Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
Sports Park - USA Amendment Traffic Impact AnalysisGILROY SPORTS PARK
AND URBAN SERVICES AREA
AMENDMENT
TRAFFIC-IMPACT ANALYSIS-
Fehr And Peers Associates, Inc. '
January, 1999
FINAL REPORT
„I
TRANSPORTATION IMPACT ANALYSIS
GILROY SPORTS PARK
(Gilroy, California)
Prepared for:
EMC Planning Group, Inc.
Prepared by:
Fehr & Peers Associates, Inc.
January 1999
�f
Final Report
TRANSPORTATION IMPACT ANALYSIS
for the
GILROY SPORTS PARK
(Gilroy, California)
Prepared for:
EMC Planning Group, Inc.
Prepared by:
Fehr & Peers Associates, Inc.
January 1999
TABLE OF CONTENTS
Chapter
Page
EXECUTIVE SUMMARY .................. ............................... iv
1- INTRODUCTION ........................ ..............................1
2 - EXISTING CONDITIONS ................ ............................... 6
Roadway Network ...................... ..............................6
Transit Service ......................... ..............................7
Pedestrian and Bicycle Facilities .......... ............................... 7
Existing Intersection Volumes and Lane Configurations ...................... 8
Existing Intersection Levels of Service ..... ............................... 8
3 - BACKGROUND CONDITIONS .......... ............................... 13
Background Traffic Estimates ........................................... 13
t Background Intersection Level of Service .. ............................... 14
4 - PROJECT CONDITIONS ................ ............................... 17
Project Traffic Estimates ............... ............................... 17
Project Intersection Levels of Service ..... ............................... 20
Freeway Segment Level of Service Analysis .............................. 27
Improvements to Other Travel Modes ..... ............................... 28
Site Access, On -Site Circulation and Parking .............................. 31
5 - CUMULATIVE CONDITIONS ........... ............................... 34
Cumulative Traffic Estimates ........... ............................... 34
Cumulative Intersection Levels of Service . ............................... 34
6- CONCLUSIONS .......................... .............................36
Technical Appendices
985 -114
LIST OF TABLES
Table
Page
ES -1.
Intersection Level of Service Summary ..... ...............................
vi
1.
Two -Way Stop - Controlled Intersection Level of Service Definitions Using
--
Average Total Vehicular Delay ........... ...............................
11
2.
Existing Intersection Levels of Service .... ...............................
12
3.
Approved Developments ................. .............................13
4.
5.
Background Intersection Levels of Service . ...............................
Trip Generation Estimates .............................................
16
19
6.
Background and Project Intersection Levels of Service ......................
24 —
7.
Signalized Intersection Level of Service Definitions Using
Average Stopped Vehicular Delay ........ ...............................
27
8.
Project Freeway Segment Analysis (PM Peak Hour) ........................
28
9.
Parking Demand and Supply Summary .... ...............................
33
10.
Cumulative Intersection Levels of Service . ...............................
35
LIST OF FIGURES
Figure Page
1. Site Location
......................... ...............................
2. Site Plan ............................. ............................... 3
3. Existing Peak -Hour Intersection Volumes ... ............................... 9
4. Existing Lane Configurations ............ ............................... 10
5. Background PM Peak -Hour Intersection Volumes .......................... 15
6. Trip Distribution Pattern ................ ............................... 21
7. Peak -Hour Project Trip Assignment (Project Buildout) :................... :. 22
8. Background Plus Project Buildout Peak -Hour Traffic Volumes ................ 23
Gilroy Sport Park EIR TIA
January 1999
EXECUTIVE SUMMARY
This report presents the results of the Transportation Impact Analysis (TIA) conducted for the
proposed Gilroy Sports Park in Gilroy, California. The project site is located on the west side
of Monterey Street, south of Thomas Road/Luchessa Avenue,' and is bounded on the west and
south by Uvas Creek. The purpose of the analysis is to identify the likely transportation impacts
of the proposed development on the surrounding roadway system and to identify improvements
to mitigate significant impacts.
The proposed development is for a park containing 10 softball fields, three baseball fields, seven
soccer fields (which are overlaid on the ball fields), a commercial recreation area, and a park
area. The commercial recreation area will house a community meeting room and has the
potential to house additional indoor athletic activities (roller hockey, indoor soccer, and BMX).
The park area includes picnic areas, children's play areas, two sand volleyball courts, six bocce
ball courts, and six horseshoe pits. The project will be developed in nine phases. Direct access
to the project site will be provided via a main entryway on Farman Frontage Road (formerly
Monterey Frontage Road).
The impacts of the proposed project were estimated following guidelines of the City of Gilroy
and the Santa Clara Valley Transportation Authority (VTA), which is the congestion
management agency for Santa Clara County. The project is not estimated to add traffic volumes
that exceed the CMP threshold for analysis at CMP intersections or on freeway segments near
the site during the AM or PM Peak hours. The operations of the intersections of Monterey Street
with Farman Frontage Road, Thomas Road/Luchessa Avenue with Princevalle Street, and
Thomas Road/Luchessa Avenue with Church Street were evaluated. All of these intersections
are unsignalized under Existing Conditions. Signalizafion of the intersection of Monterey Street
and Farman Frontage Road is proposed as part of the final phase of the Gilroy Sports Park. The
methodology presented in the 1994 Highway Capacity Manual (1994 HCM) for two -way stop -
controlled intersections was used to evaluate the unsignalized intersections. Under signalized
conditions, the intersection of Monterey Street and Farman Frontage Road was evaluated using
the approved CMP methodology. This methodology has also been adopted by the City of Gilroy.
The operation of the key intersections were evaluated during the evening (PM) and Saturday
peak hours under Existing, Background, Project, and Cumulative Conditions.
The amount of traffic generated by the proposed development was based on the planned
operation of the park. The project, as proposed, is estimated to add 550 PM peak -hour trips (275
'The City of Gilroy is in the process of changing the name of Thomas Road between Monterey Street and its
intersection with Luchessa Avenue in the west to Luchessa Avenue. The north/south segment of the street between Santa Teresa
Boulevard and Luchessa Avenue will remain Thomas Road.
Fehr & Peers Associates, Inc. iv
Gilroy Sport Park EIR TIA
Janua/v 1999
inbound/275 outbound) and 800 Saturday peak -hour trips (400 inbound/400 outbound) to the
surrounding roadways. The project - generated traffic was assigned to specific roadway segments,
intersections, and turning movements based on existing travel patterns in the vicinity of the site
and the relative locations of complementary land uses.
Using existing counts, estimate traffic projections for approved and pending developments in the
area, intersection lane configurations, signal phasings and timings, and the project - generated
trips, level of service calculations were conducted for Existing, Background, Project, and
Cumulative Conditions. The results of the level of service calculations are presented in Table
ES -1.
The level of service calculation results indicate that the project will have a significant adverse
impact on the intersection of Monterey Street and Farman Frontage Road. The installation of the
proposed traffic signal at this intersection will mitigate the project's impacts and provide LOS
C operations during both the PM and Saturday peak hours. Installation of the traffic signal will
be needed prior to the completion of Phase IV of the proposed Sports Park. Caltrans' Peak Hour
Volume Warrant for signal installation will be satisfied with the addition of traffic volumes
estimated for the development of Phases I through IV of the proposed park. It is recommended
that a separate eastbound left -turn lane be provided to serve the traffic added to the eastbound
to northbound left -turn movement by the project. The project is estimated to have an
insignificant impact on the operations of the intersections of Princevalle Street and Thomas
Road/Luchessa Avenue and Church Street and Thomas Road/Luchessa Avenue. The intersection
of Thomas Road/Luchessa Avenue and Princevalle Street is projected to continue to operate at
an acceptable level with the addition of project traffic through buildout, as well as under
Cumulative Conditions. The worst case approach, the southbound Princevalle Street approach,
is projected to operate at LOS C. The intersection of Thomas Road/Luchessa Avenue with
Church Street is also projected to operate at an acceptable level through Cumulative Conditions,
with its worst case approach, southbound Church Street, operating at LOS C or better.
Potential project impacts on area freeway segments were evaluated. The project is not estimated
to add sufficient traffic to the nearby segments of U.S. 101 to cause a significant. impact
according to the criteria established in the Santa Clara County CMP.
Recommendations were made in regard to other improvements proposed by the project,
including:
It is recommended that the crosswalk across Monterey Street at Farman Frontage
Road not be provided until the traffic signal is installed at this intersection. The
Fehr & Peers Associates, Inc.
_1
fa
Gilroy Sport Park EIR TIA
January 1999
Fehr & Peers Associates, Inc.
vi
Table ES -1
Intersection Level of Service Summary
Worst Case
Intersection
Approach
Peak
Average
Average
Scenario
Hour
Delay'
LOS=
Delay
LOS
Thomas Road/Luchessa Avenue and Princevalle Street
Existing Conditions
PM
1.2
A
4.8
A
Sat
0.9
A
4.1
A
Background Conditions (Existing Conditions
PM
1.2
A
5.5
B
+ Approved Projects)
Sat
0.8
A
4.7
A
Project Conditions (Existing Conditions +
PM
1.6
A
8.1
B
Approved Projects + Project Buildout)
Sat
1.3
A
8.0
B
Cumulative Conditions (Project Conditions+
PM
1.7
A
8.3
B
Other Pending Projects)
Sat
1.3
A
8.2
B
Thomas RoadlLuchessa Avenue and Church
Street
Existing Conditions
PM
0.8
A
5.1
B
Sat
0.9
A
3.8
A
Background Conditions (Existing Conditions
PM
0.8
A
5.8
B
+ Approved Projects)
Sat
0.8'
A
4.2
A
Project Conditions (Existing Conditions +
PM
1.5
A
11.1
C
Approved Projects+ Project Buildout)
Sat
1.6
A
9.8
B
Cumulative Conditions (Project Conditions+
PM
1.7
A
12.1
C
Other Pending Projects)
Sat
2.1
A
11.5
C
Monterey Street and Farman Frontage Road
Existing Conditions
PM
0.6
A
9.2
B
Sat
0.2
A
6.0
B
Background Conditions (Existing Conditions
PM
0.8
A
11.2
C
+Approved Projects)
Sat
0.5
A
7.5
B
Project Conditions (Existing Conditions +
PM
60.0
'F 4
266.3
F4
Approved Projects + Project Buildout)'
Sat
117.1
F4
407.9
F4
Cumulative Conditions (Project Conditions +
PM
116.9
F4
560.6
F4
Other Pending Projects)
Sat
241.4
F4
934.1
F4
Notes: ' Average total intersection delay for unsignalized intersection, expressed in seconds per vehicle.
= LOS calculations performed using the CMP level of service analysis program, TRAFFIX, and
the 1994 Highway Capacity
Manual methodology for two -way stop - controlled intersections.
' The majority of traffic added to this intersection by approved projects is to the
uncontrolled through movements
on Thomas
Road /Luchessa Avenue, which experience no delay. Therefore,
the addition of
traffic to these movements results in a small
decrease in overall average intersection delay.
4 With installation of traffic signal, intersection operations are projected to be
LOS C during both
the PM and
Saturday peak
hours.
Fehr & Peers Associates, Inc.
vi
Gilroy Sport Park EIR TIA
Januarv1999
high travel speeds on Monterey Street (in excess of 50 mph) and the width of the street
(120 feet) make it hazardous for pedestrians to cross without the protection of a traffic
signal.
• The proposed Farman Frontage Road bus stop should be designed to VTA standards.
Pedestrian access should be provided from the bus stop to along Farman Frontage Road
that connects to the internal pedestrian paths.
The proposed sidewalk along the west side of Monterey Street should connected to and
coordinated with the City's improvement plans for the intersection of Thomas
Road/Luchessa Avenue and Monterey Street (which include traffic signal installation
and pedestrian signals). It is recommended that the sidewalks along Monterey Street be
installed when the other improvements (i.e., the installation of the traffic signal) occur
at the Monterey Street/Farman Road intersection prior to Phase IV.
• Due to travel speeds along Thomas Road/Luchessa Avenue (in excess of 40 mph), a
crosswalk is not recommended without the protection of a traffic signal with pedestrian
heads for pedestrian crossing or all -way stop sign control (stop signs on all three
intersection approaches). The recommended pedestrian and bicycle facility is the
connection of the existing trail north of Thomas Road/Luchessa Avenue with the
proposed trail to the south via the future under- crossing of the Thomas Road/Luchessa
Avenue bridge. It is recommended that this location be monitored for both vehicular and
pedestrian/bicycle volumes, and an all -way stop or traffic signals (with pedestrian heads)
be installed if warrant requirements are met.
Site access, on -site circulation and parking were assessed. The proposed parking supply of 1,049
was found to be adequate to serve the estimated demand. However, a shortfall is projected to
occur after the completion of Phase V. It is recommended that 180 of the 298 parking spaces that
will be constructed with Phase VI be constructed instead with Phase V to offset the projected
shortfall.
Site access was found to be adequate, with sufficient storage provided for queued vehicles
between Farman Frontage Road and the main entry building, where a parking fee will be
collected.
On -site circulation was reviewed and generally found to be adequate. The following 1.
recommendation were made:
• The outbound lanes of the entry road near Farman Frontage Road should be narrowed
to one lane with paint to allow two outbound lanes (with park personnel directing
traffic), if needed.
Fehr & Peers Associates, Inc. vii
Gilroy Sport Park EIR TIA
January 1999
• All -way stop sign control is recommended at the intersection of the entry road and the
main north -south road. All -way stop sign control will provide safer conditions for
pedestrians crossing this intersection.
• It is recommended that the first driveway on the entrance road (closest to Farman
Frontage Road) be widened to allow both inbound and outbound traffic and the
landscape median along the entry road be cut back to allow left turns from this parking
area onto the entry road. Currently, the on -site traffic is concentrated at the intersection
l of the entry road and the main north -south circulation road. Allowing left turns out of
the eastern most driveway will diffuse some of this traffic. Landscaping in the median
- should be low (two to 2.5 feet in height) or taller trees with thin trunks, which should
be pruned to maintain adequate sight distance.
• The provision of an additional north -south circulation aisle in the western -most parking
area to break -up the long rows of parking spaces is recommended. In addition, the
parking bays and circulation aisles should be extended eastward, eliminating the isolated
landscaped barrier at the east end of the parking area.
Fehr & Peers Associates, Inc. viii
Gilroy Sport Park EIR TIA
January 1999
CHAPTER 1 - INTRODUCTION
This report presents the results of the Transportation Impact Analysis (TIA) conducted for the
proposed Gilroy Sports Park in Gilroy, California. The project site is located on the west side
of Monterey Street, south of Thomas Road/Luchessa Avenue,' and is bounded on the west and
south by Uvas Creek. The site location and surrounding roadway network are presented on
Figure 1.
The proposed project is the development of a park containing 10 softball fields, three baseball
fields, seven soccer fields (which are overlaid on the ball fields), a commercial recreation area,
and a park area. The commercial recreation area will house a community meeting room and has
the potential to house additional indoor athletic activities (roller hockey, indoor soccer, and
BMX). The park area includes picnic areas, children's play areas, two sand volleyball courts, six
bocce ball courts, and six horseshoe pits. The project's Master Plan indicates that it will be
developed in nine phases, as follows:
Phase I - Utility infrastructure, entrance, corporation yard, and Uvas Creek Trail
extension (rough grading)
Phase II - Two premier Little League fields (over -laid with one soccer field),
parking, and Uvas Creek Trail extension
Phase III - One ball field (over -laid with one soccer field) and commercial
recreation
Phase IV- North multi -use field area and parking (four softball fields over -laid with s
two soccer fields)
Phase V- South multi -use field area and parking (four softball fields over -laid with
two soccer fields)
Phase VI- One premier softball/baseball field (overlaid with one soccer field)
Phase VII- Informal recreation area (park area with volley ball and bocce ball courts
and horseshoe pits)
Phase VIII- Farman Frontage Road improvements
Phase IX- Uvas Creek Trail extension to Gavilan College
The sports park will be constructed over twenty years, with the first ballfields ready for use in
Spring 2002.
'The City of Gilroy is in the process of changing the name of Thomas Road between Monterey Street and its
intersection with Luchessa Avenue in the west to Luchessa Avenue. The north/south segment of the sheet between Santa Teresa
Boulevard and Luchessa Avenue will remain Thomas Road.
Fehr & Peers Associates, Inc. /
F
Gilroy Sports Park EIR
January 1999
Key:
® Study Intersection
Figure 1 SITE LOCATION
„Y„ -0,
Fehr & Peers Associates, Inc.
O
Not to Scale
Gilroy Sports Park EIR
Jmmary 1999
G9mySpwts Camper -ftA Master Plan
G_ 1LROYSPORTS COMPLEX- PRELIMINARY MASTER PLAN GILROY, CALIFORNIA
deals Lanasrape kmfequre, Inc -- June 1999
Figure 2 SITE PLAN
1W 12 01
Fehr S Peerrs Associales, G1c.
O
N
Not to Scale
Gilroy Sport Park EIR TIA
January 1999
The purpose of the analysis is to identify the potential impacts of the proposed development on
the transportation system in the vicinity of the site. The impacts of the proposed project were
estimated following the guidelines set forth by the City of Gilroy and the Santa Clara Valley
Transportation Authority (VTA), which is the congestion management agency for Santa Clara
County. The key intersections, Monterey Street at Farman Frontage Road, Thomas
Road/Luchessa Avenue at Princevalle Street, and Thomas Road/Luchessa Avenue at Church
Street, were evaluated with level of service calculations.
The operation of the key intersections were evaluated during the evening (PM) peak hour (the
time period when traffic volumes on the surrounding roadways are highest) and the Saturday
peak hour (the time period when project - generated traffic will be highest) for the following
scenarios:
Scenario 1: Existing Conditions. Existing volumes obtained from counts,
representing peak one -hour traffic conditions during the evening
commute period and on a Saturday afternoon.
Scenario 2: Background Conditions. Existing peak -hour volumes plus traffic
from approved but not yet constructed developments in the area.
Scenario 3a -e: Project Conditions. Background peak -hour volumes plus project -
generated traffic estimated for the proposed development. The project
was evaluated in five phases: Phase II, Phase III, Phase IV, Phase V,
and Phase VI &VII (Phases I, VIII, and IX will not generated
additional traffic volumes).
Scenario 4: .Cumulative Conditions. Traffic volumes estimated for conditions .
with buildout of the project (Scenario 3e) plus traffic associated with
pending (proposed but not approved) developments.
The AM peak hour was not analyzed since the park is estimated to generate negligible traffic
volumes between 7:00 am and 9:00 am?
Potential project impacts on the adjacent freeway segments and site access, on -site circulation
and parking were also reviewed.
'Minimal activity is anticipated at the sports park during the weekday morning commute hours during the winter,
spring, and fall months. Some ttatiic may be generated by sports camps during the summer months; however, these programs
have not yet been developed.
Feltr & Peers Associates, Inc.
Gilroy Sport Park EIR TIA
January 1999
This report is divided into seven chapters. Chapter 2 describes Existing Conditions regarding
roadway facilities, transit service, bicycle and pedestrian facilities, traffic volumes, and traffic
operations of the study intersections. Chapter 3 describes the approved developments in the area
and traffic operations for Background Conditions. Chapter 4 describes the methodology used to
estimate the project traffic and its impacts on the transportation system (intersections and
freeway segments). On -site circulation, site access, and parking are also discussed in this chapter.
Cumulative Conditions are presented in Chapter 5. Chapter 6 presents the conclusions of this
transportation impact analysis.
Fehr & Peers Associates, Inc.
Gilroy Sport Park EIR TIA
January 1999
CHAPTER 2 - EXISTING CONDITIONS
This chapter provides a description of Existing Conditions in terms of the roadway facilities,
-- traffic volumes, and intersection operations.
Roadway Network
Regional access to the project site is provided by U.S. 101 and State Route 152 (SR 152), while
local access is provided by Monterey Street, Farman Frontage Road, Thomas Road/Luchessa
Avenue, Princevalle Street, and Church:
U.S. 101 provides access to the project site via an interchange at Monterey Street. North of its
interchange with Monterey Street, U.S. 101 is a six -lane freeway, narrowing to four lanes north
of Cochrane Road. South of Monterey Street, U.S. 101 becomes a four -lane highway. U.S. 101
extends northward through San Jose and San Francisco and southward through the California
Central Coast.
SR 152 (Pacheco Pass Highway) connects U.S. 101 to Interstate 5 and Highway 99 in the
California Central Valley. This segment of SR 152 is a two to four lanes wide. SR 152 is also
designated on portions of U.S. 101, Leavesley Road, and Monterey Street. West of Monterey
Street, SR 152 extends westward along First Street.
Monterey Street is, generally, a four -lane arterial through the City of Gilroy. Through downtown
Gilroy (between Third and Seventh Streets), Monterey Street narrows to two travel lanes, with
angled parking on the east site of the street separated from northbound through traffic by a raised
median. North of the City Limits, Monterey Street becomes Monterey Road, a rural highway
with four travel lanes and a center tam lane. Monterey Road continues northward into San Jose.
South of its interchange with U.S. 101, Monterey Street becomes Bolsa Road. Near the project
site, the speed limit on Monterey Street is 50 miles per hour (mph).
Farman Frontage Road (formerly Monterey Frontage Road) is a two -lane road that extends
southward from Monterey Street, near the Monterey Street/U.S. 101 interchange, ending in a cul-
de -sac south of the project site. Farman Frontage Road is a frontage road located along the west
side of U.S. 101 that provides direct access to the project site (and other properties).
Thomas Road /Luchessa Avenue is a two -lane roadway, which extends northward from Santa
Teresa Boulevard to Uvas Creek and then continues eastward. The City of Gilroy is currently
in the process of changing the name of this roadway. The north/south segment between Santa
Teresa Boulevard and Luchessa Avenue (where the road curves to the east) will remain Thomas
Road. The segment from the curve to Monterey Street will be renamed Luchessa Avenue. The
roadway segment east of Monterey Street is currently named Luchessa Avenue. Luchessa
Fehr & Peers Associates, Inc.
Gilroy Sport Park EIR TIA
January 1999
Avenue terminates east of U.S. 101, east of its intersection with Rossi Lane. Near the project
site, the speed limit on this roadway is 40 mph.
Princevalle Street is a two -lane residential collector street that extends southward from First
Street to Luchessa Avenue.
Church Street is a two -lane street in the vicinity of the project site. Church Street extends
northward from Thomas Road through downtown Gilroy to north of Farrell Avenue. Church
Street, between Thomas Road/Luchessa Avenue and Farrell Avenue, is designated an arterial in
the current General Plan.
Transit Service
Bus service in Santa Clara County is operated by the Santa Clara Valley Transportation
Authority (VTA). Currently, there is one bus route operating within one mile of the project site,
Route 68. This route operates along Princevalle Street, north of Luchessa Avenue/Thomas Road
and along Thomas Road, west of Princevalle Street. Route 68 provides service between San Jose
Diridon CalTrain Station and Gavilan College in Gilroy. Hours of operation are 4:30 am to 1:00
am on weekdays and 6:00 am to 12:30 am on weekends. Route 68 operates on a 15- minute
headway during the commute hours and a 30- to 60- minute headway during other hours.
Commuter rail service (CalTrain) is provided from Gilroy to San Francisco by the Joint Powers
Board. CalTrain provides frequent train service between San Jose and San Francisco seven days
a week. Extended service is provided to Morgan Hill and Gilroy during the commute hours only.
The Gilroy CalTrain station is located east of Monterey Street between Seventh and Ninth
Streets.
Pedestrian and Bicycle Facilities
Pedestrian facilities comprise sidewalks, crosswalks, and pedestrian signals. Near the site, there
are generally no pedestrian facilities. A sidewalk is provided along the north side of Thomas
Road/Luchessa Avenue between Monterey Street and Princevalle Street, to the north of the
project site. Sidewalks are not provided along Farman Frontage Road or Monterey Street.
Bicycle facilities comprise bike paths, bike lanes, and bike routes. Bike paths are paved trails that
are separated from the roadways. Bike lanes are lanes on roadways that are designated for use
by bicycles by striping, pavement legends, and signs. Bike routes are roadways that are
designated for bicycle use with signs. Currently, no bicycle facilities directly serve the project
site. There is a bike path along the eastern side of Uvas Creek between Thomas Road/Luchessa
Avenue and Westwood Avenue, north of the site. Bike lanes are designated on Princevalle Street
between Thomas Road/Luchessa Avenue and Sixth Street.
Fehr & Peers Associates, Inc. 7
Gilroy Sport Park EIR TIA
January 1999
Existing Intersection Volumes and Lane Configurations
The operations of the key intersections were evaluated for evening (PM) and Saturday peak
traffic conditions. The PM peak conditions generally occur during the evening commute hours
between 4:00 to 6:00 pm on a weekday. The Saturday peak conditions generally occur between
noon and 2:00 pm, based on information provided by City staff (machine counts conducted on
Thomas Road/Luchessa Avenue in October 1998). Intersection operations were evaluated for
the one hour during each of these periods for which the highest traffic volumes were measured.
PM peak -hour traffic volumes for the intersections of Thomas Road/Luchessa Avenue at
Princevalle Street and Monterey Street at Farman Frontage Road were provided by City staff
from traffic counts conducted in 1998. Manual - tuming movement counts were conducted on
Saturday, October 24, Wednesday, December 16, and Saturday December 19, 1998 (see
Appendix A) to obtain supplement this information.
Figure 3 shows the existing PM and Saturday peak -hour turning movement volumes at the key
intersections. The intersection lane configurations are presented on Figure 4.
Existing Intersection Levels of Service
The operations of the key intersections were evaluated with Level of Service (LOS) calculations.
Level of Service is a qualitative description of an intersection's operation, ranging from LOS A,
or free -flow conditions, to LOS F, or over - saturated conditions. The City of Gilroy's standard
for unsignalized intersections, as well as signalized intersections and roadway segments is Level
of Service C.
Intersection levels of service were calculated using the methodology presented in Chapter 10 of
the 1994 Highway Capacity Manual for two -way stop - controlled intersections. This
methodology evaluates an intersection's operation based on the total average delay at an
intersection. The total delay for the unsignalized intersections was calculated using TRAFFIX
analysis software and then correlated to a level of service. The level of service thresholds for
two -way stop - controlled intersections are presented in Table 1.
Current operations of the key intersections were evaluated with the existing volumes, existing
lane configurations, and signal phasings /timings used as inputs to the TRAFFIX level of service
calculation program. The results are presented in Table 2, and the level of service calculation
sheets are contained in Appendix B. Table 2 presents both the level of service based on the delay
for all movements at the intersection and the level of service based on the worst case movement
or lane group, usually the left -tuna movement from the minor (stop sign- controlled) street.
The results of the LOS calculations indicate that all three intersections are operating at good
levels under Existing Conditions. Overall intersection operations at the key intersections are at
Fehr & Peers Associates, Inc.
Gilroy Sports Park EIR
Fehr & Peers Associates, Inc.
Key:
O
® = Study Intersection
N
00 (00) = PM (Saturday)
Not to Scale
Figure 3
EXISTING PEAK -HOUR TRAFFIC VOLUMES
n+sm
Fehr & Peers Associates, Inc.
Gilroy Sports Park EIR
January 1999
Fehr & Peers Associates, Grc
Key:
® = Study Intersection
O
N
r =Stop Sign
Not to Scale
Figure 4
INTERSECTION LANE CONFIGURATIONS
fp
na�a.oi
r
Fehr & Peers Associates, Grc
Gilroy Sport Park EIR TIA
January 1999
Table 1
Two -Way Stop - Controlled Intersection Level of Service Definitions Using
Average Total Vehicular Delay
Level of Service
Average Total Delay
Per Vehicle
(Seconds)
A
< 5.0
B
5.1 to 10.0
C
10.1 to 20.0
D
20.1 to 30.0
E
30.1 to 45.0
F
> 45.0
Source: 'Transportation Research Board, Highway Capacity Manual, Special Report 209, 1994. p.10 -12.
LOS A during the PM and Saturday peak hours. At all intersections, the minor street approaches
have no separate turn lanes. The worst case movement/lane groups at the intersections of Thomas
Road/Luchessa Avenue with Princevalle Street and with Church Street are the southbound
approaches (Princevalle and Church Streets). The Princevalle Street southbound approach is
operating at LOS A during both the PM and Saturday peak hours. The southbound Church Street
approach is operating at LOS B during the PM peak hour and LOS A during the Saturday peak
hour. At the Monterey Street/Farman Frontage Road intersection, the worst case approach is the
eastbound (Farman Frontage Road) approach, which is currently operating at LOS B during both
the PM and Saturday peak hours.
Fehr & Peers Associates, hic. II
Gilroy Sport Park EIR TIA
January 1999
Table 2
Existing Intersection Levels of Service
Worst Case
Intersection
Movement
Peak
Average
Average
Intersection Hour
Delay' LOS 2
Delay' LOS 3
Thomas Road/Luchessa Avenue and PM
1.2 A
4.8 A
Princevalle Street Sat
0.9 A
4.1 A
Thomas Road/Luchessa Avenue and PM
0.8 A
5.1 B
Church Street Sat
0.9 A
3.8 A
Monterey Street and Farman Frontage Road PM
0.6 A
9.2 B
Sat
0.2 A
6.0 B
Notes: ' Average total intersection delay for unsignalized intersections expressed in seconds per vehicle.
LOS calculations performed using TRAFFIX, and the 1994 Highway Capacity Manual
methodology for two -way stop -
controlled intersections.
Fehr & Peers Associates, Inc. 12
Gilroy Sport Park EIR TIA
Januarv1999
CHAPTER 3 - BACKGROUND CONDITIONS
This chapter discusses the operations of the key intersections under Background Conditions.
Background Conditions are defined as conditions prior to completion of the proposed
development. Traffic volumes for Background Conditions comprise existing volumes from
counts plus traffic generated by approved developments in the area. This chapter describes the
procedure used to estimate the background traffic volumes. The results of the level of service
analysis for Background Conditions are also presented.
Background Traffic Estimates
The traffic volumes for Background Conditions were estimated by adding existing volumes and
traffic generated by approved but not yet constructed projects in the vicinity of the site. The list
of approved projects was developed with input from City of Gilroy Planning staff. The five
approved developments identified in the vicinity of the project site are summarized in Table 3.
Table 3
Approved Developments
Development I
Location
Use /Size
Motel 6
North of U.S. 10I/Monterey
129 rooms (replacing 56 rooms)
Street interchange
Truck Stop
East of U.S. 101 at Monterey
Overnight truck stop, gas sation,
Street interchange
convenience market, fast food
restaurant, motel, and mini
storage
Eagle Ridge
West side of Santa Teresa
650 single- family and townhouse
Boulevard, between Third
units, 18 -hole golf - course
Street and Miller Avenue
The Villas
West end of Oakbrook Drive,
75 single - family residential units
west of Thomas Road
The Uplands
West of Thomas Road/North
single - family residential units
ofLuchessa Avenue
160
Fehr & Peers Associates, Inc. 13
i
Gilroy Sport Park EIR TIA
January 1999
The trip assignments and/or trip generation and distribution information for these projects were
obtained from City staff (from traffic analysis reports prepared for each development) for the PM
peak hour. Traffic associated with these developments during the Saturday peak hour was
estimated using trip generation rates in the Institute of Transportation Engineers Trip Generation
(6' Edition) and the trip distribution information provided by City staff. The traffic associated
with the approved developments was added to the existing volumes at the key intersections to
estimate traffic volumes for Background Conditions.' Figure 5 illustrates the traffic volumes
estimated at the key intersections for Background Conditions.
Background Intersection Level of Service
The results of the level of service calculations for Background Conditions are presented in Table
4. The LOS calculation sheets are contained in Appendix B. The results indicate that the key
intersections will continue to operate at acceptable levels. The overall operating levels at all three
intersections are projected to be LOS A. The worst case approach at the Thomas Road/Luchessa
Avenue/Princevalle Street intersection is projected to operate at LOS B during the PM peak hour
and LOS A during the Saturday peak hour. The worst case approach at the intersection of
Thomas Road/Luchessa Avenue and Church Street is projected to operate at LOS B during the
weekday PM peak hour and LOS A during the Saturday peak hour. At the intersection of
Monterey Street and Farman Frontage Road, the operation of the worst case approach (eastbound
Farman Frontage Road) is projected to deteriorate one level to LOS C during the PM peak hour
and continue to operate at LOS B during the Saturday peak hour with the addition of traffic
associated with already approved developments. These are acceptable operating levels.
'It should be noted that the Saturday peak -hour traffic estimates assume that all the uses included in the approved
developments peak at the same time, producing a conservatively high estimate of Saturday peak -hour volumes.
Fehr & Peers Associates, Inc. 14
Gilroy Sports Pay* EIR
January 1999
63(32) ti
>
298(117)
>
38(25) -4 Z's
168(165) 0
U
Fehr & Peers Associates, Inc
Key:
CD
Aph
wo = Study Intersection
N
lui
Not to Scale
Figure 5
I
2
I fp
1111 1
VOLUMES
103 (35)
224 (141)
nth St.
31 (20)
147 (134)
a.
19 (13)
0 (0)
6 (a)
Cn
X
27 (6
t
0 (0; y
1
04
Fehr & Peers Associates, Inc
Key:
CD
Aph
wo = Study Intersection
N
00 (00) = PM (Saturday)
Not to Scale
Figure 5
I
BACKGROUND PEAK-HOUR TRAFFIC
I
I fp
1111 1
VOLUMES
Fehr & Peers Associates, Inc
Gilroy Sport Park EIR TIA
January 1999
Table 4
Background Intersection Levels of Service
Worst Case
Intersection
Movement
Peak Average
Average
Intersection Hour Delay' LOS'
Delay' LOS'
Thomas Road/Luchessa Avenue and PM 1.2 A
5.5 B
Princevalle Street Sat 0.8 A
4.7 A
Thomas Road/Luchessa Avenue and PM 0.8 A
5.8 B
Church Street Sat 0.8 A
4.2 A
Monterey Street and Farman Frontage Road PM 0.8 A
11.2 C
Sat 0.5 A
7.5 B
Notes: ' Average total intersection delay for unsignalized intersection expressed in seconds per vehicle.
= LOS calculations performed using TRAFFIX, and the 1994 Highway Capacity Manual
methodology for two -way stop -
controlled intersections.
Fehr & Peers Associates, Inc. 16
Gilroy Sport Park EIR TIA
January 1999
CHAPTER 4 - PROJECT CONDITIONS
The impacts of the proposed Gilroy Sports Park on the surrounding roadway system are
discussed in this chapter. First, the methodology used to estimate the amount of traffic generated
by the project is described. Then, the results of the level of service calculations for Project
Conditions are presented. Project Conditions are defined as Background Conditions plus traffic
generated by the proposed project. Project Conditions were evaluated in five phases. A
comparison of intersection operating levels under Background and Project Conditions is then
presented, and the impacts of the project on the key intersections are discussed.
The potential impacts of the project on freeway segments in the vicinity of the project site, as
well as on -site circulation, site access, and parking, are also discussed in this chapter.
Project Traffic Estimates
The amount of traffic associated with the project was estimated using a three -step process: (1)
trip generation, (2) trip distribution, and (3) trip assignment. In the first step, the amounts of
traffic entering and exiting the site were estimated for the two study periods. In the second step,
the directions the trips use to approach and depart the site were estimated. The trips were
assigned to specific street segments and intersection turning movements in the third step. The
results of the process for the Gilroy Sport Park are described in the following sections.
Trip Generation
Peak -hour trip generation was estimated based on the proposed number and types of playing
fields and other uses, as well as input from the project architect on the expected operation of the
sports park. The trip generation estimates assumed the use of all softball/baseball fields at one.
time. These ball fields are overlaid with soccer fields, which would not be in use during softball
or baseball games. Basing the trip generation on the use of all softball/baseball fields was more
conservative than assuming the use of all soccer fields because soccer teams are likely to have
slightly fewer players than softball/baseball teams (12 per team versus 15 to 18 per team) and
there are fewer proposed soccer fields than ball fields (seven soccer fields versus 13 softball and
baseball fields).
Trip generation estimates were first developed for the worst case condition, the Saturday peak
hour. In addition to those described above, other assumptions include:
(1) 30 players per field for softball and Little League and 36 players per field for colt
baseball;
Fehr & Peers Associates, Inc. 17
Gilroy Sport Park EIR TIA
January 1999
(2) One spectator per player for softball and colt baseball and 35 spectators per Little
League game (slightly more than one per player to reflect more parents watching their
children);
(3) An auto occupancy of 2.0 persons per vehicle for softball and colt baseball and 2.1
persons per vehicle for Little League (the higher occupancy for Little League was
assumed due to more parents arriving with children).
(4) Seventy five percent (75 %) of the games were assumed to begin or end during the
peak hour. It was further assumed that the players and spectators associated with
these games would arrive or leave during that hour.
(5) Commercial recreation, general park use, and special events were estimated to add
200 trips (50% inbound and 50% outbound) during the Saturday peak hour.
(6) PM peak -hour trip generation was assumed to be 75 % of the Saturday peak -hour trip
generation for softball and baseball games and 50 % of Saturday peak -hour trip
generation for general park use, commercial recreation and special events.
A summary of the trips generation estimates is contained in Appendix C, including phase by
phase estimates and estimates for use of all soccer fields (for informational purposes).
The project, as proposed, is estimated to generate a total of 550 PM peak -hour trips (275 inbound
and 275 outbound) and 800 Saturday peak -hour trips (400 inbound and 400 outbound). The trip
generation estimates are presented in Table 5 by phase.
Fehr & Peers Associates, Inc. . 18
Gilroy Sport Park EIR TIA
January 1999
Table 5
Trip Generation Estimates
PM Peak Hour Saturday Peak Hour
Phase Use In Out Total In Out Total
I
Entry Road
0
0
0
0
0
0
II
Colt Baseball (1)
56
56
112
74
74
148
Little League (2)
Softball (1)
34
34
68
58
58
116
Commercial Recreation
IV
Softball (4)
78
78
156
110
110
220
V
Softball (4)
78
78
156
110
110
220
Vl & VII
Softball (1)
29
29
58
48
48
96
General Park
VIII
Other Roadway
0
0
0
0
0
0
Improvements
IX
Uvas Creek Trail south
0
0
0
0
0
Total
275
—0
275
550
400
400
800
Trip Distribution
The trip distribution pattern for the project was estimated based on existing travel patterns in the
vicinity of the site and the relative locations of complementary land uses in the area. The major
directions for project - generated traffic to approach and depart the project site are estimated to
be:
30 % to and from the west on Thomas Road/Luchessa Avenue
10 % to and from the north on Princevalle Street
15 % to and from the north on Church Street
10 % to and from the north Monterey Street
20 % to and from the north on U.S. 101
10 % to and from the south U.S. 101
5 % to and from the neighborhoods north of Thomas Road/Luchessa Avenue, west of
Monterey Street.
100%
Fehr & Peers Associates, Inc. 19
Gilroy Sport Park EIR TIA
January 1999
The trip distribution pattern is illustrated on Figure 6.
Trip Assignment
The trips generated by the proposed Gilroy Sports Park were assigned to the roadway system
based on the directions of approach and departure discussed above. Figure 7 presents the peak -
hour project trip assignments by turning movement at the study intersections and on nearby
roadway segments for buildout conditions. The project trips for each phase were added to the
traffic volumes for Background Conditions to achieve turning- movement volumes at the key
intersections for each phase of the project. The total traffic volumes under "with project'
conditions are shown on Figure 8.
Project Intersection Levels of Service
Intersection level of service calculations were conducted to evaluate the operating conditions of
the key intersections with project traffic and the potential impacts of the proposed project on the
local roadway system. The intersection operations was evaluated with each phase of the project.
The results of the intersection level of service calculations for Background and Project
Conditions are summarized in Table 6. The intersections of Thomas Road/Luchessa Avenue with
Princevalle Street and with Church Street are projected to continue to operate at acceptable levels
of service (both total intersection and worse case approach) through buildout of the proposed
project.
The overall intersection operations at the Monterey Street/Farman Frontage Road intersection
are projected to be acceptable (LOS C or better) during both peak hours through the completion
of Phase IV. With the completion of Phase V, overall intersection operations are projected to
deteriorate to LOS D during the PM peak hour and LOS F during the Saturday peak hour. With
the completion of Phases VI and VII, intersection operations during both peak hours are
projected to be LOS F. The operations of the worst case approach, eastbound Farman Frontage
Road, are projected to remain at acceptable levels during both peak hours through the completion
of Phase III. With the completion of Phase IV, this approach is project to deteriorate to LOS E
during the PM peak hour and LOS D during the Saturday peak hour.
