Farotte Construction Co., Inc. r(', /~ G"'~' SECTION 00500 RECEIVED JUN 0 6 2003 ENGINEERING AGREEMENT SUNRISE FIRE STATION PROJECT NUMBER 03-CDD-122 THIS AGREEMENT, made this ,/Wc day of and between the City of Gilroy, hereinafter called the "City," and hereinafter called the "Contractor." A JU/U ?OD3, by Farotte Construction Co., Inc. W! T N E ~ ~ E T H: WHEREAS, the City has caused the Contract Documents to be prepared comprised of bidding and contract requirements and technical specifications and drawings for the construction of the Fire Station, Project No. 03-CDD-122, as described therein, and WHEREAS, the Contractor has offered to perform the proposed work in accordance with the terms of the Contract Documents. NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties herein contained and to be performed, the City and Contractor agree as follows: Article 1. Work. Contractor shall complete the Work as specified or indicated in the Contract Documents. Article 2. Contract Time. The Work shall be completed by the Contractor in accordance with the Contract Documents within the time period required by Paragraph 00810-2.0, Time Allowed for Completion, subject to extension as expressly provided in the Contract Documents. Article 3. Liquidated Damages. THE CITY AND THE CONTRACTOR RECOGNIZE THAT THE CITY WILL SUFFER SUBSTANTIAL DAMAGES AND SIGNIFICANT FINANCIAL LOSS AS A RESULT OF Sunrise Fire Station, Project No. 03-COO-122 SECTION 00500-1 THE CONTRACTOR'S DELAYS IN PERFORMANCE OF THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS. THE CITY AND THE CONTRACTOR HEREBY ACKNOWLEDGE AND AGREE THAT THE DAMAGES AND FINANCIAL LOSS SUSTAINED AS A RESULT OF ANY SUCH DELAYS IN PERFORMANCE WILL BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN. THEREFORE, THE CITY AND CONTRACTOR HEREBY AGREE THAT IN THE EVENT OF SUCH DELAYS IN PERFORMANCE, THE CITY SHALL BE ENTITLED TO COMPENSATION BY WAY OF LIQUIDATED DAMAGES (AND NOT PENALTY) FOR THE DETRIMENT RESULTING THEREFROM IN ACCORDANCE WITH PARAGRAPH 00700-6.5, LIQUIDATED DAMAGES, OF THE CONTRACT DOCUMENTS. THE CITY AND THE CONTRACTOR FURTHER AGREE THAT THE AMOUNTS DESIGNATED AS LIQUIDATED DAMAGES ARE A REASONABLE ESTIMATE OF THE CITY'S DAMAGES AND FINANCIAL LOSS IN THE EVENT OF ANY SUCH DELAYS IN PERFORMANCE CONSIDERING ALL OF THE CIRCUMSTANCES EXISTING AS OF THE DATE OF THIS AGREEMENT, INCLUDING THE RELATIONSHIP OF SUCH AMOUNTS TO THE RANGE OF HARM TO THE CITY WHICH REASONABLY COULD BE ANTICIPATED AS OF THE DATE OF THIS AGREEMENT AND THE EXPECTATION THAT PROOF OF ACTUAL DAMAGES WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL. BY INITIALING THIS PARAGRAPH BELOW, THE PARTIES HERETO SIGNIFY THEIR APP AL D CONSENT TO THE TERMS OF THIS ARTICLE 3. ~ Contractors Initials Article 4. Contract Price. In consideration of the Contractors performance of the Work in accordance with the Contract Documents, the City shall pay the Contract Price set forth in the Contract Documents. Article 5. Contract Documents. The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of this Agreement (Section 00500 of the Contract Documents) and all of the following attachments to this Agreement, all of which are hereby incorporated into this Agreement by reference with the same force and effect as if set forth in full. Invitation to Bid Instructions to Bidders Bid Documents Designation of Subcontractors Sunrise Fire Station, Project No. 03-COO-122 SECTION 00500-2 Bid Guaranty Bond Agreement Acknowledgements Performance Bond Payment Bond General Conditions Supplementary Conditions General Requirements Standard Specifications Technical Specifications Drawings Addenda, if any Executed Change Orders, if any Notice of Award Notice to Proceed Article 6. Miscellaneous. Capitalized terms used in this Agreement which are defined in Section 01090, References, of the Contract Documents will have the meetings set forth in Section 01090, References. Contractor shall not assign any rights, obligations, duties or responsibilities under or interest in the Contract Documents without the prior written consent of the City, which consent may be withheld by the City in its sole discretion. No assignment by the Contractor of any rights, obligations, duties or responsibilities under or interests in the Contract Documents will be binding on the City without the prior written consent ofthe City (which consent may be withheld in City's sole discretion); and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, executed by the City, no assignment will release or discharge the assignor from any liability, duty, obligation, or responsibility under the Contract Documents. Subject to the foregoing, the Contract Documents shall be binding upon and shall inure to the benefit of the parties hereto and their respective successors and assigns. Nothing contained in the Contract Documents shall in any way constitute a personal obligation of or impose any personal liability on any employees, officers, directors, agents or representatives ofthe City or its successor and assigns. In accordance with California Business and Professions Code Section 7030, the Contractor is required by law to be licensed and regulated by the Contractors' State License Board which has jurisdiction to investigate complaints against Contractors if a complaint regarding a patent act or Sunrise Fire Station, Project No. 03-COO-122 SECTION 00500-3 omission is filed within four years ofthe date ofthe alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within 10 years of the date of the alleged violation. Any questions concerning the Contractor may be referred to the Registrar, Contractors' State License Board, P.O. Box 26000, Sacramento, California 95826. ~- of IN WITNESS WHEREOF, this agreement has bee ~1.....-( ,tJ;<oo3. FA(lioff'fi:; ~j>JsrY/l.JC(7(}J ~'I UJ(. Name of Contractor Jay Baksa, City Administrator Title of Signator Signature of Contractor !/l:{Sf (j ftr.,f'( Title of Signator Signature ~(2~, Signature ATTEST: Title of Signator Approved as to form: ~~~ ***END OF SECTION*** Sunrise Fire Station, Project No. 03-COO-122 SECTION 00500-4 net (/i ari~ of &}ilrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00001 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: Excavate existing cistern down to native soil, backfill to 4 feet of existing grade with llh sack cement/sand slurry mix, backfill the remaining 4 feet to finish grade with aggregate base material, remove cistern debris from site. All work base upon a 16 foot depth for existing cistern. Agreed to Lump Sum Price for 16 foot depth $ 5,995.00 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $5,995.00 Original Contract Price $ 2,983,146.00 Previous Change Orders TOTAL TO DATE $ 0.00 $ 2,983,146.00 This Change Order $ 5,995.00 By: Revised Contract Price $ 2,989,141.00 Date: Originals to: CITY: CONTR: (2) Originals (I) Original 1 Jifo aIittZ of &}HrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00002 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: Install temporary power service pole within 50 feet of the existing PG&E pole at the south end of the Sumise FS#3 project site. Install temporary power on contractor installed poles to the temporary emergency trailer