S.J. Amoroso Construction - Change Order No. 05w To contract for Contractor: City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 005 New Gilroy Police Facility Project No. 03 -CDD -114 S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 5A: Contractor to provide /install floor drains and piping at Room 1127 not shown on plumbing drawings, in accordance with response to RFI 128. 1 ................................. ............................... .....................$9,055.00. (CPE #46R) Item 513: Contractor to provide /install trap primer and piping for FD -1 at Room P122 not shown on plumbing drawings, in accordance with response to RFI- 180 ........................................ ............................... .....................$1,994.00. (CPE #37R) Item 5C: Contractor to provide /install floor drain and piping at Room 1113 not shown on plumbing drawings, in accordance with response to RFI -120. Revise waste pipe size for FS -1 in Room 1153 in accordance with response to RFI -13 9 ............................................................................................................... ............................... $ 9,429.00. (CPE #36R) Item 5D: Credit for deletion of FD -3 and piping at Room J111 in accordance with response to RFI -150 and Field Memo No. 63 ............... .............................................................................. ............................... ($2, 046.00). (CPE #44R2) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $18,432.00 Contractor Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percent $22,377,000.00 $8,083.00 0.0% $22,385,083.00 $18,432.00 $26,515.00 0.1% $22,403,515.00 *Requires emergency authorization if greater than 25 %. BYG %% �1 �Date: �l D ,36! RECOMMENDED BY: ACCEPTED BY: �zl�C