S.J. Amoroso Construction - Change Order No. 27City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 _ Phone (408) 846 -0450; Fax (408) 846 -0429 OCT 6 2005 CHANGE ORDER NO. 027 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 27A: Provide for CLSM backfill material at recommendation of Soils Engineer and RFI -271 response, where sewage ejector and sand/oil separator are within the zone of building foundation influence ..... ....................$11,303.00. (CPE #59) Item 2713: Additional field labor cost to taper /trim column flanges to eliminate overhang on beams. Time acknowledged byEarth Systems inspector ........................................................................ ............................... .....................$1,266.00. (CPE #188) Item 27C: Additional field labor cost to shorten six beams and revise beam connections to coincide with 12" masonry wall constructed (8" wall referenced on structurals) in accordance with response to RFI -485 .. .....................$1,065.00. (CPE # 166) Item 27D: Additional field labor cost to modify elevator support column for beam connection at Line 1/E.5 (no beam pocket shown) in accordance with response to RFI- 486 / 486. 1 ................. ............................... .....................$1,639.00. (CPE # 167) Item 27E: Provide for revised plaster base detail in accordance with response to RFI -347 and Harris Field Memo No. 144 .................................................................................................................................... ............................... $2,570.00. (CPE # 121 R) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $17,843.00 Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price Page 1 of 2 Cost $22,377,000.00 $443,922.00 $22,820,922.00 $17,843.00 $461,765.00 $22,838,765.00 Percent 2.0% 2.1% S.J. Amoroso Construction Co., Inc. Contractor * equires emergency authorization if greater than 25 %. BY i"' //� ��'� Date: rL7 RECOMMENDED BY ACCEPTED BY: Page 2 of 2