Loading...
Con-Quest Contractors - 2014 Agreement - Change Order No. 8Citp of O%irop 1 '• Public Works Department - Engineering Division g 7351 Rosanna St., Gilroy, CA 95020 + _ Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 8 To contract for: EIGLEBERRY WATER SERVICE AND City Project No.: 15 -PW -215 Contractor: CON -QUEST CONTRACTORS INC. Contract Date: 10/22/2014 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Description of Work Full and complete reimbursement for all costs, including all costs of the work, taxes, insurance bonds, overhead, home office, costs associated with any time extension and any other costs that may be associated with the field change orders field change orders No's 50, 51, 52. These field change orders are for urgent work on the sanitary sewer line. This includes repairs to the line. This requires bypassing existing sanitary manhole and related safety measures. All requirements of the original Contract Documents shall apply to the above work except as specifically By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at anv time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this I 0 Working Days I Cost Percentage Initial ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 8. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $33,000.00. CONTRACTOR By: RECOMMENDED BY: ACCEPTED BY: Construction Ma Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Date: S/2 / $509,230.00 $352,611.45 69.24 %� $861,841.45 $33,000.00 $385,611.45 75.72% $894,841.45 Summary of Field Orders for Change Order No. 8 Change Order No. 8 - Eigleberry Waterline Project Field Chanoe Order No. Date Description -_ - Induded_on - C/O 50 2/27/2015 9th Street Intersection - Discover sewer line - provide temporary support of exisiting sewer main. $7,250 8 51 3/2/2015 At 9th Street Intersection - Set up pump for bypassing sewer manholde $5,520 8 52 3/2/2015 By-pass sewer manhole, cut and repair leaking sewer pipe I $20,23ol 8 TOTAL $33,000