S.J. Amoroso Construction - Change Order No. 29-50 City of Gilroy Engineering Division ,'' US 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 029 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 29A: Provide for cost difference between wall louver specified (L -3 -992 Chevron Style) and revised model SLD -6 DrainableStyle per Submittal 184 ......................................................... ............................... .....................$2,545.00. (CPE #183) Item 29B: Provide for changes to structural steel for boiler roof framing in accordance with response to RFI -348 and 348. 1 ...................................................................................................... ............................... .....................$6,348.00. (CPE #195) Item 29C: Additional cost for sandblasting slab joints between concrete deck pours at first floor in accordance with responseto RFI- 490 ................................................................................ ............................... .....................$3,432.00. (CPE #189) Item 29D: Restaking costs for grades along Seventh Street and remobilization cost for grading on Dowdy due to elevationrevisions .................................................................................. ............................... .....................$1,565.00. (CPE #212) Item 29E: Provide for Pop -out at Information Records in accordance with partial drawing 3A and 3B issued under RFQ- 63 .............................................................................................................. ............................... .....................$1,390.00. (CPE #148AR) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $15,280.00 S.J. Amoroso Construction Co., Inc. Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $22,377,000.00 $486,976.00 $22,863,976.00 $15,280.00 $502,256.00 $22,879,256.00 Contractor *Requires emergency authorization if greater than 25 %. By: Date: to RECOMMENDED l ACCEPTED BY: Page 2 of 2 Percent 2.2% 2.2% U