S.J. Amoroso Construction - Change Order No. 04307 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 004 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 4A: Contractor to provide /install sump pit and grate at elevators S101 /S107 in accordance with RFQ No. 27 and CityPolicy II- 18 ........................................................................ ............................... .....................$1,245.00. (CPE #28) Item 413: Contractor to provide for concrete curb /pad for stud wall support at E.5 between Lines 1 and 2 not shown, in accordance with response to RFI- 190 ............................................... ............................... .......................$441.00. (CPE #43) Item 4C: Contractor to provide for steel angle and slab edge at Line 4 between Lines H and J not shown, in accordance withresponse to RFI- 191 ....................................... ............................... .......................$499.00. (CPE #50) Item 41): Contractor to provide /install added beams and reinforcing for deck support between Lines F/G and 4/5 not shown, in accordance with response to RFI- 133 ............... ... ............................... .....................$2,121.00. (CPE #45R) Item 4E: Contractor to provide /install added door thresholds not shown, in accordance with Submittal #73 comments andRFQ- 16 .............................................................. ............................... .....................$1,058.00. (CPE #30) Item 417: Contractor to provide /install tube steel antenna support not shown, in accordance with response to RFI -147 and225 ....................................................................... ............................... .......................$624.00. (CPE #38) Item 4G: Contractor to provide for wall changes /additions at detention areas, in accordance with response to RFI- 105/106 and RFQ- 8R ......................................................................... ............................... .......................$855.00. (CPE #17) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Cost Percent I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $1,240.00 0.0% for the NET INCREASE of $6,843.00 Total to Date $22,378,240.00 This Change Order $6,843.00 Total Change Orders to Date $8,083.00 0.0% ,R wised Contract Price $22,385,083.00 Contractor *Requires emergency authorization if greater than 25 %. Date: j A RECOMMENDED BY: ACCEPTED B`.