site. Install additional pole at the north end of project site to accommodate communication service drop. Install 4 sack concrete at the abandoned cistern site per SCVWD requirement. Agreed to Lump Sum Price for complete temporary service $ 4,977 .00 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ 4,977.00 Original Contract Price $ 2,983,146.00 Previous Change Orders TOTAL TO DATE $ 5,995.00 $ 2,989,141.00 By: ~ This Change Order $ 4,977.00 Revised Contract Price $ 2,994,118.00 Date: RECOMMENDED B Originals to: CITY: CONTR: (I) Originals (I) Original 1 /10; i.. 1.0 aIittZ of &}ilrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen. P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAJ{ (408)842-2409 FAX (408) 842-2409 ~AX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00003 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Comoanv Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: Furnish all labor, equipment and material to install a I '0" Xl '0" cut-offfooting extension at the exterior of the perimeter wall footing, per your quote dated July 10 and as required by the project soils engineer. Agreed to Lump Sum Price for excavation and concrete placement around the entire perimeter wall footing - " $ 7,268.73 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ 7,268.73 Original Contract Price $ 2,983,146.00 Previous Change Orders $ 10,972.00 TOTAL TO DATE $ 2,994,118.00 This Change Order $ 7,268.73 By: ~9r1 ( ~1 Revised Contract Price $ 3,001,386.73 Date: Originals to: CITY: CONTR: (1) Originals (1) Original "';70/) aItttZ of &}ilrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00004 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: Price differential on the washer/extractor change from a Milnor 30015T5E to a Milnor 30015T5X Agreed to Lump Sum Price for this change $ 2,144.89 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ 2,144.89 Original Contract Price $ 2,983,146.00 Previous Change Orders TOTAL TO DATE $ 18,240.73 $ 3,001,386.73 Date: This Change Order $ 2,144.89 By: lro.~. Revised Contract Price $ 3,003,531.62 Originals to: CITY: CONTR: ( I) Originals ( 1) Original 1 COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 aIittZ of &}HrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development CHANGE ORDER NO. 00005 To contract for: Sunrise Fire Station #3 i" c "\ C' ""iJ FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: FURNISH LABOR, EQUIPMENT AND MATERIAL TO INSTALL THE FOLLOWING: A- per Engineer's instructions due to a conflict between the structural and architectural drawings: reframe wall at gridline 'D' between gridlines '4' and '6' to a 9'0" elevation. cut and re-weld steel columns between gridlines '4' and '6'. install plaster directly to underside of framing. Agreed to lump sum price for this change: $ 3,106.88 B- per request from the Fire Dept.: change from the specified metal panel roofmg material to the 50 year composition roofmg material selected by the Architect and Fire Dept.: Presidential Shake TL' roofing material. Agreed to lump sum price for this change: $ -(6,963.00) C- per the Architect's response to RFQ #02: omit the specified light fixture type 'H' and replace with a new light fixture as described in RFQ #02 Agreed to lump sum price for this change: $ -(2,995.28) D- due to a request from B.L.E.S.: add one set of 'Pemco PK55' smoke seals to hardware group 13 for doors 34 and 35 as approved by the Architect. Agreed to lump sum price for this change: $ 236.07 E- per request from the Construction Manager: combine the 2" water line and the 6" fIre line in one common joint trench as approved by the Architect. Agreed to lump sum price for this change: $ -(1,1 10.00) 1 F- due to plan omissions: .add a surface mounted fIre extinguisher 'Type 2-4B' mounted to the west facing trash enclosure wall adjacent to the fuel tank emergency shut off switch as approved by the Architect. Agreed to lump sum price for this change: $ 78.00 G- per requirement ofB.L.E.S.: modify the temporary emergency facility trailer's electrical panel. Agreed to lump sum price for this change: $ 527.72 H- due to plan omissions: complete the connection to the solenoid valve for the gas shut off Agreed to lump sum price for this change: $ 483.28 J- due to plan omissions: update the connection for the washer/extractor per response to Collins Electric COR #07 Agreed to lump sum price for this change: $ 1,158.77 K- due to plan omissions: install additional outlets in and Administration offIce and Captain's quarters Agreed to lump sum price for this change: $ 1,337.64 L- due to plan omissions: install bay door raceway and power circuits per response to Farotte RFI #18 Agreed to lump sum price for this change: $ 3,688.52 M- due to plan omissions: required work for the traffIc signals per response to Farotte RFI #06 Agreed to lump sum price for this change: $ 1,755.38 I (We) hereby agree to make the above changes subject to the terms of this Change Order for a NET INCREASE OF: Original Contract Price $ 2,983,146.00 Previous Change Orders TOTAL TO DATE $ 20,385.62 $ 3,003,531.62 $ 1,303.98 Date: r( (tf /() 3 This Change Order $ 1,303.98 Revised Contract Price $ 3,004,835.60 ---- Originals to: CITY: CONTR: (1) Originals ( 1) Original bate 2 aIittZ of &}ilrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00006 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: All labor, equipment and material to perform the installation ofPG&E's permit requirements as shown on PG & E drawing: OH to UG conversion - rule 20C and per response to RFQ #08. Agreed to Lump Sum Price for this change .~ $ 48,196.80 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ 48,196.80 Original Contract Price $ 2,983,146.00 Previous Change Orders TOTAL TO DATE $ 21,689.60 $ 3,004,835.60 This Change Order $ 48,196.80 d(u (O~ Revised Contract Price $ 3,053,032.40 Originals to: CITY: CONTR: (I) Originals (I) Original 1 j'" aIittZ of &}ilrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00007 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: Per statement by the Fire Dept. - need for visual through front bay doors due to safety issues with equipment exiting the apparatus bay during emergency response situations - All labor, equipment and material to perform the installation of: All glass, except bottom panels, in the two north apparatus bay doors per field memo #00006, option 2 of response to RFI #10 Agreed to Lump Sum Price for this change $ 5,608.33 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ 5,608.33 Original Contract Price $ 2,983,146.00 ~. I Previous Change Orders TOTAL TO DATE $ 69,886.40 $ 3,053,032.40 This Change Order $ 5,608.33 Date: Revised Contract Price $ 3,058,640.73 By: Originals to: CITY: CONTR: (1) Originals ( I) Original /2/~ { 2j1e 1 . GILROY FIRE DEPARTMENT 7070 CHESTNUT STREET GILROY, CALIFORNIA 95020-6610 Telephone: (408) 846-0370 FAX: (408) 848.0379 JEFFREY L. CLET FIRE CHIEF December 5, 2003 RECEIVED DEe 0 9 2003 ENGINEERING Bill Headley Parks and Facilities Development Manager Community Development Department This letter is a follow-up to our discussion today about a construction change order that the department has initiated related to the Sunrise