Intersection Impacts
The results indicate that the project will have a significant adverse impact on the intersection of
Monterey Street and Farman Frontage Road. Although overall intersection operations are
projected to be LOS B during both peak hours, the addition of project generated traffic will result
in the deterioration of worst case approach operations to LOS E (average total delay of 32.4
Fehr & Peers Associates, Inc. 20
Gilroy Sports Park EIR
Jannarv1999
Key:
® Study Intersection
O
N
Not to Scale
Figure 6 TRIP DISTRIBUTION PATTERN fp
Fehr d Peers Associates, Inc.
Gilroy Sports Park EIR
.1antertry 1999
Key:
® Study Intersection
XX (XX) = PM (Saturday)
Figure 7 PEAK -HOUR PROJECT TRIP ASSIGNMENT
(PROJECT BUILDOUT)
Fehr & Peers Associates, Inc.
O
N
Not to Scale
136 (83)
X307 (281)
31 (17)
230 (254)
017
19/11,
1.
Key:
® = Study Intersection
00 (00) = PM (Saturday)
r R- 113(104)
414(285)
38/(25)_W
284(333) '""
N
Gilroy Sports Park EIR
January 1999
rn
N flm
rvvNi
X19(13)
a (e)
'a
r fi(8)
R
tf
m 220 (286)
3 94 (123)
m ^g
^�N
lii
N m
y�Figure 8 I BACKGROUND PLUS PROJECT BUILDOUT
PEAK -HOUR TRAFFIC VOLUMES
Fehr & Peers Associates, Inc.
O
N
Not to Scale
Gilroy Sport Park EIR TIA
January 1999
Table 6
Background and Project Intersection Levels of Service
'
Worst Case
Intersection
Movement'
Average
Peak
Average
Total
Scenario
Hour
Delay'
LOS2
Delay
LOS
Thomas Road/Luchessa Avenue and Princevalle Street
Background Conditions (Existing Conditions
PM
1.2
A
5.5
B
+ Approved Projects)
Sat
0.8
A
4.7
A
Phase II Conditions (Background Conditions +
PM
1.3
A
6.0
B
Project Phase II Traffic)'
Sat
0.9
A
5.1
B
Phase III Conditions (Phase II Conditions +
PM
1.9
A
6.2
B
Project Phase III Traffic)
Sat
1.0
A
5.5
B
Phase IV Conditions (Phase III Conditions +
PM
1.4
A
6.9
B
Project Phase IV Traffic)
Sat
1.1
A
6.4
B
Phase V Conditions (Phase IV Conditions +
PM
1.6
A
7.8
B
Project Phase V Traffic)
Sat
1.2
A
7.4
B
Phase VI &VII Conditions (Phase V
PM
1.6
A
8.1
B
Conditions+ Project Phase VI &VII Traffic)°
Sat
1.3
A
8.0
B
Thomas Road/Luchessa Avenue and Church Street
Background Conditions (Existing Conditions
PM
0.8
A
5.8
B
+ Approved Projects)
Sat
0.8
A
4.2
A
Phase II Conditions (Background Conditions +
PM
0.9
A
6.6
B
Project Phase II Traffic)'
Sat
0.9
A
4.9
A
Phase III Conditions (Phase II Conditions +
PM
1.0
A
7.2
B
Project Phase III Traffic)
Sat
1.0
A
5.5
B
Phase IV Conditions (Phase III Conditions +
PM
1.2
A
8.5
B
Project Phase IV Traffic)
Sat
1.2
A
6.9
B
Phase V Conditions (Phase N Conditions +
PM
1.4
A
10.2
C
Project Phase V Traffic)
Sat
1.5
A
8.8
B
Phase VI &VII Conditions (Phase V
PM
1.5
A
11.1
C
Conditions+ Project Phase VI &VII Traffic'
Sat
1.6
A
9.8
B
Fehr & Peers Associates, Inc. 24
Gilroy Sport Park EIR TIA
January 1999
seconds per vehicle) during the PM peak hour and LOS D (25.1 seconds of average total delay
per vehicle) during the Saturday peak hour with the coritpletion of Phase IV of the project. While
the City of Gilroy does not have an LOS standard for individual turning movements at an
unsignalized intersection, LOS E operations are generally considered unacceptable.
The project would not have a significant impact on the intersections of Thomas Road/Luchessa
Avenue with Princevalle and Church Streets.
Intersection Mitigation Measures
With the final phase of the project, the installation of a traffic signal at the Monterey
Street/Farman Frontage Road intersection is proposed. Mitigation for project impacts would be
the installation of this traffic signal prior to completion of Phase IV of the project. The Peak
Hour Volume Warrant for signal installation in the Caltrans Traffic Manual was investigated to
Fehr & Peers Associates, Inc. 25
Table 6
Background and Project Intersection Levels of Service
Worst Case
Intersection
Movement'
Average
Peak
Average
Total
Scenario
Hour
Delay'
LOS'-
Delay
LOS
Monterey Street and Farman Frontage Road
Background Conditions (Existing Conditions
PM
0.8
A
11.2
C
+ Approved Projects)
Sat
0.5
A
7.5
B
Phase II Conditions (Background Conditions +
PM
1.7
A
14.2
C
Project Phase II Traffic)'
Sat
1.4
A
9.8
B
Phase III Conditions (Phase II Conditions +
PM
2.5
A
17.1
C
Project Phase III Traffic)
Sat
2.3
A
12.3
C
Phase IV Conditions (Phase III Conditions+
PM
6.0
B
32.4
E
Project Phase IV Traffic)
Sat
6.1
B
25.1
D
Phase V Conditions (Phase IV Conditions +
PM
28.4
D
132.3
F
Project Phase V Traffic)
Sat
45.6
F
- 167.1
F
Phase VI &VII Conditions (Phase V
PM
60.0
F
266.3
F
Conditions + Project Phase VI &VII Traffic)°
Sat
117.1
F
407.9
F
Notes: ' Average total intersection delay, expressed in seconds per vehicle.
' LOS calculations performed using the CMP level
of service analysis
program, TPAFFIX, and
the 1994 Highway Capacity
Manual methodology for two -way stop - controlled intersections.
' Phase I does not include trip generating uses. Phase 1 operations would be the same as Background Conditions.
' Equal to project buildout conditions. Phase VIII and IX do not generate additional traffic.
seconds per vehicle) during the PM peak hour and LOS D (25.1 seconds of average total delay
per vehicle) during the Saturday peak hour with the coritpletion of Phase IV of the project. While
the City of Gilroy does not have an LOS standard for individual turning movements at an
unsignalized intersection, LOS E operations are generally considered unacceptable.
The project would not have a significant impact on the intersections of Thomas Road/Luchessa
Avenue with Princevalle and Church Streets.
Intersection Mitigation Measures
With the final phase of the project, the installation of a traffic signal at the Monterey
Street/Farman Frontage Road intersection is proposed. Mitigation for project impacts would be
the installation of this traffic signal prior to completion of Phase IV of the project. The Peak
Hour Volume Warrant for signal installation in the Caltrans Traffic Manual was investigated to
Fehr & Peers Associates, Inc. 25
Gilroy Sport Park E/R TIA
Jarurary 1999
determine when traffic volumes at the intersection would satisfy the warrant requirements. The
estimated traffic volumes for Phase III through Buildout (Phase VI +VII) were compared to the
requirements for rural areas because travel speeds on Monterey Street at Thomas Road/Luchessa
Avenue exceeds 45 mph (the speed limit is 50.mph). Traffic volumes after the completion of
Phases IV through buildout satisfy the warrant requirements during both peak hours. Traffic
projections for the PM peak hour after completion of Phase III would marginally meet
requirements. The signal warrant sheets are included in Appendix D.
The operation of the signalized intersection was evaluated with the level of service methodology
approved by the VTA, and adopted by the City of Gilroy. This method evaluates an
intersection's operation based on the average stopped vehicular delay calculated using the
method described in Chapter 9 of the 1985 Highway Capacity Manual (HCM) with adjusted
saturation flow rates. The average delay for signalized intersections is calculated using the
TRAFFIX analysis software and is correlated to a level of service designation as shown in Table
7. The Level of Service Standard for signalized City of Gilroy intersections is LOS C.
With installation of the traffic signal, the intersection is projected to operate at LOS C during
both peak hours with the addition of Phase IV through buildout traffic volumes. The lane
configuration was assumed to remain unchanged from Existing Conditions:
Southbound Approach - one left -turn lane, one through lane, one shared through/right-
turn lane
Westbound Approach - one shared lane for all movements
Northbound Approach - one left -tum lane, one through lane, one shared through/right-
turn lane
Eastbound Approach - one shared lane for all movements
It was assumed that protected left -turn phasing would be provided for the northbound and
southbound approach, while a single signal phase would be provided to serve the eastbound and
westbound approaches. It is recommended that a separate left -tam lane be added to the
eastbound approach to serve the traffic leaving the sports park and to allow for the addition of
protected left-tam phasing for this approach in the future. Under buildout conditions, up to 286
vehicles are projected to turn left from eastbound/northbound Farman Frontage Road onto
northbound Monterey Street. With the low volumes projected for the hotel driveway that forms
the westbound approach of the intersection, a left -turn phase is not warranted. However, in the
future, changes to traffic conditions in the area may require the addition of a left -turn phase.
Fehr & Peers Associates, Inc. 26
Gilroy Sport Park EIR TIA
January 1999
Table 7
Signalized Intersection Level of Service Definitions Using
Average Stopped Vehicular Delay
Average
Level of
Stopped Delay
Service
Per Vehicle (Seconds)
Description
A
< 5.0
Operations with very low delay occurring with favorable
progression and/or short cycle length.
B+
5.1 to 7.0
Operations with low delay occurring with good progression
B
7.1 to 13.0
and/or short cycle lengths.
B-
13.1 to 15.0
C+
15.1 to 17.0
Operations with average delays resulting from fair progression
C
17.1 to 23.0
and/or longer cycle lengths. Individual cycle failures begin to
C-
23.1 to 25.0
appear.
D+
25.1 to 28.0
Operations with longer delays due to a combination of
D
28.1 to 37.0
unfavorable progression, long cycle lengths, or high V/C ratios.
D-
37.1 to 44.0
Many vehicles stop and individual cycle failures are noticeable.
E+
40.1 to 44.0
Operations with high delay values indicating poor progression,
E
44.1 to 56.0
long cycle lengths, and high V/C ratios. Individual cycle failures
E-
56.1 to 60.0
are frequent occurrences. This is considered to be the limit of
acceptable delay.
F
> 60.0
Operation with delays unacceptable to most drivers occurring
due to oversaturation, poor progression, or very long cycle
lengths.
Source: VTA's CMP Transportation Impact Analysis Guidelines, May 1998 and Highway Capacity Manual, Special Report 209,
Transportation Research Board, 1994.
Freeway Segment Level of Service Analysis
According to CMP guidelines, freeway segments to which a proposed development is projected
to add trips equal to or greater than one percent of the freeway segment's capacity must be
evaluated. Segments of U.S. 101 were reviewed to determine if a significant amount of project
traffic would be added to these freeway segments' during the PM peak hour. Capacities of 2,200
4The segments of U.S. 101 south of Monterey Street are highway (not freeway) segments. The CMP TIA guidelines
do not specify a methodology for the analysis of multi -lane highway segments. Therefore, the freeway segment methodology
was used to determine if a significant amount of project traffic is added to these segments.
Fehr & Peers Associates, Inc. 27
Gilroy Sport Park EIR TIA
January 1999
vehicles per hour per lane (vphpl) for four -lane segments' and 2,300 vphpl for freeway segments
with six or more lanes were used in the analysis. Table 8 presents the capacities of each segment,
the estimated number of trips added to each segment by the proposed development during the
PM peak hour, and whether or not the freeway segment must be evaluated'in greater detail.
Freeway Segment Impacts
The project is not estimated to add traffic equal to or greater than one percent of the capacity to
the four nearby freeway segments. Therefore, additional analysis is not required. The project's
impact on the segments of U.S. 101 in the study area is estimated to be insignificant.
Improvements to Other Travel Modes
Pedestrian Access
As part of the project, six -foot wide sidewalks are proposed to be constructed along the west side
of Farman Frontage Road between Monterey Street and the park entrance and along the west side
of Monterey Street between Thomas Road/Luchessa Avenue and Farman Frontage Road.
Crosswalks are proposed across the north leg of the Monterey Street/Farman Frontage Road
'The 1994 Highway Capacity Manual indicates a capacity of 2,200 vphpl for multi -lane highway segments (assuming
a design speed 60 miles per hour).
Fehr & Peers Associates, Inc. 28
Table 8
Project Freeway Segment Analysis (PM Peak Hour)
1% of
Project
Requires
Segment
Capacity'
Capacity
Trips _
Analysis?
Northbound U.S. 101,
6,900
69
55
No
Tenth Street to Monterey Street
Southbound U.S. 101,
6,900
69
55
No
Tenth Street to Monterey Street
Northbound U.S. 101,
4,400
44
28
No
Monterey Street to Castro Valley Road
Southbound U.S. 101,
4,400
44
28
No
Monterey Street to Castro Valley Road
Notes: ' A capacity of 2,200 vehicles per hour per lane was used for four -lane highway segments, while a capacity of 2,300 vehicles
per hour per lane was used for freeway segments with six or more lanes.
Improvements to Other Travel Modes
Pedestrian Access
As part of the project, six -foot wide sidewalks are proposed to be constructed along the west side
of Farman Frontage Road between Monterey Street and the park entrance and along the west side
of Monterey Street between Thomas Road/Luchessa Avenue and Farman Frontage Road.
Crosswalks are proposed across the north leg of the Monterey Street/Farman Frontage Road
'The 1994 Highway Capacity Manual indicates a capacity of 2,200 vphpl for multi -lane highway segments (assuming
a design speed 60 miles per hour).
Fehr & Peers Associates, Inc. 28
'Gilroy Sport Park EIR TIA
January 1999
crossing of the Thomas Road/Luchessa Avenue bridge is the recommended pedestrian and
bicycle facility.)
Due to travel speeds along Thomas Road/Luchessa Avenue (in excess of 40 mph), crosswalks
are not recommended without the protection of traffic signals with pedestrian heads for
pedestrian crossing or all -way stop sign control (stop signs on all three intersection approaches).
The installation of signals were investigated via Caltrans traffic signal warrants. The vehicular
volumes projected after the completion of the sports park do not satisfy the Peak Hour Volume
Warrant requirements (see Appendix D). Caltrans' "Warrant3 - Minimum Pedestrian Volume"
for traffic signal installation requires a pedestrian volume crossing the major street of 100 or
more for each of any four hours or 190 or more during any one hour during an average day.'
Data provided in the Santa Clara County Countywide Trails Master Plan (July 1995) indicates
that usage of the Uvas Creek Trail (measured at Miller Avenue) was about 260 persons on a
Saturday and 150 persons on a Tuesday in May 1994. The most likely users of the trail for park
access will be residents living in the neighborhoods immediately north of Thomas
Road/Luchessa Avenue. As shown on Figure 6, five percent of the project - generated traffic is
estimated to originate or be destined for this area. Assuming a vehicle occupancy of 2.0 person
per vehicle, 80 person trips during the Saturday peak hour and 55 person trips during the PM
peak hour would be generated by these neighborhoods. This projection does not meet the
minimum volume required. Therefore signals are not recommended in the near -term.
It is recommended that this location be monitored for both vehicular and pedestrianibicycle
volumes, and an all -way stop or traffic signals (with pedestrian heads) be installed if warrant
requirements are met. As land use developments in the area are builtout, traffic volumes along
Thomas Road/Luchessa Avenue will increase. The City monitors traffic volumes at this
intersection and staff indicates that this intersection will be signalized in the future when traffic
volumes meet the required levels.
Transit Access
The project master plan indicates that the VTA will extend bus service to serve the sports park.
City staff has indicated that the VTA will extend service when other development in this area
(including hotels and other commercial along Monterey Street) generate sufficient demand for
bus service.
The site plan shows a bus stop and tam around area on Farman Frontage Road south of the
project entrance. This bus stop and turn around should be designed to VTA standards. Pedestrian
'In addition to the minimum pedestrian volume, less than 60 gaps per hour in the traffic stream of adequate length
for pedestrians to cross during the same time period must be observed.
Fehr & Peers Associates, Inc. 30
Gilroy Sport Park EIR TIA
January 1999
access should be provided from the bus stop to the park, including a sidewalk along Farman
Frontage Road that connects to the internal pedestrian paths.
Site Access, On -Site Circulation and Parking
Site Access
The Gilroy Sports Park will be served by one driveway on Farman Frontage Road. The
intersection of the driveway with Farman Frontage Road will be controlled by a stop sign on the
driveway approach. During the worst case peak hour on a Saturday, 400 vehicles are projected
to exit the site during one hour. Due to the low volumes along Farman Frontage road (currently
17 vehicles during the Saturday peak hour and 56 vehicles during the PM peak hour), the
intersection of the driveway with Farman Frontage Road is projected to operate at acceptable
levels — overall LOS A operations with LOS B operations for the park driveway approach (see
Appendix E).
Entry to the park will be controlled by a cashier at the entry building located approximately 500
feet from intersection of the park entry road with Farman Frontage Road. A flat parking fee
would be charged to vehicles entering the park with some park users (such as tournament players
and members of league teams) using passes provided in advance. The hourly design capacity for
a parking entrance with a cashier and a flat fee is approximately 300 vehicles per hour per entry
lane (vphpl). The project proposes to have at least two entry lanes. The highest inbound volume
to the park is expected to occur during the Saturday peak hour. The estimated hourly peak
volume is 400 vehicles. The 951 percentile queue was calculated using a Poisson distribution,
a capacity of 300 vphpl, two entry lanes, and a peak volume of 400 vph (see Appendix E). The
results indicate that the maximum queue would be approximately 175 feet in each of two lanes.
The 500 -foot storage length would be sufficient to serve this queue.
Two turn around areas are provided along the entry road: one between the park gates and Farman
Frontage Road and a second west of the entry building. These locations will allow vehicles
arriving after the park has closed (or drivers wishing to exit for other reasons) to make U -turns
and exit the park.
On -Site Circulation
On -site circulation was reviewed and generally found to be adequate. Pedestrian paths and
sidewalks are located throughout the park and provide adequate internal pedestrian circulation
and connections to the Uvas Creek Trail and Farman Frontage Road. Pedestrians paths along the
perimeter of the park are 12 feet wide and double as emergency access roadways.
Fehr & Peers Associates, Inc. 31
Gilroy Sport Park EIR TIA
January 1999
Some recommended improvements for vehicular circulation are listed below. Sketches
illustrating the changes are included in Appendix F.
The outbound lanes of the entry road near Farman Frontage Road should be narrowed
to one lane with paint to allow two outbound lanes (with park personnel directing
traffic), if needed.
• All -way stop sign control is recommended at the intersection of the entry road and the
main north -south road. All -way stop sign control will provide safer conditions for
pedestrians crossing this intersection.
• It is recommended that the first driveway on the entrance road (closest to Farman
Frontage Road) be widened to allow both inbound and outbound traffic and the
landscape median along the entry road be cut back to allow left turns from this parking
area onto the entry road. Currently, the on -site traffic is concentrated at the
intersection of the entry road and the main north -south circulation road. Allowing left
turns out of the eastern most driveway will diffuse some of this traffic. Landscaping
in the median should be low (two to 2.5 feet in height) or taller trees with thin trunks,
which should be pruned to maintain adequate sight distance.
The provision of an additional north -south circulation aisle in the westem -most
parking area to break -up the long rows of parking spaces is recommended. In addition,
the parking bays and circulation aisles should be extended eastward, eliminating the
isolated landscaped barrier at the east end of the parking area.
Parkine
The parking demand was estimated in a manner similar to trip generation, based on the planned
operation of the sports park and assumptions regarding numbers of persons per vehicle for the
different uses within the park. The parking demand estimates by phase are presented in Table
9. Details of the parking estimate calculations are contained in Appendix G. The parking demand
after buildout of the park is estimated be 996 parked vehicles.
The recommended parking supply is the parking demand plus five percent to account for
circulating vehicles. Therefore, the recommended parking supply for the Gilroy Sports Park is
1,047 parking spaces. The recommended parking supply by phase is presented in Table 8.
The site plan (date June 16, 1998) includes 1,049 parking spaces, which will adequately serve
the projected demand. Table 9 presents a comparison of the recommended parking supply by
phase to the proposed parking supply by phase. A shortfall is projected to occur after the
Fehr & Peers Associates, Inc. 32
Gilroy Sport Park EIR TIA
January 1999
completion of Phase V. It is recommended that 180 of the 298 parking spaces that will be
constructed with Phase VI be constructed instead with Phase V to offset the projected shortfall.
The City of Gilroy Zoning Ordinance does not include an off - street parking requirement for ball
parks. The most similar land use included in the ordinance is a theater or auditorium with fixed
seats. The parking requirement for this land use is one parking space per four seats or seven feet
of bench space. The proposed sports park will have approximately 300 feet of bench space for
each of the 13 ballfields, for a total of 3,900 feet of bench. The required off - street parking supply
would be 558 spaces. The proposed 1,049 parking spaces would be sufficient to meet this
requirement.
Table 9
Parking Demand and Supply Summary
Phase
Cumulative
Estimated
Demand
Cumulative Supply
Recommended
Provided
Difference
I
0
0
117
+117
II
196
206
278
+72
III
326
343
439
+96
IV
606
637
751
+114
V
•886
931
751
-180
VI &VII
996
1047
1049
+2
VII & IX
996
1047
1049
+2
Fehr & Peers Associates, Inc. 33
Gilroy Sport Park EIR TIA
January 1999
CHAPTER 5 - CUMULATIVE CONDITIONS
This chapter presents the results of the level of service calculations under Cumulative
Conditions. Cumulative Conditions are defined as existing volumes plus traffic generated by
approved but not yet constructed developments in the project study area, plus traffic generated
by the proposed project, plus traffic associated with proposed but not approved developments
in the study area.
Cumulative Traffic Estimates
Traffic volumes for Cumulative Conditions were estimated by adding traffic associated with
pending developments to traffic volumes estimated for Project Conditions. There are two
pending developments in the study area: a 113 -room Hilton at Monterey Street and U.S. 101 and
the Gilroy Cinemas (an 8- screen, 1,100 -seat movie theater) located on the west side of Monterey
Street, south of Tenth Street. PM peak -hour traffic volumes for these developments were
estimated based on traffic reports prepared for the developments and provided by City staff.
Saturday peak -hour volumes were estimated using trip generation rates from ITE Trip
Generation.'
Cumulative Intersection Levels of Service
The operation of the key intersections were evaluated with a level of service calculation. The
results are presented in Table 10.
Under Cumulative Conditions, the intersection ofPrincevalle Street and Thomas Road/Luchessa
Avenue is projected to continue to operate at acceptable levels. The overall intersection
operations are projected to be LOS A during both the PM and Saturday peak hours, while the
worst case approach is projected to operate at LOS B during both peak hours. The intersection
of Thomas Road/Luchessa Avenue and Church Street is projected to operate at an overall LOS
A during the PM and Saturday peak hours. The worst case movement is projected to operate at
LOS C during both peak hours. The intersection of Monterey Street and Farman Frontage Road,
with two -way stop -sign control, is projected to operate at LOS F (both overall intersection
operations and the worst case approach) during both peak hours. With the installation of a traffic
signal, the intersection is projected to operate at LOS C during both PM and the Saturday peak
hours.
'It should be noted that the Saturday peak hour traffic estimates assume that all the uses included in the approved
and cumulative developments, as well as the proposed project, peak at the same time, resulting a conservatively high estimate
of Saturday peak -hour volumes.
Fehr & Peers Associates, Inc. 34
Gilroy Sport Park EIR TIA
January 1999
Fehr & Peers Associates, Inc. 35
Table 10
Cumulative Intersection Levels of Service
Worst Case
Intersection
Movement'
Average
Peak Average
Total
Intersection
Hour Delay' LOS 1
Delay LOS
Thomas Road/Luchessa Avenue and
PM 1.7 A
8.3 B
Princevalle Street
Sat 1.3 A
8.2 B
(Two -Way Stop Controlled)
Thomas Road/Luchessa Avenue and
PM 1.7 A
12.1 C
Church Street
Sat 2.1 A
11.5 C
(Two -Way Stop Controlled)
Monterey Street and Farman Frontage Road
PM 116.9 F
560.6 F
(Two -Way Stop Controlled)
Sat 241.4 F
934.1 F
Monterey Street and Farman Frontage Road
PM 16.7 C
n/a
(Signalized)
Sat 18.8 C
n/a
Notes: ' Average total intersection delay for unsignalized intersection and whole intersection weighted average stopped delay for
signalized intersections, expressed in seconds per vehicle.
c LOS calculations performed using the CMP level of service analysis program, TRAFFIX,
and the 1994 Highway Capacity
Manual methodology for two -way stop - controlled intersections and the 1985 Highway Capacity Manual delay methodology
for signalized intersections.
' For unsignalized intersections only.
Fehr & Peers Associates, Inc. 35
Gilroy Sport Park EIR TIA
January 1999
CHAPTER 6 - CONCLUSIONS
The proposed development of the Gilroy Sports Park is estimated to generate 550 PM peak -hour
trips (275 inbound/275 outbound) and 800 Saturday peak -hour trips (400 inbound/400
outbound). The impacts of the proposed development on the surrounding roadway system were
evaluated following guidelines of the City of Gilroy and the Santa Clara Valley Transportation
Authority (VTA).
The results indicate that the project will have a significant adverse impact on the intersection
on Monterey Street and Farman Frontage Road. The installation of the proposed traffic signal
at this intersection would mitigate project impacts and provide LOS C operations during both
the PM and Saturday peak hours. Installation of the traffic signal will be needed prior to the
completion of Phase IV of the proposed sports park. Caltrans' Peak Hour Volume Warrant for
signal installation will be satisfied with the addition of traffic volumes estimated for the
development of Phases I through IV of the proposed park. It is recommended that a separate
eastbound left -turn lane be provided to serve the traffic added to the eastbound to northbound
left -tum movement by the project. The project is estimated to have an insignificant impact on
the operations of the intersections of Princevalle Street and Thomas Road/Luchessa Avenue and
Church Street and Thomas Road/Luchessa Avenue, as well as segments of U.S. 101 north of and
south of Monterey Street.
Recommendations were made in regard to other improvements proposed by the project,
including:
It is recommended that the crosswalk across Monterey Street at Farman Frontage Road
not be provided until the traffic signal is installed at this intersection. The high travel
speeds on Monterey Street (in excess of 50 mph) and the width of the street (120 feet)
make it hazardous for pedestrians to cross without the protection of a traffic signal.
• The proposed Farman Frontage Road bus stop should be designed to VTA standards.
Pedestrian access should be provided from the bus stop to along Farman Frontage Road
that connects to the internal pedestrian paths.
The proposed sidewalk along the west side of Monterey Street should connected to and
coordinated with the City's improvement plans for the intersection of Thomas
Road/Luchessa Avenue and Monterey Street (which include traffic signal installation
and pedestrian signals). It is recommended that the sidewalks along Monterey Street be
installed when the other improvements (i.e., the installation of the traffic signal) occur
at the Monterey Street/Farman Road intersection prior to Phase IV.
Fehr & Peers Associates, Inc. 36
Gilroy Sport Park EIR TIA
Janamy 1999
• Due to travel speeds along Thomas Road/Luchessa Avenue (in excess of 40 mph), a
crosswalk is not recommended without the protection of a traffic signal with pedestrian
heads for pedestrian crossing or all -way stop sign control (stop signs on all three
intersection approaches). The recommended pedestrian and bicycle facility is the
connection of the existing trail north of Thomas Road/Luchessa Avenue with the
proposed trail to the south via the future under - crossing of the Thomas Road/Luchessa
Avenue bridge. It is recommended that this location be monitored for both vehicular and
pedestrian/bicycle volumes, and an all -way stop or traffic signals (with pedestrian heads)
be installed if warrant requirements are met.
Site access, on -site circulation and parking were assessed. The proposed parking supply of 1,049
was found to be adequate to serve the estimated demand. However, a shortfall is projected to
occur after the completion of Phase V. It is recommended that 180 of the 298 parking spaces that
will be constructed with Phase VI be constructed instead with Phase V to offset the projected
shortfall.
Site access was found to be adequate, with sufficient storage provided for queued vehicles
between Farman Frontage Road and the main entry building, where a parking fee will be
collected.
On -site circulation was reviewed and generally found to be adequate. The following
recommendation were made:
• The outbound lanes of the entry road near Farman Frontage Road should be narrowed
to one lane with paint to allow two outbound lanes (with park personnel directing
traffic), if needed.
• All -way stop sign control is recommended at the intersection of the entry road and the
main north -south road. All -way stop sign control will provide safer conditions for
pedestrians crossing this intersection.
• It is recommended that the first driveway on the entrance road (closest to Farman
Frontage Road) be widened to allow both inbound and outbound traffic and the
landscape median along the entry road be cut back to allow left turns from this parking
area onto the entry road. Currently, the on -site traffic is concentrated at the intersection
of the entry road and the main north -south circulation road. Allowing left turns out of
the eastern most driveway will diffuse some of this traffic. Landscaping in the median
should be low (two to 2.5 feet in height) or taller trees with thin trunks, which should
be pruned to maintain adequate sight distance.
Fehr & Peers Associates, Inc. 37
Gilroy Sport Park EIR TIA
January 1999
• The provision of an additional north -south circulation aisle in the westem -most parking
area to break -up the long rows of parking spaces is recommended. In addition, the
parking bays and circulation aisles should be extended eastward, eliminating the isolated
landscaped barrier at the east end of the parking area.
`l
Fehr & Peers Associates, Inc. 38
APPENDICES
APPENDIX A
TRAFFIC COUNTS
MARES TRAFFIC DATA SERVICE
( f OF GILROY
Site Code : 00000000
Start Date: 10/24/98
File I.D.: FRONTA -S
Page : I
MONTEREY ST. RESTAURANT D/W MONTEREY ST. MONTEREY FRONTAGE RD.
Southbound Westbound Northbound Eastbound
,crnrt
e Roht Thru Left Totl Roht Thru Left Totl Rmht Thru Left Totl Rght Thru Left Totl Total
'OOpm 1 48 2 51 1 0 1 2 2 58 0 60 1 0 1 2 115
12:15 2 50 1 53 1 0 2 3 1 55 0 56 2 3 0 5 117
30 0 55 6 61 1 0 1 2 2 63 1 66 0 0 1 1 130
45 0 75 3 78 1 0 1 2 0 79 0 79 1 0 1 2 161
Hour Total 3 228 12 243 4 0 5 9 5 255 1 261 4 3 3 10 523
OOpm 3 70 3 76 0 0 1 1 1 74 2 77 0 0 1 1 155
' -15 3 63 2 68 1 0 0 1 0 77 1 78 2 0 1 3 150
_1:30 1 61 1 63 1 0 1 2 1 58 1 60 1 0 1 2 127
45 1 58 3 62 1 0 0 1 2 82 4 88 2 0 2 4 155
r Total 8 252 9 269 3 0 2 5 4 291 8 303 5 0 5 10 587
r" nd 11 480 21 512 7 0 7 14 9 546 9 564 9 3 8 20 1110
f Total 1.0% 43.2% 1.9% .6% 0.0% .6% .8% 49.2% .8% .8% .3% .7%
apprch % 46.1% 1.3% 50.8% 1.8%
g_nf Apprch 2.1% 93.8% 4.1% 50.0% 0.0% 50.0% 1.6% 96.8% 1.6% 45.0% 15.0% 40.0%
Peak Hour Analysis By Entire Intersection for the Period: 12:00pm to 01:45pm on 10/24/98
StartPeak Hr ......... Volumes ......... ....... Percentages .......
Direction Street Name Peak Hour Factor Rght Thru Left Total Rght Thru Left
Southbound MONTEREY ST. 12:30pm .907 6 263 14 283 2.1 92.9 4.9
,- Westbound RESTAURANT D/W .750 3 0 3 6 50.0 .0 50.0
Northbound MONTEREY ST. .949 3 293 4 300 1.0 97.6 1.3
Eastbound MONTEREY FRONTAGE RD. .583 3 0 4 7 42.8 .0 57.1
CITY OF GILROY
MONTEREY ST.
6 2631 14 4
293
3
300
Inbound 83
Outbound 300
Total 583
4
10 0
6
4
Inbound 7
^utbound 10
0 Total 17
3
Inbound 300
Outbound 269
Total 569
3 4 293
263
3
269
MONTEREY ST.
MARKS TRAFFIC DATA SERVICE
0
Inbound 5
Outbound 17 3
Total 23
14
0 17
3
RESTAURANT D/N
Site Code : 00000000
Start Date: 10/24/98
File I.D.: FRONTA -S
Page : 2
HARKS TRAFFIC DATA SERVICE
CITY OF GILROY Site Code : 00000000
PRINCEVALE ST. THOMAS RD.
Southbound Westbound
Start
Start Date: 10/24/98
File I.D.: PRINCE -S
Page : 1
THOMAS RD.
Northbound Eastbound
Time
Ruht
Thru
Left
Totl
Rcht
Thru
Left
Totl
Rght
Thru
Left
Totl
Root
Thru
Left
Totl
Total
12:00pm
4
0
8
12
6
16
0
22
0
0
0
0
0
25
3
28
62
12:15
3
0
10
13
5
14
0
19
0
0
0
0
0
21
4
25
57
12:30
5
0
5
10
5
18
0
23
0
0
0
0
0
27
6
33
66
12:45
5
0
10
15
11
17
0
28
0
0
0
0
0
21
2
23
66
Hour Total
17
0
33
50
27
65
0
92
0
0
0
0
0
94
15
109
251
1:00pm
1
0
10
11
9
30
0
39
0
0
0
0
0
19
4
23
73
1:15
6
0
5
11
5
24
0
29
0
0
0
0
0
21
2
23
63
1:30
4
0
7
11
8
14
0
22
0
0
0
0
0
13
3
16
49
1:45
4
0
5
9
9
15
0
14
0
0
0
0
0
15
3
18
51
Hour Total
15
0
27
42
31
83
0
114
0
0
0
0
0
68
12
80
236
Grand
32
0
60
92
58
148
0
206
0
0
0
0
0
162
27
189
487
% of Total
6.6%
0.0%
12.3%
11.9%
30.4%
0.0%
0.0%
0.0%
0.0%
0.0%
33.3%
5.5%
Apprch %
18.9%
42.3%
38.8%
% of Apprch
34.8%
0.0%
65.2%
28.2%
71.8%
0.0%
0.0%
0.0%
0.0%
0.0%
85.7%
14.3%
Peak Hour Analysis By Entire Intersection for the Period: 12:00pm to 01:45pm on 10/24/98
....... Percentages .......
Rght Thru Left
36.1 .0 63.8
25.2 74.7 .0
0.0 0.0 0.0
.0 86.2 13.7
Start Peak Hr
.........
Volumes .........
Direction
Street Name
Peak Hour Factor
Rght
Thru Left
Total
Southbound
PRINCEVALE ST.
12:30pm .783
17
0 30
47
Westbound
THOMAS RD.
.763
30
89 0
119
Northbound
.0
0
0 0
0
Eastbound
THOMAS RD.
.773
0
88 14
102
....... Percentages .......
Rght Thru Left
36.1 .0 63.8
25.2 74.7 .0
0.0 0.0 0.0
.0 86.2 13.7
0
MARES TRAFFIC DATA SERVICE
Y OF GILROY Site Code : 00000000
0
106 89
17
14
PRINCEVALE ST.
17 0 30 14
0
30
44
Inbound 47
Outbound 44
Total 91
Inbound 102
Outbound 106
88 Total 208
0
Inbound 0
Outbound 0
Total 0
0 0 0
0
0
Start Date: 10/24/98
File I.D. PRINCE -S
Page 2
89
Inbound 119
Outbound 118 0
Total 237
30
88 118
0
THOMAS RD.
FROM : MARKS TRAFFIC DATA SERVICE PHONE NO. 925 229 8296 Dec. 19 1998 04:05PM P4
MARES TRAFFIC DATA SERVICE
_..Y OF GILROY Site Code : 00000000
Start Date: 121]6198
Pile I:D.: CHURCH -P
Page : 7
CHURCH ST. THOMAS RD. THOMAS ED.
Southbound Westbound Northbound Eastbound
in
to A ht Thru Left Totl A t Tbru Left Totl' R ht Thru Left Teti R ht Thru Left Ta45 Total
4:00pn 5 0 7 12 14 21 0 41 0 0 0 0 0 35 10 45 98
15 5 0 5 11 14 38 0 52 0 0 0 0 0 33 4 37 100
30 5 0 5 19 13 39 0 52 0 0 0 0 O• 34 6 40 102
v45 5 0 6 11 17 44 0 61 0 0 0 0 0 31 1 36 110
a ^jr Total 21 0 23 44 58 148 0 206 0 0 0 0 0 133 27 160 410
,00pa 5 0 4 10 is S7 0 75 0 0 0 0 0 36 15 52 137
5:15 6 0 5 11 18 48 0 66 0 0 0 0 0 25 6 31 108
`1:30 11 0 13 24 I1 61 0 72 0 0 0 0 0 33 10 43 139
:45 3 0 4 7 13 55 0 78 O 0 0 0 0 32 5 37 122
numr Total 26 0 26 52 60 231 .0 291 0 0 0 0 0 126 37 163 506
and 17 0 43 96 118 379 0 497 0 0 0 0 0 259 54 323 916
of Total 5.14 0.09 5.3% 12.9141.4% 0.01 0.01 0.0% 0.01 0.0% 26.3% 7.0% 35.31
Apprch % 10.51 54.31
of Apprch 49.01 0.01 51.0% 23.7% 76.3% 0.0% 0.01 0.01 0.0% 0.0% 80.21 19.6%
Peak Hoar Analysis By Entire Intersection for the Period: 04:00pa to 05:45pa 0112/16/98
Start Peak Hr ......... Volumes ......... ....... Percentages .......
Direction Street Name Peak lour Factor Rgbt Tbru Left Total H ht Thru Left
Soothbound CHURCH ST. 05:90ps .542 25 0 26 52 50.0 .0 50.0
Westbound THOMAS RD. .933 60 231 0 291 20.5 79.3 .0
Northbound .0 0 0 0 0 0.0 0.0 0.0
Eastbound THOMAS RD. .784 0 126 37 163 .0 77.3 22.6
FROM : MARKS TRAFFIC DATA SERVICE PHONE NO. 925 229 8296 Dec. 19'1998 04 :05PM P5
MKS TRAFFIC DATA SERVICE
:ITY OF OILROY Site Code : 00000000
Start Date: 12/16/98
File I.D.: CHURCH -Y
Page : 2
CHURCH ST.
261 OI 261 60
Inbound 163
--------Outbound 257
126 Total 420
0
97
Inbound 51
Outbound 97
Total 149
Inbound 0
Outbound 0
Total 0
0 1 0 0
0
0
231
Iaboend 291
Outbound 152 0
Total 443
26
126 152
0
TRUEAS RD.
0
257
231
26
37
CHURCH ST.
261 OI 261 60
Inbound 163
--------Outbound 257
126 Total 420
0
97
Inbound 51
Outbound 97
Total 149
Inbound 0
Outbound 0
Total 0
0 1 0 0
0
0
231
Iaboend 291
Outbound 152 0
Total 443
26
126 152
0
TRUEAS RD.
