S.J. Amoroso Construction - Change Order No. 11City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 011
To contract for: New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 11A: Contractor to provide for changes to the security ceiling and lighting for ease of access to overhead utilities
in accordance with WLC Instruction Bulletin 3 and RFQ No. 31............ ($9,041.00)
.............. ............................... .
(CPE #68)
Item I IB: Contractor to provide for deepened pad footings (H3- H4 -H5) due to proximity of adjacent electrical trench in
accordance with response to RFI- 195 ...................................................... ............................... .....................$8,410.00.
(CPE #42R)
Item 11C: Contractor to provide for keying "Two Sides" in lieu of specified "One Side" at jail doors identified in
responseto RFI- 24 ....................................................................... ............................... $1,118.00.
(CPE #86)
Item 11 D: Contractor to change water closet and lavy in Room 1084 from rear access to front access penal fixtures in
accordance with response to RFI -181.1 & 233 ..................................... ............................... .....................$4,897.00.
(CPE #58 & #58.1 )
Item I lE: Contractor to change lavys at J123413141324144 and WC -2 at J123 to front access penal fixtures in
accordance with response to RFI- 105.1, 105.2, 105.3 and RFQ- 23 .. ............................... .....................$8,060.00.
(CPE #57 & #57.1)
Item 11F: Revise contract completion date from January 12, 2006 to January 18, 2006 due to inclement weather delays
preventing prosecution of work on 1110105, 1111105, 1/26/05 and 1/28/05 (4 work days or 5.8 calendar days). A total of
six (6) calendar days non - compensable time is hereby added to the contract duration.
All requirements of the original Contract Documents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
Page 1 of 2
Y
i
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $13,444.00
S.J. Amoroso Construction Co., Inc.
Contractor
Original Contract Price
Previous Change Orders to Date
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percent
$22,377,000.00
$118,189.00 0.5%
$22,495,189.00
$13,444.00
$131,633.00 0.6%
$22,508,633.00
*Requires emergency authorization if greater than 25 %.
56%14e D. ,
RECOMMENDED BY_.cs.,.� i.-` S�,i ✓�---r S 2- �i
ACCEPTED BY:
C1ZanV Drc�Pr I
03 c_D
Page 2 of 2