Loading...
S.J. Amoroso Construction - Change Order No. 15City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 015 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 15A: Contractor to provide for additional footing concrete /reinforcing and sleeve installation at perimeter grade beams in accordance with response to RFI -232, RFQ -26, and Field Directive No. 2 ...................... .....................$8,304.00. (CPE #I 9B Revised) Item 1513: Retrofit plumbing waste due to toilet/sink fixture changes at P123 in response to RFI -233. Work performed underT& M ...................................................................................................... ............................... .......................$191.00. (CPE #58.2) Item 15C: Contractor to upgrade Energy Management System at City Hall to provide for gateway link to the new BACnet energy management system at PD in accordance with RFQ- 21 ......... ............................... .....................$7,098.00. (CPE #55 Revised) Item 15D: Additional detailing costs to revise approved shop drawings resulting from responses to RFI -269, 269.1 and 269. 2 ................................................................................................................. ............................... .......................$379.00. (CPE #85) Item 15E: Additional detailing costs to revise shop drawings resulting from design changes issued under revised responseto RFI- 32 ......................................................................................... ............................... .......................$252.00. (CPE #103) Item 15F: Additional labor cost to field bend lower reinforcing mat of jail core thickened slab to pass over column pad concrete in accordance with Harris Conversation Record No. 2 ...................... ............................... .......................$882.00. (CPE # 127) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $17,106.00 Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percent $22,377,000.00 $184,003.00 0.8% $22,561,003.00 $17,106.00 $201,109.00 0.9% " $22,578,109.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: RECOMMENDED BY: ACCEPTED BY: Project Engineer Page 2 of 2 � Z-1 1 ©`� D . e Date Date 71P Date