FROM : MARKS TRAFFIC DATA SERVICE PHONE N0. : 925 229 8296 Dec. 19 1998 04:04PM P2
MARES TRAFFIC DATA SERVICE
Y OF 6I1ROY Site Code : 00000000
Start Date: 12119/98
Pile 1.0. : CHORCH_B
:
C80RCH ST. THOMAS RD. THOMAS RD. Page 1
Southbound ilestbouod Northbound Eastbound
:.I Raht Tbru Left TotI Raht Thru Left Totl Roht Thra Left Totl Raht Turn Left Totl Total
...30pa 3 0 8 11 10 28 0 38 0 0 0 0 0 22 5 27 75
12:15 1 0 9 10 6 17 0 23 0 0 0 0 0 34 4 38 71
30 3 0 3 6 9 19 0 28 0 0 0 0 0 31 7 38 72
45 11 0 7 18 5 18 0 24 0 0 0 0 0 28 4 32 74
Hour Total 18 0 27 45 31 82 0 113 0 0 0 0 0 115 20 135 293
OOps 13 0 I 15 E 25 0 33 0 0 0 0 0 23 9 32 80
_.15 5 0 4 9 5 19 0 24 0 0 0 0 0 25 5 30 63
1:30 5• 0 4 9 4 32 0 36 0 0 0 0 0 27 5 32 77
5 1 0 4 5 8 15 0 23 D 0 0 0 0 21 3 24 52
r Total 24 0 14 38 25 91 0 116 0 0 0 0 0 96 22 118 172
"'lad 42 0 41 83 56 173 0 129
{f Total 7.46 '0.06 7.36 9.96 30.64 0.06
Srch 6 14.76 40.56
6 of Appreh 50.61 0.06 49.46. 24.56 75.56 0.06
0 0 0 0 0 211 42 253 565
0.06 0.06 0.06 0.06 37.36 7.46
44.86
0.06 '0.06 0.06 0.06 63.46 16.66
Peak Boor Analysis By Entire intersection for the Period: 12:00ps to 01:45pa on 12/19198
....... Percentages .......
fight Tbra Left
57.1 .0 42.8
26.8 73.1 .0
0.0 04 0.0
.0 82.8 17.1
Start
Peak Rr
.........
Volnnes .........
Direction
Street Hare
Peak Hour
Factor
Hght
Thrn Left
Total
Soutbbound
CHURCH St.
12:15pa
.581
28
0 21
49
Westbound
THOMAS MD.
.816
29
79 0
108
Northbound
.0
D
0 0
0
8astbeund
THOMAS RD.
.921
0
116 24
140
....... Percentages .......
fight Tbra Left
57.1 .0 42.8
26.8 73.1 .0
0.0 04 0.0
.0 82.8 17.1
FROM : MARKS TRAFFIC DATA SERVICE PHONE NO. : 925 229 6296
ME TRAFFIC OITA SEEYICE
CITY OF GILROY
CIU8C8 Si.
IB 0 I1 24
0
t9
53
labouad 49
Outbound 53
Total 14Z
0
107 ]9
28
24
Inbound 140
-- Outbound 107
116 Total 247
0
Inbound 0
Outbound 0
Total 0
0 0 0
0
0
79
Inbound 108--
outbound 137 0
Total 245
21
116 137
0
TSOUAS AD.
Dec. 19 1998 04:04PM P3
Site Code : 00000000
Start Date: 12/19198
Pile U. CHOECB 3
Page : Z
FROM MARKS TRAFFIC DATA �FRVl[E PHONE NO. � 925 229 8296 Dec. Z1 1998 83:38PM P3
' � �
!
APPENDIX B
LEVEL OF SERVICE CALCULATION SHEETS
COMPARE Mon Dec 2108:57:20 1998 Page 3-1
eve ervice amps ion epo
1994 HCM Unsignallzed (Future Volume Marrative)
EzistPM
Intersection #1: Luchessa /Princevalle
Approach: North Bound
South Bound
East Bound
Signal =Step /Rights = Include
Movement: L
- T
- R
Initial Vol:
50
0
53
T
- R
Lanes:
0
-r0 fly 11 IyR0
f 7 ■
0
Count
- - II
Date:
Signal= Ummntrol
1998
II---------------
<< PM
Peak
Signal= Unmatrol
Initial Vol: Lanes:
Rights = lntlude
Vol Cnt Date:
111198
Rights = Include Lanes: Initial Vol:
0
�
0
Cycle Time (sec):
100
0 98
29 0
0
160
98
Growth Adj: 1.00
1.00
1
1.00
1.00
Loss Time (sec):
0
1
106 0
_.
1.00
Critical V /C:
0.000
0 160
0
1•
0
Avg Crit Del (seclveh):
1.2
0
0 0
0
160
Avg Delay (sedveh):
1.2
0 0
0
7
0
LOS:
A
0
0
0
1�l
` }I
t
PasserByVOl: 0
0
0
Lanes:
0
0 0 0
0
0
0
Initial Vol:
0
0
0
0
0
53
0
Signal= SloplRights =lntlude
29
106
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L
- T
- R
L -
T
- R
L -
T
- R
L
- T
- R
------------ I -------------
Volume Module: »
Count
- - II
Date:
--
1 Jan
1998
II---------------
<< PM
Peak
----------
- - - - -I
Base Vol: 0
0
0
53
0
50
29
106
0
0
160
98
Growth Adj: 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial BEE: 0
0
0
53
0
50
29
106
0
0
160
98
Added Vol: 0
0
0
0
0
0
0
0
0
0
0
0
PasserByVOl: 0
0
0
0
0
0
0
0
0
0
0
0
Initial Fut: 0
0
0
53
0
50
29
106
0
0
160
98
User Adj: 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0
0
0
53
0
50
29
106
0
0
160
98
Reduct Vol: 0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0
0
0
53
0
50
29
106
0
0
160
98
Adjusted Volume Module:
Grade:
096
096
0%
0%
% Cycle /Cars: xxxx
xx2cx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
% Truck / Comb: xxxx
xxacx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj: 1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.: 0
0
0
58
0
55
32
106
0
0
160
98
Critical Gap Module:
MoveUp Time: xxxxx
xxxx
xxxxx
3.4
xxxx
2.6
2.1
=c;c
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx
xxxx xxxxx
6.5
xxxx
5.5
5.0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
--------_--- I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol: xxxx
xxxx
xxxxx
344
xxxx
209
258
xxxx
xxxacx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx
xxxx
xxxxx
669
xxxx
1085
1292
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx
xxxx
xxxxx
0.97
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx
xxxx
xxxxx
652
xxxx
1085
1292
xxxx
xxx:cx
xxxx
xxxx
xxxxx
----_------- I ---------------
Level Of Service
Module:
---------------
---------------
II----------
- - - - -I
Stopped Del:xxxxx
xxxx
xxxxx
6.0
xxxx
3.5
2.9
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: *
*
*
*
*
*
A
Movement: LT
- LTR
- RT
LT -
LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx
xxxx
xxxxx
xxxx
808
xxxxx
xxxx
xxxx
xxxxx
xxxx
xDOCx
xxxxx
Shrd StpDel:xxxxx
x
xxxxx
xxxxx
4.8
xxyyY
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: *
*
*
*
A
ApproachDel:
0.0
4.8
0.7
0.0
Trahix 7.1.0427 Copyright (c)1998 Dowling Associates, Inc. Licensed to FEHR 8 PEERS, SAN JOSE
COMPARE Mon Dec 21 08:57:20 1998 Page 3-2
Levei Ut bewXe UOMPUWton KePcA
1994 HCM Unsignalized (Future Volume Alternative)
BackPM
Intersection #1: Luchessa /Princevalle
Approach: North Bound
Signal= StDP1Rlghts= lncIude
East Bound
West Bound
Initial Vol:
54 0
58
T
Lanes:
0 00^Iy 111 0
0
- R
II
Signal = Uncontrol
T
- R
- - - - - I
Signal= Uncontol
Initial Vol: Lanes: Rights = Include
�
Vol Cat Date:
Cycle Time (sec):
Na
100
Rights= lnUUde Lanes: Initial Vol:
0 103
31 0
1
Loss Time (sec):
0
1
147 0
critical V /C:
0.000
._ 0 224
0
Avg Cal Del(secNeh):
1.2
0
0 0
Avg Delay (seNVeh):
1.2
0 0
1.00
LOS:
B
1.00
1.00
11•I�.
1.00
1.00
Lanes:
0 0 0 0
0
0
Initial Vol:
0 0
0
0
0
Signal = Stop /Rights= lncIude
98
Added Vol: 0 0
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L -
T
- R
II
L -
---------------
T
- R
II
L -
----------
T
- R
- - - - - I
------_----- I ---------------
Volume Module:
II
---------------
Base Vol: 0 0
0
53
0
50
29
109
0
Q
160
98
Growth Adj: 1.00 1..00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial BEE: 0 0
0
53
0
50
29
109
0
0
160
98
Added Vol: 0 0
0
0
0
0
0
0
0
0
0
0
ApprovedDev: 0 0
0
5
0
4
2
38
0
0
64
5
Initial Put: 0 0
0
58
0
54
31
147
0
0
224
103
User Adj: 1.00 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
58
0
54
31
147
0
0
224
103
Reduct Vol: 0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0 0
0
58
0
54
31
147
0
0
224
103
Adjusted Volume Module:
Grade: 0%
0%
0%
0%
% Cycle/ Cars: xxxx xxxx
xxxx
>ocxx
xxxx
xxxx
xxxx
xxxx
% Truck/ Comb: xxxx xx�ac
xxxx
xxx.`c
xxxx
xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10 1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
x�ooc
Adj Vol.: 0 0
0
64
0
59
34
147
0
0
224
103
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx'xxxxx
Critical Gp:xxxxx xxxx xxxxx
------------ I ---------------
6.5
---------------
xxxx
5.5
5.0
---------------
xxxx
xxxxx
xxxxx
----------
xxxx
xxxxx
- - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx
454
xxxx
276
327
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx xxxxx
578
xxxx
1004
1197
xxxx
xxxxx
xxxx
xxxx
xlLxxx
Adj Cap: xxxx xxxx xxxxx
0.97
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx >0C=
560
xxxx
1004
1197
---------------
xxxx
xxxxx
xxxx
----------
xxxx
xxxxx
- - - - -I
------------ I ---------------
Level Of Service Module:
---------------
Stopped Del: xxxxx xxxx xxxxx
7.2
xxxx
3.8
3.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
*
*
*
A
Movement: LT - LTR -
RT
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx
712
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxaocx
Shrd StpDel:xxxxx xxxx xxxxx
xxxxx
5.5
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xsjcx
xxxxx
Shared LOS: * *
*
*
B
ApproachDel: 0.0
5.5
0.6
0.0
COMPARE Mon Dec 2108:57:20 1998 Page 3 -3
Levei Ut bewice Qompulation epu
1994 HCM Unsignalized (Future Volume Alternative)
Ph2PM
Intersection #1: Luchessa /Princevalle
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
Volume Module:
Base Vol: 0 0 0 53 0 50 29 109 0 0 160 98
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial BSe: 0 0 0 53 0 50 29 109 0 0 160 98
Added Vol: 0 0 0 7 0 0 0 17 0 0 17 7
ApprovedDev: 0 0 0 5 0 4 2 38 0 0 64 5
Initial Fut: 0 0 0 65 0 54 31 164 0 0 241 110
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 65 0 54 31 164 0 0 241 110
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 65 0 54 31 164 0 0 241 110
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck/ Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 72 0 59 34 164 0 0 241 110
Critical Gap Module:
MoveUp Time; xxxxx xxxx xxxxx 3.4 xxxx 2.6 2.1 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx 6.5 xxxx 5.5 5.0 xxxx xxxxx xxxxx xxxx xxxxx
------------ I --------------- --------------- --------------- II ---------- - - - - -
I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 491 xxxx 296 351 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 550 xxxx 980 1166 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx 0.97 xxxx 1.00 1.00 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 532 xxxx 980 1166 xxxx xxxxx xxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del:xxxxx xxxx xxxxx 7.7 xxxx 3.9 3.2 xxxx xx= xxxxx xxxx xxxxx
LOS by Move: * * * * * * A + * + * +
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx 672 xxxxx xxxx xxxx xxxxx xxxx x-, x xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 6.0 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * * * * B * + * x * x +
ApproachDel: 0.0 6.0 0.5 0.0
Signal= Stop/Rights= Include
Initial Val:
54
0
65
Lanes:
0
-!�
0 11 0
4�1�►4
0
Signal= Ummntrol
Signal= Uncontml
Initial Vol: Lanes: Rights = lndude
�
Vol Cm Dale:
Cycle Time (sec):
n1a
100
Riglus= lndude Lanes: Initial Vol:
31 0
0 110
1
Lass Time (sec):
0
1
164 0
Critical V /C:
0.000
0 241
0
Avg Crit Del (sec/veh):
1.3
0
0 0
Avg Delay (sedveh):
1.3
0 0
LOS:
B
■T
1
Lanes:
0
0 0 0
0
Initial Vol:
0
0
0
Signal= Stop/Righls= lndude
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
Volume Module:
Base Vol: 0 0 0 53 0 50 29 109 0 0 160 98
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial BSe: 0 0 0 53 0 50 29 109 0 0 160 98
Added Vol: 0 0 0 7 0 0 0 17 0 0 17 7
ApprovedDev: 0 0 0 5 0 4 2 38 0 0 64 5
Initial Fut: 0 0 0 65 0 54 31 164 0 0 241 110
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 65 0 54 31 164 0 0 241 110
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 65 0 54 31 164 0 0 241 110
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck/ Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 72 0 59 34 164 0 0 241 110
Critical Gap Module:
MoveUp Time; xxxxx xxxx xxxxx 3.4 xxxx 2.6 2.1 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx 6.5 xxxx 5.5 5.0 xxxx xxxxx xxxxx xxxx xxxxx
------------ I --------------- --------------- --------------- II ---------- - - - - -
I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 491 xxxx 296 351 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 550 xxxx 980 1166 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx 0.97 xxxx 1.00 1.00 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 532 xxxx 980 1166 xxxx xxxxx xxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del:xxxxx xxxx xxxxx 7.7 xxxx 3.9 3.2 xxxx xx= xxxxx xxxx xxxxx
LOS by Move: * * * * * * A + * + * +
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx 672 xxxxx xxxx xxxx xxxxx xxxx x-, x xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 6.0 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * * * * B * + * x * x +
ApproachDel: 0.0 6.0 0.5 0.0
COMPARE Mon Dec 21 08:5720 1998 Page 34
eve t UrSe-rvWic-=-mputau6o Repent ,
1994 HCM Unsignalized (Future Volume Alternative)
Ph3PM
Intersection #1: Luchessa /Pflncevalle
Volume Module
Base Vol: 0 0
0
53
Signal= Stop/Rights= Include
50
29
109
Initial Vol:
54
0
69
,
Growth Adj: 1.00 1.00
Lanes:
0
00AIy 11111 yIA0
t
0
1.00
Initial Vol: Lanes:
31 0
1
Signal= Uncontml
Rights = lntlude
Vol Cnl Date:
Cycle Time (sec):
Loss Time (sec):
rda
100
0
Signal= Uncontrol '
Rights = lntlude Lanes: Initial Vol:
0 114
1
174 0
0
53
Critical V /C:
0.000
0 251
0
0
Avg Cnt Del (seclveh):
1.3
0
0 0
0
11
Avg Delay (sedveh):
1.3
0 0
27
0
LOS:
B
11
ApprovedDev: 0 0
0
1
0
4
2
38
Lanes:
0
0 0 0
0
5
Initial Put: 0 0
Initial Vol:
0
0
0
31
174
0
Signal= Stop0ghls= lntlude
251
114
Approach:
North
Bound South Bound
East Bound West Bound
Movement:
L -
T -
R L - T
- R
L - T - R L - T - R
Volume Module
Base Vol: 0 0
0
53
0
50
29
109
0
0
160
98
Growth Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Bee: 0 0
0
53
0
50
29
109
0
0
160
98
Added Vol: 0 0
0
11
0
0
0
27
0
0
27
11
ApprovedDev: 0 0
0
5
0
4
2
38
0
0
64
5
Initial Put: 0 0
0
69
0
54
31
174
0
0
251
114
User Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
69
0
54
31
174
0
0
251
114
Reduct Vol: 0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0 0
0
69
0
54
31
174
0
0
251
114
Adjusted Volume Module:
,
Grade: 0%
0&
0%
0%
% Cycle /Cars: xxxx xxxx
xxxx
XYYY
xxxx
xxxx
xxxx
xxxx
% Truck/ Comb: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10
1.10
1..10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
CyCl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx.
xxxx
xxxx
Trck /Cmb PCE: xxxx xloac
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
76
0
59
34
174
0
0
251
114
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
6.5
xxxx
5.5
5.0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
------------ I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol: xxxx xxxx
xxxxx
513
xxxx
308
365
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx
xxxxx
534
xxxx
967
1149
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx
xxxxx
0.97
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx
xxxxx
517
xxxx
967
1149
xxxx
xxxxx
xxxx
xxxx
xxxxx
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - - -I
Stopped Del:xxxxx xxxx xxxxx
8'.0
xxxx
3.9
3.2
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
+
x
x
A
+
+
x
x
x
Movement: LT - LTR
- RT
LT
- LTR
- RT
LT
- LTR
-
RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx
649
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx
xxxxx
xxxxx
6.2
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
*
B
ApproachDel: 0.0
6.2
0.5
0.0
COMPARE Mon Dec 2108:59:23 1998 . Page 3 -1
Level V1 bervice QoMputaton epo
1994 HCM Unsignalized (Future Volume Alternative)
Ph4PM
Intersection #1: Luchessa /Princevalle
Approach: North Bound
Initial Vol:
Lanes:
54
0
Signal= Stop/Rights= Include
0
0 11 0
78
0
- T -
Initial Vol: Lanes:
31 0
1
Signal= Ummntrol
Rights= Include
J
`
1.
T
Vol Cm Dale:
Cycle Time (sec):
Loss Time (sec):
me
100
0
Signal= Uncontrol
Rights = Include Lanes: Initial Vol:
0 123
1
197 0
L
- T
Critical V /C:
0.000
0 274
0
---------------
Avg Crit Del (secIvehr
1.4
0
0 0
_______________�
Avg Delay(secti
1.4
0 0
0
53
0
LOS:
B
109
0
0
160
T
Growth Adj: 1.00
1.00
1.00
Lanes:
Initial Vol:
0
0
0 0 0
0
Signal=Stcp/Rights= lndude
0
0
1.00
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L
- T -
R
L -
T
- R
L -
T
- R
L
- T
- R
---------------------------
Volume Module:
---------------
---------------
_______________�
Base Vol: 0
0
0
53
0
50
29
109
0
0
160
98
Growth Adj: 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial BEE: 0
0
0
53
0
50
29
109
0
0
160
98
Added Vol: 0
0
0
20
0
0
0
50
0
0
50
20
ApproviiiDev: 0
0
0
5
0
4
2
38
0
0
64
5
Initial Fut: 0
0
0
78
0
54
31
197
0
0
274
123
User Adj: 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0
0
0
78
0
54
31
197
0
0
274
123
Reduct Vol: 0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0
0
0
78
0
54
31
197
0
0
274
123
Adjusted Volume Module:
Grade:
0%
0%
0%
0%
% Cycle /Cars: xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
% Truck /Comb: xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj: 1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx
xxvv
xxvv
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.: 0
0
0
86
0
59
34
197
0
0
274
123
Critical Gap Module:
Movei Time:xxxxx
xxxx xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx
xxxx xxxxx
6.5
xxxx
5.5
5.0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
---------------------------
Capacity Module:
---------------
---------------
---------------
Cnflict Vol: xxxx
xxxx xxxxx
564
xxxx
336
397
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx
xxxx xxxxx
499
XYYY
936
1109
xxxx
xxxxx
xxxx
XYYY
xxxxx
Adj Cap: xxxx
xxxx xxxxx
0.97
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx
xxxx xxxxx
482
xxxx
936
1109
xxxx
xxxxx
xxxx
xxxx.
xxxxx
------------ I---------------
Level Of Service
Module:
---------------
---------------
---------------
Stopped Del: xxxxx
xxxx xxxxx
8.9
xxacx
4.1
3.3
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: *
*
Jr
*
+
*
A
*
*
*
+
Movement: LT
- LTR -
RT
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx
xxxx xxxxx
xxxx
601
xxxxx
xxxx
xxxx
xxxxx
xxacx
xxxx
xxxxx
Shrd StpDel:xxxxx
xxxx xxxxx
xxxxx
6.9
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: *
*
*
*
B
*
*
*
x
*
*
x
ApproachDel:
0.0
6.9
0.5
0.0
Traffix 7.1.0427 Copyright (c) 1998 Dowling Associates, Inc. Licensed to FEHR 8 PEERS, SAN JOSE
COMPARE Mon Dec 2108:59:23 1998 Page 3 -2
Level ennce Gompucition Report
1994 HCM Unsignalizec (Future Volume Allemmw)
Ph5PM
Intersection #1: Luchessa /Princevalle
Approach: North Bound
South Bound
Signal= Stop /Rights = Include
West Bound
Movement: L - T -
Initial Vol:
54
0
88
L -
Lanes:
0
Y-0 ^Iy 111 Iyn0
0
- R
Signal = Uncontrol
II
---------------
Signal= Uncontrol
Initial Vol: Lanes: Rights= lncluce
Vol Cnt Date:
nta
Rights = lndutle Lanes: Initial Vol:
37 0
Base Vol: 0 0
Cycle Time (sec):
100
� 0 733
1 ■
29
Loss Time (sec):
0
4L 1
221 0
98
Cntical VIC:
0.000
._ 0 298
0
1.00
Avg Cm Del(seWeh):
1.5
0
0 0
1.00
Avg Delay (sedveh):
1.6
0 0
53
0
LOS:
B
109
0
_1l
1
160
96
Added Vol: 0 0
Lanes:
0
0 0 0
0
0
Initial Vol:
0
0
0
30
ApprovedDev: 0 0
0
Signal= Stopffghts= lndutle
0
4
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L -
T
- R
L -
T
- R
L -
T
- R
-----_------ I ---------------
Volume Module:
II
---------------
---------------
----------
- - - - -I
Base Vol: 0 0
0
53
0
50
29
109
0
0
160
98
Growth Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Bse: 0 0
0
53
0
50
29
109
0
0
160
96
Added Vol: 0 0
0
30
0
0
0
74
0
0
74
30
ApprovedDev: 0 0
0
5
0
4
2
38
0
0
64
5
Initial Fut: 0 0
0
88
0
54
31
221
0
0
298
133
User Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PEP Volume: 0 0
0
Be
0
54
31
221
0
0
298
133
Reduct Vol: 0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0 0
0
88
0
54
31
221
0
0
298
133
Adjusted Volume Module:
Grade: 0%
0%
0%
-
0%
% Cycle/ Cars: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
'
xxxx
xxxx
% Truck/ Comb: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
97
0
59
34
221
0
0
298
133
Critical Gap Module:
MoveUp Time: xxxxx xxxx xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx xxxxx
Critical Gp:xxxxx xxxx
xxxxx
6.5
xxxx
5.5
5.0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
------------ I ---------------
Capacity Module:
---------------
---------------
-
II
----------
- - - - - I
Cnflict Vol: xxxx xxxx
xxxxx
617
365
431
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx, xxxx
xxxxx
465
xxxx
905
1068
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx
xxxxx
0.96
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx
xxxxx
448
xxxx
905
1068
xxxx
xxxxx
xxxx
xxxx
xxxxx
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - - -I
Stopped Del:xxxxx xxxx xxxxx
10.0
xxxx
4.2
3.5
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
*
*
*
A
Movement: LT - LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx
555
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx
7.8
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
*
B
ApproachDel: 0.0
7.8
0.5
0.0
COMPARE Mon Dec 2108:59:23 1998 Page 3 -3
Level erv¢e luomputaulon epo
1994 HCM Unslgnalized (Future Volume Alternative)
Phi
Intersection #1: Luchessa /Princevalle
Approach:
North Bound
South Bound
Signal= S(oplRights= lndude
West Bound
Movement:
L
Initial Vol:
54
0
91
- R
L -
---------------
Lanes:
0
0 11 0
0
T
Initial Vol: Lanes:
Signal= Uncontrol
Rights =lndude
---------------
Vol Cnt Date:
Na
Signal = Uncontrol
Righ6= Include Lanes: Initial Vol:
II
Cycle Time (see):
100
0 136
31 0
Base Vol:
0
0
1
53
0
Lass Time (set):
0
109
230 0
0
0
Critical V /C:
0.000
._ 0 307
0
1.00
1.00
Avg Cdl Del (seclveh):
1.6
0
0 0
1.00
1.00
Avg Delay(secrveh):
1.6
0 0
1.00
Initial SEE:
0
LOS:
It
53
0
50
29
109
0
0
Lanes:
0
0 0 0
0
0
0
Initial Vol:
0
0
0
83
0
0
Signal= SloplRights= lndude
33
ApprovedDev:
Approach:
North Bound
South Bound
East Bound
West Bound
Movement:
L
- T -
R
L -
T
- R
L -
---------------
T
-
R
II
L -
----------
T
- R
- - - - - I
------------ I
Volume Module:
---------------
---------------
II
Base Vol:
0
0
0
53
0
50
29
109
0
0
160
98
Growth Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial SEE:
0
0
0
53
0
50
29
109
0
0
160
98
Added Vol:
0
0
0
33
0
0
0
83
0
0
83
33
ApprovedDev:
0
0
0
5
0
4
2
38
0
0
64
5
Initial Fut:
0
0
0
91
0
54
31
230
0
0
307
136
User Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume:
0
0
0
91
0
54
31
230
0
0
307
136
Reduct Vol:
0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
0
0
0
91
0
54
31
230
0
0
307
136
Adjusted Volume
Module:
Grade:
0%
0%
0%
0%
% Cycle /Cars:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx.
xxxx
xxxx
% Truck /Comb:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
=oc
xxxx
Trck /Cmb PCE:
xxxx
xxxx
xxxx
xxxx
=oL
xxxx
xxxx
xxxx
Adj Vol.:
0
0
0
100
0
59
34
230
'0
0
307
136
Critical Gap
Module:
MoveUp Time: xxxxx
xxxx
xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx
xxxx
xxxxx
6.5
xxxx
5.5
5.0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
------------ I
Capacity Module:
---------------
---------------
---------------
----------
- - - - -I
Cnflict Vol:
xxxx
xxxx
xxxxx
636
xxxx
375
443
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.:
xxxx
xxxx
xxxxx
453
xxxx
894
1054
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap:
xxxx
xxxx
xxxxx
0.96
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.:
xxxx
xxxx
xxxxx
437
xxxx
894
1054
xxxx
xxxxx
xxxx
xxxx
xxxxx
------------ 1---------------
Level Of Service
Module:
---------------
---------------
----------
- - - - -I
Stopped Del: xxxxx
xxxx
xxxxx
10.4
xxxx
4.3
3.5
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move:
*
*
*
*
*
*
A
Movement:
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
-
RT
LT
- LTR
- RT
Shared Cap.:
xxxx
xxxx
xxxxx
xxxx
539
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx
8.1
xxlncx
xxxxx
xxxx
xxxxx
xxxxx
xXXY
xxxxx
Shared LOS:
*
*
*
*
B
*
x
x
x
x
x
x
ApproachDel:
0.0
8.1
0.5
0.0
COMPARE Mon Dec 21 08:59:23 1998 Pane 34
Level ervice computation Report
1994 HCM Unsignal¢ed (Future Volume Altemative)
CumIPM
Intersection #1: Luchessa/Princevalle
Signal= SloplRights= lnGUde
Approach:
North Bound
Sl9nal= Stop/Righls= Include
East Bound
West Bound
Initial Vol:
54
0
93
L
Lanes:
0
41
0 11 0
4 �*
0
4
- R
Signal= UmmnVOl
T
- R
------------ I
Volume Module:
Signal= Unconmal
Initial Vol: lanes: Rights= Include
II
Vol Grit Date:
Na
Rights = include Lanes: Initial Vol:
31 0
Cycle Time (sec):
100
� 0 748
`T►
Base Vol:
Loss Time (sec):
0
1
227 0
CliOral V /C:
0.000
0 307
0
0
Avg Cdl Del (seNVeh):
1.7
.0
0 0
Avg Delay (serlveh):
1.7
r 0 0
1.00
1.00
LOS:
B
7
1.00
1
Initial Bse:
0
0
Lanes:
0
0 0 0
0
29
Initial Vol:
0
0
0
98
Signal= SloplRights= lnGUde
Approach:
North Bound
South Bound
East Bound
West Bound
Movement:
L -
T -
R
L
- T
- R
L -
T
- R
L -
T
- R
------------ I
Volume Module:
---------------
II
---------------
---------------
----------
- - - - -I
Base Vol:
0
0
0
53
0
50
29
106
0
0
160
98
Growth Adj:
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Bse:
0
0
0
53
0
50
29
106
0
0
160
98
Added Vol:
0
0
0
33
0
0
0
83
0
0
83
33
App +Pending:
0
0
0
7
0
4
2
38
0
0
64
17
Initial Fut:
0
0
0
93
0
54
31
227
0
0
307
148
User Adj:
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume:
0
0
0
93
0
54
31
227
0
0
307
148
Reduct Vol:
0
0
0
0,
0
0
0
0
0
0
0
0
Final Vol.:
0
0
0
93
0
54
31
227
0
0
307
148
Adjusted Volume
Module:
Grade:
0%
0%
0%
0%
% Cycle/ Cars:
xxxx
xxxx
xxxx
xxxx
xicxx
xxxx
xxxx
xxxx
% Truck/ Comb:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10 1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1..00
Cycl /Car PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.:
0
0
0
102
0
59
34
227
0
0
307
148
Critical Gap
Module:
MoveUp Time: xxxxx
xxxx
xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
6.5
xxxx
5.5
5.0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
------------ I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol:
xxxx xxxx
xxxxx
639
xxxx
381
455
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.:
xxxx xxxx
xxxxx
452
xxxx
888
1041
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap:
xxxx xxxx
xxxxx
0.96
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.:
xxxx xxxx
xxxxx
435
xxxx
888
1041
xxxx
xxxxx
xxxx
xxxx
xxxxx
------------ I
Level Of Service
---------------
Module:
---------------
---------------
----------
- - - - -I
Stopped Del: xxxxx
xxxx
xxxxx
10.5
xxxx
4.3
3.6
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move:
*
*
*
*
*
*
A
Movement:
LT -
LTR
- RT
'LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.:
xxxx xxxx
xxxxx
xxxx
535
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx
8.3
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS:
*
*
*
*
B
ApproachDel:
0.0
8.3
0.5
0.0
COMPARE Mon Dec 21 09:00:56 1998 Page 3 -1
Level awice Computation.Keport
1994 HCM Unsignalized (Future Volume Alternative)
Fxissat
Intersection #1: Luchessa /Princevalle
Approach: North Bound
South Bound
East Bound
Signal= Stop/Righls= lnGude
Movement: L - T -
R
L -
Initial Vol:
17
0
30
-
R
Lanes:
0
0 11 0
0
11
Date:
Initial Vol: Lanes:
14 0
Signal = Uncontml
Rights = lnGude
�
11 ---------------
<< Sat Peak
Vol Grit Date: 10124/98
Cycle Time (sec): 100
Loss Time (sec): 0
Signal= Uncomml
Rightsm Include Lanes: Initial Vol:
� 0 30
1
�
Base Vol: 0 0
0
1
88 0
17
14
Critical V /C:
0.000
0 89
0
89
30
Avg Crit Del (seclveh):
0.9
0
1.00
1.00
1.00
1.00
0 0
1.00
1.00
Avg Delay (sedveh):
0.9
0 0
0
17
14
LOS:
A
0
0
89
30
Added Vol: 0 0
0
0
0
Lanes:
0
0 0 0
0
0
0
Initial Vol:
0
0
0
0
0
0
0
Signal= StopRiights= lnclude
0
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L -
T -
R
L
- T
-
R
L -
T
- R
------------ ---------------
Volume Module: >> Count
11
Date:
---------------
24 Oct
1998
11 ---------------
<< Sat Peak
11
---------------
�
Base Vol: 0 0
0
30
0
17
14
88
0
0
89
30
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Beer 0 0
0
30
0
17
14
88
0
0
89
30
Added Vol: 0 0
0
0
0
0
0
0
0
0
0
0
PasserByVol: 0 0
0
0
0
0
0
0
0
0
0
0
Initial Put: 0 0
0
30
0
17
14
88
0
0
89
30
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
30
0
17
14
88
0
0
'89
30
Reduct Vol: 0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0 0
0
30
0
17
14
88
0
0
89
30
Adjusted volume Module:
Grade: 0%
0%
0%
0%
% Cycle/ Cars: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
% Truck /Comb: xxxx xxxx
xxxx
xxxx
xxxx
xXYY
xxxx
XxXX
PCE Adj: 1.10 1.10
1.10
1.10 1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
acxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
33
0
19
15
88
0
0
89
30
Critical Gap Module:
MoveUp Time: xxxxx xxxx
xxxxx
3.4 xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
6.5 xxxx
5.5
5.0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
-- I ---------------
Capacity Module:
---------------
-----------
-
- - -II
-
- - - - -I
Cnflict Vol: xxxx xxxx
xxxxx
206 xxxx
104
119
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx
xxxxx
805 xxxx
1226
1504
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx
xxxxx
0.99 xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx
xxxxx
796 xxxx
1226
1504
xxxx
xxxxx
xxxx
xxxx
xxxxx
------------ I---------------
Level Of Service Module:
---------------
---------------
II----------
- - - - -I
Stopped Del: xxxxx xxxx
xxxxx
4.7 xxxx
3.0
2.4
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
**
*
*
A
Movement: LT - LTR
- RT
LT -
LTR -
RT
LT
- LTR
-
RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx
912 xxxxx
xxxx
xxXX
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx
xxxxx
xxxxx
4.1 xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
*
A
ApproaChDel: 0.0
4.1
0.4
0.0
Tral6x 7.1.0427 Copyright (c) 1998 Dowling Associates, Inc. Licensed to FEHR 8 PEERS. SAN JOSE
COMPARE Mon Dec 2109:00:56 1998 . Page 3.2
LeVel Ut Semce UoMputaliOn pc
1994 HCM Unsignalized (Future Volume Alternative)
BackSal
Intersection #1: Luchessa /Princevalle
Approach:
North Bound
Signal= Stop /Rights= lncude
East Bound
West Bound
Initial Vol:
20
0
35
L -
Lanes:
0
0 11 0
0
- R
II
Slgnal=Uncontrol
Initial Vol: Lanes: Rights= Include
T
Vol Cat Date:
Na
Signal= Uncontrol
Rights = Include Lanes: Initial Vol:
J,
II
Cycle Time (sec):
100
0 35
77 0
1
Base Vol:
Loss Time (sec):
0
1
134 0
0
Critical V /C:
0.000
0 141
0
0
Avg Cnl Del (sedveh):
0.8
{ 0
0 0
1.00
Avg Delay (sedveh):
0.8
0 0
1..00
1.00
LOS:
A
1.00
1.00
1.00
T
I t
r*
0
Lanes:
0
0 0 0
0
14
Initial Vol:
0
0
0
30
Added Vol:
0
Signal= Stop /Rights = lnclude
0
0
Approach:
North Bound
South Bound
East Bound
West Bound
Movement:
L
- T -
R
L -
T
- R
II
L -
---------------
T
- R
II
L -
----------
T
- R
- - - - - I
------------ I
Volume Module:
---------------
II
---------------
Base Vol:
0
0
0
30
0
17
14
88
0
0
89
30
Growth Adj:
1.00
1.00
1.00
1.00
1.00
1..00
1.00
1.00
1.00
1.00
1.00
1.00
Initial BEE:
0
0
0
30
0
17
14
88
0
0
89
30
Added Vol:
0
0
0
0
0
0
0
0
0
0
0
0
ApprovedDev:
0
0
0
5
0
3
3
46
0
0
52
5
Initial Fut:
0
0
0
35
0
20
17
134
0
0
141
35
User Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume:
0
0
0
35
0
20
17
134
0
0
141
35
Reduct Vol:
0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
0
0
0
35
0
20
17
134
0
0
141
35
Adjusted Volume Module:
Grade:
0%
0%
0%
08
Cycle/ Cars:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx'
xxxx
xxxx
Truck/ Comb:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xx-`cx
xxxx
PCE Adj:
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.:
0
0
0
39
0
22
19
134
0
0
141
35
Critical Gap
Module:
MoveUp Time:xxxxx
xxxx
xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx
---------------
xxxx
xxxxx
6.5
---------------
xxxx
5.5
5.0
---------------
xxxx
xxxxx
xxxxx
----------
xxacx
xxxxx
- - - - -I
------------ I
Capacity Module:
Cnflict Vol:
xxxx
xxxx
xxxxx
310
xxxx
159
176
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.:
xxxx
xxxx
xxxxx
701
xxxx
1151
1413
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap:
xxxx
xxxx
xxxxx
0.99
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.:
xxxx
=oc
xxxxx
691
xxxx
1151
1413
---------------
xxxx
xxxxx
x=
----------
xxxx
xxxxx
- - - - -I
------------ I ---------------
Level Of Service
Module:
---------------
Stopped Del:xxxxx xxxx xxxacx
5.5'xxxx
3.2
2.6
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move:
*
*
*
*
*
*
A
Movement:
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.:
=uc
xxxx
xxxxx
xxxx
808
xxxxx
xxxx
=CC
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx
4.7
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS:
*
*
*
*
A
ApproachDel:
0.0
4.7
0.3
0.0
COMPARE
Mon Dec 21 09:00:56 1998
Levei Ul berviCe ompu a ion Heprm
1994 HCM Unsignali¢ed (Future Volume Alternative)
Ph2Sat
Intersection #1: Luchessa /Princevalle
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- II --------------- II --------------- II ---------- - - - - -
I
Volume Module:
Base Vol: 0 0 0 30 0 17 14 88 0 0 89 30
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 0 0 30 0 17 14 88 0 0 89 30
Added Vol: 0 0 0 9 0 0 0 22 0 0 22 9
ApprovedDev: 0 0 0 5 0 3 3 46 0 0 52 5
Initial Fut: 0 0 0 44 0 20 17 156 0 0 163 44
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 44 0 20 17 156 0 0 163 44
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 44 0 20 17 156 0 0 163 44
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck / Comb: xxxx xxxx xxxx xxxx x�ccc oocxx xxxx xxxx
PCE Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx XXXY xxxx xxxx
Adj Vol.: 0 0 0 48 0 22 19 156 0 0 163 44
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx 3.A xxxx 2.6 2.1 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx 6.5 xxxx 5.5 5.0 xxxx xxxxx xxxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 358 xxxx 185 207 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 657 xxxx 1116 1366 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx 0.98 xxxx 1.00 1.00 xxxx xxxxx xxxx xxxx =ncx
Move Cap.: xxxx xxxx xxxxx 647 xxxx 1116 1366 xxxx xxxxx xxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del:xxxxx xxxx xxxxx 6.0 xxxx 3.3 2.7 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * x x x x x A * x * * . *
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx 745 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 5.1 xxxxx xxxxx xxxx xxxxx xxxxx xxkx xxxxx
Shared LOS: * * * x B x x x x x
ApproachDel: 0.0 5.1 0.3 0.0
Signal= Stop/W ghts= Include
Initial Vol:
20
0
44
Lanes:
0
�-0',1Iy 111 IyA0
I t 9
0
Signal= Uncontrol
Initial Vol: Lanes: Rights= Include
Vol Cnt Date:
Na
Signal= Uncontml
RIgh6= Include Lanes: Initial Vol:
77 0 J
Cyde Time (sec):
100
0 44
Loss Time (sec):
0
1
156 0 ,.
