and faulty workmanship.
In lieu of said faithful performance bond for maintenance, the
Developer may furnish a maintenance bond in the amount of 10% of the
total contract price (with a minimum amount of one thousand dollars,
$1,000.00) to cover the one (1) year maintenance period.
e. That upon approval of the final map of the subdivision, the record of
survey or the building permit covering the real estate to be improved
and before any work is done therein, the Developer shall pay to the City
all sums, shown in Section 8 thereof to be due under the terms and
provisions of this agreement.
SECTION 3
That all sums shown herein to be payable by the Developer to the City are due
and payable to the City upon the execution of this agreement.
SECTION 4
That all the provisions of this agreement and all work to be done pursuant to
the terms of this agreement are to be completed within one year from and after the
date and year first above written.
SECTION 5
That the special provisions concerning the particular real estate referred to
above, being attached hereto, are hereby incorporated herein and expressly made a
part of this agreement.
SECTION 6
That the faithful and prompt performance by the Developer of each and every term
and condition contained herein is made an express condition precedent to the duty of
the City to perform any act in connection with this transaction, and the failure,
neglect or refusal of the Developer to so perform, or to pay any monies due hereunder
when due shall release the City from any and all obligations hereunder and the City, at
its election, may enforce the performance of any provision herein, or any right
accruing to the City or may pursue any remedy whatsoever it may have under the laws of
the State of California or the Codes, Ordinances, Resolutions of the City, in the event
of any such default by Developer.
SECTION 7
That this agreement, together with the attached stipulations, is an instrument
affecting the title or possession of the real property described in Exhibit A. All
the terms, covenants and conditions herein imposed shall be binding upon and inure to
the benefit of the successors in interest of Developer. Upon the sale or division of
the property described in Exhibit A, the terms of this agreement shall apply separately
to each parcel and the Developer of each parcel shall succeed to the obligations
imposed on Developer by this agreement.
-2-
s
s
J S f 3PA6E1285
That the following General Stipulations and the attached stipulations shall be
completed subject to the approval of the Director of Public Works.
1. Locate and properly dispose of any wells, septic tanks and underground fuel
storage facilites.
NOTE: The capping of any well will require inspection by the Santa Clara
Valley Water District.
2. Schedule the construction of improvements along existing public roads so that
the work affecting vehicular traffic is completed with a minimum interruption
to traffic.
3. All work within the public right -of -way shall be subject to the approval of
the City Engineer.
4. Before construction utilizing combustible materials may proceed, an all
weather access must be provided to within 150 feet of the building site; and
at least one in service fire hydrant must be available within 500 feet of each
portion of the site wherein this construction is to take place. Location of
the fire hydrants will be determined by the Fire Chief.
I
SECTION 9
That the attached Development Cost Schedule enumerates all fees and their
extentions.
TOTAL AMOUNT DUE CITY
$ 18,408.00
IN WITNESS WHEREOF, said parties have caused these presents to be executed
the date and year first above written.
t--
ATTE
r City.C,lerk-
BY
BY
DATE
NOTE: If Developer is a corporation, the complete legal name and corporate seal of the
corporation and the corporate titles of the persons signing for the corporation
shall appear above.
-3-
t
W
C
W
I
W
J
L
a
CAT. NO. NNO0627
TO 1944 CA (9 -84)
(Individual)
STATE IF NIA
COUN OF �n
On °S
said State, asonally appeared
Jf TICOR TITLE INSURANCE
} SS.
JS' 3PAGEI28G
before n$ the yndgrsigned, a Notary Public in and for
, personally known to me or
proved to me on the basis of satisfactory evidence to be
the person_ whose name _L--164 subscri to the
within instrument and acknowledged that e
cuted the same.
WITNESS y hand an ,elfficial seal.
Signature
JANET K. WALLACE
NOTARY PUB iC- CAifFC,2NIA
Cv4lmlWWfi Ex *n APO 4.. 1.989
(This area for official notarial seal)
CITY OF GILROY
I 8 r 3PA6 E1281
No. 86 -43
DEVELOPMENT COS: SCHEDULE Date 7-17-86
Initialed NSA /JBL
Location of Property Eighth Street approximately 338 feet east of
Chestnut Street.
