S.J. Amoroso Construction - Change Order No. 12City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 012 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Contractor to provide for all foundation changes to the jail core area in accordance with RFQ No. 13 and direction therein issued 11/ 5/ 04 .................................................................... ............................... ....................$20,633.00. (CPE #19CR2) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Cost Percent I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $131,633.00 0.6% for the NET INCREASE of $20,633.00 Total to Date $22,508,633.00 This Change Order $20,633.00 Total Change Orders to Date $152,266.00 0.7% Revised Contract Price $22,529,266.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: ACCEPTED : -��`�1 Ci a Date n r Date 1 5 (/Project Engineer Date Page 1 of 1 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 012 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Contractor to provide for all foundation changes to the jail core area in accordance with RFQ No. 13 and direction thereinissued 11/ 5/ 04 .................................................................... ............................... ....................$20,633.00. (CPE #19CR2) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Cost Percent I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $131,633.00 0.6% for the NET INCREASE of $20,633.00 Total to Date $22,508,633.00 This Change Order $20,633.00 0 * �_ Total Change Orders to Date $152,266.00 0.7% Revised Contract Price $22,529,266.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: RECOMMENDED BY: ACCEPTED BY: 41 (tog Manager Date trat Date �11141,�J-r TlatP Page 1 of 1 City of Gilroy New Police Facility Project TRANSMITTAL NO. 00365 = I Harris & Associates TO: Bill Headley DATE: 4/l/2005 City of Gilroy 7351 Rosanna St. REF: CCO No. 12 Gilroy, CA 95020 Phone: (408) 846 -0450 Fax: (408)846 -0460 WE ARE SENDING: SUBMITTED FOR: ❑ hop Drawings ADDroval ❑ Approved mi d ❑ Resubmit 0 Copies for Approval ❑ Letter ❑ Your Use/information ❑ Approved as Noted ❑ Submit 0 Copies for Distribution ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Returned 0 Copies Corr. Print lir Change Order ❑ Review and Comment ❑ Returned for Corrections ❑ Plans SENT VIA: ❑ Samples ❑ Hand Delivered ❑ Specifications ❑ U.S. Mail ❑ Other: I ❑ Overnight: ❑ Faxed: ITEM NO. COPIES DATE ITEM NUMBER DESCRIPTION STATUS 1 3 CCO CCO No. 12 Remarks: Bill, please have the attached change order executed and return copy to Harris office ASAP. The Contractor has declined to accept this change order due to disagreement in cost and time, therefore we will issue it unilaterally. We need to pay for the work performed, so that SJA cannot accuse us of non - payment of change order work. Thanks Signed: Dated: �7`-- Scott ric Copies To: Transmittal and Attachments: HA Project Files: File: 9810312.02.063.Transmittal #00365 Issue File: Page I of I 178 -C Second Street Gilroy, CA 95020 Phone (408) 842 -5777 FAX (408) 842 -5758 sgilpatric @harris- assoc.com f a_tr_01