Critical V /C:
O.00D
♦_ 0 163
0
Avg Cdl Del (sectyeh):
0.9
0
0 0
Avg Delay(sedveh):
0.9
r 0 0
LOS:
B
p
Lanes:
0
0 0 0
0
Initial Vol:
0
0
0
Signal = Stop /Rights = Include
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- II --------------- II --------------- II ---------- - - - - -
I
Volume Module:
Base Vol: 0 0 0 30 0 17 14 88 0 0 89 30
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 0 0 30 0 17 14 88 0 0 89 30
Added Vol: 0 0 0 9 0 0 0 22 0 0 22 9
ApprovedDev: 0 0 0 5 0 3 3 46 0 0 52 5
Initial Fut: 0 0 0 44 0 20 17 156 0 0 163 44
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 44 0 20 17 156 0 0 163 44
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 44 0 20 17 156 0 0 163 44
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck / Comb: xxxx xxxx xxxx xxxx x�ccc oocxx xxxx xxxx
PCE Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx XXXY xxxx xxxx
Adj Vol.: 0 0 0 48 0 22 19 156 0 0 163 44
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx 3.A xxxx 2.6 2.1 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx 6.5 xxxx 5.5 5.0 xxxx xxxxx xxxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 358 xxxx 185 207 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 657 xxxx 1116 1366 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx 0.98 xxxx 1.00 1.00 xxxx xxxxx xxxx xxxx =ncx
Move Cap.: xxxx xxxx xxxxx 647 xxxx 1116 1366 xxxx xxxxx xxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del:xxxxx xxxx xxxxx 6.0 xxxx 3.3 2.7 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * x x x x x A * x * * . *
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx 745 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 5.1 xxxxx xxxxx xxxx xxxxx xxxxx xxkx xxxxx
Shared LOS: * * * x B x x x x x
ApproachDel: 0.0 5.1 0.3 0.0
COMPARE Man Dec 2109:00:56 1998 Page 34
LeVel La berviCe Gampulation Report
1994 HCM Unsignalized (Future Volume Alternative)
Ph3Sat
Intersection #1: Luchessa/Princevalle
Approach: North Bound
South Bound
East Bound
Signal= Stop/Rlghts= lnc1ude
Movement: L - T -
R
L -
---------------
Initial Vol:
20
0
51
- R
II
L -
----------
Lanes:
0
0 11 Iy^0
r
0
Initial Vol: Lanes:
Signal= Uncontrol
Rights = Include
Vol Cnt Date:
Na
Signal= Uncantrol
Rights = Include Lanes: Initial Vol:
Base Vol: 0 0
Cycle Time (sec):
100
0 51
17 0
14
88
0
0
89
30
Growth Adj: 1.00 1.00
1.00
Loss Time (sec):
0
1.00
1.00
1.00
1.00
1.00
1..00
1
174 o
0
30
Critical V /C:
0.000
♦_ a 181
0
0
0
Avg Cdt Del (seelveh):
1.0
0
0 0
16
0
Avg Delay (seclveh):
1.0
0 0
0
0
40
LOS:
B
0
5
0
3
3
46
0
0
Lanes:
a
0 0 0
0
51
0
Initial Vol:
0
0
0
0
181
51
User Adj: 1.00 1.00
Signal= Stop/Rigms= Include
1.00 1.00
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L -
---------------
T -
R
II
L -
---------------
T
- R
II
L -
----------
T -
R
- - - - - I
------------ I ---------------
Volume Module:
II
Base Vol: 0 0
0
30
0
17
14
88
0
0
89
30
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1..00
1.00
Initial Bse: 0 0
0
30
0
17
14
88
0
0
89
30
Added Vol: 0 0
0
16
0
0
0
40
0
0
40
16
ApprovedDev: 0 0
0
5
0
3
3
46
0
0
52
5
Initial Fut: 0 0
0
51
0
20
17
174
0
0
181
51
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
51
0
20
17
174
0
0
181
51
Reduct Vol: 0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0 0
0
51
0
20
17
174
0
0
181
51
Adjusted Volume Module:
Grade: 0%
0%
0%
08
% Cycle/ Cars: xxxx xxxx
xxxx
>vcx
-`L
xxxx
xxxx.
>ov<x
>vo<x
S Truck /Comb: xx1L2c xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10
1.10
1.10 1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx =CiC
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE: )ct= xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
56
0
22
19
174
0
0
181
51,
Critical Gap Module:
MoveUp Time:xxxxx xxxx
xxxxx
3.4 xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx -xxxxx
Critical Gp:xxxxx xxxx xxxxx
I ---------------
6.5 xxxx
---------------
5.5
5.0
---------------
xxxx
xxxxx
xxxxx
----------
xxxx
xxxxx
- - - - -I
------------
Capacity Module:
Cnflict Vol: xxxx xxxx
xxxxx
398 xxxx
207
232
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx
xxxxx
623.xxxx
1088
1329
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx
xxxxx
0.96 xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx
xxxxx
613 xxxx
---------------
1088
1329
---------------
xxxx
xxxxx
xxxx
----------
xxxx
xxxxx
- - - - -I
------------ I ---------------
Level Of Service Module:
Stopped Del:xxxxx xxxx xxxxx
6.4 xxxx
3.4
2.7
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
*
*
*
A
Movement: LT - LTR
- RT
LT -
LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx
699
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx
xxxxxxxxxx
5.5
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
*
B
ApproachDel: 0.0
5.5
0.3
0.0
COMPARE Mon Dec 2109:04:27 1998 Page 3 -1
eve erv¢e COMPUtatiOn KepOn
1994 HCM Unsignalized (Future Volume Alternative)
Ph4Sat
Intersection #1: Luchessa/Princevalle
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- II --------------- II --------------- II ---------- - - - - -
I
Volume Module:
Base Vol: 0 0 0 30 0 17 14 88 0 0 89 30
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial BEE: 0 0 0 30 0 17 14 88 0 0 89 30
Added Vol: 0 0 0 29 0 0 0 73 0 0 73 29
ApprovedDev: 0 0 0 5 0 3 3 46 0 0 52 5
Initial Fut: 0 0 0 64 0 20 17 207 0 0 214 64
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 64 0 20 17 207 0 0 214 64
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 64 0 20 17 207 0 0 214 64
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck /Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00
Cycl /Car PCE: xxxx xxxx .xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 70 0 22 19 207 0 0 214 64
Critical Gap Module:
MoveUp Time: xxxxx xxxx xxxxx 3.4 xxxx 2.6 2.1 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx 6.5 xxxx 5.5 5.0 xxxx xxxxx xxxxx xxxx xxxxx
-------_---- I --------------- --------------- --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 470 xxxx 246 278 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 566 xxxx 1039 1264 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx 0.98 xxxx 1.00 1.00 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 556 xxxx 1039 1264 xxxx xxxxx xxxx xxxx xxxxx
------------ I --------------- ----------- - - - -II ------- ---------- - - - - -I
Level Of Service Module:
Stopped Del: xxxxx xxxx xxxxx 7.3 xxxx 3.5 2.9 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * * A
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx 625 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 6.4 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * * * * B * * * +
ApproachDel: 0.0 6.4 0.2 0.0
Traftix 7.1.0427 Copyright (c) 1998 Dmling Associates, Inc. Licensed to FEHR 8 PEERS. SAN JOSE
Signal= StopRLghts= Include
Initial Vol:
20
0
64
Lanes:
0
0 111 0
■
0
Initial Vol: Lanes:
Signal= Uncontrol
Rights = Include
Vol Cat Date:
Na
Signal= Unccntral
Rights= Include Lanes: Initial Vol:
Cycle Time (sec):
100
0 64
17 0
-/
`T`
►
Loss me (sect:
0
207 0
_♦
critical V /C:
0.000
0 214
0
Avg CAL Del (seWeh):
1.1
0
0 0
Avg Delay (seclveh):
1.1
0 0
LOSS:
8
1.l
t
Lanes:
0
0 0 0
0
Initial Vol:
0
0
0
Signal= Stop /Rights = Include
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- II --------------- II --------------- II ---------- - - - - -
I
Volume Module:
Base Vol: 0 0 0 30 0 17 14 88 0 0 89 30
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial BEE: 0 0 0 30 0 17 14 88 0 0 89 30
Added Vol: 0 0 0 29 0 0 0 73 0 0 73 29
ApprovedDev: 0 0 0 5 0 3 3 46 0 0 52 5
Initial Fut: 0 0 0 64 0 20 17 207 0 0 214 64
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 64 0 20 17 207 0 0 214 64
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 64 0 20 17 207 0 0 214 64
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck /Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00
Cycl /Car PCE: xxxx xxxx .xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 70 0 22 19 207 0 0 214 64
Critical Gap Module:
MoveUp Time: xxxxx xxxx xxxxx 3.4 xxxx 2.6 2.1 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx 6.5 xxxx 5.5 5.0 xxxx xxxxx xxxxx xxxx xxxxx
-------_---- I --------------- --------------- --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 470 xxxx 246 278 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 566 xxxx 1039 1264 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx 0.98 xxxx 1.00 1.00 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 556 xxxx 1039 1264 xxxx xxxxx xxxx xxxx xxxxx
------------ I --------------- ----------- - - - -II ------- ---------- - - - - -I
Level Of Service Module:
Stopped Del: xxxxx xxxx xxxxx 7.3 xxxx 3.5 2.9 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * * A
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx 625 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 6.4 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * * * * B * * * +
ApproachDel: 0.0 6.4 0.2 0.0
Traftix 7.1.0427 Copyright (c) 1998 Dmling Associates, Inc. Licensed to FEHR 8 PEERS. SAN JOSE
COMPARE Mon Dec 2109:0427 1998 Page 3 -2
eve ervtce Computation Repoft
1994 HCM Unsignaliied (Future Volume ARemative)
Ph5Sal
Intersection #1: LuchessalPrincevalle
Signal= SloplHighls= Include
Initial Vol: 20 0 77
Lanes: 0 0 11 0 0
'144, �*4
Signal= Uncontml
Signal= Unrontrol
,
Initial Vol: Lanes: Rights = Include
Vol Cnt Date:
Na Rights = Include Lanes: Initial Vol:
J,
Cycle
Cycle
me (sec):
100
17 0
0
77
Loss
Time (see):
0
1
-t- 1
240 0
CmIcal V /C:
0.000
0
247
0
Avg Crit
Del (secheh):
1.2
0
0 0
Avg Delay (seclveh):
12
0
0
LOS:
e
Lanes:
0 0
0 0
0
Initial Vol:
0
0
0
Signal= Stop/Rlghls= Include
Approach: North Bound
South Bound
East Bound
west Bound
Movement: L - T -
R
L - T
- R
L - T -
R
L -
----------
T
- R
- - - - -I
------ - - - - -- ---------------
Volume Module:
II
---------------
---------------
Base Vol: 0 0
0
30 0
17
14 88
0
0
89
30
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial BSe: 0 0
0
30 0
17
14 88
0
0
89
30
Added Vol: 0 0
0
42 0
0
0 106
0
0
106
42
ApprovedDev: 0 0
0
5 0
3
3 46
0
0
52
5
Initial Fut: 0 0
0
77 0
20
17 240
0
0
247
77
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
77 0
20
17 240
0
0
247
77
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
Final Vol.: 0 0
0
77 0
20
17 240
0
0
247
77
Adjusted Volume Module:
Grade: 0$
0%
0%
0%
% Cycle/ Cars: xxxx xxxx
xxxx
=C)C
xxxx xxxx-
xxxx
xxxx
5 Truck/ Comb: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10
1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
,
Adj Vol.: 0 0
0
85 0
22
19 240
0
0
247
77
Critical Gap Module:
-
MoveUp Time:xxxxx xxxx xxxxx
3.4 xxxx
2.6
2.1 xxxx xxxxx xxxxx
xxxx'xxxxx
Critical Gp:xxxxx xxxx xxxxx
------------ I---------------
6.5 xxxx
---------------
5.5
5.0 xxxx
---------------
xxxxx
xxxxx
----------
xxxx
xxxxx
- - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx
543 xxxx
286
324 xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx . xxxx xxxxx
514 xxxx
992
1201 xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx xxxxx
0.98 xxxx
1.00
1.00 xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx xxxxx
504 xxxx
992
1201 xxxx
xxxxx
xxxx
----------
xxxx
xxxxx
- - - - -I
------------ I ---------------
Level Of Service Module:
---------------
---------------
Stopped Del:xxxxx xxxx xxxxx
6.4 xxxx
3.7
3.0 xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
* *
*
A
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx 561
xxxxx
xxxx xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx
XXXXX 7.4
xxYYY
xxxxx xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
* B
ApproachDel: 0.0
7.4
0.2
0.0
COMPARE Mon Dec 2109 0427 1998 Page 3.3
LaVic ut 5eivice computation Report
1994 HCM Unsignalized (Future Volume Alternative)
Ph65at
Intersection #1: Luchessa /Princevalle
Approach: North Bound
South Bound
East Bound
Signal =Stop /Rights= lndude
Movement: L - T -
R
L -
Initial Vol:
20
0
63
- R
L -
----------
Lanes:
0
r-0^I{ 111 IyA0
7 t 7
0
---------------
Signal= Ummntrol
---------------
Signal= Uncontrol
Initial Vol: Lanes:
Rights= Include
Base Vol: 0 0
Vol Cnt Dale:
Na
Rights = Include Lanes: Initial Vol:
17
14
88
Cycle Time (sec):
100
Ilk-
0 83
17 p
Growth Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Loss Time (sec):
0
1.00
Initial BEE: 0 0
0
30
0
17
14.
254 0
0
0
Critical V /C:
0.000
♦_ 0 261
0
�.
0
Avg Cnt Del (sedveh):
1.3
0
0 0
0
120
Avg Delay(sedveh):
1.3
0 0
5
0
3
LOS:
9
0
0
52
5
Initial Fut: 0 0
0
83
0
Lanes:
0
0 0 0
0
0
261
Initial Vol:
0
0
0
1.00
1.00
1.00
1.00
Signal= Stop/Rights= lncIude
1.00
1.00
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L -
T
- R
L -
T
- R
L -
----------
T
- R
- - - - -I
------------ I ---------------
Volume Module:
---------------
---------------
Base Vol: 0 0
0
30
0
17
14
88
0
0
89
30
Growth Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial BEE: 0 0
0
30
0
17
14.
88
0
0
89
30
Added Vol: 0 0
0
48
0
0
0
120
0
0
120
48
ApprovedDev: 0 0
0
5
0
3
3.
46
0
0
52
5
Initial Fut: 0 0
0
83
0
20
17
254
0
0
261
83
User Adj: 1.00 1.00
1.00
1..00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
83
0
20
17
254
0
0
261
83
Reduct Vol: 0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0 0
0
63
0
20
17
254
0
0
261
83
Adjusted Volume Module:
Grade: 0%
0%
0%
,.
0%
% Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
.
xxxx
xxxx
% Truck/ Comb: xxxx xxxx
xxxx
xxxx
xxxx
XYYY
xxxx
xxxx
PCE Adj: 1.10 1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
91
0
22
19
254
0
0
261
83
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
6.5
xxxx
5.5
5..0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
------------ I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol: xxxx xxxx
xxxxx
574
xxxx
303
344
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx
xxxxx
493
xxxx
973
1175
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx
xxxxx
0.98
xxxx
1.00
1.00
xxxx
xxxxx
xxacx
xxxx
xxxxx
Move Cap.: xxxx xxxx
xxxxx
484
xxxx
973
1175
xxxx
xxxxx
xxxx
xxxx
xxxxx
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - - -I
Stopped Del:xxxxx xxxx
xxxxx
9.0
xxxx
3.8
3.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * x
*
*
*
x
A
Movement: LT - LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx
536
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx
xxxxx
xxxxx
8.0
xxxxx
xxxxx
xxxx
xxxxx
xxacacx
xxxx
xxxxx
Shared LOS: * *
*
*
B
ApproachDel: 0.0
8.0
0.2
0.0
COMPARE 'Mon Dee 21 09:04271998 Page 3-4
Level emce Computation Report
1994 HCM Unsignal¢ed (Future Volume Altemative)
Quonset
Intersection #1: Luchessa /Princevalle
Signal = Slap /Rights= lndude
Initial Vol: 20
0
85
Lanes: 0
00AIy
I
11 I {rt0_0
0
Signal= Ummntml
Signal= Uncontrol
Initial Vol: Lanes: Rights = Include
Vol Cut Date:
We Rights= lndude Lanes:
Initial Vol:
Cycle Time (sec):
100
17 0 ./
0
103
s
Lass
Time (sec):
0
1
1
254 0
Critical V /C: 11A00
0
281
0
Avg Cut
Del (sedveh):
1.3
0
0 0
Avg Delay(seWeh):
1.3
0
0
LOS:
B
T
Lanes: 0
0
0 0
0
Initial Vol: 0
0
0
Signal= SleplRlghts= Include
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L - T
- R
L - T -
---------------
R
L -
----------
T
- R
- - - - -I
------------ ---------------
Volume Module:
II
---------------
Base Vol: 0 0
0
30 0
17
14 88
0
0
89
30
Growth Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial BEE: 0 0
0
30 0
17
14 88
0
0
89
30
Added Vol: 0 0
0
48 0
0
0 120
0
0
120
48
App +Pending: 0 0
0
7 0
3
3 46
0
0
52
25
Initial Fut: 0 0
0
85 0
20
17 254
0
0
261
103
User Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
85 0
20
17 254
0
0
261
103
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
Final Vol.: 0 0
0
85 0
20
17 254
0
0
261
103
,Adjusted Volume Module:
Grade: OS
0%
08
0%
% Cycle/ Cars: xxxx xxxx
xxxx
xxxx
xxxx xxxx-
xxxx
xxxx
% Truck /Comb: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10 1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
94 0
22
19 254
0
0
261
103
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
3.4 xxXX
2.6
2.1 xxxx
xxxxx
xxxxx
xxxx'xxxxx
Critical Gp:xxxxx xxxx xxxxx
I ---------------
6.5 xxxx
---------------
5.5
5.0 xxxx.
---------------
xxxxx
xxxxx
----------
xxxx
xxxxx
- - - - -I
------------
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx
584 xxxx
313
364 xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx xxxxx
486 xxxx
962
1150 xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx xxxxx
0.98 xxxx
1.00
1.00 xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx xxxxx
477 xxxx
---------------
962
1150 xxxx
---------
xxxxx
xxxx
----------
xxxx
xxxxx
- - - - -I
------------ 1---------------
Level Of Service Module:
•------
Stopped Del:xxxxx xxxx xxxxx
9.2 xxxx
3.8
3.2 xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
* *
*
A
Movement: LT - LTR -
RT
IT - LTR
- RT
IT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx 528
xxxxx
xxxx xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDelcxxxxx xxxx xxxxx
xxxxx 8.2
xxxxx
xxxxx xxxx
xxxxx
xxxxx
xxkx
xxxxx
Shared LOS: * *
*
* B
ApproachDel: 0.0
8.2
0.2
0.0
r�
COMPARE
Mon Dec 21 08:5720 1998
Level ervice L;omputalion heloon
1994 HCM Unsignalized (Future Volume Alternative)
Exis(PM
Intersection #2: Luchessa /Church
Approach:
North Bound
South Bound
Signal= ScplRights= Include
West Bound
Movement:
L
Initial Vol:
26
0
26
R
L -
Lanes:
0
0',7Iy 111 Iyn'a
1 7 ■
0
- R
- - - - - I
Initial Vol: Lanes:
Signal= Ummntml
Rights = Include
Count
Vol Cnt Date: 1912198
Signal= Uncontrol
Rights = Include Lanes: Initial Vol:
II
c< PM
---------------
Peak
Cycle Time (sec):
100
0 60
37 0
Base Vol:
0
0
0
26
0
26
37
Loss Time (sec):
0
0
126 0
60
Growth Adj:
Critical V/C: 0.000
0 231
0
1.00
1.00
Avg Cnt Del (senlveh):
0.8
0
0 0
1.00
1.00
Avg Delay (seciveh):
0.8
0 0
0
0
26
LOS:
S
37
126
0
0
231
60
Added Vol:
0
Lanes:
0
0 0 0
0
0
0
Initial Vol:
0
0
0
0
PasserByVol:
0
0
Signal= Stop/RighLs= lnctude
0
0
Approach:
North Bound
South Bound
East Bound
West Bound
Movement:
L
- T -
R
L -
T -
R
L -
T
- R
II
L -
----------
T
- R
- - - - - I
------------ I
Volume Module:
---------------
>>
Count
II
Date:
---------------
12 Dec 1998
II
c< PM
---------------
Peak
Base Vol:
0
0
0
26
0
26
37
126
0
0
231
60
Growth Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Sae:
0
0
0
26
0
26
37
126
0
0
231
60
Added Vol:
0
0
0
0
0
0
0
0
0
0
0
0
PasserByVol:
0
0
0
0
0
0
0
0
0
0
0
0
Initial Fut:
0
0
0
26
0
26
37
126
0
0
231
60
User Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume:
0
0
0
26
0
26
37
126
0
0
231
60
Reduct Vol:
0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
0
0
0
26
0
26
37
126
0
0
231
60
Adjusted Volume
Module:
Grade:
0%
08
0%
0%
% Cycle /Cars:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx-
xxxx
xxxx
& Truck/ Comb:
xxxx
acxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.:
0
0
0
29
0
29
41
126
0
0
231
60.
Critical Gap
Module:
MoveUp Time:xxxxx
xxxx xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xXYy
xxxxx
Critical Gp:xxxxx
------------ I
---------------
xxxx
xxxxx
6.5
---------------
xxxx
5.5
5.0
---------------
xxxx
xxxxx
xxxxx
----------
xxxx
xxxxx
- - - - -I
Capacity Module:
Cnflict Vol:
xxxx
xxxx
xxxxx
424
xxxx
261
291
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.:
xxxx
xxxx
xxxxx
602
xxxx
1021
1246
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap:
xxxx
xxxx
xxxxx
0.96
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.:
xxxx
xxxx
xxxxx
580
xxxx
1021
1246
xxxx
xxxxx
xxxx
xxxx
xxxxx
------------ I
Level Of Service
---------------
Module:
---------------
---------------
----------
- - - - -I
Stopped Del:xxxxx
xxxx
xxxxx
6.5
xxxx
3.6
3.0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move:
*
*
*
*
*
*
A
Movement:
LT
- LTR
- RT
LT
- LTR -
RT
LT -
LTR
- RT
LT
- LTR
- RT
Shared Cap.:
xxxx
xxxx
xxxxx
xxxx
740
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx,
5.1
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS:
*
*
*
*
B
*
*
*
*
+
*
+
ApproachDel:
0.0
5.1
0.7
0.0
&5
COMPARE Mon Dee 2108 5720 199B Page 3�6
Level or bemice ompuwticn
Kepon
1994 HCM Unsignalized (Future
Volume Alternative)
BackPM
Intersection #2: Luchessa/Church
Signal= Stop/Rlghts= Include
Initial Vol:
28
0
29
Lanes:
0 0
11 00_x'
0
Signal= Uncontrol
Signal= UnronOol
Initial Vol: Lanes: Rights= Include
Vol Grit Date:
We Rights = lndude Lanes:
Initial Vol:
Cycle Time (see):
100
38 0 J
0
63
Loss
Time (sec):
0
■
1
1
168 0
Critical VIC:
0.000
0
298
0
Avg Cm
Del (sedveh):
0.8
0
0 0
Avg Delay (sed mh):
0.8
0
0
l
LOS:
B
T
1
Lanes:
0 0
0 0
0
Initial Vol:
0
0
0
Signal= Stop/Rights= lndude
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L -
T -
R
L - T
- R
L - T -
---------------
R
L -
----------
T
- R
- - - - -I
------------ ---------------
Volume Module:
II
---------------
Base Vol: 0
0
0
26 0
26
37 126
0
0
231
60
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial Bse: 0
0
0
26 0
26
37 126
0
0
231
60
Added Vol: 0
0
0
0 0
0
0 0
0
0
0
0
Approved: 0
0
0
3 0
2
1 42
0
0
67
3
Initial Fut: 0
0
0
29 0
28
38 168
0
0
298
63
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00 ,
PHF Volume: 0
0
0
29 0
28
38 168
0
0
298
63 _
Reduct Vol: 0
0
0
0 0
0
0 0
0
0
0
0
Final Vol.: 0
0
0
29 0
28
38 168
0
0
298
63
Adjusted Volume Module:
Grade:
0%
0%
0%
08
% Cycle/ Cars: xxxx
xxxx
xxxx
xxxx
xxxx =oc-
xxxx
xxxx
% Truck/ Comb: xxxx
xxxx
xxxx
xxxx
xxxx xxxx
gCXJCX
xxxx
PCE Adj: 1.10 1.10
1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx
xxxx
=0c
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx
xxxx
xxxx
xxxx
xxxx xxxx
xxxx
=DC
Adj Vol.: 0
0
0
32 0
31
42 168
0
0
298
63
Critical Gap Module:
MoveUp Time:xxxxx =Ctc
xxxxx
3.4 xxxx
2.6
2.1 xxxx xxxxx xxxxx
xxxx
xxxxx
Critical Gp:x=cc =ctc xxxxx
------------ I ---------------
6.5 xxxx
---------------
5.5
5.0 xxxx xxxxx
---------------
xxxxx
----------
xxxx
xxxxx
- - - - -I
Capacity Module:
�t
Cnflict Vol: xxxx xxxx
xxxxx
536 xxxx
330
361 xxxx xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: =oc xxxx
xxxxx
518 xxxx
943
1154 =utc xxxxx
xxxx
xxxx
xxxxx
Adj Cap: =oc xxxx
xxxxx
0.96 =oc
1.00
1.00 xxxx xxxxx
xxxx
xxxx
xxxxx
Move Cap.: =Dc xxxx
xxxxx
498 xxxx
943
1154 xxxx xxxxx
---------------
xxxx
----------
xxxx
xxxxx
- - - - -I
------------ I ---------------
Level Of Service Module:
---------------
Stopped Del: xxxxx =oc
xxxxx
7.7 xxxx
3.9
3.2 xxxx xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: x
x
x
x x
x
A x
x
x
*
x
Movement: LT - LTR
- RT
"LT - LTR
- RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx 648
xxxxx
xxxx =uc
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx
xxxxx
xxxxx 5.8
xxxxx
xxxxx xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: *
*
*
* B
ApproachDel:
0.0
5.8
0.6
0.0
I
COMPARE
Intersection #2: Luchessa /Church
Mon Dec 2108:57:20 1998
1994 HCM Unsignai¢ed
-
Approach: North Bound
Signal = Stop /Rights = lntlude
East Bound
West Bound
Initial Vol:
28
0
39
- T
Lanes:
0
0 it Iyn0`0
0
L -
----------
Signal=Uncontrcl
Initial Vol: Lanes: Rights= lntlude
- R
- - - - - I
1
Vol Cot Date:
No
Signal= Uncontrol
Rights = Include Lanes: Initial Val:
---------------
Cycle Time (sec):
100
0 73
38 0
Base Vol: 0 0
0
Loss Time (sec):
0
26
37
126
0
0
1
192 0
-ti
Cdtical V /C:
0.000
0 322
0
1.00
Avg Cdl Del (secheh):
0.9
0
0 0
1.00
Avg Delay(sedveh):
0.9
0 0
0
26
LOS:
B
37
1
0
At t
231
60
Added Vol: 0 0
0
10
0
Lanes:
0
0 0 0
0
0
Initial Vol:
0
0
0
0
3
0
S1gnal= Stop1Rights= lntlude
1
42
-
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L
- T
- R
II
L -
---------------
T
- R
II
L -
----------
T
- R
- - - - - I
-----------_ I ---------------
Volume Module:
II
---------------
Base Vol: 0 0
0
26
0
26
37
126
0
0
231
60
-ti
Growth Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Bse: 0 0
0
26
0
26
37
126
0
0
231
60
Added Vol: 0 0
0
10
0
0
0
24
0
0
24
10
Approved: 0 0
0
3
0
2
1
42
0
0
67
3
Initial Fut: 0 0
0
39
0
28
38
192
0
0
322
73
User Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
39
0
28
38
192
0
0
322
73
Reduct Vol: 0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0 0
0
39
0
28
38
192
0
0
322
73
Adjusted Volume Module:
Grade: 0%
0%
096
0%
It Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
% Truck/ Comb: xxxx xxxx
xxxx
xaocx
arxxx
=oc
xxxx
xxxx
PCE Adj: 1.10 1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xgOCx
xxxx
Adj Vol.: 0 0
0
43
0
31
42
192
0
0
322
73
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
3:4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
------------ I ---------------
6.5
---------------
xxxx
5.5
5.0
---------------
xxxx
xxxxx
xxxxx
----------
xxxx
xxxxx
- - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx
xxxxx
589
xxxx
359
395
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx
xxxxx
483
xxxx
911
1111
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xx21:x xxxx
xxxxx
0.96
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx.
xxxxx
463
xxxx
911
1111
xxxx
xxxxx
xxxx
xxxx
xxxxx
/
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - - -I
Stopped Del:xxxxx xxxx
xxxxx
8.5
xxxx
4.1
3.4
xxxx
xxxxx
xxxXX
xxxx
xxxxx
LOS by Move: * *
*
*
*
*
A
'
Movement: LT - LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx
582
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx
xxxxx
xxxxx
6.6
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
*
B
ApproachDel: 0.0
6.6
0.6
0.0
Page 3.7
COMPARE
Mon Dec 2108:57:20 1998
L.vel U, bemce Computabon Kepon
1994 HCM Unsignaki (Future Volume Alternative)
Ph3PM
Intersection #2: Luchessa /Church
Approach:
North Bound
Signal= Slop/RJghts= lndude
East Bound
west Bound
Movement:
Initial Vol:
26 0
45
L -
---------------
T
Lanes:
0 0 11 0
0
IniUal Vol: Lanes:
Signal= Uncontrol
Rights= Include
Vol Cnt Date:
We
Signal =Unconinel
Righs= Include Lanes: Initial Vol:
---------------
Cycle nme (sec):
100
0 79
36 0
1
Loss Time (see):
0
1T-' 1
206 0
0
Cdtical V /C:
0.000
._ 0 336
0
126
Avg Cat Del (serNeh):
1.0
0
0 0
60
Avg Delay(seWeh):
1.0
0 0
1.00
1.00
LOS:
B
1.00
1.00
1.00
1.00
1.00
1.00
Lanes:
0 0 0 0
0
0
26
Initial Vol:
0 0
0
126
0
Signal= Stop1RIgh6= 1ndude
231
60
Approach:
North Bound
South Bound
East Bound
west Bound
Movement:
L
- T -
R
II
L -
---------------
T
- R
II
L -
---------------
T -
R
II
L -
----------
T
- R
- - - - - I
------------ I
Volume Module:
---------------
Base Vol:
0
0
0
26
0
26
37
126
0
0
231
60
Growth Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Bse:
0
0
0
26
0
26
37
126
0
0
231
60
Added Vol:
0
0
0
16
0
0
0
38
0
0
38
16
Approved:
0
0
0
3
0
2
1
42
0
0
67
3
Initial Fut:
0
0
0
45
0
28
38
206
0
0
336
79
User Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume:
0
0
0
45
0
28
38
206
0
0
336
79
Reduct Vol:
0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
0
0
0
45
0
26
38
206
_
0
0
336
79
Adjusted Volume Module:
Grade:
0%
0%
0%
0%
% Cycle/ Cars:
YD=
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
8 Truck/ Comb:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.:
0
0
0
50
0
31
42
206
0
0
336
79
Critical Gap
Module:
MoveUp Time:xxxxx
xxxx
xx=
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
I ---------------
6.5
---------------
xxxx
5.5
5.0
---------------
xxxx
xxxxx
II
xxxxx
----------
xxxx
xxxxx
- - - - - I
----_-------
Capacity Module:
Cnflict Vol:
xxxx
xxxx
xxxxx
620
xxxx
376
415
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.:
xxxx
xxxx
xxxxx
464
xxxx
893
1087
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap:
xxxx
xxxx
xxxxx
0.96
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.:
xxxx
xxxx
xxxxx
443
xxxx
893
1087
---------------
xxxx
xxxxx
xxxx
II ----------
xxxx
xxxxx
- - - - - I
------------ I ---------------
Level Of Service
Module:
---------------
Stopped Del:
xxxxx
xxxx
xxxxx
9.0
xxxx
4.2
3.4
xxxx
xxxxx
xxxxx
xxxx
xx=
LOS by Move:
*
*
*
*
*
*
A
Movement:
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
-
RT
LT
- LTR
- RT
Shared Cap.:
xxxx
xxxx
xxxxx
xxxx
549
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx
7.2
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS:
*
*
*
*
B
ApproachDel:
0.0
7.2
0.6
0.0
Page 3-8
I
COMPARE Mon Dec 21 08:59:23 1998 Page 3.5
Level mace Lomputahan Keparl
1994 HCM Unsignalaed (Future Volume Alternative)
Ph4PM
Intersection #2: Luchessa /Church
Signal= Slop/Rights= include
Initial Vol:
28 0
59
_
Lanes:
0 0 111 0
0
Initial Vol: Lanes:
30 0
naloUn
Riglutleml
Vol Cat Dal
Cycle Time (see):
Loss Time (sec):
Na�
100
0
de Lanes: Initial Vol:
Rlights =Intlu 1
0 93
1
�
� 1
239 0
_.
Critical VEC:
0.000
._ 0 369
a 0
V
Avg Cdt Del (seWeh):
12
0
i
1, ) 0 0
Avg Delay(seWeh):
11
0 0
LOS:
B
Lanes:
0 0
0
0 0
Initial Vol:
0 0 0
Signal= SloplRights= lntlude
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L -
T -
R
L -
T
- R
L -
T
- R
____________ _______________
Volume Module:
_______________
---------------
_______________�
Base Vol: 0 0
0
26
0
26
37
126
0
0
231
60
Growth Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Bee: 0 0
0
26
0
26
37
126
0
0
231
60
Added Vol: 0 0
0
30
0
0
0
71
0
0
71
30
Approved: 0 0
0
3
0
2
1
42
0
0
67
3
Initial Fut: 0 O
0
59
0
28
38
239
0
0
369
93
User Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
59
0
28
38
239
0
0
369
93
Reduct Vol: 0 0
0
0
0
0
0
0
0
0
0
0
„
Final Vol.: 0 0
0
59
0
28
38
239
0
0
369
93
-
Adjusted Volume Module:
Grade: 0%
0%
0%
0%
% Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
8 Truck /Comb: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
65
0
31
42
239
0
0
369
93
Critical Gap Module:
MoveUp Time: xxxxx xxxx xXYYY
3:4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
}
Critical Gp:xxxxx xxxx xxxxx
6.5
xxxx
5.5
5.0
xxxx
xxxxx
xxxxx
xxxx
xxxxx
------------ I ---------------
Capacity Module:
---------------
---------------
II----------
- - - - -I
Cnflict Vol: xxxx xxxx xxxxx
693
xxxx
416
462
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx xxxxx
421
xxxx
853
1033
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx xxxxx
0.95
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx xxxxx
401
xxxx
853
1033
xxxx
xxxxx
xxxx
xxxx
xxxxx
"
__________ __ _______________
Level Of Service Module:
_______________
__ _______
---------------
Stopped Del:xxxxx xxxx xxxxx
10.5
xxxx
4.4
3.6
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
*
*
*
A
'
Movement: LT - LTR -
RT
LT
- LTR -
RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx
483 xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
-
Shrd StpDel:xxxxx xxxx xxxxx
xxxxx
8.5 xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
*
B
ApproachDel: 0.0
8.5
0.5
0.0
COMPARE
Mon Dec 21 095923 Wall
Page 341
Level ennce mpulauon
Report
1994 HCM Unstgnalind (Future Volume A9emative)
t.
PhsPM
Intersection #2: Luchessa /Church
Signal =Stop /Rights= Include
Initial Vol: 29
0
73
Lanes: 0
0
11 0
0
Signal= Uncontrol
Signal=
Uncontrol
Initial Vol: Lanes: Ngh6= Include
Vol Cnl Date:
We Rights = Include Lanes: Inllial Vol:
Cycle
nme (see):
100
38 0
i 0
107
Loss
Time (sec):
0
1
4L 1
271 0
Critical Vic:
0.000
0
401
0
Avg Cdt
Del (secivett):
1.4
a
-
0 0
Avg Delay(seWeh):
1.4
0
0
�l
LOS:
C
Lanes: 0
0
0 o
0
Initial Vol: 0
0
0
Signal =Stop `Rlghls= Include
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L - T
- R
L - T -
R
L
- T
- R
------ - - - - -- ---------------
Volume Module:
---------------
---------------
----------
- - - --�
Base Vol: 0 0
0
26 0
26
37 126
0
0
231
60
Growth Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial Bee: 0 0
0
26 0
26
37 126
0
0
231
60
lip.
Added Vol: 0 0
0
44 0
0
0 103
0
0
103
44
Approved: 0 0
0
3 0
2
1 42
0
0
67
3
Initial Fut: 0 0
0
73 0
28
38 271
0
0
401
107
User•Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Y
PHF Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
,.
PHF Volume: 0 0
0
73 0
28
38 271
0
0
401
107
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
Final Vol.: 0 0
0
73 0
28
38 271
0
0
401
107
Adjusted Volume Module:
"•
Grade: 0%
0%
0%
OS
% Cycle /Cars: xxxx xxxx
xxxx xxxx
Xo xxxx
xxxx
xxxx
* Truck/ Comb: xxxx xxxx
xxxx xxxx
xxxx xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10 1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xXYY
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: =MC =yMC
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
80 0
31
42 271
0
0
401
107 .
Critical Gap Module:
MoveUp Time: xxxxx xxxx xxxxx
3.4 xxxx
2.6
2.1 xxxx
xxxxx
xxxxx
=oc
xxxxx
r 7
Critical Gp:xxxxx xxxx xxxxx
6.5 xxxx
5.5
5.0 xxxx
xxxxx
xxxxx
xxxx
xxxxx
II I+
------------ I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol: xxxx xxxx xxxxx
764 xxxx
455
508 xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx xxxxx
383 xxxx
815
982 xxxx
xxxxx
xxxx
=tuc
xxxxx
`
Adj 'Cap: xxxx xxxx xxxxx
0.95 xxxx
1.00
1.00 xxxx
xxxxx
xxxx
=nc
xxxxx
Move Cap.: xxxx xxxx xxxxx
363 xxxx
815
982 xxxx
xxxxx
=uc
xxxx
xxxxx
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - - -I
,
Stopped Del:xxxxx =cic xxxxx
12.4 xxxx
4.6
3.8 xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
* *
*
A
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Ca p.: xxxx xxxx xxxxx
xxxx 429
xxxxx
xxxx xxxx
xxxxx
=cc
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx =uu;c
xxxxx 10.2
xxxxx
xxxxx xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
* C
ApproachDel: 0.0
10.2
0.5
0.0
COMPARE Mon Dec 2108-5923 1998 Page 3.7
Level Ul Service Computation Keport
1994 HCM Unsignalized (Future Volume Alternative)
Ph6PM
Intersection #2: Luchessa /Church a
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- --------------- --------------- II ---------- - - - - -
I
Volume Module:
Base Vol: 0 0 0 26 0 26 37 126 0 0 231 60
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 0 0 26 0 26 37 126 0 0 231 60
Added Vol: 0 0 0 50 0 0 0 116 0 0 116 50
Approved: 0 0 0 3 0 2 1 42 0 0 67 3
Initial Fut: 0 0 0 79 0 28 38 284 0 0 414 113
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 79 0 28 38 284 0 0 414 113
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 79 0 28 38 284 0 0 414 113
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck/ Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 87 0 31 42 284 0 0 414 113
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx 3.4 xxxx 2.6 2.1 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx 6.5 xxxx 5.5 5.0 xxxx xxxxx xxxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 793 xxxx 471 527 xxxx xxxxx xxxx xxxx xxxxx'
Potent Cap.: xxxx xxxx xxxxx 368 xxxx 800 962 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx 0.95 xxxx 1.00 1.00 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 349 xxxx 800 962 xxxx xxxxx xxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del:xxxxx xxxx xxxxx 13.3 xxxx 4.7 3.9 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * * A
Movement: IT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx 409 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 11.1 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * * * * C
ApproachDel: 0.0 11.1 0.5 0.0
Signal= Stopaghts= lndude
Initial Vol:
28 0
79
Lanes:
0 0 11 0
0
Signal= Ummnlrol
Signal= Uncontrat
Initial Vol: Lanes:
Rights = Include
Vol Cnl Date:
Na
Rights = Include Lanes: Initial Vol:
Cycle Time (sec):
100
0 113
38 0
-/
1
Loss Time (sec):
0
1
284 0
_.
