American Asphalt Repair & Resurfacing - 2013 Agreement - Change Order No. 1City of Oifrov Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846 -0429 CHANGE ORDER NO. 1 To contract for: Pavement Maintenance Project FY 13 City Project No. Contractor: American Asphalt Contract Date: 13 -PW -204 (PO 140471) 4/22/2013 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This change order is to account for the difference between actual and original bid quantities: an additional 6.41 ELT of slurry seal type II ($1,317.34), 24.08 ELT of slurry seal type III ($5,454.12), 61 LF of Caltrans Detail 39 thermoplastic ($61.00), 177 LF of 12" wide white strip thermoplastic ($1,416.00), plus removal of existing striping prior to slurry sealing on Westwood Drive & Sixth Street ($3,210.00), and removal of striping at other locations ($3,100.00), and for providing a traffic control plan for future work on Santa Teresa Boulevard ($1,125.00), for a total amount of $15,926.96. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order: I I Working Days Cost Percentage Initial ► All Extra Work authorized under this Change Order Original Contract Price $244,798.00 must be billed separately from the original contract. All Previous Change Orders $0.00 N/A bills for work done under this Change Order shall Total to Date $244,798.00 reference this Change Order No. 1. This Change Order $15,926.96 Total Change Orders to Date $15,926.96 6.51% Revised Contract Price $260,724.96 I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $15,926.96. By: RECOMMENDED BY: ACCEPTED BY: Date: —5 " 3 i— / Z y /q /i Construction Manaqer" Date Item Unit Quantity Price Contract Amount Quantity Billing to Date Balance Remaining Slurry Seal City Street (Type II) ELT 500 $243.50 $121,750.00 506.41 $123,310.84 $1,560.84 Slurry Seal City Street (Type III) ELT 100 $226.50 $22,650.00 124.08 $28,104.12 $5,454.12 Caltrans Detail 39 (Thermoplastic) LF 1200 $1.00 $1,200.00 1261 $1,261.00 $61.00 12" Wide White Stripe (Thermoplastic) LF 36 $8.00 $288.00 213 $1,704.00 $1,416.00 TOTAL 1 $8,491.96 Item Unit Quantity Price Contract Amount Quantity Billing to Date Balance Remaining Change Order $3,210.00 Change Order $3,100.00 Traffic Control Plan $1,125.00 TOTAL $7,435.00 GRAND TOTAL $15,926.96 total for items over original materials total for items from change orders `• "f '� �[�, Amancae .A:a�aa mo s e,: zr.� 7751 9eaw.ra Sc.eeT 1."•ia a r -,' i4 3:300 Csa a.ate -ta atc}ncA ia:ny s1 rw: G w:AS COA AAti ' Aa'VaOU {tquNG 1 aM1LA.c:s 700aTE RENA.wN(: t N0. +AESCaiPeWaO NSAT OWNll7T RKE Y00{IIIT gaa evC OW{lf777 ASIOIINE tO04NTaTY OUANTITY AMOUNT A017UNT OUANTtir AMOUNT uam uni 2 T.TS z^.z" Ls YEf DUE TO OA7E S .]tl0 1 3: 07 ` f t { 1::, i4 : j 9 ^ S 1 Cnn+_'t a lnrp`xc AC I—I—V sP t 0 i S m00C s •" Gv`� a Rya" af: Par.naM aP 300 L.:O 3 } f 3a0M.:}: 7 i ]00 $ 36 0m m 0000 f 16, M:0 m 5 TR. —Aftpp AtP6rsRMm sp tall 2 S 2100 S 7m.t10 +003,) 3 - 9m a �.2C0 00 600 f a.?Dn m s 6 Reea90tJ: rA tiai AAW EA t 3 2 - a 100 3 2,Mcat Im f a.'iom 1 . 7 t ?aUl SeM is t s 6mm b ]5.90030 a da:uo. 3 i s tmm � s room y t �0 { 36 0W De i 4� t i s 3e�m t 9 M.000m y t9 LF ® s �R f I f �' /0E s �idl i ! t y CM"MOMMV't>OMWtgMnq � car.�sa+r4zrs ps.smetewo LP LE 1,4W s ISO f 2mOo - s 39. 1 251.00 1781 3 ism" a t Sa3 .1 .at0Mt6 O1Br30 (iRSreryfu001 LP 630 3m t e $1 t s moo "am s m1 s 3e+ l s »t s 13"001$ s s s is i moo• 100 3 am 3 1 Odmbi& i 2A0 f ri903 200 t 100 S fea AO 23 Cl— CWW 3Ra(T1.rm0O —q L7 200 a 000 1 'sOm 3 -4,wor ; Idmamm .. ! r R01 SW to .Una) LA 2 f 3003 t 600.3 s - 1T0 1 In in { l3{.W 30 ! }500 29 As.1: Sy' :May U.a P;dt ;4nat EA a 5 7m W f M•C OC s 2 3 50000 } i 0W W am - y 26 Ap• :9.. Revd EA 1 i Ma'aff f 3"W i S } 7 600 m 2 ! m j - AWTI A 66TCD 9C.4 36 !— Pawmrl LL—MS EA T f too m S fag 00 s s 1 S 3000 1 t 30000 i ff _ ) 1 200W 7 f 7400 t 29 C L f 400 S a VA o) ! a RaM _-ax2 N1targ 69000 us 7t 1 row 30 7VIO —p"- :4 EA 2 s 29000 s SCC m U. tma Psr.tnaM M.1,n A..u. A:sC } s me 70 2 t sm Do a 31 !T1wT?D'sY 1 u 0 s tm $1 t 006 m{ I t! $10.00 32 Pyan•0 St., TOT !TC 4AL SASE 010 3A 40 s 60 m s : T0a n, . s a6 ! 2 500" e 46 s 600 00 t a 700 00 t s u X00 00 f s 2f 3.334 J1 L 252.9 }4.T1 7$1S Y3 tt9M ' 1 i s 1 '. t i 11 I I i i To AL now IMMS s s i ro 0o s f, ;`709 s PO /WC1TI 0 to pay TOTAL BILLINGS t0 DATE 153 i•i LE 53 SG P.ETENTWN _S:SO .5'30;117 YEf DUE TO OA7E 574.'{::.x1 PREwOU3lr 91LCED - Nf MS'M!!Y1 Da1f {0.30 � feyy6y }y- ^ 590! e -- - - - .o? t-t 340 2 `