Station front roll-up apparatus doors. The original station design committee had specified doors that only had two sections of glass panels in the front doors. This design is inconsistent with the current standard in use at the two other stations. I first became aware of this a few weeks ago when meeting with the architect to select exterior paint colors for the new station. I immediately requested that the door design be change to the full glass design. The following list provides an overview of why I feel that a construction change order is necessary to accommodate the front roll-up apparatus doors at the Sunrise Station. . The full glass panel doors present a more customer friendly design making the station appear open and inviting rather than closed and distant. . The full glass panel doors provide for a clear view for the public when approaching the fire station during an emergency to see if the station is occupied or vacant. . The full glass panel doors provide better visibility for the responding fire company while the doors are being raised since all panels can be seen through. . The full glass panel doors are consistent with the existing station design making the use, operation and function consistent with our current operations. . The full glass panel doors will reduce the potential for apparatus door accidents related to the use and operation of different door visibility patterns at each station. If you have any questions please don't hesitate to contact me. Thanks for your support, "First in Service to the Community" aIittZ of &}HrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00008 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: Provide 120 volt power to each of the dampers indicated on sheet M3.2, detail 2 per Mechanical Engineer. The 24 volt system will not work as shown on plans. Agreed to Lump Sum Price for this change $ 4,949.50 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ 4,949.50 Original Contract Price $ 2,983,146.00 Previous Change Orders TOTAL TO DATE $ 75,494.73 $ 3,058,640.73 This Change Order $ 4,949.50 By: Revised Contract Price $ 3,063,590.23 Date: Originals to: CITY: CONTR: (1) Originals (I) Original 1 aIittZ of &}HrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00009 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: Due to existing site condition as follows: Remove, haul away, backfill and compact the existing septic tank system under the proposed building and site concrete footprint as directed by the city. Agreed to Lump Sum Price for this change $ 6,369.46 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ 6,369.46 Original Contract Price $ 2,983,146.00 Previous Change Orders TOTAL TO DATE $ 80,444.23 $ 3,063,590.23 This Change Order $ 6,369.46 By: Revised Contract Price $ 3,069,959.69 Date: Originals to: CITY: CONTR: (1) Originals ( 1) Original 1 ")/1,' , .~:P.(~~,~ " _ ('..~.:.: \", - ";r;. 'I J ~(\\ , ' .,i 'fl \ f~\\l b. ' ' ::C J . '.)() aIittZ '""J'ltf)HI~E COPl " , " Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development MMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 , (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00010 ~i'itiih!~r;,Sunri5e fire Station #3 ~~..~]fi""'€~jt..aetion Company Ine. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF ITEMS AS FOLLOWS: A. Balance of credit to omit the cable tray system and add for' J' hook system Agreed to lump sum price for this item- $ -( 2,107.00) B. Credit for dedication plaque only Agreed to lump sum price for this item- $ -( 956.00) C. Provide 2 ea. attic access hatches not shown on the plans Agreed to lump sum price for this item- $ 506.00 D. Provide 8" and 12" cast aluminum letters as directed by the Architect Agreed to lump sum price for this item- $ 2,265.33 E. Provide mortar set tile in rooms #102 and #104 due to error in the plan fmish schedule Agreed to lump sum price for this item- $ 8 11.00 F. Provide credit to omit dry block CMU walls Agreed to lump sum price for this item- $ -( 1,727.85) G. Provide gypboard wrap of glulam beam as directed by the Architect Agreed to lump sum price for this item- $ 108.44 H. Lower ceiling in the exercise room, add a header in the kitchen, lower the ceiling in the TV room, And modify the soffit/ceiling in the main entry area Agreed to lump sum price for this item- $ 3,155.24 1 Cfl ':1)..-- . " .. 1.. ,'" Credit to omit the electrical work associated with the central vacuum system shown on sheet E2.1 Agreed to lump sum credit for this item- TOTAL FOR THIS CHANGE: I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ -(251.84) Original Contract Price Previous Change Orders TOTAL TO DATE This Change Order By: Revised Contract Price /// Originals to: CITY: CONTR: ACCEPTED BY: 2 $ -( 2,307.00) $ -( 251.84) $ 2,983,146.00 $ 86,813.69 $ 3,069,959.69 $ -( 251.84) $ 3,069,707.85 ( I) Originals (1) Original aIittZ of &}UrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. AI/en, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00010 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF ITEMS AS FOLLOWS: A. Balance of credit to omit the cable tray system and add for' J' hook system Agreed to lump sum price for this item- $ -( 2,107.00) B. Credit for dedication plaque only Agreed to lump sum price for this item- $ -( 956.00) C. Provide 2 ea. attic access hatches not shown on the plans Agreed to lump sum price for this item- $ 506.00 D. Provide 8" and 12" cast aluminum letters as directed by the Architect Agreed to lump sum price for this item- $ 2,265.33 E. Provide mortar set tile in rooms #102 and #104 due to error in the plan finish schedule Agreed to lump sum price for this item- $ 811.00 F. Provide credit to omit dry block CMU walls Agreed to lump sum price for this item- $ -( 1,727.85) G. Provide gypboard wrap of glulam beam as directed by the Architect Agreed to lump sum price for this item- $ 108.44 H. Lower ceiling in the exercise room, add a header in the kitchen, lower the ceiling in the TV room, And modify the soffit/ceiling in the main entry area Agreed to lump sum price for this item- $ 3,155.24 1 J. ~ Credit to omit the electrical work associated with the central vacuum system shown on sheet E2.1 Agreed to lump sum credit for this item- TOTAL FOR THIS CHANGE: I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ -(251.84) Original Contract Price Previous Change Orders TOTAL TO DATE This Change Order ;;;d0. ~-. ....~.