Critical WC: 0.000
0 414
0
Avg Cot Del (sedveh):
1.5
0
0 0
Avg Delay(sedveh):
1.5
0 0
LOS:
C
`T
I t
Lanes:
0 0 0 0
0
Initial Vol:
0 0
0
S1gnal= Stop1Rights= lndude
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- --------------- --------------- II ---------- - - - - -
I
Volume Module:
Base Vol: 0 0 0 26 0 26 37 126 0 0 231 60
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 0 0 26 0 26 37 126 0 0 231 60
Added Vol: 0 0 0 50 0 0 0 116 0 0 116 50
Approved: 0 0 0 3 0 2 1 42 0 0 67 3
Initial Fut: 0 0 0 79 0 28 38 284 0 0 414 113
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 79 0 28 38 284 0 0 414 113
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 79 0 28 38 284 0 0 414 113
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck/ Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 87 0 31 42 284 0 0 414 113
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx 3.4 xxxx 2.6 2.1 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx 6.5 xxxx 5.5 5.0 xxxx xxxxx xxxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 793 xxxx 471 527 xxxx xxxxx xxxx xxxx xxxxx'
Potent Cap.: xxxx xxxx xxxxx 368 xxxx 800 962 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx 0.95 xxxx 1.00 1.00 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 349 xxxx 800 962 xxxx xxxxx xxxx xxxx xxxxx
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del:xxxxx xxxx xxxxx 13.3 xxxx 4.7 3.9 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * * A
Movement: IT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx 409 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 11.1 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * * * * C
ApproachDel: 0.0 11.1 0.5 0.0
COMPARE
Mon Dee 21 08:59231998
Page 3.8
i
Level er ice computation Kepag
1994 HCM Unsignatized (Future
Volume Alternative)
�
CurnIPM
Intersection #2: Luchessa /Church
Signal= StaplRighn;= lndude
(i
Initial Vol: 28
0
89
Lanes: 0
0
111 0
0
Signal= Unconaal
Signal= Unconwl
_
r
Initial Vol: Lanes: Rights = lntlude
Vol Cal Dale:
Na RighUi= Include Lanes: Initial Vol:
Cycle
Time (see):
100
38 0
� 0
123
Lass
Time (see):
0
1
7
�
266 0 �
Critical VlC:
0.000
� 0
426
0 ��
Avg Call
Del (seNVeh):
1.7
0
0 0
Avg Delay(seWeh):
1.7
0
0
LOS:
C
Lanes: 0
o
0 0
0
Initial Vol: 0
0
0
Signal= Slop /Rights= lntlude
Approach: North Bound
South Bound
East Bound
West Bound
_
Movement: L - T -
R
L - T
- R
L - T -
R
L -
T
- R
,
------ - - - - -- ---------------
Volume Module:
---------------
---------------
----------
- - - --�
Base Vol: 0 0
0
26 0
26
37 126
0
0
231
60
Growth Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial Bse: 0 0
0
26 0
26
37 126
0
0
231
60
1
Added Vol: 0 0
0
50 0
0
0 116
0
0
116
50
App +Pending: 0 0
0
13 0
2
1 44
0
0
79
13
`-
Initial Fut: 0 0
0
89 0
28
38 286
0
0
426
123
User Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1:00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
,I
PHF Volume: 0 0
0
89 0
28
38 286
0
0
426
123
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
Final Vol.: 0 0
0
69 0
28
38 286
0
0
426
123
t:
Adjusted Volume Module:
-•.
Grade: 0%
0 F
09
0%
* Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx xxxx
=Dc
xxxx
% Truck/ Comb: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
I
PCE Adj: 1.10 1.10 1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
98 0
31
42 286
0
0
426
123
)
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
3.4 xxxx
2.6
2.1 xxxx
xxxxx
xxxxx
xxxx
xxxxx
,
Critical Gp:xxxxx xxxx xxxxx
6.5 xxxx
---------------
5.5
5.0 xxxx
---------------
xxxxx
xxxxx
----------
xxxx
xxxxx
- - -
1
------------ I ---------------
Capacity Module:
- -I
Cnflict Vol: xxxx xxxx xxxxx
812 xxxx
488
549 xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx xxxxx
359 xxxx
784
939 xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx xxxxx
0.95 xxxx
1.00
1.00 xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx xxxxx
340 xxxx
784
939 xxxx
xxxxx
xxxx
xxxx
xxxxx
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - - -I
I,
Stopped Del: xxxxx xxxx xxxxx
14.4 xxxx
4.8
4.0 xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
* +
*
A
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx 393
xxxxx
xxxx xxxx
xxxxx
xxxx
xxxx
xxxxx
j
Shrd StpDel:xxxxx xxxx xxxxx
xxxxx 12.1
xxxxx
xxxxx xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
* C
+
+ *
*
*
+
ApproachDel: 0.0
12.1
0.5
0.0
'*
!
COMPARE Mon Dec 2109:00:56 1998 Page 3 -5
s
Level emCe Urampulat,Oa Kepoa
'1 1994 HCM Unsignalized (Future Volume Alternative)
ExistSat
Intersection #2: Luchessa/Church
Signal= SlWp/Rights= lntlude
Initial Vol:
28
0
21
Lanes:
0 0
1i 0
0
1 �►
�►
�I
Signal= Umm�trol
Signal =I ncontrol
Initial Vat: Lanes: Rights = lntlude
Vol Cnt Date: 12A 9195 Rights = lntlude Lanes: Initial Vol:
Cycle Time (see):
100
24 0
0
29
Loss
Time (sec):
0
'
1
_
116 0
Critical V /C:
0.000
._ 0
79
1�
0
0 0
Avg Crit Del (seo'veh):
Avg Delay(seWeh):
0.9
0.9
0
0
0
LOS:
A
Lanes:
0 0
0 0
0
Initial Vol:
0
0
0
Signal= Stop/Rights= lnGUde
Approach: North
Bound
South Bound
East Bound
West Bound
Movement: L -
T -
R
L - T
- R
L - T -
R
L
- T
- R
--------- _________________
Volume Module: >> Count
Date:
-__-_____-___
19 Dec 1998 <<
_ ____________
_________-----�
Base Vol: 0
0
0
21 0
28
24 116
0
0
79
29
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00'1.00
1.00
1.00
1.00
1.00
!
Initial ESE: 0
0
0
21 0
28
24 116
0
0
79
29
Added Vol: 0
0
0
0 0
0
0 0
0
0
0
0
PasserByVol: 0
0
0
0 0
0
0 0
0
0
0
0
Initial Fut: 0
0
0
21 0
28
24 116
0
0
79
29
-'t
�( !
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
i
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 0
0
0
21 0
28
24 116
0
0
79
29
Reduct Vol: 0
0
0
0 0
0
0 0
0
0
0
0
Final Vol.: 0
0
0
21 0
28
24 116
0
0
79
29
Adjusted Volume Module:
Grade:
0%
0%
0%
0%
'
% Cycle /Cars: xxxx
xxxx
xxxx
xxxx
xxxx xxxx
_
xxxx
xxxx
% Truck/ Comb: xxxx
xxxx
xxxx )Ci=
xxxx xxxx
xxxx
xxxx
'
PCE Adj: 1.10 1.10
1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx
xxxx
-xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx
=cIc
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 0
0
0
23 0
31
26 116
0
0
79
29
'
Critical Gap Module:
MoveUp Time:xxxxx xxxx
xxxxx
3.4 xxxx
2.6
2.1 xxxx xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
6.5 xxxx
5.5
5.0 xxxx
xxxxx
xxxxx
xxxx
xxxxx
___________________________
_______________
---------------
---------------
Capacity Module:
Cnflict Vol: xxxx xxxx
xxxxx
234 xxxx
94
108 xxxx
xxxxx
=oc
xxxx
xxxxx
Potent Cap.: xxxx xxxx
xxxxx
776 xxxx
1242
1523 xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx
xxxxx
0.98 xxxx
1.00
1.00 xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx
xxxxx
761 xxxx
1242
1523 xxxx xxxxx
xxxx
xxxx
xxxxx
�
___________________________
Level Of Service Module:
---------------
---------------
_______________�
Stopped Del:xxxxx xxxx
xxxxx
4.9 xxxx
3.0
2.4 xxxx
xxxxx
xxxxx
xxxx
xxxxx
_
LOS by Move: *
*
*
* *
*
A
i.
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR -
RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx 977
xxxxx
xxxx xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx
xxxxx
xxxxx
3.8
xxxxx
xxxxx xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: *
*
*
* A
ApproachDel: 0.0
3.8
0.4
0.0
COMPARE Mon Dec 21 09:00:561998 Page 3 -6
Approach: North Bound
South Bound
eve erv¢e Computation Report
1994 HCM Unsignalaed (Future Volume Alternative)
BackSol
Intersection #2: Luchessa /Church
Movement: L - T -
R
'
T
- R
Signal= Stop/Rights= Include
T
-
Initial Vol:
30
0
24
------------ ---------------
Volume Module:
Lanes:
0
0 11 0
0
---------------
Signal= Unconlrcl
11
Signal= Unconlrol
Initial Vol: Lanes: Rights = Include
Base Vol: 0 0
Vol Cnt Dale:
n/a
Rights = Include Lanes: Initial Vol:
25 0 J,
24
Cycle
Cycle me (sec):
100
0 32
0
79
29
Growth Adj: 1.00 1.00
1.00
* 7�
1 --+•
1.00
Loss Time (sec):
0
-t- 1
►
165 0
Critical V /C:
0.000
♦_ 0 117
0
0
Avg Cnt Del (sectveh):
0.6
0
0 0
116
Avg Delay (sedveh):
0.8
0 0 i
79
29
LOS:
A
0
0
0
t
0
Lanes:
0
0 0 0
0
Approved: 0 0
Initial Vol:
0
0
0
1
49
Signal= Stop /Rights = Include
0
38
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L -
T
- R
L -
T
-
R
L
---------------
- T
- R
�
------------ ---------------
Volume Module:
11
---------------
11
---------------
11
Base Vol: 0 0
0
21
0
28
24
116
0
0
79
29
Growth Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial SEE: 0 0
0
21
0
28
24
116
0
0
79
29
Added Vol: 0 0
0
0
0
0
0
0
0
0
0
0
Approved: 0 0
0
3
0
2
1
49
0
0
38
3
Initial Put: 0 0
0
24
0
30
25
165
0
0
117
32
User Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
24
0
30
25
165
0
0
117
32
Reduct Vol: 0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.: 0 0
0
24
0
30
25
165
0
0
117
32
Adjusted Volume Module:
Grade: 0%
0%
0%
0%
% Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
% Truck/ Comb: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
26
0
33
28
165
0
0
117
32
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
3.4
xxxx
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
___________________________
6.5
---------------
xxxx
5.5
5.0
__ _____________
xxxx
xxxxx
xxxxx
---------------
xxxx
xxxxx
Capacity Module:
Cnflict Vol: xancx xxxx
xxxxx
323
xxxx
133
149
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx
xxxxx
688
xxxx
1186
1456
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx
xxxxx
0.98
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx
xxxxx
674
xxxx
1186
1456
xxxx
xxxxx
xxxx
xxxx
xxxxx
_________ _ __ _______________
Level Of Service Module:
---------------
___ ______
---------------
Stopped Del:xxxxx x:t=
xxxxx
5.5
xxxx
3.1
2.5
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
*
*
*
A
Movement: LT - LTR
- RT
LT
- LTR
- RT
IT
- LTR
-
RT
LT
=:
COMPARE
Man Dec 2109:00:56 1998
Page 3.7
�.`
Level U1 berwice mpuffabon
Frpon
1994 HCM Unsignalized (Future Volume Alternative)
Ph2Sal
Intersection #2: Luchessa /Church
Signal= Stop/Righu= lntlude
Inlgal Val: 30
0
37
Lanes:
0 0
11 0
0
Signal= Uncontrol
Signal=
Uncontrol
'
Initial Vol: Lanes: Rights-Include
Val Cat Dale:
n/a Rights
= lntlude Lanes:
Initial Vol: '
Cycle Time Isar):
100
26 0
Loss Time (sec):
0
0
45
{
1
1
196 0 _.
Critical V /C:
0.000
0
148
0
Avg Cm
Del (secNeh):
0.9
0
" I
0 0
Avg Delay(sedveh):
0.9
0
0
LOS:
A
1
�
I
Lanes:
0 0
0 0
0
Initial Vol:
0
0
0
X
Signal= Stcp/Rlghts= lncIude
Approach: North Bound
South Bound
East Bound
west Bound
_
'
Movement: L - T -
R
L - T
- R
L - T -
---------------
R
L -
----------
T
- R
- - - - -I
------ - - - - -- ---------------
Volume Module:
II
---------------
V
Base Vol: 0 0
0
21 0
28
24 116
0
0
79
29
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial Bse: 0 0
0
21 0
28
24 116
0
0
79
29
Added Vol: 0 0
0
13 0
0
0 31
0
0
31
13
Approved: 0' 0
0
3 0
2
1 49
0
0
38
3
.,1
Initial Fut: 0 0
0
37 0
30
25 196
0
0
148
45
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
37 0
30
25 196
0
0
148
45
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
• +
Final Vol.: 0 0
0
37 0
30
25 196
0
0
148
45
Adjusted Volume Module:
Grade: 0%
0%
0%
0%
• ,i
% Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx xxxx,
3c3gxx
xxxx
t
8 Truck / Comb: XXXX X=
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
-
PCE Adj: 1.10 1.10
1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx 7cZOCx
xxxx
xxxx
xxxx =Dc
xxxx
xxxx
(
Adj Vol.: 0 0
0
41 0
33
28 196
0
0
148
45
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
3:4 xxxx
2.6
2.1 xxxx xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
6.5 xxxx
5.5
5.0 xxxx xxxxx
xxxxx
xxxx
xxxxx
------------ 1---------------
Capacity Module:
---------------
---------------
----------
- - - - -�
Cnflict Vol: xxxx x3c1c3L xxxxx
392 xxxx
171
193 xxxx xxxxx
xxxx
xxxx
xxxxx
�l
Potent Cap.: xxxx xxxx xxxxx
628 xxxx
1135
1387 xxxx xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx xxxxx
0.98 xxxx
1.00
1.00 xxxx xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx xxxxx
614 xxxx
1135
1387 xxxx xxxxx
xxxx
xxxx
xxxxx
y
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - - -I
Stopped Del:xxxxx xxxx xxxxx
6.2 xxxx
3.3
2.6 xxxx xxxxx
xxxxx
xxxx
xxxxx
_
LOS by Move: * *
*
* *
*
A
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xx xxxxx
xxxx 773
xxxxx
xxxx xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 4.9
xx3Lxx
xxxxx xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
* A
•
ApproachDel: 0.0
4.9
0.3
0.0
COMPARE Man Dec 2109,00:56 1998 Page 3-8
Level emee GcunpulaWn
,Pun
1994 HCM Unsignaloed (Future Volume Alternative)
i
Ph3Sal
Intersection #2: Luchessa/Church
Slgnal= Stop/Wghla= lndude
Initial Vol: 30
0
48
S
Lanes:
0 0
11 0
0
_
Signal= UnconUOl
Slgnal=
uncontrol
Initial Vol: Lanes: Rights= lndude
Vol Cnl Dale:
Na Bights=
lndude Lanes: Initial Vol:
j
�
Cycle nine (see):
100
25 0
� 0
56
Loss
Time (sec):
0
1
1
220 0 _.
Critical V /C: 0.000
♦_ 0
172
`5
0
Avg Cdl
Del (secheh):
1.0
0
0 0
Avg Delay(seWeh):
1.0
0
0
J. '
LOS:
B
Lanes:
0 0
0 0
0
Initial Vol:
0
0
0
Signal= Stop1R1ghts= lndude
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
------ - - - - -- ---------------
R
II
L - T
---------------
- R
L - T -
---------------
R
L -
----------
T
- R
- - - - -I
Volume Module:.
Base Vol: 0 0
0
21 0
28
24 116
0
0
79
29
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
_
Initial BEE: 0 0
0
21 0
28
24 116
0
0
79
29
Added Vol: 0 0
0
24 0
0
0 55
0
0
55
24
Approved: 0 0
0
3 0
2
1 49
0
0
38
3
Initial Put: 0 0
0
48 0
30
25 220
0
0
172
56
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
^�
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
I
PHF Volume: 0 0
0
48 0
30
25 220
0
0
172
56
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
�.
Final Vol.: 0 0
0
48 0
30
25 220
0
0
172
56
Adjusted Volume Module:
Grade: 0%
0%
0%
OS
% Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx xxxx.
xxxx
xxxx
°
!k Truck / Comb: xxxx xxxx
xxxx
xxxx
xxxx xxxx
X=
xxxx
PCE Adj: 1.10 1.10
1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
'
Adj Vol.: 0 0
0
53 0
33
28 220
O
0
172
56
�.
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
3.4 ,xxxx
2.6
2.1 xxxx xxxxx =cxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
6.5 xxxx
---------------
5.5
5.0 xxxx
---------------
xxxxx
xxxxx
---------------
xxxx
xxxxx
------------ I ---------------
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx
445 xxxx
200
228 xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.: xxxx xxxx xxxxx
585 xxxx
1096
1335 xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap: xxxx xxxx xxxxx
0.98 xxxx
1.00
1.00 xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx xxxxx
------------ ---------------
571 xxxx
---------------
1096
1335 xxxx
---------------
xxxxx
xxxx
----------
xxxx
xxxxx
- - - - -I
I
Level Of Service Module:
`
Stopped Del:xxxxx xxxx xxxxx
6.9 xxxx
3.4
2.7 xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
* *
*
A
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx 700
xxxxx
xxxx xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx
xxxxx 5.5
xxxxx
xxxxx xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
* B
ApproachDel: 0.0
5.5
0.3
0.0
COMPARE Mon Dec 21 09:0427 1998 Page 3 -a
t eve el-vice Computation Rep5n
1 d 1994 HCM Unsignalized (Future Volume Altemative)
Ph4Sat
Intersection #2: Luchessa/Church
S1gnal= Slop1Mghts= lntlude
r
Initialvol:
30
0
68
Lanes:
0 0
11 0
0
Signal= Unconaal
Signal= Uncontrol
Initial Vol: Lanes: Rights-Include
Vol Cnt Date:
Na Rights = lntlude Lanes:
Initial Vol:
Cycle Time (see):
100
25 0
0
76
j
Loss
Time (see):
0
1
1
267 0
Critical V /C: 0.000
0
219
0
Avg Cril
Del(seclveh):
12
0
/
0 0
Avg Delay(seNVeh):
1.2
0
0
LOS:
B
Lanes:
0 0
0 0
0
^I
Initial Vol:
0
0
0
Signal= Slop/Rigms= Include
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L -
T -
R
L - T
- R
L - T -
R
L -
T
- R
V
------ - - - - -- ---------------
Volume Module:
11
---------------
---------------
----------
- - - --�
.--)
Base Vol: 0
0
0
21 0
28
24 116
0
0
79
29
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial Bee: 0
0
0
21 0
28
24 116
0
0
79
29
.
Added Vol: 0
0
0
44 0
0
0 102
0
0
102
44
'
Approved: 0
0
0
3 0
2
1 49
0
0
38
3
Initial Fut: 0
0
0
68 0
30
25 267
0
0
219
76
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 0
0
0
68 0
30
25 267
0
0
219
76
Reduct Vol: 0
0
0
0 0
0
0 0
0
0
0
0
1
Final Vol.: 0
0
0
68 0
30
25 267
0
0
219
76
Adjusted Volume Module:
Grade:
0%
0%
0%
0%
% Cycle /Cars: xxxx
xxxx
xxxx
xxxx -
xxxx xxxx
xxxx
xxxx
% Truck / Comb: xxxx
xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10
1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx
xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx
xxxx
xxxx
xxxx
xxxx xxxx
xxxx
=oc
Adj Vol.: 0
0
0
75 0
33
28 267
'0
0
219
76
Critical Gap Module:
MoveUp Time:xxxxx xxxx
xxxxx
3.4 xxxx
2.6
2.1 xxxx xxYVY
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
6.5 xxxx
5.5
5.0 XY xxxxx
xxxxx
xxxx
xxxxx
------------ I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol: xxxx xxxx
xxxxx
549 xxxx
257
295 xxxx xxxxx
xxxx
xxxx
xxxxx
Il
Potent Cap.: xxxx xxxx
xxxxx
509 xxxx
1026
1240 xxxx xxxxx
xxxx
xxxx
xx=
Adj Cap: xxxx xxxx
xxxxx
0.97 xxxx
1.00
1.00 xxxx xxxxx
xxxx
xxxx
xxxxx
Move Cap.: xxxx xxxx
xxxxx
496 xxxx
1026
1240 xxxx xxxxx
xxxx
xxxx
xxxxx
,^
------------ I ---------------
---------------
---------------
----------
- - - - -I
Level Of Service Module:
t
Stopped Del:xxxxx xxxx
xxxxx
8.4 xxxx
3.6
3.0 xxxx xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: *
*
*
* *
*
A +
Movement: LT -
LTR -
RT
LT - LTR
- RT
LT - LTR -
RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
XYYY 589
xxxxx
xxxx xxxx xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx
xxxxx
xxxxx 6.9
xxxxx
xxxxx xxxx xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: *
*
*
* 13
*
* *
+
*
+
+
ApproachDel: 0.0
6.9
0.3
0.0
COMPARE Mon Dec 2109:04271999 a Page
Level ervice CompuMloon Repon
1994 HCM Unsignalized (Future Volume Altemative)
Ph5Sat
Intersection #2: Luchessa/Church
Approach:
North Bound
Signal= S1opRghts= Include
East Bound
West Bound
Initial Vol:
30
0
87
L -
Lanes:
0
0 11 0
0
- R
Signal= Unconwl
T
- R
- - - - - I
------------ I
Volume Module:
Signal= Ummnhol
Initial Vol: Lanes: Rightszlndude
II
Vol Cnt Date:
Na
Rights = lndude Lanes: Initial Vol:
25 0
Cycle Time (sec):
100
Ilk-
0 95
Base Vol:
0
0
0
i
0
Lass Time (sec):
0
1
313 0
0.
CriticaIV/C:
0.000
0 255
0
1.00
Avg Cel Del (secNeh):
1.5
0
0 0
1.00
Avg Delay(seWeh):
1.5
0 0
1.00
1.00
LOS:
B
0
0
1
0
28
24
Lanes:
0
0 0 0
0
29
Initial Vol:
0
0
0
63
0
0
Signal =Stop /Rights= lncIude
148
0
Approach:
North Bound
South Bound
East Bound
West Bound
Movement:
L
- T -
R
L -
T
- R
L -
T
- R
L -
----------
T
- R
- - - - - I
------------ I
Volume Module:
---------------
II
---------------
II
---------------
II
Base Vol:
0
0
0
21
0
28
24
116
0
0.
79
29
Growth Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial BEE:
0
0
0
21
0
28
24
116
0
0
79
29
Added Vol:
0
0
0
63
0
0
0
148
0
0
148
63
Approved:
0
0
0
3
0
2
1
49
0
0
38
3
Initial Fut:
0
0
0
87
0
30
25
313
0
0
265
95
User Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume:
0
0
0
87
0
30
25
313
0
0
265
95
Reduct Vol:
0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
0
0
0
87
0
30
25
313
0
0
265
95
Adjusted Volume Module:
Grade:
08
0&
08
0%
% Cycle /Cars:
xxxx
xxxx
xxxx
xxxx
xxxx
=0c
xxxx
xxxx
% Truck / Comb:
xxxx
xxxx
=CC
=DC
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE:
xxxx
xxxx
xxxx
=DC
xxxx
=DC
xxxx
xxxx
Trck /Cmb PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.:
0
0
0
96
0
33
28
313
0
0
265
95
Critical Gap
Module:
MoveUp Time: xxxxx
xxxx
xxxxx
3.4
'=oc
2.6
2.1
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx
------------ I ---------------
xxxx xxxxx
6.5
---------------
xxxx
5.5
5.0
---------------
xxxx
xxxxx
x=oc
----------
xxxx
xxxxx
- - - - -I
Capacity Module:
Cnflict Vol:
xxxx
xxxx
xxxxx
651
xxxx
313
360
xxxx
xxxxx
xxxx
xxxx
xxxxx
Potent Cap.:
xxxx
xxxx
xxxxx
445
xxxx
962
1155
xxxx
xxxxx
xxxx
xxxx
xxxxx
Adj Cap:
xxxx
xxxx
xxxxx
0.97
xxxx
1.00
1.00
xxxx
xxxxx
xxxx
xxxx
xxxxx
Move Cap.:
------------ I
xxxx
---------------
xxxx
xxxxx
432
---------------
xxxx
962
1155
---------------
xxxx
xxxxx
xxxx
----------
xxxx
xxxxx
- - - - -I
Level Of Service
Module:
Stopped Del: xxxxx
xxxx
=ouc
10.4
xxxx
3.9
3.2
xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move;
*
*
*
*
*
*
A
Movement:
LT
- LTR
- RT
IT
- LTR
- RT
IT
- LTR
- RT
IT
- LTR
- RT
Shared Cap.:
xxxx
xxxx
x c
xxxx
503
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx
8.8
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS:
*
*
*
*
B
ApproachDel:
0.0
8.8
0.3
0.0
COMPARE
Mon Dec 2109:0427 1998
Page 3.1
�N
G
eve emce ampu an Report
1994 NCM Unsignali ted (Future Volume Alternative)
-
Ph6Sa1
Intersection #2: Luchessa /Church
Signal= Sap/Rigms= Include
Initial Vol: 30
0
96
-
Lanes: 0
0
11 0
0
Signal= UncoMrol
Signal=Uncontrol
,
Initial Vol: Lanes: Rights = Include
Vol Cnl Date:
Na Rights = Include Lanes: Initial Vol:
Cycle Time (sec):
100
!�
25 0 J
0
104
Loss
Time (see):
0
1
,-
333 0
Critical VIC:
0.000
0
285
r-�
0
Avg Crit
Del(seWeh):
1.6
0
I0
0
Avg Delay(sedveh):
1.6
0
0
LOS:
8
d
Lanes: 0
0
0 0
0 ,
-.
Initial Vol: 0
0
0
„
Signal= Stop/RighLs= lntlude
--
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L - T
- R
L - T -
R
L -
----------
T
- R
- - - - -I
------------ ---------------
Volume Module:
II
---------------
---------------
�-
Base Vol: 0 0
0
21 0
28
24 116
0
0
79
29
Growth Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial Bee: 0 0
0
21 0
28
24 116
0
0
79
29
Added Vol: 0 0
0
72 0
0
0 168
0
0
168
72
Approved: 0 0
0
3 0
2
1 49
0
0
38
3
-�
Initial Fut: 0 0
0
96 0
30
25 333
0
0
285
104
User Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 0 0
0
96 0
30
25 333
0
0
285
104
-
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
Final Vol.: 0 0
0
96 0
30
25 333
0
0
285
104
Adjusted Volume Module:
Grade: 0%
0%
0%
0%
"
% Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
% Truck/ Comb: xxxx xxxx
xxxx
xxxx
zcxxx xxxx
xxxx
xxxx
PCE Adj: 1.10 1.10 1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
I
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
106 0
33
28 333
0
0
285
104
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx
3:4 xxxx
6.5 xYYY
2.6
5.5
2.1 xxxx
5.0 xxxx
xxxxx
xxxxx
xxxxx
xxxxx
xxxx
xxxx
xxxxx
xxxxx
_
------------ I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol: xxxx xxxx xxxxx
695 xxxx
337
389 xxxx
xxxxx
xxxx
xxxx
xxxxx
+
Potent Cap.: xxxx xxxx xxxxx
419 xxxx
934
1119 xxxx
xxxxx
xxxx
xxxx
xxxxx
:FA
Adj Cap: xxxx xxxx xxxxx
0.97 xxxx
1.00
1.00 xxxx
xxxxx
xxxx
xxxx.
xxxxx
_
Move Cap.: xxxx xxxx xxxxx
406 xxxx
934
1119 xxxx
xxxxx
xxxx
xxxx
xxxxx
r
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - - -I
Stopped Del:xxxxx xxxx xxxxx
11.6 xxxx
4.0
3.3 xxxx
xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
* *
*
A
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx 470
xxxxx
xxxx xxxx
xxxxx
xxxx
XXYY
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx
xxxxx 9.8
xxxxx
xxxxx xxxx
xxxxx
xxxxx
xxxx
xxxxx
Shared LOS: * *
*
* 13
ApproachDel: 0.0
9.8
0.3
0.0
COMPARE
Mon Dec 2109:042'11998
Page 3.8
Level emvu:e mpu
an w
1994 HCM Unsignalized (Fulume
Vdume Altemaeve)
CumSa1
Intersection #2: Luchessa /Church
i.
Signal=Stop/Righls= lntlude
I
Initial Vol: 30
0
119
Lanes:
0 0
11 0
0
'-
Signal= UnwnVOl
Signal= Unwnnl
Initial Vol: Lanes: Rights - Include
Vol Cnt Date:
Na Righ6= lntlude Lanes:
Initial Vol:
�
Cycle Time (am):
100
26 0
� 0
120
■
Less
Time (sec):
0
1
i
,
335 0
CdOtal V /C:
0.000
0
305
0
Avg CM
Del (seWeh):
2.1
0
•1
/
0 0
Avg Delay (seWeh):
2.7
0
0
i
LOS:
C
1
Lanes:
0 0
0 0
0
Idtial Vol:
0
0
0
Signal=Slop/Rights= lntlude
l
Approach: North Bound
South Hound
East Bound
West Bound
Movement: L - T -
R
L - T
- R
L - T -
R
L -
T
- R
------------ I---------------
Volume Module:
II---------------
II---------------
II----------
- - - - - I
Base Vol: 0 0
0
21 0
28
24 116
0
0
79
29
"-'
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1..00
1.00
Initial Bee: 0 0
0
21 0
28
24 116
0
0
79
29
)
Added Vol: 0 0
0
72 0
0
0 168
0
0
168
72
j
App +Pending: 0 0
0
26 0
2
2 51
0
0
58
19
Initial Fut: 0 0
0
119 0
30
26 335
0
0
305
120
-
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
'��
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
1
PHF Volume: 0 0
0
119 0
30
26 335
0
0
305
120
Reduct Vol; 0 0
0
0 0
0
0 0
0
0
0
0
r
Final Vol.: 0 0
0
119 0
30
26 335
0
0
305
120
1
Adjusted Volume Module:
_
Grade: 0%
08
0%
0%
"
8 Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx xxxx
.:
xxxx
xxxx
��
9 Truck /Comb: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
1
PCE Adj: 1.10 1.10
1.10
1.10 1.10
1.10
1.10 1.00
1.00
1.10
1.00
1.00
.I.
1
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
1-_
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 0 0
0
131 0
33
29 335
0
0
305
120
,
Critical Gap Module:
MoveUp Time: xxxxx xxxx xxxxx
3.4 xxxx
2.6
2.1 xxxx xxxxx
xxxxx
xxxx
xxxxx
Critical Gp:xxxxx xxxx xxxxx
6.5 xxxx
5.5
5.0 xxxx xxxxx
xxxxx
xxxx
xxxxx
I'
------------ I ---------------
Capacity Module:
II---------------
II---------------
II
----------
- - - - - I
V
Cnflict Vol: xxxx xxxx xxxxx
726 xxxx
365
425 xxxx xxxxx
xxxx
xxxx
xxxxx
1
Potent Cap.: xxxx xxxx xxxxx
402 xxxx
904
1075 xxxx xxxxx
xxxx
xxxx
xxxxx
( 11
Adj Cap: xxxx xxxx xxxxx
0.97 xxxx
1.00
1.00 xxxx xxxxx
xxxx
xxxx
xxxxx
�--
Move Cap.: xxxx xxxx xxxxx
389 xxxx
904
1075 xxxx xxxxx
xxxx
xxxx
xxxxx
_
------------ I ---------------
Level Of Service Module:
II---------------
II---------------
II
----------
- - - - - I
i
i. I
Stopped Del:xxxxx xxxx xxxxx
13,.3 xxxx
4.1
3.4 xxxx xxxxx
xxxxx
xxxx
xxxxx
LOS by Move: * *
*
* *
*
A
Movement: LT - LTR -
RT
IT - LTR
- RT
LT - LTR -
RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx 439
xxxxx
xxxx xxxx xxxxx
xxxx
xxxx
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx 11.5
xxxxx
xxxxx xxxx xxxxx
xxxxx
xxxx
xxxxx
•' „i
Shared LOS: * *
*
* C
ApproachDel: 0.0
11.5
0.3
0.0
COMPARE Mon Dec 2108:57:20 1998 Page 3.9
Level Lit bevice Gon-putat,on Kepor.
y 1994 RCM Unsignal¢ed (Future Volume Alternative)
y s
ExisIPM
Intersection #3: Monterey /Farmn Frontage
Signal= UncontroVRlghls =Intlude
Initial Vol:
11
390
7
-`
Lanes:
0 �-1',1Iy
11 Iyr�`0_►`
t 7
1
Signal =Stop
Signal =Slop
Initial Vol: lanes: RlghLS= Include
Vol Cnl Date: 2/78/96
Rights= lntlude Lanes: Initial Vol:
J,
Ti
Cycle me (sec):
100
� ,
25 0
0
11
Loss
Time (sec):
0
0
0
0 11
Critical WC:
0.000
it
0
0
Avg Crit
Del (seciveh):
0.6
0
11 0
Avg Delay (seclveh):
0.6
0
2
LOS:
B
Lanes:
1 0
1 1
0
Initial Val:
9
362
1
n ~�
Slgnal=UnconOOl/Rlghts= Include
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L - T
- R
L - T
- R
L -
T
- R
Volume Module: >> Count
Date:
18 Feb 1998 <<
PM Peak
Base Vol: 9 362
1
7 390
11
25 0
11
2
0
11
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial BEE: 9 362
1
7 390
11
25 0
11
2
0
11
Added Vol: 0 0
0
0 0
0
0 0
0
0
0
0
PasserByVol: 0 0
0
0 0
0
0 0
0
0
0
0
Initial Fut: 9 362
1
7 390
11
25 0
11
2
0
11
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
'
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 9 362
1
7 390
11
25 0
11
2
0
11
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
Final Vol.: 9 362
1
7 390
11
25 0
11
2
0
11
I
Adjusted Volume Module:
Grade: 0%
0%
0%
0%
% Cycle /Cars: xxxx xxxx
xxxx
xxxx
xxxx xxxx,,
xxxx
xxxx
% Truck/ Comb: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
`
PCE Adj: 1.10 1.00
1.00
1.10 1.00
1.00
1.10 1.10
1.10
1.10
1.10
1.10
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 10 362
1
8 390
11
28 0
12
2
0
12
-
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx
2.1 xxxx
xxxxx
3.4 xxxx
2.6
3.4
xxxx
2.6
_
Critical Gp: 5.5 xxxx xxxxx
__________________________________________
5.5 xxxx
xxxxx
7.0 xxxx
5.5
7.0
xxxx
5.5
Capacity Module:
______ ________________________I
Cnflict Vol: 401 xxxx xxxxx
363 xxxx
xYyyY
774 xxxx
201
769
xxxx
182'
Potent Cap.: 1044 xxxx xxxxx
1094 xxxx
xxxxx
339 xxxx
1096
342
xxxx
1120
Adj Cap: 1.00 xxxx xxxxx
1.00 xxxx
xxxxx
0.98 xxxx
1.00
0.98
xxxx
1.00
w
Move Cap.: 1044 xxxx xxxxx
1094 xxxx
xxxxx
331 xxxx
1096
334
xxxx
1120
1---------------
Level Of Service Module:
---------------
---------------
---------------
_
Stopped Del: 3.5 xxxx xxxxx
3.3 xxxx
xxxxx
11.8 xxxx
3.3
10.9
xxxx
3.2
LOS by Move: A *
*
A
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx xxxx
xxxxx
xxxx 421
xxxxx
xxxx
822
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx
xxxxx
xxxx
xxxxx
xxxxx 9.2
xxxxx
xxxxx
4:4
xxxxx
Shared LOS: * *
*
* *
*
* B
*
*
A
ApproachDel: 0.1
0.1
9.2
4.4
COMPARE
Intersection #3: Monterey /Farmn Frontage
Mon Dec 21 08:57301998
1994 HCM Unsignallzed (Future Volume Altemative)
Signal= Unwntrol/Rlghts= include
Inital Vol: 12 424 22
Lanes: 0 1 1 0 1
.144l,*4
Signal =Stop
Initial Vol: lanes: Rights= lndude
27 0 JL
0
0 ll
0
11 0
Vol Cnl Date: Na
Cycle Tune (see): 100
Loss Time (see): 0
Cntleal V /C: 0.000
Avg Crit Del (seWeh): 0.8
Avg Delay (sedveh): 0.8
LOS: C
Signal =Stop
Rights= Include
0
Lanes: Initial Vol:
0 19
0
11 0
0
0 6
Lanes:
1 0
1
1 0
Initial Vol:
12
415
2
S1gnal= UmmnhoVRigh6= 1nclude
Approach:
North Bound
South Bound
East Bound
West Bound
Movement:
L - T
- R
L -
T -
R
L -
T
- R
L -
T
- R
------------ I ---------------
Volume Module:
---------------
---------------
----------
- - - - -I
Base Vol:
9 362
1
7
390
11
25
0
11
2
0
11
Growth Adj:
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Bee:
9 362
1
7
390
11
25
0
11
2
0
11
Added Vol:
0 0
0
0
0
0
0
0
0
0
0
0
ApprovedDev:
3 53
1
15
34
1
2
0
0
4
0
8
Initial Fut:
12 415
2
22
424
12
27
0
11
6
0
19
User Adj:
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume:
12 415
2
22
424
12
27
0
11
6
0
19
Reduct Vol:
0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
12 415
2
22
424
12
27
0
11
6
0
19
Adjusted Volume Module:
Grade:
0%
0%
0%
08
% Cycle /Cars:
xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
>o=
% Truck / Comb:
xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10 1.00
1.00
1.10
1.00
1.00
1.10
1.10
1.10
1.10
1.10
1.10
Cycl /Car PCE:
xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE:
xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.:
13 415
2
24
424
12
30
0
12
7
0
21
Critical Gap
Module:
MoveUp Time:
2.1 xxxx
xxxxx
2.1
xxxx
xxxxx
3.4
xxxx
2.6
3.4
xxxx
2.6
Critical Gp:
5.5 xxxx
xxxxx
5.5
xxxx
xxxxx
7.0
xxxx
5.5
7.0
xxxx
5.5
------------ I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol:
436 xxxx
xxxxx
417
xxxx
xxxxx
879
xxxx
218
874
xxxx
209
Potent Cap.:
1000 xxxx
xxxxx
1024
xxxx
xxxxx
290
xxxx
1074
292
xxxx
1086
Adj Cap:
1.00 xxxx
xxxxx
1.00
xxxx
xxxxx
0.95
xxxx
1.00
0.96
xxxx
1.00
Move Cap.:
------------
1000 xxxx
I ---------------
xxxxx
1024
---------------
xxxx
xxxxx
277
---------------
xxxx
1074
281
----------
xxxx
1086
- - - - -I
Level Of Service Module:
Stopped Del:
3.6 xxxx
xxxxx
3.6
xxxx
xxxxx
14.4
xxxx
3.4
13.1
xxxx
3.4
LOS by Move:
A *
*
A
Movement:
LT - LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.:
xxxx xxxx
xxxxx
xxxx
xxxx
xxxxx
xxxx
352
xxxxx
xxxx
644
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
11.2
xxxxx
xxxxx
5:7
xxxxx
Shared LOS:
* *
*
*
*
*
*
C
*
*
B
ApproachDel:
0.1
0.2
11.2
5.7
COMPARE Mon Dee 21 08:57301998 Page 3.11
LeVel U1 bennce ompuwuon Kepon
° 1994 HCM Unslgnalized (Future Volume Altemative)
Ph2PM
Intersection #3: Monterey /Farrnn Frontage
Signal= UnconhoMghts= Include
Initial Vol:
51 424
22
'
'
Lanes:
0 1 1 0
41 44,
1
A
Signal =Stop
1 0
1
Signal=Stop
Initial Vol: Lanes:
Rlghls= lndude
Vol Cot Date:
Na
Rights = lndude Lanes: Initial Vol:
Cycle lime (sec):
100
0 19
,..., 66 0
2
Lass 71me (sec):
0
I
g
Signal= UmmnOOVRights= lndude
0
0 11
Cntical V /C:
0.000
11 0
_ 0
r,
�.
Avg Cril Del (sedveh):
1.7
0
I
26 0
�
Avg Delay (sedveh):
1.7
� 0 fi
R
L
LOS:
C
L -
Lanes:
1 0
1
1 0
1011161 Vol: 29
415
2
I
Signal= UmmnOOVRights= lndude
Approach:
North Bound
South
Bound
East Bound
West Bound
Movement:
L - T -
R
L
- T -
R
L -
T
- R
L -
----------
T
- R
- - - - -I
k
------------ I ---------------
Volume Module:
---------------
---------------
•�
Base Vol:
9 362
1
7
390
11
25
0
11
2
0
11
Growth Adj:
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial Bse:
9 362
1
7
390
11
25
0
11
2
0
11
o
Added Vol:
17 0
0
0
0
39
39
0
17
0
0
0
ApprovedDev:
3 53
1
15
34
1
2
0
0
4
0
8
Initial Fut:
29 415
2
22
424
51
66
0
28
6
0
19
User Adj:
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
v
PHF Volume:
29 415
2
22
424
51
66
0
28
6
0
19
Reduct Vol:
0 0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
29 415
2
22
424
51
66
0
28
6
0
19
Adjusted Volume
Module:
Grade:
0%
O6
0%
0%
% Cycle/ Cars:
xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
% Truck/ Comb:
x3acx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10 1.00
1.00
1.10
1.00
1.00
1.10
1.10
1.10
1.10
1.10
1.10
Cycl /Car PCE:
xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
r,
Trck /Cmb PCE:
xxxx xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
1
Adj Vol.:
32 415
2
24
424
51
73
0
31
7
0
21
Critical Gap
Module:
- >1
MoveUp Time:
2.1 xxxx xxxxx
2:1
xxxx
xxxxx
3.4
xxxx
2.6
3.4
xxxx
2.6
Critical Gp:
5.5 xxxx xxxxx
5.5
xxxx
xxxxx
7.0
xxxx
5.5
7.0
xxxx
5.5
------------ I ---------------
Capacity Module:
---------------
---------------
II----------
- - - - -I
Cnflict Vol:
475 xxxx xxxxx
417
xxxx
xxxxx
916
xxxx
238
891
xxxx
209
Potent Cap.:
953 xxxx xxxxx
1024
xxxx
xxxxx
275
xxxx
1050.
