Loading...
NV5, Inc. - 2014 Agreement - Amendment No. 1AMENDMENT TO THE AGREEMENT FOR SERVICES BETWEEN CITY OF GILROY AND NV5 Inc. FOR Waterline Design Services DATED March 5th, 2014 AMENDMENT NO. 1 This Amendment shall become effective when it has been signed by the City Administrator, Project Manager, and Consultant. All copies forwarded to Consultant for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Consultant's copy will be returned to him as his authority to proceed with the work. As per the attached proposal, this amendment is for additional design services for Eigleberry Street water services, in an amount not to exceed $41,576. All requirements of the original Agreement Documents shall apply to the above work except as specifically modified by this Amendment. The contract time shall not extend unless expressly provided for in this Amendment. NV5 Inc. hereby agrees to perform the above work subject to the terms of this Amendment for additional design services for Project No. 15 -PW -215. Consultant: NV5 Inc. By Parag Mehta, Senior Vice President Date Sl / = I J ACCEP Project Understanding The City of Gilroy is looking to replace water services with new copper services and two sections of water main (6`h Street to 7th Street and 8`h Street to 9`h Street) along Eigleberry Street from 10`h Street on the south to Is` Street on the north, approximately one mile long. For the services replacement, the City plans to replace 58 f- inch steel services and three 2 -inch steel services with the same size copper services to existing meters. For the two sections of water main (6`h Street to ,7th Street and 8`h Street to 9`h Street), the City would like to replace the existing 4 -inch main with a new 8 -inch ductile iron main for a total of 1200 feet. This project is on a fast -track schedule. The City would like to complete design of the project by June to allow for bidding in the summer with construction by early November. To avoid potential delays and to streamline design, we recommend including potholing during design and furnishing two main submittals. A scope of services to accomplish the fast -track design is presented below Task 1: Project Management This task will include preparation of and periodic updates to the project schedule, monthly project invoicing and status reports, quality assurance /quality control (QA /QC), and milestone meetings. The project schedule will be submitted within five days of award of contract. The following meetings are anticipated as a part of this task: • One 1 -hour project kick -off meeting One 2 -hour review meetings following submission of the 50 percent design One 2 -hour pre- construction meeting All meetings include attendance by the NV5 project manager. The kick -off meeting also includes attendance by the project engineer. Task 2: Preliminary Investigation and Topographic Mapping This task includes review of available data and existing site conditions, survey of the project area, and potholing of locations for critical connections. Task 2.1: Review Existing Conditions The NV5 team will attend a kick -off meeting with the City (included under Task 1) to review project requirements and existing information. Two members of the NV5 project team will visit the project site to investigate existing site conditions, identify opportunities and constraints, and verify the location of existing utilities and water services. The site visit will occur after the topographic survey (Task 2.2) is completed. In addition, available background information provided by the City will be reviewed including: City utility maps of water, sanitary sewer, storm drain, and streetlight systems and water and sewer as -built plans. Utility companies (gas, cable, phone) will be contacted to verify the location of other utilities within the project area. Utility "A," "B," and "C" packages will subsequently be prepared during design development. The project team will also review current City Standard Provisions; City Standard Details; as well as City codes, ordinances, and design criteria. Task 2.2: Site Analysis and Field Survey Under this task, the NV5 survey group will collect survey data as required in support of the design team. Survey tasks will include topographic surveys, drafting, and preparing a base map of the project area. Control Surveys By utilizing GPS and traditional methods, horizontal and vertical control for the topographic surveys will be tied horizontally to the California State Plane Coordinate System (NAD83 Zone 3, US Feet) and vertically to the North American Vertical Datum of 1988 (NAVD88). Control