Loading...
S.J. Amoroso Construction - Change Order No. 21City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. "021 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 21A: Additional cost to effect foundation changes at elevator 5103 in accordance with response to RFI -126, 161, 162R, 174, Submittal 926 revisions, and RFQ- 17 ..................................... ............................... .....................$8,850.00. (CPE #2913) Item 2113: Additional cost to effect foundation changes at elevator S101 in accordance with response to RFI -126, 161, 162R, 174, Submittal #26 revisions, and RFQ- 17 ...................................... ............................... .....................$7,434.00. (CPE #29A) Item 21 C: Contractor to provide for generator /fuel tank footing changes and additions in accordance with RFQ -36 and FieldDirective No. 5 .................................................................................. ............................... .....................$5,878.00. (CPE #77R3) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 Cost Percent I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $300,495.00 1.3% for the NET INCREASE of $22,162.00 Total to Date $22,677,495.00 This Change Order $22,162.00 Total Change Orders to Date $322,657.00 1.4% Revised Contract Price $22,699,657.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By. Date: % %wit RECOMMENDED BY: C ACCEPTED BY: Project Engineer Date r lT'� —/ / Date Page 2 of 2 Date 05""'