285
xxxx
1086
y
Adj Cap:
1.00 xxxx xxxxx
1.00
xxxx
xxxxx
0.94
xxxx
1.00
0.93
xxxx
1.00
Move Cap.:
953 xxxx xxxxx
1024
xxxx
xxxxx
258
xxxx
1050
265
xxxx
1086
ti------------
I ---------------
---------------
---------------
----------
- - - - -I
Level Of Service Module:
'
Stopped Del:
3.9 xxxx x3cx3cx
3.6
xxxx
xxxxx
18.7
xxxx
3.5
13.9
xxxx
3.4
_•
LOS by Move:
A *
*
A
Movement:
LT - LTR -
RT
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.:
xxxx xxxx xxxxx
xxxx
xxxx
xxxxx
xxxx
333
xxxxx
xxxx
623
xxxxx
Shrd StpDel:xxxxx
xxxx xxxxx
xxxxx
xxxx
xxxxx
xxxxx
14.2
xxxxx
xxxxx
5.9
xxxxx
Shared LOS:
* *
*
*
*
*
*
C
*
*
B
ApproachDel:
0.3
0.2
14.2
5.9
:alnpoW awnToA
- 1--- --- ---- --
H - S - 7 H - S - 'I
0'9
- 'I : :juawaAOw
punog 7saM punog
T'LS
punog ggnoS punog
g7zoN :gO2oxddV
Z'0
apnpul =slO.woqumun=leuSlS
D'0
:TaQgoeozddy
+
9
s
+
o
x
+
+
x
x
+
+ :SOR Pa=egS
xxxxx
0.9
xxxxx
xxxxx
T•LT
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx: TaQd7S PzgS
xxxxx
OT9
0
OZE
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx :•deo paxugs
SH -
HSlI -
ZZ
SH -
H17 -
Z'I
SH -
HS'I -
III
S.H
- 2LL'I -
.L'I : :juawaAOw
x
s
+
+
+
+
+
+
H
+
x
K :avow Ag SO'I
D'E
xxxx
D' DT
9'E
xxxx
81 z
xxxxx
xxxx
9•E
xxxxx
xxxx
T•D :19Q paddoaS
:aTnpoW aotASaS 30 Isearl
---------------
980T
xxxx
SSZ
---------------
SLOT
xxxx
LDZ
---------------
xxxxx
xxxx
DZOT
-------
xxxxx
-- ------
xxxx
I- ---- - - - -- --
SZ6 :'deo avow
00'T
xxxx
T6'0
00'T
xxxx
E6'0
xxxxx
xxxx
00'T
xxxxx
xxxx
00'T :deo Epy
980T
xxxx
T8Z
S£OT
xxxx
99Z
xxxxx
xxxx
DZOT
xxxxx
xxxx
SZ6 :•duo :Iua-;od
60Z
xxxx
106
OSZ
xxxx
BE6
xxxxx
xxxx
LTD
xxxxx
xxxx
66D :TOA 40TUMD
:aTnpoW AaTOedeD
---------------
S'S
xxxx
O'L
---------------
S'S
xxxx
O•L
---------------
xxxxx
xxxx
II---------------
S•S
xxxxx
xxxx
I ------ - - - ---
S'S :d0 leo,:gzzo
9'Z
xxxx
D'£
9'Z
xxxx
D'E
xxxxx
xxxx
T'Z
xxxxx
xxxx
T•Z :awzy d[leAOW
:aTnpoW de0 1=4Tzo
TZ
0
L
ZD
0
66
SL
DZD
DZ
Z
STD
ED :'lOA �PK
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
:Hod QulO /KOaL
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
:god ze0 /T013
OT'T
OT'T
OT'T
01'1
OT'T
OT'T
OO'T
00'T
OT'T
00'T
OO'T
OT'T :APB god
XXXX
XXXX
xxxx
XXXX
XXXX
XXXX
XXXX
Xxxx
:Gwoo /Nonx,j, %
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
:Szeo /alOAo %
.0
60
90
%0
:apez0
:alnpoW awnToA paa snEpV
61
0
9
BE
0
06
SL
DZD
ZZ
Z
STD
6E :'TOA leutd
0
0
0
0
0
0
0
0
0
0
0
0 :ToA 4DnpaH
61
0
9
BE
0
06
SL
DZD
ZZ
Z
STD
6E :awnToA aHd
00'1
00'T
00'1
00'T
00'T
00'1
00'T
00'1
00'1
00'1
00'T
00'T :�Pld dHd
00'T
OO'T
00'1
00'T
OO'T
00'1
00'1
00'1
00'1
0011
0011
DO'T :£P7 zasn
61
0
9
BE
0
06
SL
DZD
ZZ
Z
STD
6E :lnd Tet7TUI
8
0
D
0
0
Z
T
DE
ST
T
£S
E :AaQpanoxddy
0
0
0
LZ
0
E9
E9
0
0
0
0
LZ :LOA PappK
TI
0
Z
TT
0
SZ
TT
06E
L
T
Z9E
6 :asg 1e71TUI
00'T
00'1
00'1
00'T
00'1
00'T
00'T
00'1
00'1
00'T
00'T
00'T :�PK gamOas
TT
0
Z
TT
0
SZ
TT
06E
L
T
Z9£
6 :ToA aseg
:alnpoW awnToA
- 1--- --- ---- --
H - S - 7 H - S - 'I
H - S - 'I H - L
- 'I : :juawaAOw
punog 7saM punog
gses
punog ggnoS punog
g7zoN :gO2oxddV
apnpul =slO.woqumun=leuSlS
Z 919 BE
:IOA IeO!ul
0 L t L
:sauel
1l0
9 0
O :Sol
SZ :(wrzas) Aela06ntl
0 as
0
SZ :(4aMas) IaO 1pO &V
0
0 ll
000'0 :O/A 103.440
IL 0
0
0 :(*as) awLL ssol
0
61. 0
OM :(ass) awLL apAO
0 05
:IOA PAM :sauel
apnpul =s146M
elu :OWO IuO IOA
apnpul= e146Itl :sauel :IoA le6!ul
oo1S= IeuBIS
ccjS= leu6!S
1 -4-t 1
L 0 L l 0
:sauel
ZZ 9Z9 SL
:IOA lelllul
apnpul =sl4SOL0o4umuO =IeuBIS
a6e(uojj uuued /Aej9juoy4 :E# uoBOasia)ul
ROM 966E
Zl- abed 8661 OZ:45:90 LZOaO uoyy DUVd"00
COMPARE
Mon Dee 210"9:23 1998
Page 3-9
l ,
Level emice Uoreputahon
pa
1994 HCM Unsignalized (Future Volume Altemalive)
Ph4PM
Intersection #3: Monterey /Farmn Frontage
Signal= UnwnnMghts= lndude
`
Initial Vol: 130
424
22
Lanes:
0 1
1 0
1
Signal =Slop
Signal =Slop
Initial Vol: Lanes: Rights = lndude
Vol Cnt Date:
n/a Rights = lndude Lanes: Initial Vol:
Cycle Time (sec):
100
--
746 0 -/
0
19
Loss
Time (sec):
0
0 _A*
4 0
`
0 11 _.
Critical V /C:
0.000
f_ 11
0
I
a �.
Avg Ctlt
Del (sedveh):
6.0
0
61 0
Avg Delay(seWeh):
6.0
0
6
LOS:
E
Lanes:
1 0
1 1
a
J
Initial Vol:
62 416 2
Signal= UmmnwURights =lndude
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
____________ ---------------
Volume Module:
R
11---------------
L - T
- R
L - T -
---------------
R
L -
---------------
T
- R
Base Vol: 9 362
1
7 390
11
25 0
11
2
0
11
Growth Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial Bse: 9 362
1
7 390
11
25 0
11
2
0
11
_
Added Vol: 50 0
0
0 0
118
118 0
50
0
0
0
ApprovedDev: 3 53
1
15 34
1
2 0
0
4
0
8
Initial Fut: 62 415
2
22 424
130
145 0
61
6
0
19
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 62 415
2
22 424
130
145 0
61
6
0
19
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
I
Final Vol.: 62 415
2
22 424
130
145 0
61
6
0
19
•-
Adjusted Volume Module:
Grade: 0%
0%
0%
0%
-
% Cycle/ Cars: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
J1
% Truck/ Comb: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
PCE Adj: 1.10 1.00
1.00
1.10 1.00
1.00
1.10 1.10
1.10
1.10
1.10
1.10
'o,
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
LI
Adj Vol.: 68 415
2
24 424
130
160 0
67
7
0
21
Critical Gap Module:
,r1
MoveUp Time: 2.1 xxxx xxxxx
2:1 xxxx
xxxxx
3.4 xxxx
2.6
3.4
xxxx
2.6
}
Critical Gp: 5.5 xxxx xxxxx
5.5 xxxx
xxxxx
7.0 xxxx
5.5
7.0
xxxx
5.5
__________ __ _______________
Capacity Module:
_______________
---------------
_______________�
Cnflict Vol: 554 xxxx xxxxx
417 xxxx
xxxxx
988 xxxx
277
924
xxxx
209
Potent Cap.: 864 xxxx xxxxx
1024 xxxx
xxxxx
247 xxxx
1002
272
xxxx
1086
'-
Adj Cap: 1.00 xxxx xxxxx
1.00 xxxx
xxxxx
0.91 xxxx
1.00
0.86
xxxx
1.00
Move Cap.: 864 xxxx xxxxx
1024 xxxx
xxxxx
224 xxxx
1002
234
xxxx
1086
____________ _______________
---------------
---------------
---------------
4
Level Of Service Module:
Stopped Del: 4.5 xxxx xxxxx
3.6 xxxx
xxxxx
44.4 xxxx
3.8
15.8
xxxx
3.4
LOS by Move: A *
*
A +
*
+ *
*
+
'
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx xxxx
xxxxx
xxxx 291
xxxxx
xxxx
579
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx xxxx
xxxxx xxxxx 32.4
xxxxx
xxxxx
6.4
xxxxx
-
Shared LOS: * +
*
+ +
*
+ E
+
+
B
+
I
ApproachDel: 0.6
0.2
32.4
6.4
COMPARE
Mon Dec 2108:5923 1998
eve emce Uumputalion Kepon
1994 HCM Unsignallaed (Future Volume Altemalive)
Ph5PM
Intersection #3: Monterey /Farmn Frontage
Initial Val: 164
Lanes: 0
Lanes:
Initial Vol:
424
22
Signal =Stop
ImHal Vol:
Lanes:
Rights = Include
199
0
Loss Time (sec):
0
0
0.000
0
11
_.
L -
o
- R
85
0
Lanes:
Initial Vol:
424
22
r'1 ^1y 1 Iy^0
1
Vol Cnl Date:
Na
Cycle Time (see):
100
Loss Time (sec):
0
Cduml V/C:
0.000
Avg Cdl Del (sectveh):
28.4
Avg Delay (seclveh): 28.4
LOS: F
1 0 1 1 0
66 415 2
Signal= UnccntmVRights= lnclude
Signal=Stop
RIgh6= Include Lanes: Initial Val:
0 19
0
._ 11 0
o
0 6
Approach:
North Bound
South Bound
East Bound
West Bound
Movement:
L
- T
- R
L -
T
- R
L -
T
- R
L -
T
- R
---__------- I
Volume Module:
---------------
--_------------
II
---------------
---------------
Base Vol:
9
362
1
7
390
11
25
0
11
2
0
11
Growth Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
initial Bee:
9
362
1
7
390
11
25
0
11
2
0
11
Added Vol:
74
0
0
0
0
172
172
0
74
0
0
0
ApprovedDev:
3
53
1
15
34
1
2
0
0
4
0
8
Initial Fut:
86
415
2
22
424
184
199
0
85
6
0
19
User Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume:
86
415
2
22
424
184
199
0
85
6
0
19
Reduct Vol:
0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
86
415
2
22
424
184
199
0
85
6
0
19
Adjusted Volume Module:
Grade:
0%
0%
0%
0&
% Cycle /Cars:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
% Truck/ Comb:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10
1.00
1.00
1.10
1.00
1.00
1.10
1.10
1.10
1.10
1.10
1.10
Cycl /Car PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Club PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.:
95
415
2
24
424
184
219
0
94
7
0
21
Critical Gap
Module:
MoveUp Time:
2.1
xxxx
xxxxx
2.1,xxxx
xxxxx
3.4
xxxx
2.6
3.4
xxxx
2.6
Critical Gp:
5.5
xxxx
xxxxx
5.5
xxxx
xxxxx
7.0
xxxx
5.5
II----------
7.0
xxxx
5.5
- - - - -I
----------- I ---------------
Capacity Module:
---------------
---------------
Cnflict Vol:
608
xxxx
xxxxx
417
xxxx
xxxxx
1039
xxxx
304
948
xxxx
209
Potent Cap.:
809
xxxx
xxxxx
1024
xxxx
xxxxx
229
xxxx
971
262
xxxx
1086
Adj Cap:
1.00
xxxx
xxxxx
1.00
xxxx
xxxxx
0.88
xxxx
1.00
0.81
xxxx
1.00
Move Cap.:
------------ I
809
---------------
xxxx
xxxxx
1024
---------------
xxxx
xxxxx
201
---------------
xxxx
971
212
----------
xxxx
1086
- - - - -I
Level Of Service
Module:
Stopped Del:
5.0
xxxx
xxxxx
3.6
xxxx
xxxxx
187.0
xxxx
4.1
17.5
xxxx
3.4
LOS by Move;
A
*
*
A
Movement:
LT
- LTR
- RT
IT
- LTR
- RT
IT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.:
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
xxxx
264
xxxxx
xxxx
546
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
132
xxxxx
xxxxx
6..8
xxxxx
Shared LOS:
*
*
*
*
*
*
*
F
*
x
B
ApproachDel:
0.9
0.1
132.3
6.8
Page 110
COMPARE
Mon Dec 2108: 59: 231998
Page 3-11
r,J
t
Levei U, semce Computation
Repon
1994 HCM Unsignalized (Future
Volume Alternative)
Ph6PM
Intersection #3: Monterey /Farmn Frontage
Signal= UnccntroVF igms= Include
-.
Initial Vol: 205
424
22
Lanes: 0
1
1 0
1
Signal =Stop
Signal =Stop
Initial Vol: Lanes: Rights= lnclutle
Vol Cnl Dale:
n/a Rights = lnclutle Lanes:
Initial Vol:
�
Cycle Time (sec):
100
-'
220 0
0
19
Loss
Time (sec):
0
0
0
0 11 �
Critical V /C:
0.000
� 11
0
0
Avg Crit
Del (sedveh):
60.0
0
94 0
Avg Delay(sedveh):
60.0
0
6
LOS:
F
_
Lanes: 1
0
1 1
0
Initial Vol: 95
415
2
}.
Signal= UHccrUr011Rlghts =Include
`-
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
------------------------
Volume Module:
R
11___-_----------
L - T
- R
��---
L - T -
_-----------
R
��--
L -
________
T
- R
-_ - - -�
Base Vol: 9 362
1
7 390
11
25 0
11
2
0
11
'
Growth Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
I
Initial Bee: 9 362
1
7 390
11
25 0
11
2
0
11
t..
Added Vol: 83 0
0
0 0
193
193 0
83
0
0
0
ApprovedDev: 3 53
1
15 34
1
2 0
0
4
0
8
Initial Fut: 95 415
2
22 424
205
220 0
94
6
0
19
User Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 95 415
2
22 424
205
220 0
94
6
0
19
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
+
Final Vol.: 95 415
2
22 424
205
220 0
94
6
0
19
Adjusted Volume Module:
_
Grade: 0%
096
0%
0%
'
% Cycle /Cars: =ClC xxxx
xxxx
xxxx
xxxx =oE
xxxx
xxxx
% Truck /Comb: xxxx xxxx
xxxx
xxxx
xxvv xxxx
xxxx
=oC
PCE Adj: 1.10 1.00 1.00
1.10 1.00
1.00
1.10 1.10
1.10
1.10
1..10
1.10
'- -t
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 105 415
2
24 424
205
242 0
103
7
0
21
Critical Gap Module:
'
MoveUp Time: 2.1 xxxx xxxxx
2.1 xxxx
xxxxx
3.4 xxxx
2.6
3.4
xxxx
2.6
Critical Gp: 5.5 xxxx xxxxx
5.5 xxxx
xxxxx
7.0 xxxx
5.5
7.0
xxxx
5.5
___________________________
Capacity Module:
---------------
---------------
----------
- - - - -�
Cnflict, Vol: 629 =uc xxxxx
417 xxxx
xxxxx
1059 xxxx
315
957
xxxx
209
i
Potent Cap.: 788 xxxx xxxxx
1024 xxxx
xxxxx
223 xxxx
959
259
xxxx
1086
Adj Cap: 1.00 xxxx xxxxx
1.00 xxxx
xxxxx
0.87 xxxx
1.00
0.79
xxxx
1.00
Move Cap.: 788 xxxx xxxxx
------------ I---------------
Level Of Service Module:
1024 xxxx
---------------
xxxxx
193 xxxx
---------------
959
204
----------
xxxx
1086
- - - - -I
Stopped Del: 5.2 xxxx xxxxx
3.6 xxxx
xxxxx
378.3 xxxx
4.2
18.2
xxxx
3.4
LOS by Move: B *
*
A
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR -
RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx.xxxx
xxxxx
xxxx 254 xxxxx
xxxx
532
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx
xxxxx xxxx
xxxxx
xxxxx 266 xxxxx
xxxxx
6.9
xxxxx
Shared LOS: * *
*
* *
*
* F
*
*
B
ApproachDel: 1.0
0.1
266.3
6.9
COMPARE Mon Dec 2108:59:23 1998 Page 3 -12
Ltr,el Ut bervjCe UmmluWU0n Kepor,
1994 HCM Unsignalized (Future Volume Altemative)
CumlPM
Intersection #3: Monterey /Farrnn Frontage
Signal= Unconlml /Rights = Include
Initial Vol: 205 473 22
Lanes: 0 1 1 0 1
Lanes: Initial Vol:
0 19
0
11 0
0
p :a
Lanes: 1 0 1 1 0
Initial Vol: 109 468 2
Signal= UncontroVMghts =Include
Approach: North Bound South Bound East Bound West Bound
Movement; L - T - R L - T - R L - T - R L - T - R
----_------- I --------------- --------------- --------------- ---------- - - - - -I
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 11
Growth Adj: 1.00.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00
Initial Bee: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 83 0 0 0 0 193 193 0 83 0 0 0
App +Pending: 17 106 1 15 83 1 2 0 0 4 0 8
Initial Fut: 109 468 2 22 473 205 220 0 94 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 109 468 2 22 473 205 220 0 94 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
.Final Vol.: 109 468 2 22 473 205 220 0 94 6 0 19
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck /Comb: xxxx xxxx xxloc xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.00 1.00 1.10 1.00 1.00 1.10 1.10 1.10 1.10 1.10 1.10
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 120 468 2 24 473 205 242 0 103 7 0 21
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx 2.1 xxxx xxxxx 3.4 xxxx 2.6 3.4 xxxx 2.6
Critical Gp: 5.5 xxxx xxxxx 5.5 xxxx xxxxx 7.0 xxxx '5.5 7.0 xxxx 5.5
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: 678 xxxx xxxxx 470 xxxx xxxxx 1175 xxxx 339 1073 xxxx 235
Potent Cap.: 741 xxxx xxxxx 959 xxxx xxxxx 188 xxxx 932 218 xxxx 1053
Adj Cap: 1.00 xxxx xxxxx 1.00 xxxx xxxxx 0.84 xxxx 1.00 0.76 xxxx 1.00
Move Cap.: 741 xxxx xxxxx 959 xxxx xxxxx 158 xxxx 932 167 xxxx 1053
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del: 5.7 xxxx xxxxx 3.8 xxxx xxxxx 798.3 xxxx 4.3 22.4 xxxx 3.5
LOS by Move: B * * A
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx 211 xxxxx xxxx 463 xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 561 xxxxx xxxxx 8:0 xxxxx
Shared LOS: * * * * * * * F * * B
ApproachDel: 1.2 0.1 560.6 8.0
Signal =Stop
Initial Vol: Lanes:
220 0
Rights = Include
J,
0
Rights = Include
0 11
100
0
Loss Time (see):
96 0
Lanes: Initial Vol:
0 19
0
11 0
0
p :a
Lanes: 1 0 1 1 0
Initial Vol: 109 468 2
Signal= UncontroVMghts =Include
Approach: North Bound South Bound East Bound West Bound
Movement; L - T - R L - T - R L - T - R L - T - R
----_------- I --------------- --------------- --------------- ---------- - - - - -I
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 11
Growth Adj: 1.00.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00
Initial Bee: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 83 0 0 0 0 193 193 0 83 0 0 0
App +Pending: 17 106 1 15 83 1 2 0 0 4 0 8
Initial Fut: 109 468 2 22 473 205 220 0 94 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 109 468 2 22 473 205 220 0 94 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
.Final Vol.: 109 468 2 22 473 205 220 0 94 6 0 19
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck /Comb: xxxx xxxx xxloc xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.00 1.00 1.10 1.00 1.00 1.10 1.10 1.10 1.10 1.10 1.10
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 120 468 2 24 473 205 242 0 103 7 0 21
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx 2.1 xxxx xxxxx 3.4 xxxx 2.6 3.4 xxxx 2.6
Critical Gp: 5.5 xxxx xxxxx 5.5 xxxx xxxxx 7.0 xxxx '5.5 7.0 xxxx 5.5
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: 678 xxxx xxxxx 470 xxxx xxxxx 1175 xxxx 339 1073 xxxx 235
Potent Cap.: 741 xxxx xxxxx 959 xxxx xxxxx 188 xxxx 932 218 xxxx 1053
Adj Cap: 1.00 xxxx xxxxx 1.00 xxxx xxxxx 0.84 xxxx 1.00 0.76 xxxx 1.00
Move Cap.: 741 xxxx xxxxx 959 xxxx xxxxx 158 xxxx 932 167 xxxx 1053
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del: 5.7 xxxx xxxxx 3.8 xxxx xxxxx 798.3 xxxx 4.3 22.4 xxxx 3.5
LOS by Move: B * * A
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx 211 xxxxx xxxx 463 xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 561 xxxxx xxxxx 8:0 xxxxx
Shared LOS: * * * * * * * F * * B
ApproachDel: 1.2 0.1 560.6 8.0
Signal top
Vol Cnl Date:
Na
Rights = Include
Cycle Time (sec):
100
Loss Time (see):
0
Cdtical VIC:
0400
Avg Cdl Del (sedveh):
116.9
Avg Delay(seWeh):
116.9
LOS:
F(yI
Lanes: Initial Vol:
0 19
0
11 0
0
p :a
Lanes: 1 0 1 1 0
Initial Vol: 109 468 2
Signal= UncontroVMghts =Include
Approach: North Bound South Bound East Bound West Bound
Movement; L - T - R L - T - R L - T - R L - T - R
----_------- I --------------- --------------- --------------- ---------- - - - - -I
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 11
Growth Adj: 1.00.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00
Initial Bee: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 83 0 0 0 0 193 193 0 83 0 0 0
App +Pending: 17 106 1 15 83 1 2 0 0 4 0 8
Initial Fut: 109 468 2 22 473 205 220 0 94 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 109 468 2 22 473 205 220 0 94 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
.Final Vol.: 109 468 2 22 473 205 220 0 94 6 0 19
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck /Comb: xxxx xxxx xxloc xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.00 1.00 1.10 1.00 1.00 1.10 1.10 1.10 1.10 1.10 1.10
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 120 468 2 24 473 205 242 0 103 7 0 21
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx 2.1 xxxx xxxxx 3.4 xxxx 2.6 3.4 xxxx 2.6
Critical Gp: 5.5 xxxx xxxxx 5.5 xxxx xxxxx 7.0 xxxx '5.5 7.0 xxxx 5.5
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: 678 xxxx xxxxx 470 xxxx xxxxx 1175 xxxx 339 1073 xxxx 235
Potent Cap.: 741 xxxx xxxxx 959 xxxx xxxxx 188 xxxx 932 218 xxxx 1053
Adj Cap: 1.00 xxxx xxxxx 1.00 xxxx xxxxx 0.84 xxxx 1.00 0.76 xxxx 1.00
Move Cap.: 741 xxxx xxxxx 959 xxxx xxxxx 158 xxxx 932 167 xxxx 1053
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del: 5.7 xxxx xxxxx 3.8 xxxx xxxxx 798.3 xxxx 4.3 22.4 xxxx 3.5
LOS by Move: B * * A
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx 211 xxxxx xxxx 463 xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 561 xxxxx xxxxx 8:0 xxxxx
Shared LOS: * * * * * * * F * * B
ApproachDel: 1.2 0.1 560.6 8.0
COMPARE Man Dec 2109:00:56 1998 Page 3-9
-*� -ot t t► r►
Lanes: 1 0 1 1 0
Initial Vol: 4 293 3
1. Slgnal= UnccntncIHghIs= lncIude
-I Approach: North Bound South Bound East Bound west Bound
movement: L - T - R L - T - R L - T - R L - T - R
--------------- II--------------- --------------- ---------------
Volume Module: >> Count Date: 24 Oct 1998 << Sat Peak
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 4 293 3 14 263 6 4 0 3 3 0 3
` Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 4 293 3 14 263 6 4 0 3 3 0 3
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 4 293 3 14 263 6 4 0 3 3 0 3
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 4 293 3 14 263 6 4 0 3 3 0 3
Adjusted Volume Module:
Grade: 0% 06 0% 0%
i� % Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
I I % Truck/ Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
•' PCE Adj: 1.10 1.00 1.00 1.10 1.00 1.00 1.10 1.10 1.10 1.10 1.10 1.10
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 4 293 3 15 263 6 4 0 3 3 0 3
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx 2.1 xxxx xxxxx 3.4 xxxx 2.6 3.4 xxxx 2.6
Critical Gp: 5.5 xxxx xxxxx 5.5 xxxx xxxxx 7.0 xxxx 5.5 7.0 xxxx 5.5
____________ _______________ _______________ --------------- ---------------
Capacity Module:
Cnflict Vol: 269 xxxx xxxxx 296 xxxx xxxxx 577 xxxx 135 576 xxxx 148
Potent Cap.: 1229 xxxx xxxxx 1189 xxxx xxxxx 453 xxxx 1184 454 xxxx 1165
Adj Cap: 1.00 xxxx xxxxx 1.00 xxxx xxxxx 0.98 xxxx 1.00 0.98 xxxx 1.00
Move Cap.: 1229 xxxx xxxxx 1189 xxxx xxxxx 446 xxxx 1184 447 xxxx 1165
" ___________________________ _______________ __ _____________ ---------------
Level Of Service Module:
Stopped Del: 2.9 xxxx xxxxx 3.1 xxxx xxxxx 8.1 xxxx 3.0 8.1 xxxx 3.1
LOS by Move: A * * A * * x x x
` Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx 608 xxxxx xxxx 646 xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 6.0 xxxxx xxxxx 516 xxxxx
Shared LOS: * * * * * * * B * * B
ApproachDel: 0.0 0.2 6.0 5.6
eve ompu ion epc
1994 HCM Unstgnaleed allzed (Future Volume AllemaUve)
..
ExistSal
Intersection #3: Monterey /Farmn Frontage
Signal= Uncon"VRlghts= lntlude
Initial Vol:
6 263 14
Lanes:
0 1 1 0 1
Initial Val: Lanes:
Signal =Stop
Rights = lntlude
Signal =Slop
Vol Cnl Date: 102458 Rights = lntlude Lanes: Initial Vol:
J
Cycle Time (see): 100
0 3
� 4 0
Loss Tme (sec): 0
I 0
0 11
J*
-,
g
Cduml VIC: 0.000 tl 0
I 0
Avg Cdt Del ( sedveh): 0.2 0
3 0
Avg Delay (sedveh): 02 0 3
LOS: B
-*� -ot t t► r►
Lanes: 1 0 1 1 0
Initial Vol: 4 293 3
1. Slgnal= UnccntncIHghIs= lncIude
-I Approach: North Bound South Bound East Bound west Bound
movement: L - T - R L - T - R L - T - R L - T - R
--------------- II--------------- --------------- ---------------
Volume Module: >> Count Date: 24 Oct 1998 << Sat Peak
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 4 293 3 14 263 6 4 0 3 3 0 3
` Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVOl: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 4 293 3 14 263 6 4 0 3 3 0 3
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 4 293 3 14 263 6 4 0 3 3 0 3
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 4 293 3 14 263 6 4 0 3 3 0 3
Adjusted Volume Module:
Grade: 0% 06 0% 0%
i� % Cycle /Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
I I % Truck/ Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
•' PCE Adj: 1.10 1.00 1.00 1.10 1.00 1.00 1.10 1.10 1.10 1.10 1.10 1.10
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 4 293 3 15 263 6 4 0 3 3 0 3
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx 2.1 xxxx xxxxx 3.4 xxxx 2.6 3.4 xxxx 2.6
Critical Gp: 5.5 xxxx xxxxx 5.5 xxxx xxxxx 7.0 xxxx 5.5 7.0 xxxx 5.5
____________ _______________ _______________ --------------- ---------------
Capacity Module:
Cnflict Vol: 269 xxxx xxxxx 296 xxxx xxxxx 577 xxxx 135 576 xxxx 148
Potent Cap.: 1229 xxxx xxxxx 1189 xxxx xxxxx 453 xxxx 1184 454 xxxx 1165
Adj Cap: 1.00 xxxx xxxxx 1.00 xxxx xxxxx 0.98 xxxx 1.00 0.98 xxxx 1.00
Move Cap.: 1229 xxxx xxxxx 1189 xxxx xxxxx 446 xxxx 1184 447 xxxx 1165
" ___________________________ _______________ __ _____________ ---------------
Level Of Service Module:
Stopped Del: 2.9 xxxx xxxxx 3.1 xxxx xxxxx 8.1 xxxx 3.0 8.1 xxxx 3.1
LOS by Move: A * * A * * x x x
` Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx 608 xxxxx xxxx 646 xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 6.0 xxxxx xxxxx 516 xxxxx
Shared LOS: * * * * * * * B * * B
ApproachDel: 0.0 0.2 6.0 5.6
COMPARE Mon Dee 21 09:00:561998 Page 3 -10
eve uwice GOMPUt2tiOn Report
1994 HCM Unsignalized (Future Volume AltemaWe)
BackSat
Intersection #3: Monterey /Farmn Frontage
Signal= Uncontml /Rights = Include
Initial Vol: 9 300 26
Lanes: 0 1 1 0 1
-4141�►4
Lanes: Initial Vol:
0 13
0
11 0
0
0 0 '
Approach:
Signal =Slap
South Bound
East Bound
Signal =Slop
Initial Vol: Lanes:
Rights= lndude
Vol Call Date:
Na
flights = Include
fi 0
- R
Cycle Time (Sao):
100
`
B
T
Lass Time (sec):
0
---------------
0 11
Cdtimi V /C:
0.000
0
�'
Avg Cm Del (seciveh):
0.5
3 0
Base Vol:
Avg Delay (sedveh):
0.5
3
14
263
LOS:
B
0
3
3
0
/yam
Growth Adj:
1.00
Lanes:
1 0 1 1
0
1.00
1.00
Initial Vol:
9 341
4
1.00
1.00
1.00
Signal=UncontmVRights= Include
4
Lanes: Initial Vol:
0 13
0
11 0
0
0 0 '
Approach:
North Bound
South Bound
East Bound
West Bound
Movement:
------------
L
- T -
R
L -
T
- R
L -
T
- R
L -
T
- R
I
Volume Module:
---------------
---------------
---------------
----------
- - - - -I
Base Vol:
4
293
3
14
263
6
4
0
3
3
0
3
Growth Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial SEE:
4
293
3
14
263
6
4
0
3
3
0
3
Added Vol:
0
0
0
0
0
0
0
0
0
0
0
0
ApprovedDev:
4
48
1
12
37
2
2
0
0
5
0
10
Initial Fut:
8
341
4
26
300
8
6
0
3
8
0
13
User Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF•Volume:
8
341
4
26
300
8
6
0
3
8
0
13
Reduct Vol:
0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
8
341
4
26
300
8
6
0
3
8
0
13
Adjusted Volume Module:
Grade:
096
0%
0%
0%
% Cycle /Cars:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
& Truck/ Comb:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10
1.00
1.00
1.10
1.00
1.00
1.10
1.10
1.10
1.10
1.10
1.10
Cycl /Car PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Trck /Cmb PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.:
9
341
4
29
300
8
7
0
3
9
0
14
Critical Gap
Module:
MoveUp Time:
2.1
xxxx
xxxxx
2.1
xxxx
xxxxx
3.4
xxxx
2.6
3.4
xxxx
2.6
Critical Gp:
-----_------
5.5
xxxx
xxxxx
5.5
xxxx
xxxxx
7.0
xxxx
5.5
7.0
xxxx
5.5
I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol:
308
xxxx
xxxxx
345
xxxx
xxxxx
679
xxxx
154
677
xxxx
173
Potent Cap.:
1171
xxxx
xxxxx
1119
xxxx
xxxxx
390
xxxx
1157
391
xxxx
1132
Adj Cap:
1.00
xxxx
xxxxx
1.00
xxxx
xxxxx
0.96
xxxx
1.00
0.97
xxxx
1.00
Move Cap.:
------------
1171
xxxx
xxxxx
1119
xxxx
xxxxx
375
xxxx
1157
380
xxxx
1132
I
Level Of Service
---------------
Module:
---------------
---------------
----------
- - - - -I
Stopped Del:
3.1
xxxx xxxxx
3.3
xxxx
xxxxx
9.8
xxxx
3.1
9.7
xxxx
3.2
LOS by Move:
A
*
*
A
*
*
*
*
*
+
+
+
Movement:
IT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
IT
- LTR
- RT
Shared Cap.:
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
xxxx
484
xxxxx
xxxx
645
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
7.5
xxxxx
xxxxx
5.7
xxxxx
Shared LOS:
*
*
*
*
*
*
*
B
*
*
B
ApproachDel:
0.1
0.3
7.5
5.7
1
I
a6eluad uwedpiwaluoW :E# u0110as/alul
966E
t L-E abed 966195:00:60 a 0aO uoW awd"00
11
0'9
apnpupsl46.1d/101ju00up= leu61S
8'6
4 M OE
Z'0
E'0
:sauel
:TaQgoeoaddy
g
.
+
El
.
.
.
.
r
.
,
: SO'I PazagS
xxxxx
0.9
xxxxx
xxxxx.
8'6
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx:
TaOdaS P =g5
xxxxx
9T9
XXXX
XXXXX
tE5
XXxx
xxxxx
xxxx
xxxx
xxxxx
xxxx
xxxx
de:) paam4s
,Tx -
HJrl -
S'I
I'd -
x5'I -
II
Id -
x5rl -
M
Ild
- 2iSI
71I
:jnawaAOW
H
r
+
v
: aAOK Aq SO'I
Z "£
XXXX
5'OT
E "E
Soocx
91ZT
XXXXX
xxxx
E'E
3noocx
xxxx
b'E
:TaO paddogS
:aTnpoW
GOTAaaS 30 TanaZ
---------------
ZETT
X
bSE
---------------
ZZTT
XXXX
EbE
---------------
XXXXX
X
611T
-------
XXXXX
--- -----
x
6601
I -- -- -- - - - - --
:-de0 anoW
OO'T
XXXX
E6'O
00'1
xxxx
S6'O
XxlacX
Xxxx
00'T
XXXXX
xxxx
OUT
:de0 Cpy
ZETT
X
BL£
ZZTT
XXXX
£9£
XXXXX
xxxx
6TTT
xxxXX
XXXX
660T
:*de0 '4ualod
ELT
x
669
081
Xx
LZL
XXXXX
XXXX
STYE
XXXXX
x
09E
:ToA 7071JUD
:aTnpoW AgToede0
---------------
S'S
x
0'L
---------------
S'S
X
0'L
--------------
xxxxx
x
-
S'S
---------------
xxxxx
xxxx
S•5
------- --- --
:do Ieozgiz0
9'Z
x
VIE
9'Z
xxxx
b-E
xxxxx
X
T'Z
xxxxx
xxxx
T "Z
:awTS dfleAOW
:aTnpoW
deo TEOTgTS3
61
0
6
8Z
0
b9
09
DOE
6Z
b
T5E
EE
:'ToA CPK
xscsnc
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
:Hod qw0 /Noz.L
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
:aod SQO /ToLO
OT'T
OT'T
OT'T
OT'T
OT'T
OT'T
00'T
00'1
OT'T
OO'T
00'T
OT'T
:Cpv HOB
acxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxXx
xxxx
:gwoZ)/XDn3J. %
xxxx
XXXX
xxxx
xxxx
xxxx
xxxx
xxax
xxxx
:szEO /aToIO %
%0
%0
%0
%0
: ape.xo
:aTnpoW awnToA paasn Cpy
ET
0
B
SZ
0
as
09
DOE
9Z
4
IVE
OE
:,10A T=,j
0
0
0
0
0
0
0
0
0
0
0
0
:ToA gonpag
ET
0
8
SZ
0
as
09
00£
9Z
9
T6E
OE
:awnToA 3Hd
00'T
OO'T
00'T
OO'T
00'T
00'T
OO'T
00 "T
0001
00'1
00'T
00'T
:CPK aHd
0001
00'T
0001
00'T
00'T
00'T
00'1
00'T
00'T
00'T
00'T
00'T
:CPK aasl.I
ET
0
8
SZ
0
as
09
DOE
9Z
b
TtE
OE
:7neI TET;TUI
OT
0
s
0
0
Z
Z
LE
ZL
T
Bb
9
:A9Gpano:iddy
0
0
0
ZZ
0
ZS
ZS
0
0
0
0
ZZ
:ToA PaPPV
£
0
E
E
0
b
9
E9Z
vT
E
EGZ
b
:asg TEFgTuI.
00'T
00'T
00'T
00'T
00'T
OO'T
00'1
00'T
00'1
00'T
00'T
00'1
:CPV q:1m0a0
E
0
€
E
0
b
9
E9Z
oT
E
EGZ
D.
