S.J. Amoroso Construction - Change Order No. 03City of Gilroy COMMUNITY DEVELOPMENT DEPARTMENT Planning Division Engineering Division Building, Life & Environmental Safety Housing & Community Development CHANGE ORDER NO. 00003 To contract for: New Police Facility Project Contractor: S.J. Amoroso Construction Co., Inc. (408) 846 -0440; fax (408) 846 -0429 (408) 846 -0450; fax (408) 846 -0429 (408) 846 -0430; fax (408) 846 -0429 (408) 846 -0290; fax (408) 846 -0429 Contract Date: 8/16/04 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City the Contractor's copy will be returned to him as his authority to proceed with the work. Item 3A: Contractor to provide for Board of Correction plan check comments in accordance with RFQ No. 5 dated 10/4/04 forthe lump sum amount of .............................................. ............................... .....................$1,956.00. (CPE #8R) Item 3B: Contractor to provide /set traffic rated lid at existing PGE vault in accordance with RFQ No. 6 dated 10/11/04 for thelump sum amount of ................................................... ............................... .....................$3,191.00. (CPE #11) Item 3C: Added compensation for excavation of building pad to allow for additional 2" layer of sand at pad section not Identified on drawings ....................................................... ............................... °..................$4,232.00. (CPE #20) Item 3D: Furnish/install additional door hardware not identified in bid documents in accordance with RFQ No. 3 dated 10/4/04 for the lump sum amount of .................................... ............................... .......................$612.00. (CPE #10) This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, associated with acceptance of the above substitution. A time extension is not warranted nor required I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE OF By: VA�'/g S.J. Amoroso Date: / // O/D L/ Original Contract Price $ 22,377,000.00 Previous Change Orders $ ($8,751.00) TOTAL TO DATE $ 22,368,249.00 This Change Order $9,991.00 Revised Contract Price $ 22,378,240.00 v(" 'Q,Ef- nKf"VXMr7n nv ACCEPTED BY m- Project 2 1z (Dr4 Originals to: CITY: CONTR: Ir (2) Originals (1) Original