~ .....c= - By: ~ Date: / / ~ /of Revised Contract Price Originals to: CITY: CONTR: ACCEPTED BY: 2 $ -( 2,307.00) $ -( 251.84) $ 2,983,146.00 $ 86,813.69 $ 3,069,959.69 $ -( 251.84) $ 3,069,707.85 (I) Originals (I) Original Jq0 aIittZ of &}HrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00011 To contract for: Sunrise Fire Station #3 Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF ITEMS AS FOLLOWS: A. Install bay door push buttons per revisions by the Electrical Engineer in response to RFI #18 - incomplete information on plans Agreed to lump sum price for this item- $ 2,241.99 B. Additional landscaping per RFQ #03, doubled planter area on east and west sides due to conflict with perimeter wall footing and area light footings on plans Agreed to lump sum price for this item- $ 10,430.07 C. Credit for cabinet and grommets per RFQ #21 & 22 Agreed to lump sum price for this item- $ - (174.00) D. Installation of updated light control due to insufficient information in documents Agreed to lump sum price for this item- $ 213.31 E. Installation of underground raceway at the refueling tank per instruction by the Electrical Engineer due to insufficient information in documents Agreed to lump sum price for this item- $ 296.63 F. Install CAB in selected areas for on site parking per FD #22 Agreed to lump sum price for this item- $ 1,500.00 G. City portion of Parking/traffic control installation costs to Friday, 0l/09/04, per meeting item #01,01/08/04 Project coordination meeting Agreed to lump sum price for this item- $ 2,777.00 1 H. Install heat lamps in four rest rooms per City request Agreed to lump sum price for this item- 1. Credit for downsizing generator and switchgear due to elimination of the proposed well site at this project location Agreed to lump sum price for this item- K. Refer to Attachment to Change Order #00012B GC superintendent from February 27, 2004, through April 30, 2004 due to project delays outlined in the Attachment Agreed to lump sum price for this item- L. Griffin lime application to soil per Soils Engineer's report and reference to Change Order Attachment #13A Agreed to lump sum price for this item- M. Work required for the Lintern light installation as described in the response to RFI # 18 from the Electrical Engineer - complete information not included in the contract documents - Agreed to lump sum price for this item- N. Additional cost to change the apparatus bay doors from 'high lift', as called out in the contract documents, to 'standard doors' due to a conflict with the ceiling gas heaters - Agreed to lump sum price for this item- O. Install rings and trim (insulation) to 'J' boxes per Deficiency Notice #000001 from The City Building Inspector per Energy Code regulations not indicated in the contract documents - Agreed to lump sum price for this item- P. Install a fixture 'K' in the pop-out below the flag pole soffit per Architect's instructions due to insufficient information regarding the fixture as shown in the bid documents. Agreed to lump sum price for this item- Q. Net credit to omit the furring as listed and described in RFQ #14, and Attachment to Change Order 014 E, and add metal angle closure Agreed to lump sum credit for this item- R. Omit the expansion joints in the apparatus room CMU walls as noted on detail 6, sheet S1.2 per the Architect's instructions Agreed to lump sum credit for this item- 2 $ 3,800.00 $ -(38,696.00) $ 35,946.00 $ 23,512.00 $ 2,250.88 $ 4,044.04 $ 927.69 $ 671.04 $ -(867.15) $ -(482.00) . ' TOTAL FOR THIS CHANGE: I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF Original Contract Price Previous Change Orders $ 48,391.50 TOTAL TO DATE This Change Order By: .~ Revised Contract Price ~ Date: ~/ RECOMMENDED B : L-- ~ Ryan Fair 02/18/04 Date Construction Manager Originals to: CITY: -~- ._~...~~~... 'It ) CONTR: ACCEPTED BY: ") Date i1 3 $ 48,391.50 $ 2,983,146.00 $ 86,561.85 $ 3,069,707.85 $ 48,391.50 $ 3,118,099.35 (1) Originals (1) Original r,/"I . JL....-:..# -...._ C.... 1-/ >> 1 QIittZ of &}HrotZ ------ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. AI/en, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00012 To contract for: Sunrise Fire Station Project Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF ITEMS AS FOLLOWS: A. Install conduit between HP unit I and the heating unit Due to incomplete information on plans Agreed to lump sum price for this item- $ 515.50 B. Credit back to the City to delete 8 ea. concrete footings, waterproofing, and CMU planter boxes at the building perimeter per Architect's instructions Agreed to lump sum credit for this item- $ -(7,560.00) C. Installation of 'Cat 5' cable as required by the County of Santa Clara, and per Electrical Engineer's response to RFI #67 Agreed to lump sum price for this item- $ 443.00 D. Install additional thresholds at terrazzo floor doorways Agreed to lump sum price for this item- $ 1,478.34 E. Raise cabinets in the training room to accommodate the refrigerator - The refrigerator called for in the project documents did not match the cabinet height shown on the drawings. Agreed to lump sum price for this item- $ 354.99 1 J F. Lower the Captain's desk as discussed at the March II th site meeting per instructions from the City's ergonomic consultant Agreed to lump sum price for this item- G. Install receivers on all 4 bay doors with 4 ea. - 4 button transmitters Furnish and install red/green signal light system at the 2 front bay doors Furnish and wire in photo cells with flex Agreed to lump sum price for this item- H. Cost of'T & M' directive #FD 00035 for installation of the street lighting on Sunrise Dr. The street light conduit was unmarked by USA prior to start of work, and location of the conduit was in the proposed PG&E CCO #006 contract work. Agreed to lump sum price for this item- J. The PG&E connection point on the west end of the frontage work in CCO #006 was not where PG&E located it. This cost is for additional time searching for this location. Agreed to lump sum price for this item- K. Additional 6" conduit run and riser at the new PG&E pole location on the west end of the project frontage Agreed to lump sum price for this item- L. Install one 2" conduit from the PG&E vault at the east property line of the project, to the existing point of connection at the adjacent residence on the west side of the site. Agreed to lump sum price for this item- M. Credit for deleted site concrete at the east and west planter areas per attachment to CCO # 12M, and as negotiated on site with the General Contractor Agreed to lump sum price for this item- N. Install additional terrazzo due to Fire Station floor maintenance factors per response to RFQ #00024 Agreed to lump sum price for this item- P Credit back to the City for VCT floors originally called for in the bid documents Agreed to credit for this item- TOTAL FOR THIS CHANGE: 2 $ 1,467.63 $ 3,555.20 $ 6,053.94 $ 2,069.79 $ 1,418.75 $ 2,398.65 $ -(8,000.00) $ 36,759.15 $ (435.00) $ 40,519.94 , I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF $ 40,519.94 BY~' D"e/ 4/6/04- Original Contract Price Previous Change Orders TOTAL TO DATE This Change Order Revised Contract Price D"e f/Z3/tif il1 3 Originals to: CITY: CONTR: $ 2,983,146.00 $ 134,953.35 $ 3,118,099.35 $ 40,519.94 $ 3,158,619.29 (1) Originals (1) Original h~') C' . aI ittZ of &} HrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00013 (close out) To contract for: Sunrise Fire Station Project Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF ITEMS AS FOLLOWS: A. Omit the casework base cabinet on the west wall of the training room #105 per Architects direction - see sheet A 7.1 - framing conflict Agreed to lump sum credit for this item- $ - (130.00) B. Pothole for existing 8.S. stub out - miss marked by USA, and miss staked by the Civil Engineer Connect S.S. and domestic water to the temporary trailer facility as directed Agreed to lump sum price for this item- $ 4,304.83 C. Modify the covered canopy at the north entry of the building due to truss and soffit re-design Agreed to lump sum price for this item- $ 4,772.48 D. Relocate four gas lines in the apparatus bay ceiling corners for suspended heaters per Architect's direction- originally installed per plan - changed due to plan conflict with overhead doors Agreed to lump sum price for this item- $ 977.68 E. 'Q' bollards and installation of traffic bearing street light boxes at the east and west driveway areas Agreed to lump sum price for this item- $ 2,335.36 1 Agreed to lump sum price for this item- F. Install a 2" backflow device as required by the City Water Dept. per City Standards - not shown on plans $ 2,827.50 G. Ice makers required - not shown on plans Connect washer/dryer hose per manufacturers requirements - not shown on plans Install a pre-dump tank on the extractor in de-con room per code requirement Agreed to lump sum price for this item- H. Install a dedicated electrical circuit to the fIre alarm bell per FD #40 - not shown on plans Agreed to lump sum price for this item- J. Install electrical hard wiring to the compressor unit and install one 11O-volt circuit for the pressure switch - not shown on plans Agreed to lump sum price for this item- K. Furnish and install on the north wall of the de-con room one disconnect for the hose dryer including electrical run and termination per code and as required by BLES Relocate the specified disconnect for the washer/extractor to the north wall of the de-con room as required by BLES due to code clearance requirements Agreed to lump sum price for this item- L. Install a 4" conduit from the V erizon termination point shown on the plans to the actual termination point at the Verizon vault on the west side of the site Agreed to lump sum price for this item- M. Extend the required fire insurance for one month due to time extension on the original contract Agreed to lump sum price for this item- $ 2,132.60 $ 1,993.13 $ 1,007.68 $ 3,587.51 $ 3,824.06 $ 2,711.95 N. Remove existing approach - replace with concrete curb and gutter - not indicated on the project drawings Install material to raise the elevation of site concrete at the west end of the building - due to miss information on the contract drawings and per direction of the Civil Engineer Agreed to lump sum price for this item- P Install additional landscaping and irrigation system necessary to cover a new 18" planter added along the east side of the apparatus bay driveway - condition created by changed concrete elevations due to plan conflict Agreed to lump sum price for this item- Q. Install additional sheet metal column caps on the two rear south exterior building columns - not shown on the contract drawings Agreed to lump sum price for this item- 2 $ 5,432.79 $ 1,657.03 $ 1,782.62 R. Add bollards at the fuel tank/generator area per Fire Marshall requirements Bollard spacing on the drawings at this area shown too far apart. Agreed to lump sum price for this item- S. Wire the double head light standard at the refueling station to work with LCP and by-pass switch per Fire Dept. direction Install an owner provided audio cable in the day room per Fire Dept. direction Agreed to lump sum price for this item- T. Extend one GFI circuit from the patio to the irrigation controller as required by BLES Code requirement - not shown on contract drawings Agreed to lump sum price for this item- U. Add one course ofCMU at the perimeter masonry wall- due to elevation/drainage conflict per Deputy Inspector's instruction Agreed to lump sum price for this item- V. Additional supervision due to delays caused by the downsizing of the original generator and switch gear in December Agreed to lump sum price for this item- W. Add one additional vehicle exhaust vent to accommodate one additional fire truck Agreed to lump sum price for this item- TOTAL FOR THIS CHANGE: I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF Original Contract Price Previous Change Orders $ 83,665.82 TOTAL TO DATE By: ~l.q)O-V Cl, 'J)/(, 6/zS-j04 . Revised Contract Price This Change Order Date: 3 $ 3,714.17 $ 3,156.35 $ 1,088.78 $ 5,279.47 $ 24,043.88 $ 7,165.95 $ 83,665.82 $ 2,983,146.00 $ 175,473.03 $ 3,158,619.03 $ 83,665.82 $ 3,242,284.85 , RECOMMENDED Ryan Fair 06/24/04 Date Construction Manager /2"(.)lj Date ~~j/Jf ta 4 Originals to: CITY: CONTR: (1) Originals (1) Original \ aIittZ of &}HrotZ COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development CHANGE ORDER NO. 00014 To contract for: Sunrise Fire Station Project Contractor: Farotte Construction Company Inc. ~l . ., ....- ... FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF ITEMS AS FOLLOWS: A. Calhoun Brothers Grading and Paving, Invoice #07856 - just received this billing is for the off haul of debris created by removal of the cistern. Verbal authorization was given on site by the CM to remove this debris. Subcontractor forgot to invoice for this item. Agreed to lump sum price for this item- B. Extreme Air. Invoice #1135 - this billing is for fabrication and installation of a plenum required at the hose drier vent in the decontamination room. Verbal authorization was given on site due to offset connection points. The project drawings gave a location for the connection point. The equipment specified and received at the job site had a different connection point. Subcontractor forgot to invoice for this item. Agreed to lump sum price for this item- C. Inland Showcase and Fixture Co., Inc. Invoice #3039-02 - this billing is for the installation of the cabinet locks referred to in the response to RFI #00079 and Field Directive #00044. The same cabinet locks, in the same locations on the doors, that are called out in the bid documents and installed for the Captain's ~arters, are not called out in the bid documents for dorm rooms 109, 110, and 111. These 12 new locks needed to be installed, and are in addition to the locks installed in the Captain's quarters. This item was forgotten by the CM and General Contractor during construction. Agreed to lump sum price for this item- 1 $ 874.00 $ 475.00 $ 931.50 .. TOTAL FOR THIS CHANGE: I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF Original Contract Price Previous Change Orders $ 2,280.50 TOTAL TO DATE This Change Order By Y?1:ftM ~ ~!16(C+ Revised Contract Price Date: Originals to: CITY: CONTR: ACCEPTED BY: Date a - '2 e> - , 'f ?4f~t !j~ D~ 2 $ 2,280.50 $ 2,983,146.00 $ 259,138.85 $ 3,242,284.85 $ 2,280.50 $ 3,244,565.35 (1) Originals ( 1) Original City of Gilroy Sunrise Fire Station #3 Project . Harris & Associates TO: Bill Headley City of Gilroy 7351 Rosanna St. Gilroy, CA 95020 TRANSMITTAL NO. 00218 DATE: 8/18/2004 y -;;p c AUG 1 9 -20(0 1'141 ~-\/ REF: Change Order / Phone: (408) 846-0450 Fax: (408)846-0460 WE ARE SENDING: SUBMITTED FOR: o l;hnn Or'win"s 0 An n rnv' I 0 Annrnv"ri ,. <:lIhmitt"d o R","hmit 0 ('nni". fnr Annrnv.1 0 Letter ~ Your Use/Information 0 Aooroved as Noted 0 Submit o Copies for Distribution 0 Pri nts ~ As Reauested 0 Returned After Loan 0 Returned o Cooies Corr. Print [i!' Chanl!e Order 0 Review and Comment 0 Returned for Corrections 0 Plans SENT VIA: 0 Samples o Hand Delivered 0 Specifications o U.S. Mail 0 Other: o Overnight: o Faxed: ITEM NO. COPIES DATE 8/1812004 ITEM NUMBER DESCRIPTION STATUS Change Order No. 00014 Remarks: Bill, Per your request, attached is the backup documentation for Change Order # 14. Hardcopy will follow in interoffice mail. Signed::~C- - Ryan Fair \~~~lr-- 'F .'12-0 (~ -~'-~ Dated: ~-l6-oi Copies To: Transmittal and Attachments: HA Project Files: File: 9810312.02.053.Transmittal #00218 Issue File: Page I of I Ca_tr _0 I I 78-C Second Street Gilroy. CA 95020 Phone (408) 842-5777 FAX (408) 842-5758 rfair@harris-assoc.com ---- ./ aI i~ of &}i!rotZ COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E. Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 Planning Division Engineering Divison Building. Life & Environmental Safety Division Housing & Community Development CHANGE ORDER NO. 0 To contract for: Sunrise Fire S Contractor: Farotte Construction FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 [~~ [' rnp" r It t uU' I Contract Date: 6/11/03 This order shall become effective when the City forwarded to Contractor for signature shall be re Contractor's copy will be returned to him as his autb , Project Engineer, and Contractor have signed it All copies ry properly filled out. Upon acceptance by the City, the the work. DESCRIPTION OF ITEMS AS FOLLOWS: A Calhoun Brothers Grading and Paving, Invoice this billing is for the offhaul of debris crea VerbaI authorization was given on site by Subcontractor forgot to invoice for this i ,I Agreed to lump sum price for this item- B. Extreme Air. Invoice #1135 - this billing is for fabrication and . !ion of a plenum required at the hose drier vent in the decon on room. Verbal authorization was giv site due to offset connection points. The proj drawings gave a location for connection point.. The equipment specified and received at the job site had erent connection point. Subcontractor forgot to in ce for this item. C. Inland Showcase an e Co., Inc. Invoice #3039-02 - this billing is for the inStallation of the cabinet locks referred to in the respQIJSe to RFI #00079 and Field Directive #00044, This item was forgotten by CM during COR/RFQ process. Agreed to 1mnp sum price for this item- $ 874.00 $ 475.00 $ 931.50 Ci93' TOTAL FOR TIllS CHANGE: I (We) hereby agree to make the above changes subject to the Ie fthis Change Order fur NET IN E OF Original Contract Price S 2,280.50 By: Date: RECOMMENDED BY: Construction Manager Originals to: CITY: CONTR: ACCEPTED BY: Date Jjzdc;f Date Project Engineer S 2.280.50 $ 2,983,146.00 $ 259,138.85 $ 3,242,284.85 $ 2,280.50 S 3,244,565.35 (1) Originals (1) Original CitY,of Gilroy Sunrise Fire Station #3 Project .. .. Harris & Assodates CHANGE ORDER REQUEST NO. 00063 To: Ryan Fair Harris & Associates I 78-C Second Street Gilroy, CA 95020 Date: July 28.2004 Hlt enp, Re~uired Date: August 04, 2004 Status: NEW Subject: outstanding sub invoices Reference: COR 00063 TO: HARRIS FROM: FAROTTE You are requested, in accordance with the Contract Documents, to provide a written quotation to perform work described in this Change Order Request. Execution of a Contract Change Order by all parties is required to perform the work described herein. Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 0000 I Calhoun Brothers Grading and Paving, Invoice #07856 - this billing is for the off haul of the debris from removal of the cistern. Verbal authorization was given on site by the CM to remove this debris. 1.000 Is $874.00 0.00% $0.00 $874.00 00003 Extreme Air. Invoice #1135. This billing is for fabrication and installation of the plenum required at the hose drier vent in the deeon. room. Verbal authorization was given on site due to offset connection points. 1.000 Is $475.00 0.00% $0.00 $475.00 00002 Inland Showcase and Fixture Co., Inc. Invoice #3039-02 - this billing is for the installation of the cabinet locks referred to in the response to RFI #00079 and Field Directive #00044. 1.000 Is $931.50 0.00% $0.00 $93 1.50 Total Unit Cost: Total Lump Sum Cost: Total Cost: $2,280.50 $0.00 2,280.50 In accordance with the Contract Documents, please submit an itemized cost breakdown, including all necessary supponing data. If the Contract TIme is impacted by the proposed change. timely submittal of htis information to enable agreement on the magnitude and impact of this proposed change is required prior to commencement of work. Please ensure that all future correspondence regarding this issue refers to the COR number shown above. Prepared By: Date: Gary Farotte File No.: 981 0312.02.053 Issue File: LATEIN Page I of I Ca_cor02 80 Casey Street Gilroy. CA 95020 Phone 408-847-3200 FAX 408-847-1015 0(0\ . . Harris & Associates Sunrise Fire Station #3 Project CONTRACT CHANGE ORDER NO. 00014 To: Gary Farotte Farotte Construction 80 Casey Street Gilroy, CA 95020 Date: July 28, 2004 Reference Spec. Section: Subject: Late Subcontractor Invoices Gentlemen: You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications of this contract. All new work herein described shall be done in accordance with the applicable provisions of the plans and specifications, except as modified by this contract change order. NOTE: This change order is not effective until approved by the Owner, or until an authorized Field Directive is executed. I DESCRIPTION OF CHANGE/REASON FOR CHANGE: '-$~28(l5o-1 COST OF CHANGE: CONTRACT TIME ADJUSTMENT: o Days J This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit any and all indirect costs, and time adjustment to perform the above described change. All other costs are non-compensable. File No.: 981 0312.02.053 Issue File: LATEIN Page I of I 7351 Rosanna St. Gilroy. CA 95020 Phone (408) 846-0450 FAX (408)846-0460 bheadley@ci.gilroy.ca.us La_ccoOl3 (C ((5) Jd> Y CONSTRUCTION ........--..... COMPANY "cO".O"'''''' No. 354355 GENERAL BUILDING CONTRACTOR. Mr. Ryan Fair Harris &Associates 178 - C Second Street Gilroy, California 95020 July 21,2004 RE: Sunrise Fire Station Dear Mr. Fair: As you and I discussed this morning, we have three outstanding subcontractor invoices for work performed at the Sunrise Fire Station that have not been included in the change orders processed to date. The three invoices are for the following: 1) Calhoun Brothers Grading and Paving, Invoice #07856 in the amount of$874.00. This billing is for the offhaul of the debris from the removal of the cistern. You may recall the debris from the cistern removal was left on the far south portion of the lot at the time the cistern was demolished. You and I verbally authorized Calhoun to remove this debris from the site at the time the, paving operation was in progress. We understood this work is an extra to the contract and would be billed as part of the cistern removal 2) Inland Showcase and Fixture Co., Inc., Invoice #3039-02 in the amount of $931.50. This billing is fOF the installation of the cabinet locks referred to in the response to RFI #00079 and Field Directive 00044. Please refer to the attached copies of the RFI and FD for details. 