:ToA aseg
:aTnpoW
awnToA
---------------11---------------11---------------11---------------I------------
-d
- Z
- 'I
x
- S
- 'I
u
- S
- 'I
H
- S
- 'I
: guawaAOW
punog gsam
punog
gs>?H
punog
g7noS
punog
ggaoN
:goeoaddy
a6eluad uwedpiwaluoW :E# u0110as/alul
966E
t L-E abed 966195:00:60 a 0aO uoW awd"00
11
apnpupsl46.1d/101ju00up= leu61S
4 M OE
:10A RPM
0 L L L
:sauel
IyA0
41 4 7 1*
9 0
J,
a :Sol
43 :(4aApes)6elao 6ny
0 SZ
0
J�,
9'L :(4anpas)IGo JUD 6ntl
0
0 IL
*
000'0 :O /A leO!L40
� LL 0
p :(0as) awLL ss0l
EL 0
OOt :(0as) aw!1 ap60
0 95
♦
:10A IeINI :saue'I
apnjoul =s146R1
Eo1S =Ieu6!S
ex :aleO 1U3 10A
apnpu1= s746!y sauel aoA le!1!ul
dolS= leu6!S
L 0 l L 0
sauel
9Z 00C 09
40A Ie!IM
apnpu1= 5146!84w1u00u0= 1eu61S
a6eluad uwedpiwaluoW :E# u0110as/alul
966E
t L-E abed 966195:00:60 a 0aO uoW awd"00
11
COMPARE
Mon Dec 21 09:00:56 1998
Page 3 -12
Level Ut Service Computation Report
1994 HCM Unsignalized (Future Volume Alternative)
'
Ph3Sat
Intersection #3: Monterey /Farmn Frontage
Signal= UncontroliRights=lnclude
Initial Vol: 100
300 26
`
Lanes:
0 1
1 0 1
1 �► �►
Signal =Stop
Signal
=Stop
'
Initial Vol: Lanes: Rights= lnGUde
Vol Cnl Dale: Na Rights= lnclutle Lanes: Initial Vol:
Cycle Time (sec): 100
98 0
0
13
Loss
Time (sec): 0
0
0
0 11
Critical V /C: 0.000
11
0
•-
0
Avg Cril
Del (sedveh): 2.3
0
43 0
Avg Delay(seWeh): 2.3
0
8
LOS: C
Lanes:
1 0
1 1 0
Initial Vol: 48
341 4
' -
S1gnal= UnconmVRights= Include
1
Approach: North Bound
South Bound
East Bound
West Bound •�
Movement: L - T -
R
L - T - R
L - T -
R
L -
T
- R
------------ ---------------
Volume Module:
II
---------------
---------------
----------
- - - - -I
i
Base Vol: 4 293
3
14 263 6
4 0
3
3
0
3
Growth Adj: 1.00 1.00
1.00
1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00 ,
Initial BEE: 4 293
3
14 263 6
4 0
3
3
0
3
Added Vol: 40 0
0
0 0 92
92 0
40
0
0
0
ApprovedDev: 4 48
1
12 37 2
2 0
0
5
0
SO
Initial Fut: 48 341
4
26 300 100
98 0
43
8
0
13
User Adj: 1.00 1.00
1.00
1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
PHF Volume: 48 341
4
26 300 100
98 0
43
8
0
13
Reduct Vol: 0 0
0
0 0 0
0 0
0
0
0
0
Final Vol.: 48 341
4
26 300 100
98 0
43
8
0
13
Adjusted Volume Module:
-
Grade: 0s
0%
0%
0%
g Cycle /Cars: =C)C xxxx
xxxx xxxx
xxxx xxxx-
xxxx
xxxx
Truck/ Comb: xxxx xxxx
xxxx xxxx
xxxx xxxx
=uc
xxxx
,l
PCE Adj: 1.10 1.00
1.00
1.10 1.00 1.00
1.10 1.10
1.10
1.10 1.10
1.10
Cycl /Car PCE: xxxx xxxx
xxxx xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 53 341
4
29 300 100
108 0
47
9
0
14 -
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx
2.1 xxxx xxxxx
3.4 xxxx
2.6
3.4 xxxx
2.6
Critical Gp: 5.5 =ctc xxxxx
5.5 xxxx xxxxx
7.0 xxxx
5.5
7.0 xxxx
5.5
------------ I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol: 400 xxxx xxxxx
345 xxxx xxxxx
765 xxxx
200
717 xxxx
173
Potent Cap.: 1046 xxxx xxxxx
1119 xxxx xxxxx
343 xxxx
1096
368 xxxx
1132 ,I
Adj Cap: 1..00 xxxx xxxxx
1.00 xxxx xxxxx
0.93 xxxx
1.00
0.90 xxxx
1.00
Move Cap.: 1046 xxxx xxxxx
1119 xxxx xxxxx
320 xxxx
1096
332 xxxx
1132
------------ I ---------------
Level Of Service Module:
---------------
---------------
---------------
Stopped Del: 3.6 xxxx xxxxx
3.3 xxxx xxxxx
16.2 xxxx
3.4
11.1 xxxx
3.2
LOS by Move: A *
*
A
Movement: LT -LTR -
RT
LT - LTR - RT
LT - LTR
- RT
LT -
LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx xxxx xxxxx
xxxx 408
xxxxx
xxxx
591
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx
xxxxx xxxx xxxxx
xxxxx 12.3
xxxxx
xxxxx
6.2
xxxxx
Shared LOS: * *
*
* * *
* C
*
*
B
ApproachDel: 0.5
0.2
12.3
6.2
,
COMPARE Mon Dec 2109:04:27 1998 Page 3 -9
Levei ui, bewice mpulal,On
Kepon
n
1994 HCM Unsignalized (Future Volume Alternative)
Ph4Sat
Intersection #3: Monterey /Farmn Frontage
Signal= UnconVoIJRights= Include
` Initial Vol: 177
300 26
Lanes:
0 1
11 Iyh0.0 1
Signal =Stop
Signal =Stop
- Initial Vol: Lanes: Rights= Include
Val Cnt Date: n/a Rlghts= Include Lanes:
Initial Vol:
Cycle Time (sec): 100
175 0
0
13
(
Loss
Time (sec): 0
•
- 0 11
Critical V /C: 0.000
11
0
- 0
Avg Cht
Del (sedveh): 6.1
0
76 0
Avg Delay(seclveh): 6.1
0
8
LOS: D
{
Lanes:
1 0
1 1 0
' Initial Vol:
81
341 4
Signal= Uncontro6Rights= Include
Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L - T - R
L - T -
R
L -
T
- R
------ - - - - -- ---------------
II
---------------
---------------
---------------
I
Volume Module:
_ Base Vol: 4 293
3
14 263 6
4 0
3
3
0
3
Growth Adj: 1.00 1.00
1.00
1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
Initial Beat 4 293
3
14 263 6
4 0
3
3
0
3
' Added Vol: 73 0
0
0 0 169
169 0
73
0
0
0
ApprovedDev: 4 48
1
12 37 2
2 0
0
5
0
10
Initial Fut: 81 341
4
26 300 177-
175 0
76
8
0
13
User Adj: 1.00 1.00
1.00
1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00 1.00
1.00 1.00
1.00
1.00 1.00
1.00
PHF Volume: 81 341
4
26 300 177
175 0
76
8
0
13
Reduct Vol: 0 0
0
0 0 0
0 0
0
0
0
0
Final Vol.: 81 341
4
26 300 177
175 0
76
8
0
13
y Adjusted Volume Module:
Grade: OS
0%
0%
0%
-
% Cycle /Cars: xxxx xxxx
xxxx xxxx
xxxx xxxx.
xxxx
xxxx
% Truck/ Comb: xxxx xxxx
xxxx xxxx
xxxx xxxx
xxxx
xxxx
PCE Adj: 1.10 1.00
1.00
1.10 1.00 1.00
1.10 1.10
1.10
1.10 1.10
1.10
Cycl /Car PCE: xxxx xxxx
xxxx xxxx
xxxx xxxx
xxxx
xxxx
Trck /Curb PCE: xxxx xxxx
xxxx xxx-`c
xxxx xxxx
xxxx
xxxx
Adj Vol.: 89 341
4
29 300 177
193 0
84
9
0
14
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx
2.1 xxxx xxxxx
3.4 xxxx
2.6
3.4 xxxx
2.6
Critical Gp: 5.5 xxxx xxxxx
'
5.5 xxxx xxxxx
7._0 xxxx
---------------
5.5
7.0 xxxx
---------------
5.5
I
------------ I ---------------
Capacity Module:
---------------
' Cnflict Vol: 477 xxxx
xxxxx
345 xxxx xxxxx
837 xxxx
239
750 xxxx
173
Potent Cap.: 951 xxxx
xxxx
1119 xxxx xxxxx
309 xxxx
1048
351 xxxx
1132
Adj Cap: 1.00 xxxx
xxxxx
1.00 xxxx xxxxx
0.90 xxxx
1.00
0.84 xxxx
1.00
Move Cap.: 951 xxxx
xxxxx
1119 xxxx xxxxx
278 xxxx
1048
294 xxxx
---------------
1132
I
------------ I ---------------
Level Of Service Module:
---------------
---------------
Stopped Del: 4.1 xxxx
xxxxx
3.3 xxxx xxxxx
34.3 xxxx
3.7
-12.6 xxxx
3.2
LOS by Move: A *
*
A
Movement: LT - LTR
- RT
LT - LTR - RT
LT - LTR
- RT
LT -
LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx xxxx xxxxx
xxxx 357
xxxxx
xxxx
543
xxxxx
Shrd Stpl)el:xxxxx xxxx xxxxx
xxxxx xxxx xxxxx
xxxxx 25.1
xxxxx
xxxxx
6:8
xxxxx
Shared LOS: * *
*
* * *
* D
*
*
B
ApproachDel: 0.8
0.2
25.1
6.8
COMPARE Mon Dec 21 09:04271998 Page 3 -10
Level ervice Gompulabon Kepon
1994 HCM Unsignalixed (Future Volume Alternative)
Ph5Sat
Intersection #3: Monterey /Farmn Frontage
Approach:
Signal= UncontmVRlghts= lntlude
South Bound
Initial Vol:
254 300 26
Movement:
Lanes:
0 11 nIy I11 0 1
R
Signal =Stop
T
Signal =Slop
Initial Vol: Lanes: Rights =Include
Vol Cnl Date: Na
Rights = lntlude Lanes: Initial Vol:
252 0
Cycle Time (sec): 100
0 13
------------ I
Volume Module:
---------------
■
0
Loss Time (sec): 0
0
0 11 -.
Critical V /C: 0.000
._ 11 0
0
Avg Cdl Del (sedveh): 45.6
0
109 0
Avg Delay(sectveh): 45.6
0 8
293
LOS: F
14
263
6
4
Lanes:
1 0 1 1 0
3
Initial Vol:
114 341 4
Growth Adj:
1.00
Signal =Uncc ntro11Rights= lndude
1.00
Approach:
North Bound
South Bound
East Bound
West Bound
Movement:
L -
T -
R
L -
T
- R
L -
T
- R
II
L -
----------
T
- R
- - - - - I
------------ I
Volume Module:
---------------
II
---------------
II
---------------
Base Vol:
4
293
3
14
263
6
4
0
3
3
0
3
Growth Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Initial BEE:
4
293
3
14
263
6
4
0
3
3
0
3
Added Vol:
106
0
0
0
0
246
246
0
106
0
0
0
ApprovedDev:
4
48
1
12
37
2
2
0
0
5
0
10
Initial Fut:
114
341
4
26
300
254
252
0
109
8
0
13
User Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Adj:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PHF Volume:
114
341
4
26
300
254
252
0
109
8
0
13
Reduct Vol:
0
0
0
0
0
0
0
0
0
0
0
0
Final Vol.:
114
341
4
26
300
254
252
0
109
8
0
13
Adjusted Volume Module:
Grade:
096
0%
0%
0%
% Cycle /Cars:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
% Truck/ Comb:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
PCE Adj:
1.10
1.00
1.00
1.10
1.00
1.00
1.10
1.10
1.10
1.10
1.10
1.10
Cycl /Car PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
gcgcgac
xxxx
xxxx
Trck /Cmb PCE:
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
xxxx
Adj Vol.:
125
341
4
29
300
254
277
0
120
9
0
14
Critical Gap
Module:
MoveUp Time:
2.1
xxxx
xxxxx
2.1
xxxx
xxxxx
3.4
xxxx
2.6
3.4
xxxx
2.6
Critical Gp:
5.5
xxgcx
xxxxx
5.5
xxxx
xxxxx
7.0
xxxx
5.5
7.0
xxxx
5.5
- - - -I
------------ I ---------------
Capacity Module:
---------------
---------------
----------
-
Cnflict Vol:
554
xxxx
xxxxx
345
xxxx
xxxxx
908
xxxx
277
783
xxxx
173
Potent Cap.:
864
xxxx
xxxxx
1119
xxxx
xxxxx
278
xxxx
1002
334
xxxx
1132
Adj Cap:
1.00
xxxx
xxxxx
1.00
xxxx
xxxxx
0.86
xxxx
1.00
0.77
xxxx
1.00
Move Cap.:
------------ I
864
---------------
xxxx
xxxxx
1119
---------------
xxxx
xxxxx
239
---------------
xxgcx
1002
257
----------
xxxx
1132
- - - - -I
Level Of Service Module:
Stopped Del:
4.8
xgorx
xxxxx
3.3
xxxx
xxxxx
237.6
xxxx
4.0
14.5
xxx
3.2
LOS by Move:
A
*
*
A
Movement:
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
LT
- LTR
- RT
Shared Cap.:
xxxx
xxxx
xxxxx
xxxx
xxxx
xxxxx
xxxx
311
xxxxx
xxxx
492
xxxxx
Shrd StpDel:xxxxx
xxxx
xxxxx
xxxxx
xxxx
xxxxx
xxxxx
167
xxxxx
xxxxx
7.5
xxxxx
Shared LOS:
*
*
*
*
*
*
*
F
*
*
B
ApproachDel:
1.3
0.2
167.1
7.5
r
1, ,
COMPARE Mon Dec 21 09:04:27 1998 Page 3 -11
LeVel Ut 6eNlCe GOmpatation Repcn
1994 HCM Unsignalized (Future Volume Alternative)
Ph6Sal
Intersection #3: Monterey /Farmn Frontage
Signal= UacoruollRighta= lndude
• Initial Vol: 288
300
26
Lanes:
0 1
1 0
1
Signal =Stop
Signal =Stop
Initial Vol: Lanes: Rights = Include
Vol Grit Date:
No Rights = Include Lanes:
Initial Vol:
�
Cycle Time (sec):
100
' 286 0
0
13
•
Loss
Time (sec):
0
0
0
' 0 1I
Critical V /C: -
0.000
11
0
0
Avg Grit
Del (sedveh):
117.1
0
123 0
Avg Delay (sedveh):
117.1
0
8
.--
LOS:
F
Act
1 t
Lanes:
1 0
1 1
0
' Initial Vol: 128
341
4
' I
Signal= UncontrcVRights= Include
' Approach: North Bound
South Bound
East Bound
West Bound
Movement: L - T -
R
L - T
- R
L - T -
R
L -
----------
T
- R
- - - - -I
------------ ---------------
Volume Module:
II
---------------
---------------
- Base Vol: 4 293
3
14 263
6
4 0
3
3
0
3
Growth Adj: 1.00 .1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial Bee: 4 293
3
14 263
6
4 0
3
3
0
3
Added Vol: 120 0
0
0 0
280
280 0
120
0
0
0
ApprovedDev: 4 48
1
12 37
2
2 0
0
5
0
10
,- Initial Fut: 128 341
4
26 300
288
286 0
123
8
0
13
User Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 128 341
4
26 300
288
286 0
123
8
0
13
Reduct Vol: 0 0
0
0 0
0
0 0
0
0
0
0
Final Vol.: 128 341
4
26 300
288
286 0
123
8
0
13
-- Adjusted Volume Module:
,. Grade: 0%
0%
0%
0%
% Cycle /Cars: xxxx xxxx
xxxx
xvYY
xxxx xxxx..
xxxx
xxxx
. % Truck/ Comb: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
' PCE Adj: 1.10 1.00
1.00
1.10 1.00
1.00
1.10 1.10
1.10
1.10
1.10
1.10
Cycl /Car PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx
xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 141 341
4
29 300
288
315 0
135
9
0
14
_
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx
2:1 xxxx
xxxxx
3.4 xxxx
2.6
3.4
xxxx
2.6
Critical Gp: 5.5 xxxx xxxxx
5.5 xxxx
xxxxx
7.0 xxxx
5.5
7.0
xxxx
5.5
------------ I ---------------
Capacity Module:
---------------
---------------
----------
- - - - -I
Cnflict Vol: 588 xxxx xxxxx
345 xxxx
xxxxx
939 xxxx
294
797
xxxx
173
Potent Cap.: 829 xxxx xxxxx
1119 xxxx
xxxxx
266 xxxx
983
328
xxxx
1132
- Adj Cap: 1.00 xxxx xxxxx
1.00 xxxx
xxxxx
0.84 xxxx
1.00
0.74
xxxx
1.00
Move Cap.: 829 xxxx xxxxx
1119 xxxx
xxxxx
224 xxxx
983
241
xxxx
1132
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - - -I
Stopped Del: 5.1 xxxx xxxxx
3.3 xxxx
xxxxx
581.6 xxxx
4.2
-15.5
xxxx
3.2
LOS by Move: B *
*
A
Movement: LT - LTR -
RT
LT - LTR
- RT
LT - LTR -
RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx xxxxx
xxxx xxxx
xxxxx
xxxx 292 xxxxx
xxxx
470
xxxxx
Shrd StpDel:xxxxx xxxx xxxxx
xxxxx xxxx
xxxxx
xxxxx 408 xxxxx
xxxxx
7.9
xxxxx
Shared LOS: * *
*
* *
*
* F
*
*
B
�
ApproachDel: 1.5
0.2
407.9
7.9
COMPARE
Mon Dec 21 09:04:27 1998
Page 3.12
'
Level Ul bervice Gompumnon hapon
1994 HCM Unsignalized (Future Volume Altemative)
CumSat
Intersection #3: Monterey /Farmn Frontage
Signal= UncontmVRlgh6= 1nUUde
Initial Vot: 288
376 26
Lanes:
0 1
0 1
41
11
1
Signal =Stop
Signal =Stop
Initial Vol: Lanes: Rights = Include
Vol Cnt Date: We Rights= lnciude Lanes: Initial Vol: '
Cycle Time (see): WD
266 0
0
13
Loss
Time (sec): D
0
0
0 11
critical V /C: 0.000
11
0
0
Avg Crit
Del(seWeh): 241.4
0
123 0
Avg Delay (senlveh): 241.4
0
8
LOS: F
`_\
Att
t t
Lanes:
1 0
1 1 0
Initial Vol: 143
419 4
Signal= Uncontrol /Rights= Include
Approach: North Bound
South Bound
East Bound
West Bound
Movement; L - T -
R
L - T - R
L - T
- R
L -
T
- R
-
------ - - - - -- ---------------
Volume Module:
II
---------------
---------------
----------
- - - -I
Base Vol: 4 293
3
14 263 6
4 0
3
3
0
3,
Growth Adj: 1.00 1.00
1.00
1.00 1.00 1.00
1.00 1.00
1.00
1.00
1.00
1.00
Initial Bee: 4 293
3
14 263 6
4 0
3
3
0
3
Added Vol: 120 0
0
0 0 280
280 0
120
0
0
0 ,
App +Pending: 19 126
1
12 113 2
2 0
0
5
0
10
Initial Fut: 143 419
4
26 376 288
286 0
123
8
0
13
User Adj: 1.00 1.00
1.00
1.00 1.00 1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Adj: 1.00 1.00
1.00
1.00 1.00 1.00
1.00 1.00
1.00
1.00
1.00
1.00
PHF Volume: 143 419
4
26 376 288
286 0
123
8
0
13
Reduct Vol: 0 0
0
0 0 0
0 0
0
0
0
0
Final Vol.: 143 419
4
26 376 288
286 0
123
8
0
13
Adjusted Volume Module:
Grade: 0%
0%
0%
0%
% Cycle /Cars: xxxx xxv�r
xxxx xxxx
xxxx xxxx
;.
xxx2c
xxxx
% Truck/ Comb: xxxx xxxx
xxxx xxxx
xxxx xxxx
xxxx
xxxx
PCE Adj: 1.10 1.00
1.00
1.10 1.00 1.00
1.10 1.10
1.10
1.10
1.10
1.10
Cycl /Car PCE: xxxx xxxx
xxxx xxxx
xxxx xxxx
xxxx
xxxx
Trck /Cmb PCE: xxxx xxxx
xxxx xxxx
xxxx xxxx
xxxx
xxxx
Adj Vol.: 157 419
4
29 376 288
315 0
135
9
0
14
Critical Gap Module:
MoveUp Time: 2.1 xxxx xxxxx
2.1 xxxx xxxxx
3.4 xxxx
2.6
3.4
xxxx
2.6
Critical Gp: 5.5 xxxx
xxxxx
5.5 xxxx xxxxx
7.0 xxxx
5.5
II----------
7.0
xxxx
5.5
- - - - -I
------------ I ---------------
Capacity Module:
--------------
- -------------
Cnflict Vol: 664 xxxx
xxxxx
423 xxxx xxxxx
1108 xxxx
332
966
xxxx
212
Potent Cap.: 754 xxxx
xxxxx
1016 xxxx xxxxx
207 xxxx
940
255
xxxx
1082
Adj Cap: 1.00 xxxx
xxxxx
1.00 xxxx xxxxx
0.81 xxxx
1.00
0.70
xxxx
1.00
Move Cap.: 754 xxxx
xxxxx
1016 xxxx xxxxx
168 xxxx
940
180
xxxx
1082
-I
------------ I ---------------
Level Of Service Module:
---------------
---------------
----------
- - - -
,
Stopped Del: 5.9 xxxx
xxxxx
3.6 xxxx xxxxx
1334 xxxx
4.4
21.0
xxxx
3.4
LOS by Move: B *
*
A
Movement: LT - LTR
- RT
LT - LTR - RT
LT - LTR
- RT
LT
- LTR
- RT
Shared Cap.: xxxx xxxx
xxxxx
xxxx xxxx xxxxx
xxxx 223
xxxxx
xxxx
372
xxxxx
Shrd StpDel:xxxxx xxxx
xxxxx
xxxxx xxxx xxxxx
xxxxx 934
xxxxx
xxxxx
10:1
Shared LOS: * *
*
* * *
* F
*
*
C
ApproachDel: 1.6
0.2
934.1
10.1
� I
U
rY
I
_I
MITIGS - Ph4PM Thu Oct 29, 1998 10:39:21 Page 1 -1
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
Intersection A3monterey /Farmn Frontage
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.350
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 14.4
Optimal Cycle: 39 Level Of Service: B-
*fi
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- --------------- --------------- ---------- - - - - -I
Control: Protected Protected Permitted Permitted
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0
------------ I --------------- --------------- --------------- ---------- - - - - -I
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 11
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bee: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 50 0 0 0 0 118 118 0 50 0 0 0
ApprovedDev: 3 53 1 15 34 1 2 0 0 4 0 8
Initial Fut: 62 415 2 22 424 130 145 0 61 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 62 415 2 22 424 130 145 0 61 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 62 415 2 22 424 130 145 0 61 6 0 19
PCE Adj: 1.00 1.00' 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 62 415 2 22 424 130 145 0 61 6 0 19
------------ I ---------- - - - - - H --------------- II --------------- II ---------- - - - - - I
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 0.97 0.97 0.97 0.97 0.97
Lanes: 1.00 1.99 0.01 1.00 1.52 0.48 0.70 0.00 0.30 0.24 0.00 0.76
Final Sat.: 1750 3682 18 1750 2831 868 1232 0 518 420 0 1330
------------ I --------------- --------------- --------------- II ---------- - - - - -
I
Capacity Analysis Module:
Vol /Sat: 0.04 0.11 0.11 0.01 0.15 0.15 0.12 0.00 0.12 0.01 0.00 0.01
Cri.t Moves: * * ** Y #Y# * * #*
Green Time: 9.1 40.7 40.7 7.0 38.6 38.6 30.3 0.0 30.3 30.3 0.0 30.3
Volume /Cap: 0.35 0.25 0.25 0.16 0.35 0.35 0.35 0.00 0.35 0.04 0.00 0.04
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Delay /Veh: 29.1 11.6 11.6 29.5 13.2 13.2 17.2 0.0 17.2 15.3 0.0 15.3
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj FCtr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00
AdjDel /Veh: 29.1 11.6 11.6 29.5 13.2 13.2 17.2 0.0 17.2 15.3 0.0 15.3
DesignQueue: 3 12 0 1 13 4 5 0 2 0 0 1
Tra£fix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - Ph5PM Thu Oct 29, 1998 10:39:42 . Page 1 -1
_________________________________________________ ____________ ____ __ _____ ______ __
_________________________________________________ ___ __ __ ________________________
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
Intersection #Monterey /Farmn Frontage `
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.434
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 16.2
Optimal Cycle: 39 Level Of Service: C+
# #'F # # *x #xx #xx *xxxY *x * *xt* xxx # # #x #* xxx*** xYYii++* xxxx # * *t *xxk # +xxY+ +Y * + +xYii +*xY*
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
____________ _______________ _______________ --------------- _______________�
Control: Protected Protected Permitted Permitted
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0
____________ _______________ --------------- --------------- ---------------
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 it
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 74 0 0 0 0 172 172 0 74 0 0 0
ApprovedDev: 3 53 1 15 34 1 2 0 0 4 0 8
Initial Fut: 86 415 2 22 424 184 199 0 85 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 86 415 2 22 424 184 199 0 85 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 86 415 2 22 424 184 199 0 85 6 0 19
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 86 415 2 22 424 184 199 0 85 6 0 19
___________________________ --------------- --------------- _______________�
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1600 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 0.97 0.97 0.97 0.97 0.97
Lanes: 1.00 1.99 0.01 1.00 1.38 0.62 .0.70 0.00 0.30 0.24 0.00 0.76
Final Sat.: 1750 3682 18 1750 2579 1119 1226 0 524 420 0 1330
______ _ _____ _______________ --------------- --------------- ---------------
Capacity Analysis Module:
Vol /Sat: 0.05 0.11 0.11 0.01 0.16 0.16 0.16 0.00 0.16 0.01 0.00 0.01
Crit Moves: * * **
Green Time: 10.2 37.3 37.3 7.0 34.1 34.1 33.7 0.0 33.7 33.7 0.0 33.7.
Volume /Cap: 0.43 0.27 0.27 0.16 0.43 0.43 0.43 0.00 0.43 0.04 0.00 0.04
____________ _______________ ---------------- __ _____________ ---------------
Level Of Service Module:
Delay /Veh: 29.3 13.2 13.2 29.5 15.9 15.9 16.3 0.0 16.3 13.6 0.0 13.6
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj Fctr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Del /Veh: 29.3 13.2 13.2 29.5 15.9 15.9 16.3 0.0 16.3 13.6 0.0 13.6
DesignQueue: 4 13 0 1 14 6 6 0 3 0 0 1
xxx# xxxxxxY+ xx++ x* xxxxx#** Y*++ x+ x+ ii** xx#### Y++++ Y *itxxxxtxxxxxxxxxxx * *Y + + +x + *xx
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
.t�
MITIGS - Ph6PM Thu Oct 29, 1998 10:28:52 . Page 1 -1
-------------------------------------------------------------------------- - - - - --
--------------------------------------------------------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
l++ xx* xx# 4+*I+ YY* Y+# xx!ll Y++++#**++ Yxx+ r+++++ rx+ Yr +l + + +xxx +*YYYxrYY + #4 *rll + +Y!!!
Intersection #13MOnterey /Farmn Frontage
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.466
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 16.7
Optimal Cycle: 39 Level Of Service: C+
• ++* x** xxx* 4++!*+ x* x+** 4*!! x+*+ r+ xx** 4!*!++*++ r** xx l4 + + + *xx * * * +lY + + + + + *x *xx #x *x **
Approach: North Bound South Bound East Bound West Bound
_ Movement: L - T - R L - T - R L - T - R L - T - R
------------ 1--------------- --------------- --------------- ---------- - - - - -I
Control: Protected Protected Permitted Permitted
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0
------------ I --------------- --------------- --------------- ---------- - - - - -I
Volume Module:
Base Vol: 9 362 1 7 390 it 25 0 11 2 0 11
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 83 0 0 0 0 193 193 0 83 0 0 0
ApprovedDev: 3 53 1 15 34 1 2 0 0 4 0 8
Initial Fut: 95 415 2 22 424 205 220 0 94 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 95 415 2 22 424 205 220 0 94 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 95 415 2 22 424. 205 220 0 94 6 0 19
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 95 415 2 22 424 205 220 0 94 6 0 19
--------------------------- --------------- --------------- ---------- - - - --�
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 0.97 0.97 0.97 0.97 0.97
Lanes: 1.00 1.99 0.01 1.00 1.33 0.67 .0.70 0.00 0.30 0.24 0.00 0.76
Final Sat.: 1750 3682 18 1750 2493 1205 1226 0 524 420 0 1330
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.05 0.11 0.11 0.01 0.17 0.17 0.18 0.00 0.16 0.01 0.00 0.01
Crit Moves: * * ** * * ++ * * **
Green Time: 10.5 36.3 36.3 7.0 32.9 32.9 34.7 0.0 34.7 34.7 0.0 34.7
Volume /Cap: 0.47 0.28 0.28 0.16 0.47 0.47 0.47 0.00 0.47 0.04 0.00 0.04
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Delay /Veh: 29.5 13.7 13.7 29.5 16.8 16.8 16.1 0.0 16.1 13.1 0.0 13.1
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj FCtr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00'
Adj Del /Veh: 29.5 13.7 13.7 29.5 16.8 16.8 16.1 0.0 16.1 13.1 0.0 13.1
DesignQueue: 4 13 0 1 14 7 7 0 3 0 0 1
#!!++# Y*!*+ 14x* k****** x******** x#** x**!!+! k* x+* kY4 + + +x * * *4 *x +x *rR *x + *x *x * +xx * *+*
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - CumIPM Thu Oct 29, 1998 10:40:56 Page 1 -1
_________________________________________________ __ _________ ___ __ _______ __ ______
____ ______________ _________________
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
Intersection #;13Monterey /Farmn Frontage
Yfififi } }fififi *fiY }lilfif }fii4! }f} iii }i } }lliYi!!! # #iYY!}ilff *YY!!kf !!!i!!! # }i # *YYY } } }#i}
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.490
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 16.7
Optimal Cycle: 40 Level Of Service: C+
} xx*}* x#* xx } #fi *xxx # # #x #fi *x * # # #x #xx * * *x #fi fifififi + } } * *x *x # }x *xxxfi #lffix # *xx *fi xfixi }xi!!