points for topographic surveys will be established throughout the length of the pipeline corridor. Topographic Survey and Base Mapping For this task, NV5 will utilize traditional and GPS surveying methods to collect topographic data. Data collected will include storm and sewer manhole rim elevations, clean outs, water valves, meters, boxes, and hydrants; gas valves and surface evidence of gas lines; traffic signal boxes, street lights and boxes, utility vaults, electrical poles, loop detectors, traffic sign posts, and observed surface evidence of electrical lines; cable TV boxes and observed surface evidence of lines; telephone poles, observed surface evidence of telephone lines, and overhead lines; and curb and gutter, sidewalks, edges of pavement, edges of sidewalks, edge of pavement way (gutter line), and trees (6" DBH or greater) located within the street rights -of -way. Survey data will be supplemented with dips of storm and sewer manholes, catch basins, drainage inlets, and cleanouts (if accessible) to acquire accurate drainage information. Mechanical detection of existing underground utilities is specifically excluded from this scope of services. Once the survey is completed, NV5 will prepare a detailed topographic base map for the use in design and construction of the project. Drawings will provided be in AutoCAD.dwg format and will be capable of being plotted at a scale of 1 -inch = 20 ft. Task 2.3: Potholing Under this task, NV5 will retain a subcontractor to perform one day of potholing services to locate the four connections between the existing 4 -inch main and the 8 -inch main. The potholing locations will allow an accurate design for the two sections of main replacements and minimize disturbance and cost during construction. Task 3: Design Development/Construction Documents This task will include the design development, preparation of 50 percent and 100 percent construction documents, and preparation of construction cost estimates. Task 3.1: Preliminary 50 Percent Construction Documents This task includes the following: • Preparation of a preliminary layout as 50 percent engineering plans for City review • Preparation of preliminary construction cost estimates for City review • Following receipt of City review comments, responses to each comment will be prepared • Attendance at a project review meeting with City to discuss comments on 50 percent plans (included under Task 1) Deliverables: One hard copy of 50 percent plans (alignment only) and preliminary construction cost estimate. Task 3.2: 100 Percent Construction Documents and Bid Support Construction documents will be prepared at 100 percent design level and will include plans, technical specifications, and engineer's estimates of probable construction cost. NV5 will revise the 50 percent documents to incorporate City comments and directions and will provide written responses to all City comments with submission of the 100 percent draft documents. Deliverables: One hard copy of 100 percent plans, technical specifications, and construction cost estimate; one wet - signed copy of the 100 percent final plans; one hard copy of 100 percent final technical specifications and cost estimate; one electronic copy of 100 percent construction plans (AutoCAD), technical specifications (Microsoft Word), and cost estimate (Microsoft Excel). Task 4: Post - Construction Services This task includes review of as -built record drawings prepared by the contractor. NV5 will review the changes during construction, incorporate those changes into the drawings, and submit the record drawings to the City. Deliverables: One signed, stamped set of record drawings on Mylar; one set of electronic files for each record drawing in AutoCAD and PDF format. Special Engineering Services When requested by the City, NV5 can provide special engineering services. These services represent extra work and will require additional compensation. Special engineering services may include: • Construction services — review of shop drawings, submittals, and change orders • Construction oversight • Soil sampling, analysis, and geotechnical services • Public outreach • Bid support • Permitting • Modeling or capacity study • Detailed traffic control plans City of Gilroy FEE FOR WATER MAIN DESIGN SERVICES - Eigleberry Street Task Descri on NV5 Engr Manager $198 Sr Engineer $160 Asst Engineer $125 CADD $105 Survey Manager $176 2- Person Survey Crew $238 1- Person Survey Crew $185 Project Assistant $90 Subcontractor Total NV5 Hours Total NV5 Fee Monthly invoicing and status reports 4 2 6 $820 QA/QC 5 _ 5 $990 Project kick -off meeting includes Ilow-up) 2 4 6 $820 50% Design Review Comments Meeting (includes prep/follow-up) PreConstruction meeting_ 4 2 _ 6 $890 ' 2 2 4 $570 SUBTO AL: Task 1 5 � 8 0 1 0 0 0 1 2 $0 27 $4,090 im!nary In estigationizid To _ .. ...... 