S.J. Amoroso Construction - Change Order No. 10( fl To contract for Contractor: City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 010 New Gilroy Police Facility Project No. 03 -CDD -114 S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This change order provides for a thirteen (13) calendar day time extension, revising the contract completion date from December 30, 2005 to January 12, 2006. The following items are conditions of this time extension: 10.1 Three (3) calendar days compensable time and five (5) calendar days non - compensable time, as settlement for SJA Time Impact Analysis dated 1/13/05. 10.2 One (1) calendar day compensable time for lost workday on Monday 1/17/05 due to conflict in defmition of non - work days within bid documents. Contractor to acknowledge all City holidays observed as non -work days in compliance with City Ordinance No. 2004 (Section 16.38). 10.3 An additional four (4) calendar days non - compensable time is granted to alleviate schedule impact from latent weather conditions affecting productivity, and from work inefficiencies. 10.4 In recognition of Item 10.3, the Contractor agrees to waive all costs and time impacts associated with work stoppage to CMU at Line 12. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 j I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $15,836.00 S.J. Amoroso Construction Co., Inc. Contractor Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percent $22,377,000.00 $102,353.00 0.5% $22,479,353.00 $15,836.00 $118,189.00 0.5% $22,495,189.00 *Requires emergency authorization if greater than 25 %. By j��ate: -g °5 RECOMMENDED BY: Consk-c- on er Date ACCEPTED BY—,;�� \ ' ` Date -7 ri Engineer V Date Page 2 of 2 C h /7 hnb n - ,101 -f i n ) 3 C 1)7 - 114 . ah 2et�-- Z