3) Extreme Air, Invoice #1135 in the amount of $475.00. This billing is for the fabrication and installation of the plenum required at the hose drier vent. This plenum was required because of the location of the vent on the hose drier in relationship to the vent in the building. We understand both you and Ed verbally authorized this work to be done. The total amount due for these three invoices is: $2,280.50. In addition to the above three invoices we have installed the numerous extra signs at various locations at no charge to the City of Gilroy in lieu of installing the berm at the front landscape area. We will waive our fee for overhead and profit on these three invoices and want only to be reimbursed for the cost of the work billed by these subcontractors. Please contact our office if you have any questions or need any additional information. Very truly yours, F AROTTE CONSTRUCTION CO., INC. Gary J. Farotte 80 CASEY ST. P.O. BOX 1377 GILROY, CA 95021 (408) 847-3200 FAX: (408) 847-1015 . ..~ ----.. ., Ham. & AlSDdata!l ''''V~3D5~2 6/30104 DUE UPON RECEIPT FlNAl- RETeNTION SUNRISE FIRE S1 A TION JOB it 032~ N NO. 00079 M8.1' 28. 200. :. ./line 02. 2004 : NEW :. FO fXlO.'. FROM; HAR~S TO; FAROnE f AMOUNT riitt. ~ imtrudions ror Iowar Ind IM-MJ-101S t.iUfl".QS . \ ~ ..;;::'l'~ nl,(~,"'6l C 'II.!; },.:, '.!~ .I~ ~-~ W .!2J 10) '.1.. LiP,)' 2 7 2004 t; .... CUIIIIt~ .. MIl...... DIal ... IWCM.4ql'lis.:>lI1 1047:) Nof1t\ 'The. FretInCI.c.A. g:p,.;:1:l.372"l LIe 1Il77ISS1 a - - -. --- ---. ....U"'U....14U..L~ t" AI'<<J I It:. UJII5TRI..CT1DN PAGE ell/B2 ..'~ " E:AROTTE CONSTRUCTION CO., INC. eCLC'~ so Caley Street Gi&oy; CA 9SC20 Citatnl ~~a CamnIctors (408) 847-3200 Fa'X (408) 847~10U ~No. 3S43S~ '. TO; INLAND SHOWCASe DATKi May '2.7, 2004 AI:I:i. 10HN I GINO FAX If: 559 . 237 7238 noma: GlLROY FIRE STATION f# 3 JlAC-ES - 02 U! CON5TRUcnoN MANAGEllS DBPONSlt 1"0 -:ai'J;;".' V'1 REF: 1S-13 Bl tht:lre John Attached pleas6 find COJJ8tractiOCl M.ea1<<S R:&IpO!UIe to our kFI ## 79. This should c=lari.fywhat needs to be ~. regards FAllOT't'E CO~SlllucnON CO., lNC J1dlan Hullett Project Mauaaor I Estimator M Ll~ ):; :[ ::~~ )W 400 ImED S'I'RD':'. surm A SA..-.n'A. CLABA, CA 950s0 m. (-to8) i27-4895 om. (408) 640-2626 au (408) 7Z7-4829 ~jl~@~ c r.r ~ F!Jl'Otto Conlltmetion Co., me. o 80 Casey Stteet M Gilroy, ca. 95020 E :R. .......... " ~............... INVOICE NO.: Il'W01CE DATE~ PROJECT NO.: PRO]EC!: L o ,. ~ Sunrise Pir~ Staticrl T 880 Sltarise Otiv~ I Gi1rcy. Ca o N 07856 AI2&'2oo4 2322 Sun:ise Fire stetion r I I ! i I I I I I . Original ContractAmcnaut: ,vA fJ"/ZE wltA1 ,. 111# t/I'IJ.. ... <;h~" ee O.rCtu :0 Date: . ! Cd tI/ c;/t}! ReTised Canaad Amount rrEM DESCBIFIlON l'ElnJS: ~et 10th 01 foD.owIng DlODth. PRO,TECl NO. AMOUNT Pmj cot Complete to Date L.ees Previous Billings: Amount Duo '&:tdi Invoice Less lO~ Retention: TOTALDllE TIIIS INVOICE I l Thank You! I!\'VOlCE 4078S'i 100.00% JUN 0 1 2004 .... :";, I I ! l I I I 1= I i "5,540.00 _ ~ 96,414.00 ') , . i i 96.41400 I 95,000.00 - ~ I :::::: {;~t~o ~.~~ I i I 1 I I I '~~ I TO'rAL Dt.!.E THIS INVOXCE: I $ I A _.. ChIIrao of 1'1.41> pc1' mo. (~ll~ FtII1IDDIil..nn Ill! ~N;. itI1~ dlJt' ~ $10t1'7S.00 I I j ../ MJJ8FOUatN ,2m . ~" ~b' . bit C. "\"f-. .~..... ~ LAaOl-NAMZ CLASSmCAnOr-' ftOlJRS HO~Y !XTENDED SUBTOTALS Ill' . AMOIJloo.'TS f.&l:cm OpeCltine ~r . Fel'!:mIIIl i S\J8TCrAL , ! ! EQUIPMENT - COMPLETE DESCRIPTICN I , ! , ~t PoveT! Spmde: Sax I , I 'l'JuM;1Ort 1.Qwlloy: lo.wlaa:ler ! , , , CAT Back !~ ' . I l 426C I : ! I C.\T MolDf Gradllr I :2OI14H i CAl'Tmcl: Laad=r ~]C'96JC -I i CAT Smpcr 613Ci6I SCl623E I I CAT EXClMIUIr W.1'bumb!W-HQ~ CAT COlflP'C1Or 815B1BaMIll Z!3PDB I i fdF-1'!'aQl'Of Fennec ~ (FCflill) I - BbD'll1!;: IloUCf j.a ToP/i-I.:! Ten I I , ~'atl:l'~ck 20QQ 0I110nl4.0DO GIllon ! ~;~ ~Wlll!cI~-Dull1p'!BOl(oms.1f.Sld: ~.~ fsQ"" ~' I 4coC:> : PIllk Up Tl'I1c1c IUd F.ZSD I ! I SUBTarAL I 4oo~ !'!IX: l"tUOJ 1,u....,~llP DATE: ~.. '0 - 0\4 PRDJECf NO: PROIECl': ~V ~ Ebs i. ;:\~'L C 0 ft.. .Q'A'T r D f.J ~C4: . CONTRACTOR:: F~Q~ ~~ \- AUTHORIZED BY: DESCRIPTION OF E).,,'TR,A WORK: oncmelDln $& ..., \..~~~ j- rvlAT!1UAL!StJ8CONTIV.CrORS A'ptollr Blseroc:k 112" Aspbk Mall:rtll CilllS 112 ."P"Te Due HnC:crboards R=d\lIaC.:i ~ . ItD'ci 0i1J Sil-IWSc. 'ill/OVlIdcgto. I. Weed Kill"r PIllS ir.m;lllioD Fabric Piru'F!I1 . "wir~t Solt:c:l Fin/Di~ 'pGaaible PlIrty · The :.mdcm~ed re;:tre5t:lUl:rive of IhI KC!\..onU CClltr1lct:l~ is Qtuhori.zed to mculO !hill cllanflill3"'der on ill beha.lfbqtb as :Iuchgrjty 10 p.-cccecI wiflllhe 'llII)ltt: :a!UI to pay 10 cA1JJODN 8ROTftERS the I\l1CUr.t Set fbl1b abovt. . CALHOON BROTHERS GRADI"JG & PAVING,INC ' 400 REED S'I'RDT, st1TEA. S.~"TA CUJU, CA 9505Wl4l COMBINED TOTAL 1 S% OVElUIEAD TOTAL st..'J'T'OT-'l1. ~. t;.~.., .\ ~.~i' TO: Gary Faroae Farotre Construction 80 ~ Screec GUrcy, CA 9S020 Subject: fadc.s in dorms 'TO:FAAOTTE DIRECTIVE: ";,""': ..~~~.:;';,~;;.~.~ :~~~;~~~y;:.<.r.~l'5t. :.- ';i- "; I .- .;.." . ~ . , , . "'; -.". . '-;...., ",.. - ..". .. P!aae proceed widt the inscdladon 01 key type locks on the dorm room Joc:brsa.~:sI.dOnolira ~.:Aprit 22.:zD04. ,: ;::ks. '. "".or " ,,~;.:::r~n:~~:.:"o'~"~:(i;~~;>~r/:'~: 0'. ~ . .~~ """ .":'f;o~:,':, ~'-f-'...... ,~~~. ..: .<t-'- ;l..,' .0 n.. eM ami Ownlr t-avedlQlrmrleCl d1K1:hIS woric IS Iil ~Ul ~ Conner ~ touc~~' to. pro;eedWich dle ZCCM: work pr-'or to ~ ccect.!f!OfI ofa Ccnaxt C'wlp Ord8r~ wid1 chlti~ noc ~ 8IQId ~. so.= . ' ~"'-"'~~'" ~-. ~'\;;'~~"'~: ;.:::"~.~;':" .~. +':,,:;:' ...... "'-.'~'.~ ~'~;';'. ,'..:r.:,,' o The above JlI"OVl~a dire="'" frg:n die aw"v. 111;, Co1lUKmr Is -.jd*~ ~;'Oii~~u:l~:~ ~ Wort if:..tued her'Vr. Ida the CH\ as Owner'$ cIlterInnauon dIU cIIII~ork ia _in___,=.~...pi'wnena. If_ Concracmr . . . _ c, \,' :.. '. _ . "'_ .,." ,:~"l! :" .... . clslll"ft!wIdI d11S clearmlnadOn. ytlLI must pr.mde 'M'M8n r.a&ica ';0" ~prior tl:l.~~ ~~.~ortc. . , . . ." .:'.i: '~.. '}~<_;';,...-.,:. ~-',:':'; _ ::. f.~":<':':. '~':'f'.. -~ IZJ The CM and OWl1ef'!Im "'" c'~med tnE this worlt,/s in add~~ _'~'~'c'l'CX::~ ciIreeucI to:) praceea ~:;;::~F:--~;~';~~'-~~~: . ~S'^ ~ ':":! ~. (.'~ .' "'.;", Rpn Fair .,:.. ,}.:~~~.:: .~ . ".," '. ::~~::i~~i;;:l~f:;(;:':::~' '~".:.l\;'<~- ; .. ':~:!.~:i,;iiiti~l} .. ;.j\~~~!~~: ....;,( -~'. ~; ....~~.:" . .~~~ ~:~~ File No..: 9810312.02.053 'a... Riel CA8NTS ..:~~t;~~-. .p.... [ af r 178-C Sec.ancl Streec Glray. CA "lDO /0. " t. '~'--' .i.......:.,. .._~,.~... . :--:j':~:"'~t.'t;h~.:'~~.};;~~ >'.".": 'O,!;"~~:;'~1~~!~?~~"::" -,,'. ':-:';-:;,:~~>2./.Z:::.-:-' _", ~i':'~ ,:4.-. :-7;~~.::;...;~r;~.!y , . ,-, ~'~~~;;~i.~Ii~f;~j~~:;;~.;;t .~..,:-.,.~. " ,>!t ~.~.~~ _Vy~ ._~_v ~.~ 4~V~VVVVV~~ .L"j"O.J.......\,'-W~ _~A",", .........." 300 Pal1c Cent&r Drive. SUite 5 Hollister. CA 95023 Lie. No. 817670 Date I Invoic& # ! 5/14/2004 1135 BIll To Forotte ConS1TUcllon Co~lnc. SO Casey street GIlroy. CA 95020 I p.O. No. ! Terms que on receipt I Description Arnclunt I JOB LOC.1\110N: i sunnsa FIre St01loo , I SKroy, CA j I Chonge Order J 475.ro "~Pleose see attacl'lmenr- I ] i ! I , i I ! I ! i i I ! I ; , j , I i A iAj"E CHARGE 'MLL BE APPLIED ON ?P5T DUE SALPNCE OF 1- ~ /2W, PER Total I MQN!H. (ANNUAL PERCENiASE OF 18%) i $475.00 Balance Due i $476.00 I Phone # Fox # E-mail 83 i -630-1400 831.630-0816 extrernec:i,@gQTHe.com .....:. .LV.' _'10"-" .........." ........'1.D. .l.U"'.LVVV"~".LU U4.1..!.'U:.J.!J.J:,j . .!1J.,n I ~J.'v.. il!:I"H'O/ . [ ........;:' . , .' AlR CONDITIONING · HEATING · SHEET METAL Lie. # 817670 SHOP FABRICATION.. WORK ORDER it , , ~-, ORDER DA1E~ -l.-J..t4. BY J /!(t..~7J ......... ..........,...... ...DUE DAlE L I!"" I 0'1 . ..... ,..... ,.....".. ........ JOB' NAME: G~ (l. -,~, LOTI DELlVER'y'~ JOB ADDRESS""'$ err,: MECHANIC: TIME IN_:_TIME OUT_:_ I I I )fi1T~ I i I I i I I I ! 17 ~ *17 f!."se D~r p.d.~fJ t-e ,- ... . /'l-t/, , , 'f,; ~ (J U f'(#f; / ~ -': ...-=.- " [ Ti . ') /, - - . _ ::., f ,.. -I /.1L! /~" \. ~ .-....... -- I ~~ ~ 7 i ---__'-...._------- l /".! ! ,. 1~-~-.1! ~_~ y/ ~ \of I ( . V, //,,'---~--~ . ./''------ I ......... ,,_ ,M p'.J~J. \~/' J1 i . (. ~~.) l PI )~ S P",\ I /CI'\ Co (fCvt ~ -r... {, ~ (/ r '.f; i fO\. tI \ ' \ (;01 ~f7/l{_ J '---/ / I f 11%' )f'N I' (ollWJ ( s" 1-nv<1 , I }O ~ :J.~ 2- t~ I I I . 300 Park Center Drive, Ste. 5 · Hollister, CA 950~3 · (831) 630-1400 · (831).630-9816 Fax / \,,- , -""'1 : t l \. _v~~ ._~.. .~~ ~VV~vvvvv.v ~....L'\.I.J.LUJ".;, l1..L.I.' I ,;,~.,,~.. ~V'}\1 '" FAROTTE CONSTRUCTION CO., INC. (Mnn UtOl94) CONDITIONAL ~I.A1\'''ER A..lIID RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a chcclc. from Farctte Construction Co., Iue:. in the sumofS' 415.n:) payable to Extrlilllltl Air. rue: . and v.lIm the check has been properly endorsed and has been paid 'by the bank upon which it is ~'ll, this document shall become effective to release any mechanic's lien, stop notice" or bolld right the Wldersigned has on the job of Sun.rise Fire St,a.t;ion - Cil-roy, CA located at BaC Sunrise Drive. G:Urov. CA to the following extent: This relo;lSc CoO'fors a progress pa.yment for labor. services, equipm~ or material furnished to Extreme Air. Inc. through only and does not c.JVet' any retention retained before or after the release date; extras furnished before the release date for wbiclI payment has not bee:c. received; extras or items fumished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by1he claimant m this reI_e. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the cou~ct based upon a rescission, abandonment, or breach of the contract. or t..~e right of the 1l..11d.ersigned to recover compensation for furnished labor. seITiees equipment, or material covered by this release if that furnished labar, servi.::es, equipment, or material was not compensated by the progress payment. Beforeany recipient of the document relies on it, said party should verify ~idence of payment to the undersigned. Dated: CB ( I ~J O~ Company: rt1."o!m<< r. Inc. \\~; B)': _ _ .. i I i I I I ! I I L1NCONDITIONAL WAIVER A..~ RELEASE UPON PROGRESS PADfE.NT ; The undersigned bas been paid and bs r:ceivecl a . progress payment in the sum of$.=J~ for labor, sen.ices, equipment aid/or material : furnished to I I I on I the job of I , located a.t 1. I , and does hereby relaase any mechapic's lien. stop , :notice. or bond right that the \nl.dersi3ued has on the : abo'Vc-refercncc.djob to the follo,,'in~ extent: ; I : This release covers a progress pa.yq:tent for labor, . sel'vic:es, equipment and/or materia1~ fimrished to I , I , through onlbr. and does not . cover anv retentions retained befon: or after the . I : release date: extras furnished befoTete release date : fur w ruch payment has not been recrved; extras or i.tems furnished after the rele3.$C dati Rights based upon work performed or items fw:iPshed under a v;rittcn change order wbichhas been ftUly executed by tbeparti.. prior", there!_ dalcaret~ by this : reieasc: unless specifically reserved b. the claimant in tr.i~ release. This release of anymec 'cls lien. stop notice, Qf bond right: shall net otherlwe affect the c.on1rac't rights, including rights bet\\.eb parties to the contract based upon a :rescission. ~andoDD'1ent,. or breach of the contract, or the right of ~ undersigned to recover compensation for fumishedjlabor, services, equipment, or material covered by thiIs release if that furnished labor, aervices, equipmen~ ~ material Was not compensated by the: progtess paYlPent. D~~: I Company: l I B~ I I : NOTICE: "IESDOCt.'MaI!'\\I".:\!VESRIGH!S('\NCdm>r::ONAIL Y AND STATES THATYOCBA. V'EBEENP^ID FOR (';I\I1N~ t!1'THCSE RIGHTS. nns OOCt1-1'ENT IS E-o'FOR.CEA8Ui J\QAlN5T Y!:lv IF 'YOU SIGN IT. EVYiN IT '1'OiJ HAYENOTBE6'I !'r\lD. FYOU HAr~ NOi BEEN PAID. i.'SE A CmiDiTIONAL Kf!L:EASl:! fORM. \ I I I I I lie:) r::;;^, ;..J aIi~ of &}HrotZ Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. A//en, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAJ< (408)842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00015 To contract for: Sunrise Fire Station Proiect Contractor: Farotte Construction Company Inc. Contract Date: 6/11/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it All copies forwarded to Contractor for signature shall be retmned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF ITEMS AS FOlLOWS: A. Remove the existing fire service check valve Install a new double detector check valve per new City Standard Detail W A-II Paint the device per project specifications and documents Backfill, compact, and landscape per the landscape drawings and contract documents Agreed to hnnp sum price for this item- $ 16,720.00 TOTAL FOR TIllS CHANGE: $ 16.720.00 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF Original Contract Price $ 2,983,146.00 Previous Change Orders $ 261,419.35 $ 18,720.00 TOTAL TO DATE $ 3,244,565.35 This Change Order $ 16,720.00 By: ~~ , Date: lohk)OY RECOMMENDED BV,. ^'-, Fair 10/07/04 Date Construction Manager Revised Contract Price / Date Ie U/cy !f~ Originals to: CITY: CONTR: S 3,261,285.35 (1) Originals (I) Original City of Gilroy Sunrise Fire Station #3 Project . Harris & Assodates REQUEST FOR Ct\UOTATION NO. 00028 To: Gary Farotte Farone Construction 80 Casey Street Gilroy, CA 95020 Date: September 15, 2004 Required Date: September 22, 2004 Status: PN 0 Subject: OOCV Reference: RFQ 00028 You are requested, in accordance with the Contraa Documents, to provide a written quotation to perform work described in this Request for Quotation. Execution of a Contraa Change Order by all parties h. required to perform the work described herein. Please give us a quote to remove the existing detector check valvf.!, and install a new double detector check valve, at the Sunrise Fire Station location, as shown in the revised Gilroy City VI later detail drawing number WA-II, dated 9/14/04. RESPONSE: lump sum price = $ 18,720.00 backup documentation included in CCO #0 15 / Prepared By ts, please submit an itemized cost break down, including all necessary supporting data. If the proposed change. timely submittal of this informatJ'on to enable agreement on the magnitude and impaa uired prior to commencement of work. Please ensure th ,at all correspondence regarding this issue refers to the In accordance with the Contra Contraa Time is impaaed of this proposed change . RFQ # shown above. ~ Date: IJ~ ~(S()N& ~.Oo.c ~:; ~S~ U~1OM1lfJIJ!> 3,0"00. tJ l'J~VM-l/fi-/ /WAtStMr 14(.1UJ~ - fI /6( 120... o.:J '(O-r9L &.fA7JfsIt-' .~ .~. f, File No.: 9810312.02.053 Issue File: UNDUTL 'tf,,<. ., ; r ""''4i'1': -' ,A Page I of I I 78-C Second Street Gilroy, CA 95020 Phone (-408) 8-42-5777 FAX (-408) 8-42-5758 r fair@harris-assoc.com