CHANGE ORDER NO. 00003
To contract for: New Police Facility Project
Contractor: S.J. Amoroso Construction Co., Inc.
(408) 846 -0440; fax (408) 846 -0429
(408) 846 -0450; fax (408) 846 -0429
(408) 846 -0430; fax (408) 846 -0429
(408) 846 -0290; fax (408) 846 -0429
Contract Date: 8/16/04
This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All
copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City
the Contractor's copy will be returned to him as his authority to proceed with the work.
Item 3A: Contractor to provide for Board of Correction plan check comments in accordance with RFQ No. 5 dated 10/4/04
forthe lump sum amount of .............................................. ............................... .....................$1,956.00.
(CPE #8R)
Item 3B: Contractor to provide /set traffic rated lid at existing PGE vault in accordance with RFQ No. 6 dated 10/11/04 for
thelump sum amount of ................................................... ............................... .....................$3,191.00.
(CPE #11)
Item 3C: Added compensation for excavation of building pad to allow for additional 2" layer of sand at pad section not
Identified on drawings ....................................................... ............................... °..................$4,232.00.
(CPE #20)
Item 3D: Furnish/install additional door hardware not identified in bid documents in accordance with RFQ No. 3 dated
10/4/04 for the lump sum amount of .................................... ............................... .......................$612.00.
(CPE #10)
This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any
and all indirect costs, associated with acceptance of the above substitution. A time extension is not warranted nor required
I (We) hereby agree to make the above
changes subject to the terms of this
Change Order for NET INCREASE OF
By: VA�'/g
S.J. Amoroso
Date: / // O/D L/
Original Contract Price $ 22,377,000.00
Previous Change Orders $ ($8,751.00)
TOTAL TO DATE $ 22,368,249.00
This Change Order $9,991.00
Revised Contract Price $ 22,378,240.00
v("
'Q,Ef- nKf"VXMr7n nv
ACCEPTED BY
m-
Project
2
1z (Dr4 Originals to: