S.J. Amoroso Construction - Change Order No. 16City of Gilroy Engineering Division i V1 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429` .,f,�3t� CHANGE ORDER NO. 016 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 16A: Contractor to provide for footing revisions /clarifications in accordance with response to RFI -63 and RFQ- 7 ................................................................................................................................................................. $3,461.00. (CPE # 15) Item 1613: Add communications closet provisions at second floor to facilitate cabling distances beyond performance limitations for quadrant 3 and 4 in accordance with RFQ -37 and RFI- 301.1 ........................ .....................$9,821.00. (CPE #84) Item 16C: Credit to contract for revising jail door operators and electrical provisions in accordance with RFQ -33 and responseto RFI- 311 .............................................................................. ............................... ...................($3,694.00). (CPE #70) Item 161): Credit to contract for deletion of beam steel and size revisions in accordance with response to RFI- 329/ 329. 1 ................................................................................................ ............................... .....................($333.00). (CPE #99) Item 16E: Contractor to provide for structural steel changes /additions in accordance with response to RFI -20.1 and 401 ............................................................................................................. ............................... .....................$2,444.00. (CPE #120) Item 16F: Contractor to provide for steel beam relocations in accordance with response to RFI -264 (supplemental to RFI- 10 response) ........................................................................................... ............................... .......................$430.00. (CPE # 104) Item 16G: Contractor to provide for power concealed thermometer kit #131 -251 Model 2 to mixing valve assembly piping per review comment by Designer in Submittal # 41. 3 ..................... ............................... .......................$427.00. (CPE #91) Item 16H: Contractor to replace 30# felt with bituthene product for waterproofing provision in accordance with response toRFI- 240 / 240. 1 ....................................................................................... ............................... .......................$238.00. (CPE #88R) Page 1 of 2 Item 16I: Contractor to provide for additional detailing /drawing recordation associated with response to RFI -69, 213, 218.1, 254 and 256 .................................................................................... ............................... .....................$1,111.00. (CPE #63) Item 16J: The contract completion date is hereby revised from February 5, 2006 to February 11, 2006 due to inclement weather conditions as follows: 4/4/05 -half day impact, 4/7/05 -full day, 4/8/05 -full day, 4/27/05 -half day impact, 4/28/05 - full day. Total time of 4 work days, or 6 calendar days. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $13,905.00 S.J. Amoroso Construction Co., Inc. Contractor Cost Percent Original Contract Price $22,377,000.00 Previous Change Orders to Date $201,109.00 0.9% Total to Date $22,578,109.00 This Change Order $13,905.00 Total Change Orders to Date $215,014.00 1.0% Revised Contract Price $22,592,014.00 Ok *Requires emergency authorization if greater than 25 %. By: Ae� Date: ll 05 RECOMMEND: ACCEPTED BY Page 2 of 2