S.J. Amoroso Construction - Change Order No. 241... t City of Gilroy s Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 024 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 24A: Provide for additions /changes to stainless steel counters in accordance with Architect review comments in Submittal# 86 ........................................................................................ ............................... .....................$4,357.00. (CPE #161) Item 2413: Provide for tower framing clarifications and parapet trim detail in accordance with response to RFI -353 and FieldMemo # 209 ................................................................................... ............................... .....................$1,764.00. (CPE #122R) Item 24C: Provide /install reinforcing bars along exterior edge of second floor at Lines 1 and 12 (not included in previous costssubmitted for RFQ43) .................................................................... ............................... .....................$1,495.00. (CPE #100.1) Item 24D: Remove paint from structural steel members at slip critical connections at perimeter CMU locations in accordance with response to RFI -26.1 and Field Directive No. 9 ........... ............................... .....................$1,804.00. (CPE #132) Item 24E: Remove /reinstall traffic signage in accordance with Field Directive No. 12 at the request of the City ................................................................................................ ............................... ............ .......................$199.00. (CPE #143) Item 24F: Contractor to provide for changes at CMU areas north of J Line in accordance with RFQ -60 and Field Directive No. 16 (electrical and fire sprinkler costs not included) .............. ............................... .....................$8,507.00. (CPE #151A) Item 24G: Provide for wall framing revisions and floor sink relocations to coincide /accommodate installation of PAC cabinets in accordance with response to RFI- 139.2, 256, 314, 316 and RFQ- 30 ....................... .....................$6,226.00. (CPE #60R4) Page 1 of 2 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Cost Percent I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $372,485.00 1.7% for the NET INCREASE of $24,352.00 Total to Date $22,749,485.00 This Change Order $24,352.00 Art- Total Change Orders to Date $396,837.00 1.8% (� Revised Contract Price $22,773,837.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: RECOMMENDE ACCEPTED BY Page 2 of 2