Loading...
S.J. Amoroso Construction - Change Order No. 084L To contract for Contractor: City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 008 New Gilroy Police Facility Project No. 03 -CDD -114 S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Contractor to perform all changes to Hanna Street at Sixth and Seventh Streets in accordance with Field Directive No. 1, RFQ -2 (Civil Drawing Revisions/Delta 1 and 2), Field Memo Nos. 4, 7, 13, 31, 34, and 55. All work under this change order was performed under force account provisions. This change order does not include concrete paving at Seventh and Hanna, or vertical curb changes at the south side of the traffic circle. (CPE #3R) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Cost Percent I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $58,424.00 0.3% for the NET INCREASE of $30,269.00 Total to Date $22,435,424.00 This Change Order $30,269.00 Total Change Orders to Date $88,693.00 0.4% " r-- Revised Contract Price $22,465,693.00 S.`/ • �ino.c4 g--c, Contractor *Requires emergency authorization if greater than 25 %. Byl� Date: // rlpl &S RECOMMENDED ACCEPTED BY: