Vanguard - VERBS Safe Route to School - Changed Order No. 3City of Gilroy Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 3 To contract for: Gilroy- VERBS -Safe Route to School -SR2S Project City Project No. Contractor: Vanguard Construction, Inc. Contract Date: Revised 7/24/15 12 -PW -199 10/17/2012 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Per Addendum No. 1, This Change Order changes the pavement delineation from Water -based Paint to Thermoplastic for a net increase of $31,486.46 as shown on Attachment'A' (this is the difference between the cost of water -based paint from the original bid and the thermoplastic that was used in this project), for a NET INCREASE NOT TO EXCEED $31,486.46. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order: ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 3. 0 Working Days Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percentage Initial $651,952.67 $3,189.56 0.49% $655,142.23 $31,486.46 $34,676.02 5.32% $686,628.69 I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to excee $31,48 .46. CON R By: Date: RECOMMENDED BY: Z . 6130115 Manager ACCEPTED BY: City Atimir Prepared by AI Buchanan HMM CHANGE ORDER 003 Date Page 1 1 A Change Order 3 - Reconciliation City of Gilroy VERBS Safr Route to School SR2S Project Federal Project No. RPSTPLE- 5034(024) City Project No. 12 -PW -199 PAINT ATTACHMENT 'A' Item No. Discription Unit Cost Approved Quantities Total Cost Comments 22 Arrow III $ 115.00 Sea $ 920.00 Added to contract -Due to Slurry Proj. 23 Arrow IV $ 47.25 10ea S 472.50 24 Bike $ 42.00 57ea $ 2,394.00 26 12" x -walk $ 7.70 1,3451f $ 10,356.50 34 Detail 22 $ 1.05 8,3141f $ 8,729.70 35 Detail 27B $ 0.42 11,7391f $ 4,930.38 36 Detail 29 $ 1.90 2001f $ 380.00 37 Detail 32 $ 1.68 8161f $ 1,370.88 38 Detail 38 $ 0.74 6721f $ 497.28 39 Detail 39 $ 0.47 10,0621f $ 4,729.14 40 Detail 39A $ 0.42 3,9781f $ 1,670.76 41 12" White $ 2.10 1,6451f $ 3,454.50 TOTAL $ 39,905.64 THERMOPLASTIC Item No. Discription Unit Cost* Approved Quantities Total Cost Comments ADD1 Arrow III $ 20.00 8ea $ 160.00 Added to contract -Due to Slurry Proj. ADD2 Arrow IV $ 2.75 10ea $ 27.50 ADD3 Bike $ 13.00 57ea $ 741.00 ADD4 12" x -walk $ 2.30 1,3451f $ 3,093.50 ADDS Legends $ 115.00 60ea $ 6,900.00 ADD7 Detail 22 $ 0.80 8,3141f $ 6,651.20 ADD8 Detail 27B $ 0.28 11,7391f $ 3,286.92 ADDS Detail 29 $ 1.10 2001f $ 220.00 ADD10 Detail 32 $ 1.07 8161f $ 873.12 ADD11 Detail 38 $ 0.91 6721f $ 611.52 ADD12 Detail 39 $ 0.53 10,0621f $ 5,332.86 ADD13 Detail 39A $ 0.53 3,9781f $ 2,108.34 ADD14 12" White 1 $ 0.90 1,6451f $ 1,480.50 TOTAL * Dif. between Thermo. Costs and Paint costs $ 31,486.46 Contract Costs = $39,905.64 CCO Costs = $31,486.46 Prepared by Buchanan, Al 8/4/2015 Page 2. � v1