2.1 Review Existing Conditions - Site visit 8 8 - -- _ 16 $2,280 Review as -bui0s & verify existing utilities 2 1 10 $1,320 2.2 Site Anal is and Field Survey _ Control Survey T ra hic Survey 1 2_ 1 2 1 5 $884 1 22 23 $5,434 Draffing and Base Mapping Potbd*n =7 law SUBTOTAL: Task 2 o ction Documen Prelimi 50 Percent Construction Documents i 24 _ 1 25 $2,718 0 2.3 3.1 $5,500 $5,500 Plans 12 4 28 6 32 72 10 $8780 $1,390 Cost Estimate 3.2 106 Percent Construction on Documents and Bid Support Plans and details 1 1 8 1 16 20 44 $5,380 Specifications, cost estimate _. _. UBTOTAL: T Post - Construction Services Review contractors as- builts and update Record drawings 8 2 1 8 8 4 20 .. 10 $2,640 X18,190 $1,160 4 SUBTOTAL: Task 4 Total - FEE ESTIMATE : 8 8 U 26 ' ' $1,160 $41,576 mmm ACORD® � CERTIFICATE OF LIABILITY INSURANCE' � _ °A DD.YY 4/29/2014 - THIS - CERTIFICATE ISASSUED -AS A MATTER OF INFORMATION ONLY AND CONFERS -NO RIGHTS -UPON THE CERTIFICATE- :HOLDEtL —THI$ - CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, .EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRMUCER Cavignac & Associates 450 B.Street, Suite 1800 San Diego, CA 92101 -8005 U,!jTtCT Certificate Department PHONE FAX - 619- 234 -684' N •619- 234 -8601 EAan: AAagESS, __•certif icatesecavignac. com INSURERS) AFFORDING COVERAGE NAIC0 License No. OA99520 INSURER A :r 5/1/2015 EACH OCCURRENCE _ . _ INSURED wsumR s _ PREMISES (Ea - rr NV5 Global, Inc. Avenue of Science, Suite l00 San Diego, CA 92128 United States INSuRERG TRAVELERS PROP CAS CO OF_ AMER 25674 MURED:IitMSON INS CO 25054 INSURER E,: INSURER F MED1XR(my one A. 10,000 COVERAGES CERTIFICATE NUMBER:2SBI72 REVISION NUMBER::26e135 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR_OTHER DOCUMENT WITH RESPECT TO-WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE _INSURANCE AFFORDED:BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, _ .EXCLUSIONS AND CONDITIONS OF SUCH POUCIES. LIMITS SHOWN.MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR - - - - - - _ — -- .TYPE:OF INSURANCE L SUB R POLICY NUMBER POLICY EFF POLICY EXP i OYP ' LIMITS B GBIERALLIA &LlTY 6806897547A 5/1/2014 5/1/2015 EACH OCCURRENCE _ . _ .$ _ 1.1 00.0, 000 X PREMISES (Ea - rr $ 1,000,000 .COMMERCIAL GENERAL LIABILITY MED1XR(my one A. 10,000 CLAIMS -MADE X❑ OCCUR X PERSONAL BADVINJURY : $ 1,000,000 dross.Liao /Sev of Int $ GENERAL AGGREGATE $ Poo, 006 GEWL AGGREGATE LIMIT APPLIES PER PRODUCTS - COMPIOP AGG $ 2,000,000 POLICY FX PRO- LOC JECT I I Deductible 5 p A AUTOMOBILE AS2291462442014 /1/2014 5/1/2015 BI N LIMIT ail, l., 000, 000 X BODILY INJURY (Perpamon) 1 $ ANY AUTO ALLOWNED SCHEDULED AUTOS AUTOS BODILY INJURY (Peracddent)' - S. HIRED AUTOS NO PR Y DAMAGE E - UMBRELLA LIAR HxcuR EACH,OCCURRENCE AGGREGATE $ EXCESS LIAR, CLAIMS -MADE OED [RETENTIONS '$ - C WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN ANY PROPRIETORIPARTNER/EXECUTIVE OFFICERIMEMBEREXCLUOEDI 7 U33893T34A 5/1/2014 5/1/2015 X *STATU- OTH EL EACH ACCIDENT 5 1 000, 000, EL.DISEASE'- EAEMPLO' �$ 1 .000 000 M rI►NH) fyyaeSe descnbe under : F- LDISEASE- .POLICYLIMB _ 3 1. 000 000 . DESCRIPTIONOFOPERATIONSbelow 0 iProfessional Liability AEE724 6004 /1/2014 5/1/2015 Ea. claim .$5,000 -,000 Aggreg $10,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACach ACORD 101, Addidonal Remarks Schedule,.B More apace Is MgWredl Re: Waterline Agreement for Services. Additional Insured coverage.applies to General Liability for City of Gilroy, its officers, 'representatives, agents and employees per policy form. Prof. Liab. - Claims made, defense costs included, within limit, Pollution Liability included per policy form #ADI0510o02. Professional Liability Retroactive Date: 1/1/'1949. Cavignac & Associates will provide 30 days notice of cancellation to the Certificate Holder in the event of policy cancellation. City of Gilroy 7351'Rosanna- Street Gilroy, CA 95020 United States SHOULD ANY OFTHE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL. BE DELIVERED IN ACCORDAMM"WIN THE POLIC7 PROVISIONS. AUTHOROM frey W. Cavgnac ACORD CORPORATION. ACORD 25 (2010105) The ACORD name and logo are registered marks of ACORD EXIGIS - CAVIGNAC a ASSOCIATES 288935 Paget of 4 POLICY NUMBER: 6906E97547A COMMERCIAL GENERAL LIABILITY_ DATE ISSUED: 5/1/2014 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED (ARCHITECTS, ENGINEERS AND SURVEYORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM SCHEDULE NAME OF PERSON(S) OR ORGANIZATION(S): City of Gilroy its officers, representatives, agents and employees PROJECT /LOCATION OF COVERED OPERATIONS: Waterline Agreement for Services. PROVISIONS A The following is added to WHO IS AN INSURED (Section In: The person or organization shown in the Schedule above is an . additional insured on this Coverage Part, but only with respect to liability for "bodily injury", "property damage" or "personal injury" caused, in whole or in part, by your acts or omissions or the acts or omissions of those acting on your behalf. a. In the performance of your ongoing operations; b. In connection with premises owned by or rented to you; or c. In connection with "your work" and included within the "products- completed operations hazard ". Such person or organization does not qualify as an additional insured for °bodily injury", "property damage ", or "personal injury" for which that person or organization has assumed liability in a contract or agreement.. The insurance provided to such additional insured is limited as follows: d. This insurance does not apply to the rendering of or failure to render any "professional services ". e. The limits of insurance afforded to the additional insured shall be the limits which you agreed in that ' "contract or agreement requiring insurance" to provide for that additional insured, or the limits shown in the Declarations for this coverage part, whichever are less. This endorsement does not increase the limits of insurance stated in the CG D3 82 09 07 2007 The Travelers Companies, Inc. Page 1 of 2 Includes the copyrighted material of Insurance Services Office, Inc., with its permission Page 3 of 4 LIMITS OF INSURANCE (Section 111) for this coverage part. B. The following is added to paragraph a. of 4. Other Insurance in COMMERCIAL GENERAL LIABILITY CONDITIONS (Section IV): However, if you specifically agree in a "contract or agreement requiring insurance" that, for the additional insured shown in the Schedule, the insurance provided to that additional insured under this Coverage Part must apply on a primary basis, or a primary and non- contributory basis, this insurance is primary to other insurance that is available to such additional to such additional insured which covers such additional insured as a named insured, and we will not share with the other insurance, provided that: (1) The "bodily injury" or "property damage" for which coverage is sought occurs; and (2) The "personal injury" for which coverage is sought arises out of an offense committed; . after you have entered into that "contract or agreement requiring insurance" for such additional insured. But this insurance still is excess . over valid and collectible other insurance, whether primary, excess, contingent or on any other basis, that is available to the additional insured when the additional insured is -also an additional insured under any other insurance. C. The following is added to Paragraph S. Transfer Of Rights Of Recovery Against Others To Us in COMMERCIAL GENERAL LIABILITY CONDITIONS (Section IV): We waive any rights of recovery we may have against the additional insured shown in the Schedule above because of payments we make for "bodily ;injury', "property damage" or "personal injury" arising out of `your work" on or for the project, or at the location, shown in the Schedule above, performed by you, or on your behalf, under a "contract or agreement requiring insurance with that additional insured. We waive these rights only where you have agreed to do so as part of the "contract or agreement requiring insurance" with that additional insured entered into by you before, and in effect when, the "bodily injury" or "property damage" occurs, or the "personal injury" offense is committed. D. The following definition is added to DEFINITIONS (Section V):. "Contract or agreement requiring insurance" means that any contract or agreement under which you are required to include the person or organization shown in the Schedule as an additional insured on this Coverage Part, provided that the "bodily injury" and "property damage" occurs, and the "personal injury" is caused by an offense committed. a. After you have entered into that contract or agreement; b. While that part of the contract or agreement is in effect; and c. Before the end of the policy period. CG D3 82 09 07 2007 The Travelers Companies, Inc. Page 2 of 2 Includes the copyrighted material of Insurance Services Office, Inc., with its permission Page 4 of 4