Assessor's Parcel # 841 -11 -042
Name of Applicant
MIKE BERTALONE
Address 160 W. Tenth Street, Gilroy, CA 95020
Type of Development Proposed 8 unit apartment
Area 0.52 acres Storm Drain Area "D"
Street Frontage 158.65 feet on Old Gilroy, 137.50 feet on Eighth St.
Special Public Works Services
Engineering Map Check
Subdivisions $190.00 + $3.00 /lot
Parcel Splits $83.00 + $3.00 /lot
number of lots
Miscellaneous Engineering Service
4 hours x $32.55/hr
Public Works Microfilming (Maps and Plans)
1 sheets x $5.00 /sheet
Wood Pole Mounted Electrolier
158. 65FF @ $5.25/FF
Engineering Plan Check and Inspection
5% of the Cost of Public Improvements
5% x $ 15,000.00
Storm Development Fee
Area "A" $1,868.00 /Acre
Area "A -1" $3,716.00 /Acre
Area "B`' $1,654.00 /Acre
Area "C" $2,798.00 /Acre
Area "D" $1,788.00 /Acre
Area "E" $1,364.00 /Acre•
Area "F" $2,424.00 /Acre
Area "Q" $2,333.00 /Acre
0.52 Acres @$1788.00 /Acre
Acres @$ /Acre
01 -100- 1100 - 600400 $ q6 R_nn
(Paid - 468.50)
S n/a
A l ')n An
$ 5.00
01- 100 - 1100 - 600412 $ 750.00
(Paid - 375.00)
02- 220 - 1300 - 720200 $
02- 220 -1300- 720201 $
02- 221 -1300- 720200 $
02- 222 - 1300 - 720200 $
02- 223 -1300- 720200 $ 930.00
(Paid
02- 224 - 1300 - 720200 $ x(65.00
02- 225 - 1300 - 720200 $
02- 226 - 1300 - 720200 $
,J 873ME.1288
Front Foot Charges
Water
02- 230 - 1300 - 720400 $
2,35 7.00
2(8 ") 137.50 FF
@$ 8.66
/ FF
= $1,191.00 (Paid -
1,178.50)
2 (6" ) 158.65 FF
@$ 7.35
/FF
= $1,166.00
$2,357.00
Sewer
02- 230 - 1300 - 720500 $
1,636.00
(Paid -
818.00)
2 (10" ) 158. 65 FF
@$ 10. 31
/FF
Street Improvements
02- 230 - 1300 - 720600 $
12,292.00
8th
2,475
SF @$1.51
/SF = $ 3,737.00 (paid
6,146.00)
Pavement O.G.
3,649
SF @
$1.93 /SF = $ 7,042.00
Curb & Gutter
FF @
$11.41 /FF = $ By Developer
Sidewalk SF @ $ 3.27/SF = $ By Developer
Gal. Pole
Electrolier
& Conduit 137.50 FF @ $ 5.25/FF = $ 722.00
Fire Hydrant
Resident 296.15 FF @ $ 2.67/FF = $ 791.00
Comm & Ind. FF @ $ 2.99/FF = $ n/a
Storm Drain 02- 230 - 1300 - 720700 $ 2,2 10.00
(Paid - 1,105.00)
2 (24" ) 137. 50 FF @$ 16.07 /FF
Sewer Development Fee
8 units @$627.00 /unit
Water Development Fee
8 Units @ $880.88 /Unit
Gals. @ $918.17/1000 GPD peak
07- 705 - 1300 - 720100 $ 5,016.00
(Paid - 2,508.00)
07- 725 -1300- 720300 $ 7,047.00
(Paid - 1,836.50)
Construction Water 07- 720 - 1900 - 800100 $ 174.00
296.15 FF @ $0.55/FF + 0 , 52 Acres @ $21.00 /Acre (Paid - 87.00)
Fire Hydrant Location Fee 07- 720 - 1900 - 800300 $ 31.00
(Paid - 15.50)
$31.00 for the first 5 hydrants
+$ 3.00 for each additional hydrant
Public Works Cash Bonds and Deposits 08- 800 - 1100 - 600400 $ 22,500.00**
Other $
TOTAL DUE CITY $ 33,4 11.00
PAID - 15,003.00
BALANCE DUE $ 18,408.00
NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the
time Building Permits are issued.
** Not included in total.
Accepted
jam..
Date:
-2-