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
____________ _______________ --------------- --------------- ---------------
Control: Protected Protected Permitted Permitted
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0
___________________________ --------------- __ _____________ _______________�
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 11
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 83 0 0 0 0 193 193 0 83 0 0 0
App +Pending: 17 106 1 15 83 1 2 0 0 4 0 8
Initial Fut: 109 468 2 22 473 205 220 0 94 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 109 468 2 22 473 205 220 0 94 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 109 468 2 22 473 205 220 0 94 6 0 19
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 109 468 2 22 473 205 220 0 94 6 0 19
___ __ _______ _______________ --------------- 11--------------- ---------------
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 0.97 0.97 0.97 0.97 0.97
Lanes: 1.00 1.99 0.01 1.00 1.38 0.62 .0.70 0.00 0.30 0.24 0.00 0.76
Final Sat.: 1750 3684 16 1750 2580 1118 , 1226 0 524 420 0 1330
___ __ _______ _______________ _______________ --------- _______________�
Capacity Analysis Module:
Vol /Sat: 0.06 0.13 0.13 0.01 0.18 0.18 0.18 0.00 0.18 0.01 0.00 0.01
Crit Moves: * * ** * * ** * * **
Green Time: 11.4 38.1 38.1 7.0 33.6 33.6 32.9 0.0 32.9 32.9 0.0 32.9
Volume /Cap: 0.49 0.30 0.30 0.16 0.49 0.49 0.49 0.00 0.49 0.04 0.00 0.04
____________ _______________ _______________ --------------- ---------------
Level Of Service Module:
Delay /Veh: 29.2 13.1 13.1 29.5 16.7 16.7 17.3 0.0 17.3 14.0 0.0 14.0
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj FCtr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Del /Veh: 29.2 13.1 13.1 29.5 16.7 16.7 17.3 0.0 17.3 14.0 0.0 14.0
DesignQueue: 5 14 0 1 16 7 7 0 3 0 0 1
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
I
MITIGB - Ph4Sat Thu Oct 29, 1998 10:40:04 . Page 1 -1
-------------------------------------------------------------------------- - - - - --
--------------------------------------------------------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
rxxxx++ xxYrrYr** xxtY+ rrr+* x* x+ xxYrtrrrrx* x+ YYYrrrrxxxxYYrrtx *txxrrr +t +xxx + +Yxrrr
Intersection #k3MOnterey /Farmn Frontage
* * *x * * * * *x4tYr *trxxx * *xx4xrrr tt*x xxxYrkrr t ** * *YYtrr4r * *x +xtirrr *xxYYYrrr Yr * * *rx*
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.368
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 18.0
Optimal Cycle: 39 Level Of Service: C
xxxxttYxxtYxxx rx** xxxxxtYYYrr* x* tYxYx** r* xx+ xxYY+ +x *xxxxxYrrxxxxtxYxrrr * * *tx * * *x
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- --------------- --------------- ---------- - - - - -I
Control: Protected Protected Permitted Permitted
Rights: Include Include include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 30
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0
- ------------ I --------------- --------------- --------------- ---------- - - - - -I
Volume Module:
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 4 293 3 14 263 6 4 0 3 3 0 3
Added Vol: 73 0 0 0 0 169 169 0 73 0 0 0
ApprovedDev: 4 48 1 12 37 2 2 0 0 5 0 10
Initial Fut: 81 341 4 26 300 177 175 0 76 8 0 13
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 81 341 4 26 300 177 175 0 76 8 0 13
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 81 341 4 26 300 177 175 0 76 8 0 13
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 81 341 4 26 300 177 175 0 76 8 0 13
------------ I --------------- --------------- --------------- ---------- - - - - -I
i Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 0.97 0.97 0.97 0.97 0.97
_ Lanes: 1.00 1.98 0.02 1.00 1.24 0.76 .0.70 0.00 0.30 0.38 0.00 0.62
Final Sat.: 1750 3657 43 1750 2326 1372 '1220 0 530 667 0 1083
------------ 1--------------- --------------- II --------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.05 0.09 0.09 0.01 0.13 0.13 0.14 0.00 0.14 0.01 0.00 0.01
Crit Moves: + + ** x *•+ . *rt
Green Time: 11.3 25.2 25.2 17.7 31.6 31.6 35.1 0.0 35.1 35.1 0.0 35.1
Volume /Cap: 0.37 0.33 0.33 0.08 0.37 0.37 0.37 0.00 0.37 0.03 0.00 0.03
------------ I --------------- ---------- - - - - -H --------------- ---------- - - - - -I
Level Of Service Module:
_ Delay /Veh: 27.9 19.6 19.6 22.4 16.6 16.6 15.0 0.0 15.0 12.9 0.0 12.9
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj FCtr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel /Veh: 27.9 19.6 19.6 22.4 16.6 16.6 15.0 0.0 15.0 12.9 0.0 12.9
DesignQueue: 4 13 0 1 10 6 6 0 2 0 0 0
xxkY* txxxrx*#* trttr* r* rx* Yxtr#*** r*+ x* xxx** xxttttxtrYxYtx *tttttxtt *ttttttxtttYtx
Traf£ix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
I
MITIG8 - Ph5Sat Thu Oct 29, 1998 10:40:22 . Page 1 -1
------------------------------------------------- ------------------------- - - - - --
--------------------------------------------------------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
}r >rrr >x +r > + +r > + # +xx +xxxx > +rt > } # *x + > } ++ »> xx> xt}}+ xr } #t +*xr + +r + ++rr +rrr + > #r #r + +r*
Intersection #R 3Monterey /Farmn Frontage
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.486
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 19.3
Optimal Cycle: 39 Level Of Service: C
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- --------------- --------------- ---------- - - - - -I
Control: Protected Protected Permitted Permitted
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0
------------ I --------------- --------------- --------------- ---------- - - - - -I
Volume Module:
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 4 293 3 14 263 6 4 0 3 3 0 3
Added Vol: 106 0 0 0 0 246 246 0 106 0 0 0
ApprovedDev: 4 48 1 12 37 2 2 0 0 5 0 10
Initial Fut: 114 341 4 26 300 254 252 0 109 8 0 13 ,
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 114 341 4 26 300 254 252 0 109 8 0 13
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 ,
Reduced Vol: 114 341 4 26 300 254 252 0 109 8 0 13
PCE Adj: 1.00 1.00.. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 114 341 4 26 300 254 252 0 109 8 0 13
------------ I --------------- --------------- --------------- ---------- - - - - -I
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
i
Adjustment: 0.97 1.03 1.00 0.97 1.05 1.00 0.97 0.97 0.97 0.97 0.97 0.97
Lanes: 1.00 1.96 0.02 1.00 1.06 0.94 .0.70 0.00 0.30 0.38 0.00 0.62
Final Sat.: 1750 3657 43 1750 2002 1695 1222 0 528 667 0 1083
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.07 0.09 0.09 0.01 0.15 0.15 0.21 0.00 0.21 0.01 0.00 0.01
Crit Moves: * * ** * * ** * * **
Green Time: 12.1 23.4 23.4 16.4 27.7 27.7 38.2 0.0 38.2 38.2 0.0 38.2 ,
Volume /Cap: 0.49 0.36 0.36 0.08 0.49 0.49 0.49 0.00 0.49 0.03 0.00 0.03
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Delay /Veh: 28.7 20.7 20.7 23.2 19.5 19.5 14.7 0.0 14.7 11.5 0.0 11.5
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj FCtr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel /Veh: 28.7 20.7 20.7 23.2 19.5 19.5 14.7 0.0 14.7 11.5 0.0 11.5
DesignQueue: 5 13 0 1 11 9 8 0 3 0 0 0
rxx # +xx>xx> xxxx » xxxrt* rx++ rx+++ rxr> rex+ xxxxxx+## xx >rrtrrr }rrerrx+ #r + # + >x + #xx + + >xx
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIGB - Ph6Sat Thu Oct 29, 1998 10:40:37 Page 1 -1
----------------------------------------------------- ----------------- ---- - - - - --
--------------------------------------------------------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
xrr**** r+ r* xxxxrr*+ r+ r* kxxxxrr+ x+++ kkkkxx+ firx+* rrx * *xxxrrer +kx *xrrr + + + +*x *xkxxfix
Intersection #$3MOnterey /Farmn Frontage
` +x + +kx +xxx +*rr ++ + +fi xxxx+ rrr *+ +kxxk #x #xrrrr * +rxkxxrrrrr + +xfi xxrr +++ + + +* +xr * #xx + #xr
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.536
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 19.9
Optimal Cycle: 43 Level Of Service: C
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I--------------- --------------- --------------- ---------- - - - - -I
Control: Protected Protected Permitted Permitted
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 11 0 0
-----------_ I --------------- --------------- --------------- ---------- - - - - -I
Volume Module:
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
_ Initial Bse: 4 293 3 14 263 6 4 0 3 3 0 3
Added Vol: 120 0 0 0 0 280 280 0 120 0 0 0
ApprovedDev: 4 48 1 12 37 2 2 0 0 5 0 10
Initial Fut: 128 341 4 26 300 288 286 0 123 8 0 13
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 128 341 4 26 300 288 286 0 123 8 0 13
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 128 341 4 26 300 288 286 0 123 8 0 13
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 128 341 4 26 300 288 286 0 123 8 0 13
--7--------- I--------------- --------------- --------------- ---------- - - - - -I
Saturation Flow Module:
( Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.05 1.00 0.97 0.97 0.97 0.97 0.97 0.97
Lanes: 1.00 1.98 0.02 1.00 1.00 1.00 0.70 0.00 0.30 0.36 0.00 0.62
Final Sat.: 1750 3657 43 1750 1898 1800. 1224 0 526 667 0 1083
------------ I --------------- --------------- II--------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.07 0.09 0.09 0.01 0.16 0.16 0.23 0.00 0.23 0.01 0.00 0.01
Crit Moves: * * ** * * ** * * **
Green Time: 12.3 22.8 22.8 16.0 26.5 26.5 39.2 0.0 39.2 39.2 0.0 39.2
Volume /Cap: 0.54 0.37 0.37 0.08 0.54 0.54 0.54 0.00 0.54 0.03 0.00 0.03
------------ I --------------- II---. ------------ --------------- ---------- - - - - -I
Level Of Service Module:
Delay /Veh: 29.4 21.1 21.1 23.5 20.6 20.7 14.8 0.0 14.8 11.0 0.0 11.0
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj Fctr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel /Veh: 29.4 21.1 21.1 23.5 20.6 20.7 14.8 0.0 14.8 11.0 0.0 11.0
DesignQueue: 6 13 0 1 11 11 9 0 4 0 0 0
kkkkkkkkk# 4Y* 4kkk# 4kkk* kkkikkk4* kkk4kk*** k*** k* kkk *k #kk *kk* * **kkiikkkkk +kk4k*kkk
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - CumSat Thu Oct 29, 1998 10:41:12 Page 1 -1
-------------------------------------------------- ------------------------ - - - - --
-----------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
Intersection #43MOnterey /Farmn Frontage
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.571
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 18.8
Optimal Cycle: 45 Level Of Service: C
Approach: North Bound South Bound East Bound West Bound
Movement; L - T - R L - T - R L - T - R L - T - R
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Control: Protected Protected Permitted Permitted
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1! 0 0
------ - - ---- --------------- --------------- --------------- ---------- - - - --�
Volume Module:
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 4 293 3 14 263 6 4 0 3 3 0 3
Added Vol: 120 0 0 0 0 280 280 0 120 0 0 0
App +Pending: 19 126 1 12 113 2 2 0 0 5 0 10
Initial Put: 143 419 4 26 376 288 286. 0 123 8 0 13
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 143 419 4 26 376 288 286 0 123 8 0 13
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 143 419 4 26 376 288 286 0 123 8 0 13
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 143 419 4 26 376 288 286 0 123 8 0 13
------------ I --------------- --------------- --------------- ---------- - - - - -I
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.05 1.00 0.97 0.97 0.97 0.97 0.97 0.97
Lanes: 1.00 1.98 0.02 1.00 1.11 0.89 0.70 0.00 0.30 0.38 0.00 0.62
Final Sat.: 1750 3665 35 1750 2094 1604 1224 0 526 667 0 1083
--_--------- I --------------- --------------- --------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.08 0.11 0.11 0.01 0.18 0.18 0.23 0.00 0.23 0.01 0.00 0.01
Crit Moves: * * ** *• ** * * **
Green Time: 12.9 34.2 34.2 7.0 28.3 28.3 36.8 0.0 36.8 36.8 0.0 36.8
Volume /Cap: 0.57 0.30 0.30 0.19 0.57 0.57 0.57 0.00 0.57 0.03 0.00 0.03
------------ I --------------- - - - - -- -------- --------------- II---------- - - - - -I
Level Of Service Module:
Delay /Veh: 29.6 14.9 14.9 29.6 20.1 20.1 16.4 0.0 16.4 12.1 0.0 12.1
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj Fctr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel /Veh: 29.6 14.9 14.9 29.6 20.1 20.1 16.4 0.0 16.4 12.1 0.0 12.1
DesignQueue: 6 13 0 1 14 10 9 0 4 0 0 0
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - Ph4PM Wed Oct 28, 1998 14:36:31 Page 1 -1
-------------------------------------------------------------- ------------ -- - - --
--------------------------------------------------------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
++ rt##+++ x++###+ x+##+# x#*############+#+ xt# t###### + + + + + + * +xxx #rtrt+ # #t # * #* + +*x + #+ *+
Intersection #%Uonterey /Farmn Frontage
x + * * + + + + + *xx ** xxxx++ x****#*+ x+ *x + + + * *x * *x *# * + * + * *artrtrtrt + + + + + +# #xxxx# #x# + #x ## ## #rta
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.326
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 15.6
Optimal Cycle: 49 Level Of Service: C+
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: 7 10 10 7 30 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 0 0 1! 0 0
--------------------------- --------------- --------------- ---------- - - - --�
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 11
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 50 0 0 0 0 118 118 0 50 0 0 0
ApprovedDev: 3 53 1 15 .34 1 2 0 0 4 0 8
Initial Fut: 62 415 2 22 424 130 145 0 61 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 62 415 2 22 424 130 145 0 61 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 62 415 2 22 424 130 145 0 61 6 0 19
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 62 415 2 22 424 130 145 0 61 6 0 19
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 1.00 1.00 0.97 0.97 0.97
Lanes: 1.00 1.99 0.01 1.00 1.52 0.48 '1.00 0.00 1.00 0.24 0.00 0.76
Final Sat.: 1750 3682 18 1750 2831 868 1750 0 1800 420 0 1330
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.04 0.11 0.11 0.01 0.15 0.15 0.08 0.00 0.03 0.01 0.00 0.01
Crit Moves: * * ** * * ** * * ** * * **
Green Time: 9.0 40.0 40.0 7.0 38.0 38.0 21.0 0.0 21.0 10.0 0.0 10.0
Volume /Cap: 0.35 0.25 0.25 0.16 0.35 0.35 0.35 0.00 0.15 0.13 0.00 0.13
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Delay /Veh: 29.3 11.9 11.9 29.5 13.5 13.5 22.1 0.0 20.8 27.4 0.0 27.4
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj FCtr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel /Veh: 29.3 11.9 11.9 29.5 13.5 13.5 22.1 0.0 20.8 27.4 0.0 27.4
DesignQueue: 3 12 0 1 13 4 6 0 2 0 0 1
Traffix 7.1.0427 (c) 1998 Dowling ASSOC. Licensed to FEHR 6, PEERS, SAN JOSE
MITIG8 - PhSPM Wed Oct 28, 1998 14:37:05 Page 1 -1
-------------------------------------------------------------------------- - - - - --
-----------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
+ ttxx++ x+ x+++ x++++t+ x++++++++++++++ xxxxxxxxx+ xxxxx +xxxxxtttxxxxxxx + +txttx +t + + + ++
Intersection $43Monterey /Farmn Frontage
txxxxxtxxxtxtxxx+ x+ t+ ttxttxxtt+ tttt++++++ t++++++ t + + ++x ++*+ + + + + + + + + ++t + +x + +txxxxt
Cycle (sec): 90 Critical Vol. /Cap. (X): '0.394
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 17.3
Optimal Cycle: 49 Level Of Service: C
+++ xxx* xxxxxxxx+ xtt+ xxxxxxxtx+ xxxxtxt x++ xtt++ t+++ t + + + + +xxx +xxtxx + + + + ++ +xx +x +xxxx
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 0 0 1! 0 0
------ - - - - -- --------------- --------------- -- ------------- ---------- - - - --�
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 11
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bee: 9 362 1 7 390 it 25 0 11 2 0 11
Added Vol: 74 0 0 0 0 172 172 0 74 0 0 0
ApprovedDev: 3 53 1 15 34 1 2 0 0 4 0 8
Initial Fut: 86 415 2 22 424 184 199 0 85 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00_1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 86 415 2 22 424 184 199 0 85 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 86 415 2 22 424 184 199 0 85 6 0 19
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 86 415 2 22 424 184 199 0 85 6 0 19
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 1.00 1.00 0.97 0.97 0.97
Lanes: 1.00 1.99 0.01 1.00 1.38 0.62 1.00 0.00 1.00 0.24 0.00 0.76
Final Sat.: 1750 3682 18 1750 2579 1119 1750 0 1800 420 0 1330
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.05 0.11 0.11 0.01 0.16 0.16 0.11 0.00 0.05 0.01 0.00 0.01
Crit Moves: * * ** * * ** * * ** * * **
Green Time: 10.2 37.4 37.4 7.0 34.2 34.2 23.6 0.0 23.6 10.0 0.0 10.0
Volume /Cap: 0.43 0.27 0.27 0.16 0.43 0.43 0.43 0.00 0.18 0.13 0.00 0.13
------------ I --------------- --------------- --------------- ---------- - - - - -I
Level Of Service Module:
Delay /Veh: 29.2 13.2 13.2 29.5 15.9 15.9 21.4 0.0 19.5 27.4 0.0 27.4
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj FCtr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel /Veh: 29.2 13.2 13.2 29.5 15.9 15.9 21.4 0.0 19.5 27.4 0.0 27.4
DesignQueue: 4 12 0 1 14 6 8 0 3 0 0 1
xxxx+ xxtxxxxt++ tx++++ x+ txt+ x+++ tx++++ xx+ xt+++ tt++ t + + + +xxxt +t +xxx + +t +x + + +xt + +xtxx
Tra£fix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - Ph6PM Wed Oct 28, 1998 14:37:42 . Page 1 -1
___________________________________________________ _______ ________________ __ _ _ __
_____ ___ ___ ____ _______ ______ _______
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
Intersection # #3MOnterey /Farmn Frontage
* xrtt#+ xxx# x+ x*#+ t++ xtxx+++ wxwww+ ww* t++ wttxww***** * #x ++ +xx + + # + +tx +xww +ttxxw *xwwtx
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.420
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 17.8
Optimal Cycle: 49 Level of Service: C
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
____________ _______________ --------------- __ _____________ _______________�
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 0 0 1! 0 0
____________ _______________ --------------- __ _____________ _______________�
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 11
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bee: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 83 0 0 0 0 193 193 0 83 0 0 0
ApprovedDev: 3 53 1 15 34 1 2 0 0 4 0 8
Initial Fut: 95 415 2 22 424 205 220 0 94 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 95 415 2 22 424 205 220 0 94 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 95 415 2 22 424 205 220 0 94 6 0 19
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 95 415 2 22 424 205 220 0 94 6 0 19
------------ I--------------- I--------------- II--------------- I---------------
I
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 1.00 1.00 0.97 0.97 0.97
Lanes: 1.00 1.99 0.01 1.00 1.33 0.67 1.00 0.00 1.00 0.24 0.00 0.76
Final Sat.: 1750 3682 18 1750 2493 1205 .1750 0 1800 420 0 1330
__ __________ _______________ --------------- --------------- H --------------- I
Capacity Analysis Module:
Vol /Sat: 0.05 0.11 0.11 0.01 0.17 0.17 0.13 0.00 0.05 0.01 0.00 0.01
Crit Moves: * * ** * *xt * + *w + + *w
Green Time: 10.5 36.6 36.6 7.0 33.0 33.0 24.4 0.0 24.4 10.0 0.0 10.0
Volume /Cap: 0.46 0.28 0.28 0.16 0.46 0.46 0.46 0.00 0.19 0.13 0.00 0.13
___________________________ _ ----------- --------------- 11 ---------------
�
Level Of Service Module:
Delay /Veh: 29.4 13.6 13.6 29.5 16.7 16.7 21.3 0.0 19.2 27.4 0.0 27.4
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PrcgAdjFCtr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel /Veh: 29.4 13.6 13.6 29.5 16.7 16.7 21.3 0.0 19.2 27.4 0.0 27.4
DesignQueue: 4 13 0 1 14 7 8 0 3 0 0 1
wx# xt** wwt+ x+ x*# rtwkwtx++ tt+# kkwxxxxttt++++# x* xwxttttttxkrttwx * +t+ + *kwtttttrxkxxwt
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - Cum1PM Wed Oct 28, 1998 14:38:25 Page 1 -1
-------------------------------------------------- ------------------------ - -- - --
--------------------------------------------------------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
Intersection # ;Nonterey /Farmn Frontage
+; 44f tY* x* x*! x*+ xl+ lk4; 4fii***#+!! x*+ i; tfi* kx* xlx4! #i+i4l414Y4ii4 ++ +xx4i +!!iY **!x*
cycle (sec): 90 Critical Vol. /Cap. (X): 0.445
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 17.8
Optimal Cycle: 49 Level Of Service: C
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
--------------------------- --------------- ---------- ----- -------- -- - - - --�
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 0 0 1! 0 0
------ - - - - -- --------------- --------------- --------------- ---- ------ - - - --�
Volume Module:
Base Vol: 9 362 1 7 390 11 25 0 11 2 0 11
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Sse: 9 362 1 7 390 11 25 0 11 2 0 11
Added Vol: 83 0 0 0 0 193 193 0 83 0 0 0
App +Pending: 17 106 1 15 83 1 2 0 0 4 0 8
Initial Put: 109 468 2 22 473 205 220 0 94 6 0 19
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 109 468 2 22 473 205 220 0 94 6 0 19
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 109 468 2 22 473 205 220 0 94 6 0 19
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 109 468 2 22 473 205 220 0 94 6 0 19
------ - - - - -- --------------- --------------- --------- ------ ---------- - - - --�
Saturation Flow Module:
Sat /Lane: 1600 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 1.00 1.00 0.97 0.97 0.97
Lanes: 1.00 1.99 0.01 1.00 1.38 0.62 '1.00 0.00 1.00 0.24 0.00 0.76
Final Sat.: 1750 3684 16 1750 2580 1118 1750 0 1800 420 0 1330
------------ I --------------- --------------- --------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.06 0.13 0.13 0.01 0.18 0.18 0.13 0.00 0.05 0.01 0.00 0.01
Crit Moves: * * ** • * ** * * ** *! **
Green Time: 11.4 38.0 38.0 7.0 33.6 33.6 23.0 0.0 23.0 10.0 0.0 10.0
Volume /Cap: 0.49 0.30 0.30 0.16 0.49 0.49 0.49 0.00 0.20 0.13 0.00 0.13
------------ I --------------- --------------- --------------- II---------- - - - - -I
Level Of Service Module:
Delay /Veh: 29.2 13.1 13.1 29.5 16.7 16.7 22.4 0.0 20.0 27.4 0.0 27.4*
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj Fctr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel /Veh: 29.2 13.1 13.1 29.5 16.7 16.7 22.4 0.0 20.0 27.4 0.0 27.4
DesignQueue: 5 14 0 1 16 7 8 0 4 0 0 1
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - Ph4Sat Wed Oct 28, 1998 14:36:48 . Page 1 -1
__________________________________________________ ___________ ___ ________________
_________________________________________________ __________ _____________ __ __ _ _ __
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
Intersection #03Monterey /Farmn Frontage
#ll xxxxx*} xx## x* x# x4r+ rrxxfxff###}Y*}} x}} xx* Yr+ frxxffxxx } } * * *r + #fr!llffxxlxkr!!f
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.331
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 19.1
Optimal Cycle: 49 Level Of Service: C
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I--------------- II--------------- II--------------- II---------------
I
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 30 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 0 0 1! 0 0
------------ --------------- --------------- II--------------- ---------------
Volume Module:
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 4 293 3 14 263 6 4 0 3 3 0 3
Added Vol: 73 0 0 0 0 169 169 0 73 0 0 0
ApprovedDev: 4 48 1 12 37 2 2 0 0 5 0 10
Initial Fut: 81 341 4 26 300 177 175 0 76 8 0 13
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 81 341 4 26 300 177 175 0 76 8 0 13
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 81 341 4 26 300 177 175 0 76 8 0 13
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 81 341 4 26 300 177 175 0 76 8 0 13
------------ I--------------- II--------------- I --------------- I---------------
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.04 1.00 0.97 1.00 1.00 0.97 0.97 0.97
Lanes: 1.00 1.98 0.02 1.00 1.24 0.76 1.00 0.00 1.00 0.38 0.00 0.62
Final Sat.: 1750 3657 43 1750 2326 1372 1750 0 1800 667 0 1083
_ ___ ________ _______________ _______________ --------------- ---------------
Capacity Analysis Module:
Vol /Sat: 0.05 0.09 0.09 0.01 0.13 0.13 0.10 0.00 0.04 0.01 0.00 0.01
Crit Moves: * * *+ •• ** ! + *+ +!!!
Green Time: 11.4 25.5 25.5 17.8 31.9 31.9 24.7 0.0 24.7 10.0 0.0 10.0
Volume /Cap: 0.36 0.33 0.33 0.08 0.36 0.36 0.36 0.00 0.15 0.11 0.00 0.11
___________________________ ----------- --------------- ---------------
Level Of Service Module:
Delay /Veh: 27.8 19.5 19.5 22.3 16.5 16.5 20.2 0.0 18.8 27.4 0.0 27.4
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj Fctr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00'
Adj Del /Veh: 27.8 19.5 19.5 22.3 16.5 16.5 20.2 0.0 18.8 27.4 0.0 27.4
DesignQueue: 4 13 0 1 10 6 7 0 3 0 0 1
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - PhSSat Wed Oct 28, 1998 14:37:25 Page 1 -1
------------------------------------------------- ------------------------- - - - - --
--------------------------------------------------------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
Intersection #R?jMOnterey /Farmn Frontage
++++++ +x + +x # #x #x *Y *xk + + * +* ### + + + +xx ++ xxx#### kYkY* * * * +**x #x# + +kx *x *xrkkx #Y * * *xx **
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.428
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 20.4
Optimal Cycle: 49 Level Of Service: C
k* xx* xk#**+++ x+* x++ xx+ x++# x+** k+****++++##+ x#++++ + # #k *x * +** + + # +x +x # + +xxxxxxx +xx#
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- --------------- --------------- ---------- - - - - -I
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 0 0 1! 0 0
------------ I --------------- --------------- --------------- ---------- - - - - -I
Volume Module:
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bee: 4 293 3 14 263 6 4 0 3 3 0 3
Added Vol: 106 0 0 0 0 246 246 0 106 0 0 0
ApprovedDev: 4 48 1 12 37 2 2 0 0 5 0 10
Initial Put: 114 341 4 26 300 254 252 0 109 8 0 13
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 114 341 4 26 300 254 252 0 109 8 0 13
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 _
Reduced Vol: 114 341 4 26 300 254 252 0 109 8 0 13
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 114 341 4 26 300 254 252 0 109 8 0 13
------------ I --------------- --------------- II --------------- ---------- - - - - -I
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.05 1.00 0.97 1.00 1.00 0.97 0.97 0.97 -
Lanes: 1.00 1.98 0.02 1.00 1.06 0.94 -1.00 0.00 1.00 0.38 0.00 0.62
Final Sat.: 1750 3657 43 1750 2002 1695 1750 0 1800 667 0 1083
------------ I --------------- --------------- II --------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.07 0.09 0.09 0.01 0.15 0.15 0.14 0.00 0.06 0.01 0.00 0.01
Crit Moves: * * ** * * ** * * ** * * **
Green Time: 12.3 24.0 24.0 16.8 28.4 28.4 27.3 0.0 27.3 10.0 0.0 10.0
Volume /Cap: 0.48 0.35 0.35 0.08 0.48 0.48 0.48 0.00 0.20 0.11 0.00 0.11
------------ I --------------- --------------- II --------------- ---------- - - - - -I
Level Of Service Module:
Delay /Veh: 28.4 20.4 20.4 23.0 19.1 19.1 19.9 0.0 17.7 27.4 0.0 27.4
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj FCtr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Del /Veh: 28.4 20.4 20.4 23.0 19.1 19.1 19.9 0.0 17.7 27.4 0.0 27.4
DesignQueue: 5 13 0 1 11 9 9 0 4 0 0 1
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - Ph6Sat Wed Oct 28, 1998 14:38:01 Page 1 -1
_______________________________________________________ __ ____________ __ ___ _ _____
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
* 4##*# YY## YY*#+**+***** k*** 4xxxx*** xY** x#+#* Y##*# * # * + # # #x # * * * #Y # #Y # * *k * * +kk * * *x*
Intersection #$3Monterey /Farmn Frontage
YYY* Y#** k***** k** x*** k*** Y#***### YY##* k** k***** kkkk ** * * *k * * * * * * *kkx *x # # * # # ## # # #+
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.469
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 20.9
Optimal Cycle: 49 Level Of Service: C
****** x# Y* Y#* kY****#*** kx* x* k* k* xx** xx* Y# Y####*## * # # * # * # # # # * #Y * * *k * * * * * * *xkx # #YY
Approach: North Bound South Bound East Bound West. Bound
Movement: L - T - R L - T - R L - T - R L - T - R
____________I--------------- --------------- II --------------- ---------------
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 0 0 1! 0 0
------------ I--------------- --------------- II --------------- I---------------
Volume Module:
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 4 293 3 14 263 6 4 0 3 3 0 3
Added Vol: 120 0 0 0 0 280 280 0 120 0 0 0
ApprovedDev: 4 48 1 12 37 2 2 0 0 5 0 10
Initial Fut: 128 341 4 26 300 288 286 0 123 8 0 13
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 128 341 4 26 300 288 286 0 123 8 0 13
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: .128 341 4 26 300 288 286 0 123 8 0 13
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
' Final Vol.: 128 341 4 26 300 288 286 0 123 8 0 13
------------ I--------------- II_____ ---------- I--------------- II---------------
I
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.05 1.00 0.97 1.00 1.00 0.97 0.97 0.97
Lanes: 1.00 1.98 0.02 1.00 1.00 1.00 .1.00 0.00 1.00 0.38 0.00 0.62
Final Sat.: 1750 3657 43 1750 1898 1800 1750 0 1800 667 0 1083
------------ I--------------- --------------- 11 --------------- ---------------
Capacity Analysis Module:
Vol /Sat: 0.07 0.09 0.09 0.01 0.16 0.16 0.16 0.00 0.07 0.01 0.00 0.01
Crit Moves: * * ** *k *+ # *** *xxx
Green Time: 12.6 23.4 23.4 16.4 27.2 27.2 28.2 0.0 28.2 10.0 0.0 10.0
Volume /Cap: 0.52 0.36 0.36 0.08 0.52 0.53 0.52 0.00 0.22 0.11 0.00 0.11
______ ______ _______________ ---------------- --------------- ---------------
Level Of Service Module:
Delay /Veh: 28.9 20.7 20.7 23.2 20.1 20.2 20.0 0.0 17.4 27.4 0.0 27.4
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ProgAdj Fctr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
AdjDel /Veh: 28.9 20.7 20.7 23.2 20.1 20.2 20.0 0.0 17.4 27.4 0.0 27.4
DesignQueue: 6 13 0 1 11 10 10 0 4 0 0 1
**#**** x##*** x#*******###+* k*### x** kxx# 4****** xxxY * # #kkxx # * # * *k4 *x * * * * # # # ** * *x *x
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - CumSat Wed Oct 28, 1998 14:38:44 Page 1 -1
-----------------------------------
Level Of Service Computation Report
1985 HCM Operations Method (Future Volume Alternative)
Intersection #Y3Monterey /Farmn Frontage
YY# Y#** 4##+*##*###* Y+ xY******** x******** 4* k* kk* kkkkk +k *kkk * # *kk * *kY *4 #Y4Y4 *Y * * **
Cycle (sec): 90 Critical Vol. /Cap. (X): 0.504
Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 19.7
Optimal Cycle: 49 Level Of Service: C
x** xx** xx* xkkk## x# k*# xxxYY+++# 4+ xxxkY+++++#+##++ Yx + # # #Y # + # + # + #Y # # #4 # *x # * * * * *x * +x
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Control: Protected Protected Split Phase Split Phase
Rights: Include Include Include Include
Min. Green: 7 10 10 7 10 10 10 0 10 10 0 10
Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 0 0 1! 0 0
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Volume Module:
Base Vol: 4 293 3 14 263 6 4 0 3 3 0 3
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 4 293 3 14 263 6 4 0 3 3 0 3
Added Vol: 120 0 0 0 0 280 280 0 120 0 0 0
App +Pending: 19 126 1 12 113 2 2 0 0 5 0 10
Initial Fut: 143 419 4 26 376 288 286 0 123 8 0 13
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 143 419 4 26 376 288 286 0 123 8 0 13
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 143 419 4 26 376 288 286 0 123 8 0 13
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 143 419 4 26 376 288 286 0 123 8 0 13
--------------------------- --------------- II --------------- ---------- - - - - -I
Saturation Flow Module:
Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Adjustment: 0.97 1.03 1.00 0.97 1.05 1.00 0.97 1.00 1.00 0.97 0.97 0.97
Lanes: 1.00 1.98 0.02 1.00 1.11 0.89 1.00 0.00 1.00 0.38 0.00 0.62
Final Sat.: 1750 3665 35 1750 2094 1604 1750 0 1800 667 0 1083
------------ 1--------------- --------------- --------------- ---------- - - - - -I
Capacity Analysis Module:
Vol /Sat: 0.08 0.11 0.11 0.01 0.18 0.18 0.16 0.00 0.07 0.01 0.00 0.01
Crit Moves: * * ** * * ** * * ** * * **
Green Time: 13.1 34.8 34.8 7.0 28.7 28.7 26.2 0.0 26.2 10.0 0.0 10.0
Volume /Cap: 0.56 0.30 0.30 0.19 0.56 0.56 0.56 0.00 0.24 0.11 0.00 0.11
------------ I --------------- II--------------- II-- ----- ------- II---------- - - - - -
I
Level Of Service Module:
Delay /Veh: 29.3 14.5 14.5 29.6 19.8 19.8 21.6 0.0 18.5 27.4 0.0 27.4
Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PrcgAdj Fctr: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Del /Veh: 29.3 14.5 14.5 29.6 19.8 19.8 21.6 0.0 18.5 27.4 0.0 27.4
DesignQueue: 6 13 0 1 13 10 11 0 4 0 0 1
k* kk* Ykkx k* k* x****+ xx***** x* x*+*** 44## YY4Y# x4Y444 + +kiY +44kkkk4k +4Y +4k +444k4k*k #4
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
APPENDIX C
TRIP GENERATION ESTIMATES
Gilroy Sports Park
Trip Generation Estimates -by phase
PM Peak Hour Trips
Saturday Peak Hour Trips
Phase
In
Out
Total
In
Out •
Total
1
0
0
0
0
0
0
II
56
56
112
74
74
148
III
34
34
68
58
58
116
IV
78
78
156
110
110
220
V
78
78
156
110
110
220
VI & VII
29
29
58
48
48
96
VIII &IX
0
0
0
0
0
0
Total
275
275
550
400
400
800
Gilroy Sports Park
Trip Generation Estimates -by phase
Worst Case (Saturday Peak Hour)
Phase I - No Trip Generation
Phase I/
Saturday Peak Hour
Colt Baseball
36 players x
36 spectators x
Little League
1 fields = 36 players
1 fields = 36 spectators
72 people
2.0 persons /vehicle
36 vehicles
30 players x 2 fields = 60 players
35 spectators x 2 fields = 70 spectators
130 people
2.1 persons /vehicle
62 vehicles
Phase II Total - Assume 75 % of games overlap within peak hour
In 74 vehicles
Out 74 vehicles
Total 148 vehicles
Weekday PM Peak Hour
(75% of Saturday Peak Hour for Games, 50% of other)
Phase II Total
In 56 vehicles
Out 56 vehicles
Total 112 vehicles
Phase N
Saturday Peak Hour
Softball
30 players x
30 spectators x
Commercial Rec., Special Events
1 fields = 30 players
1 fields = 30 spectators
60 people
2.0 persons/vehicle
30 vehicles
In 35
Out 35
Total 70
Phase III Total - Assume 75 % of games overlap within peak hour
In 58
Out 58
Total 116
Weekday PM Peak Hour
(75% of Saturday Peak Hour for Games, 50% of other)
Phase III Total
In 34 vehicles
Out 34 vehicles
Total 68 vehicles
Phase IV
Saturday Peak Hour
Softball
30 players x 4 fields
30 spectators x 4 fields
Special Events
120 players
120 spectators
240 people
2.0 persons/vehicle
120 vehicles
In 20
Out 20
Total 40
Phase IV Total - Assume 75 % of games overlap within peak hour
In 110
Out 110
Total 220
Weekday PM Peak Hour
(75% of Saturday Peak Hour for Games, 50% of other)
Phase IV Total
In 78 vehicles
Out 78 vehicles
Total 156 vehicles
Phase V
=
30 players
30 spectators x 1 fields
=
Saturday Peak Hour
60 people
Softball
2.0 persons /vehicle
30 vehicles
30 players
x 4 fields
=
120
players
30 spectators
x 4 fields
=
120
spectators
Total
50
Phase VI & VII Total - Assume 75 % of games overlap
240
people
In
48
2.0
persons /vehicle
Total
96
120
vehicles
Special Events
(75% of Saturday Peak Hour for Games, 50% of
other)
Phase VI & VII Total
In
20
Out 29 vehicles
Out
20
Total
40
Phase V Total - Assume 75
% of games overlap
within peak hour
In
110
Out
110
Total
220
Weekday PM Peak Hour
(75% of Saturday Peak Hour for Games, 50%
of other)
Phase V Total
In
78 vehicles
Out
78 vehicles
Total
156 vehicles
Phase W & VII
Saturday Peak Hour
Softball
30 players x 1 fields
=
30 players
30 spectators x 1 fields
=
30 spectators
60 people
2.0 persons /vehicle
30 vehicles
General Park Usage
In
25
Out
25
Total
50
Phase VI & VII Total - Assume 75 % of games overlap
within peak hour
In
48
Out
48
Total
96
Weekday PM Peak Hour
(75% of Saturday Peak Hour for Games, 50% of
other)
Phase VI & VII Total
' In 29 vehicles
Out 29 vehicles
Total 58 vehicles
Phases Vlll & IX - No Trip Generation
I_\27 pie 1 :11 1.
SIGNAL WARRANT SHEETS
Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9 -15
7 -1996
Figure 9 -9
_ PEAK HOUR VOLUME WARRANT
(Rural Areas)
CS�eecd 3 tkS ✓��I�)
?�iov�! ��re �a r ✓�na v► fro 1�5 e eCL
500
x
> 400
x
w¢
1 ¢ ¢ 300
a
Na
a
zm 200
J
7
S2100
x
0
300 400 500 600 700 800 900 1000 1100 1200 1300
MAJOR STREET - TOTAL OF BOTH APPROACHES - VPH
" NOTE:
100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET
APPROACH WITH TWO OR MORE LANES AND 75 VPH APPLIES AS THE LOWER
THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.
PM �Y�ast 3
9-11� 12-6 z Sad vha.se3 el`1, INI
3 ?M 'P1\aw LOSS, Zo(p Sad- PK-alse � qz9, asl
5 PrA `W\a5c 5 11331 Zsµ Sad- i?VLay 5 lo39 , 364
q- pf,& Phase � +-I i1 63, 31`f ® �� ?vase 6 +7 goal, 4ol
2 OR MORE LANES (MAJOR) & 2 OR MORE LANES (MINOR)
ME
--I
I
1
1111101111-
300 400 500 600 700 800 900 1000 1100 1200 1300
MAJOR STREET - TOTAL OF BOTH APPROACHES - VPH
" NOTE:
100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET
APPROACH WITH TWO OR MORE LANES AND 75 VPH APPLIES AS THE LOWER
THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.
PM �Y�ast 3
9-11� 12-6 z Sad vha.se3 el`1, INI
3 ?M 'P1\aw LOSS, Zo(p Sad- PK-alse � qz9, asl
5 PrA `W\a5c 5 11331 Zsµ Sad- i?VLay 5 lo39 , 364
q- pf,& Phase � +-I i1 63, 31`f ® �� ?vase 6 +7 goal, 4ol
9 -14 TRAFFIC SIGNALS AND LIGHTING Traffic Manual
7 -1996
600
a
> 500
x
Uj U
s rp 400
M
y a
CL.
0w300
z 2
o 200
x
c�
z 100
V
Figure 9 -8
PEAK HOUR VOLUME WARRANT
(Urban Areas)
t�rir�Ce�all� �t�now�as�f�cG�ecsct—
2 OR MORE LANES (MAJOR) & 2 OR MORE LANES (MINOR)
R 2 ) (MINOR) OR 1 LANE (MAJOR) & OR MORE LAN MWOm
1 LAVE (M4JOR) & 1 LANE (MINOR)
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
MAJOR STREET -TOTAL OF BOTH APPROACHES - VPH
* NOTE:
150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET
APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER
THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.
1P(vjec - IVA, ) h L:11
O P(A 3 low 70q) I LK-
2� $wk 1tgs ` —a- !n(S, [o3
'1
APPENDIX E
SITE ACCESS CALCULATIONS
(LOS and QUEUING)
MITIG8 - Ph6PM Thu Oct 29, 1998 14:10 :04 Page 1 -1
Level Of Service Computation Report
1994 HCM Unsignalized Method (Future Volume Alternative)
YxwxwwYx+ Y++ xl x+!l w+ xl+ x!!! w!* x!!!! x!! wl ew+ xYxx*! + +!lxxxx* + + + +l + +xl + + +!!+!!xlxY+
Intersection #5 Farman Frnt /Site DW
Average Delay (sec /veh): 3.2 Worst Case Level Of Service: B
xxxrl +l +wwxYxww!!wlxwwl +!lxxwlwY +Ylx wwYxxww+ www!! lxtxlwl +!!xxlxlxwxx*! +!!lwYYw *+
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Control: Uncontrolled Uncontrolled Stop Sign Stop Sign
Rights: Include Include Include Include
Lanes: 0 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0
------ - - - - -- --------------- --------------- --------------- ---------- - - -- -�
Volume Module:
Base Vol: 0 36 0 0 20 0 0 0 0 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 36 0 0 20 0 0 0 0 0 0 0
Added Vol: 0 0 0 0 0 275 275 0 0 0 0 0
approved: 0 2 0 0 4 0 0 0 0 0 0 0
Initial Fut: 0 38 0 0 24 275 275 0 0 0 0 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 38 0 0 24 275 275 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 D 0 0 0 0 0
Final Vol.: 0 38 0 0 24 275 275 0 0 0 0 0
Adjusted Volume Module:
Grade: 0% 0% 0% 0%
% Cycle/ Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck/ Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.00 1.00 1.10 1.00 1.00 1.10 1.10 1.10 1.10 1.10 1.10
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 38 0 0 24 275 303 0 0 0 0 0
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 3.4 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 6.5 xxxx xxxxx xxxxx xxxx xxxxx
----------- I --------------- --------------- --------------- II ---------- - - - - -
I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx xxxx xxxx xxxxx 200 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx 812 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx xxxx xxxx xxxxx 1.00 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx 812 xxxx xxxxx xxxx xxxx xxxxx
------------ I--------------- --------------- --------------- II ---------- - - - - -
I
Level Of Service Module:
Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 6.7 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * * B
Movement: LT - LTR - RT LT - LTR - RT IT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * *
ApproachDel: 0.0 0.0 6.7 0.0
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR & PEERS, SAN JOSE
MITIG8 - Ph6Sat Thu Oct 29, 1998 14:10:26 Page 1 -1
Level Of Service Computation Report
1994 HCM Unsignalized Method (Future Volume Alternative)
xxxxxrxr+ xrxx+ xr+ rrxxrrr+++ rxxx++ xr+ rxxxx+ x+ rrrxxxxrr +rxxxrrr +xxxxxxrrrrxxxxxx +r
Intersection #5 Farman Frnt /Site DW
xxxxxxxrxx+ xxxxxxrrrrxxxxr +rrx + + +xxrxrrerrr r+ rrrrrrrxxrrrrx +rx+ + +r +rxxx +rrxxr +x+
Average Delay (sec /veh): 4.8 Worst Case Level Of Service: B
xrrr+ xxx+ xxx+ x+ r+ rrxxx +rrrrxxxxxrxrrr +xxxxxrr +rxxxxtx r + +rxxrrrrrrxxrxxrrxx +rrxxx
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Control: Uncontrolled Uncontrolled Stop Sign Stop Sign
Rights: Include include Include Include
Lanes: 0 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0
------ - - - - -- --------------- --------------- --------------- ---------- - - - --�
Volume Module:
Base Vol: 0 7 0 0 10 0 0 0 0 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 7 0 0 10 0 0 0 0 0 0 0
Added Vol: 0 0 0 0 0 400 400 0 0 0 0 0
approved: 0 2 0 0 6 0 0 0 0 0 0 0
Initial Fut: 0 9 0 0 16 400 400 0 0 0 0 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 9 0 0 16 400 400 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 9 0 0 16 400 400 0 0 0 0 0
Adjusted Volume Module:
Grade: 08 0% 0% 0%
6 Cycle/ Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck/ Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 1.10 1.00 1.00 1.10 1.00 1.00 1.10 1.10 1.10 1.10 1.10 1.10
Cycl /Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck /Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 9 0 0 16 400 440 0 0 0 0 0
Critical Gap Module:
MoveUp Time: xxxxx xxxx xxxxx xxxxx xxxx xxxxx 3.4 xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx xxxxx xxxx xxxxx. 6.5 xxxx xxxxx xxxxx xxxx xxxxx
------------ I --------------- --------------- II --------------- ---------- - - - - -I
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx xxxx xxxx xxxxx 225 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx 784 xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx xxxx xxxx xxxxx 1.00 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx 784 xxxx xxxxx xxxx xxxx xxxxx
------------ I --------------- ---------------- --------------- ---------- - - - - -I
Level Of Service Module:
Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 9.3 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * * * * B
Movement: LT - LTR - RT IT - LTR - RT IT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Shrd StpDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * *
ApproachDel: 0.0 0.0 9.3 0.0
Traffix 7.1.0427 (c) 1998 Dowling Assoc. Licensed to FEHR a PEERS, SAN JOSE
Project Buildout - Saturday Peak Hour
Demand Volume (arrival rate) x=
400
Lanes L=
2
Movement Capacity (service rate) µ =
300
p = l / (µ•ti
0.667
P(0) = t - P =
0.333
P(n) = (P TO - P)
0.704
n
P(X =n)
P(X < =n)
0
0.333
0.333
1
0.222
0.556
2
0.148
0.704
3
0.099
0.802
4
0.066
0.868
5
0.044
0.912
6
0.029
0.941
7
0.020
0.961
8
0.013
0.974
9
0.009
0.983
10
0.006
0.988
11
0.004
0.992
12
0.003
0.995
13
0.002
0.997
14
0.001
0.998
APPENDIX F
RECOMMENDED SITE PLAN REVISIONS
A I I'll I I I I I I I I I
'-u ► ENTIAL SKATE: FACILITY
ENTRY POINT ELEMENT
SPORTS PARK PARK ENTRY GATES
CORPORATION
FACILITY YARD
0
ENTRY BUILDING bOV4
I O' WIDE PATHWAYS
COMMERCIAL RECRTION
SPACE STORAGE AND EA c
COMMUNITY BUILDING VTA BUS
POTENTIAL SKATE FACILITY
.121 WIDE PATHWAYS
(EMERGENCY ACCESS)
r
fr
i .
SPC
COF
FAC
:.,.
29
C
o ' J
- ;' '
j 11111111
COMMERCIAL, RE-
•, '.i`• ?
_.
- . , SPACE, STORAGE
CONCESSION STAN
1
/ �'. � 1 �_
. -
3z
-
COMMUNITY BUIL
;
RESTROOMS
=
�`•
POTENTIAL Sk
SOFTBALL FIE' •
,
300 FT 65' IAASEOADS
' '
��'
` 12' WIDI
V%
(EMERG
�'�M/ .'4�a�r •: v;e# . i' X«.c+O::Cbirryr. r�.,. 1 i '.}J•: " : ° ". 'a.e' .::" �' i'r+ -.
W
AS Co
EEK, D
TRAIL CONNI1CT10 i
/ BALL FIELD 44 r
/ 350 F'T 651
BAS
/ EPADS
,•/ SOCCER FIELD
2U YD S t
/ V
80X f
' SAND
VOLLEYBALL' .
• GOURTS
t.
CONCESSION ST .
RESTROOMS�
i,y 1 P
HORSE Y
SHOE • , q
PITS. •
VIDE PATH
yyAYS
.fir 1 ,;
SOFTBq•C.L F
IOCCE 3 O 00-F`r 65' BA
DURTS
APPENDIX G
PARKING ESTIMATES
Gilroy Sports Park
Parking Estimates -by phase
Based on Saturday Peak
Phase Demand Supply
I
0
0
II
196
206
III
130
137
IV
280
294
V
280
294
VI & VII
110
116
VIII &IX
0
0
Total
996
1047
Supply = Demand + 5%
Gilroy Sports Park
Parking Estimates -by phase
Worst Case (Saturday Peak Hour)
Phase I - No Parking Demand
Phase 11
Saturday Peak Hour
Colt Baseball
36 players x
36 spectators x
1 fields = 36 players
1 fields = 36 spectators
72 people
2.0 persons /vehicle
36 vehicles
Little League
30 players x 2 fields = 60 players
35 spectators x 2 fields = 70 spectators
130 people
2.1 persons /vehicle
62 vehicles
Worst Case: All spectators and players for 2 consectutive games on every field
on site at one time.
98 vehicles per game
2 games
Phase II Total 196 vehicles
Phase 111
Saturday Peak Hour
Softball
30 players x 1 fields
30 spectators x 1 fields
Commercial Rec., Special Events
= 30 players
= 30 spectators
60 people
2.0 persons /vehicle
30 vehicles
70 vehciles
Worst Case: All spectators and players for 2 consectutive games on every field
on site at one time.
Phase III Game Subto
Comm Rec. /Special
Phase III Total
Phase IV
Saturday Peak Hour
Softball
30 players x 4 fields
30 spectators x 4 fields
Special Events
30 vehicles per game
2 games
60 vehicles
70 vehicles
130 vehicles
120 players
120 spectators
240 people
2.0 persons /vehicle
120 vehicles
40 vehicles
Worst Case: All spectators and players for 2 consectutive games on every field
on site at one time.
Phase IV Game Subto
Special Events
Phase IV Total
120 vehicles per game
2 games
240 vehicles
40 vehicles
280 vehicles
Phase V
Saturday Peak Hour
Softball
30 players x
30 spectators x
! Special Events
4 fields = 120 players
4 fields = 120 spectators
240 people
2.0 persons /vehicle
120 vehicles
40 vehicles
Worst Case: All spectators and players for 2 consectutive games on every field
on site at one time.
120 vehicles per game
2 games
Phase V Game Subtot 240 vehicles
Special Events 40 vehicles
Phase V Total 280 vehicles
Phase W & VII
Saturday Peak Hour
Softball
30 players x 1 fields = 30 players
30 spectators x 1 fields = 30 spectators
60 people
2.0 persons /vehicle
30 vehicles
General Park Usage 50
Worst Case: All spectators and players for 2 consectutive games on every field
on site at one time.
30 vehicles per game
2 games
Phase VI & VII Game
60 vehicles
General Park Usage
50 vehicles
Phase VI & VII Total
110 vehicles
Phases VIII & IX - No Parking Demand